26

Revit Work Sample

Embed Size (px)

DESCRIPTION

BIM Documentation of the New York Times building by Renzo Piano Building Workshop using Autodesk Revit as part of my Graduate coursework.

Citation preview

Page 1: Revit Work Sample
Page 2: Revit Work Sample

Nic

k Fa

ulco

ner

A

RCH

497

Fina

l Sub

mitt

alJu

ly 2

0, 2

009

Pro

f M

Tee

r62

0 8t

h Av

e N

ew Y

ork,

New

Yor

kR

enzo

Pia

no B

uild

ing

Wor

ksho

p &

FXFo

wle

Arc

hite

cts

Sheet Index

A0.1

Drawing ListSheet

Number Sheet NameAssignment

#

A0.0 Cover 13A0.1 Sheet Index 12A0.2 Project Info 2A1.1 Floor Plan 2A1.2 Enlarged Floor Plan 8A1.3 Partial Roof Plan 3A1.4 Program 12A2.1 South Elevation 13A2.2 West Elevation 13A2.3 North Elevation 5A2.4 East Elevation 6A3.1 Building Section 3A3.2 Building Section 3A3.3 Enlarged Sections 3A4.1 Facade Axonometric 10A4.2 Facade Families 8A4.3 Facade Families 6A5.1 Exterior Rendering 13A5.2 Exterior Renderings 13A5.3 Interior Renderings 13A6.1 Schedules 12A6.2 Mass Sculpture 1A6.3 Translations 11A6.5 Furniture 7A6.6 FurnitureA6.7 Furniture

AssignmentsAssignment 1: Setup & Concept DesignAssignment 2: Armature and StructureAssignment 3: Site, Core, SkinAssignment 5: Curtain Walls & FamiliesAssignment 6: Parameters and Conditional FormulasAssignment 7: Family Types & FurnitureAssignment 8: Advanced Curtain Wall & GridsAssignment 9: DetailingAssignment 10: Advanced Detailing & Design OptionsAssignment 11: TranslationsAssignment 12: SchedulingAssignment 13: Visualizations

Page 3: Revit Work Sample

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

Project Info

A0.2

The New York Times Building

The New York Times Buidling was completed in 2007 forthe New York Times Company (NYTC), one the world's

preeminent publishers and news organizations. TheNYTC occupies 26 of the 52 stories in the 1046' (to top of

mast) tall tower with each level having approximately32000 sf of leaseable area. The project was designed byRenzo Piano Building Workshop with FXFowle Architects.

The design's goal is one of lightness and transparency.The glass facades are covered with 186,000 ceramic rods

which shield the interiors from direct sunlight while alsoattempting to reflect colors across the facade. The sunshade allowed the glass used to be highly transparentwithout heavy tinting. The skin is paired with advancedlight monitoring systems that are tied into the artificial

lighting, ensuring appropriate light levels throughout theday in the office spaces and a level of controllability for

the occupants to ensure higher worker comfort andproductivity.

The structure is primarily steel with a concrete core andfloor decking. One of the key architectural elements is

exposed steel columns, beams, and X braces running onthe outside of the skin over areas without the ceramic sunshade. For fire safety reasons these do not contribute to

the overall structural integrety of the building. Theirfunction is more for occupant comfort to ensure their isnot excessive sway in the building during high winds.

Column Grid: 30' x 40' Overall building dimensions: 157' x 194' x 1046'

Floor to Floor height: 13'-9" Clear Interior Height: 9'-6" above an elevated floor

Ceramic Rods: 4'-10" x 1'5/8" diameterCeramic Rod Spacing: 3" typical, 5" spacing in sections

Page 4: Revit Work Sample

51

B

C

D

E

F

G

2 43

A2.2 A2.41

A2.3

1

1

A2.1

2

A

1A3.1

A1.21

157' - 4"

48' - 8" 60' - 0" 48' - 8"

194'

- 0"

24' -

6"

145'

- 0"

24' -

6"

H

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

Floor Plan

A1.1 1/32" = 1'-0"1 Typical Floor Plan Levels 29-50

Page 5: Revit Work Sample

1A3.1

1A3.2

8' - 6" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0"

4' -

6"5'

- 0"

5' -

0"5'

- 0"

5' -

0"

7' -

6"5'

- 0"

5' -

0"5'

- 0"

5' -

0"5'

- 0"

5' -

0"

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

Enlarged FloorPlan

A1.2 1/8" = 1'-0"1 Enlarged Floor Plan

Page 6: Revit Work Sample

1A3.1

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

Partial Roof Plan

A1.3 1/16" = 1'-0"1 Roof

Page 7: Revit Work Sample

Program

Circulation

Office

Open Workspace

Service

Partner Office4

Associate Office7

Associate Office8

Secretary16

Copy Area17

Paralegal14

Secretary13

Associate Office5

Associate Office6

Associate Office9

Partner Office11

Circulation18

Support Area19

Associate Office10

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

Program

A1.4 1/8" = 1'-0"1 Perimeter Office Program Plan

Room ScheduleName Occupancy Area

PartnerOffice

Office 293 SF

AssociateOffice

Office 120 SF

AssociateOffice

Office 120 SF

AssociateOffice

Office 155 SF

AssociateOffice

Office 155 SF

AssociateOffice

Office 165 SF

AssociateOffice

Office 165 SF

PartnerOffice

Office 210 SF

Secretary OpenWorkspace

92 SF

Secretary OpenWorkspace

75 SF

Paralegal OpenWorkspace

100 SF

Secretary OpenWorkspace

75 SF

Copy Area OpenWorkspace

100 SF

Circulation Circulation 787 SFSupportArea

Service 3952 SF

Page 8: Revit Work Sample

A2.11

Level 327' - 6"

Level 441' - 3"

Level 555' - 0"

Roof68' - 9"

Structure82' - 6"

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

South Elevation

A2.1

1/64" = 1'-0"2 South Elevation

1/8" = 1'-0"1 Partial South Elevation

Page 9: Revit Work Sample

A2.22

Level 441' - 3"

Level 555' - 0"

Roof68' - 9"

Structure82' - 6"

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

West Elevation

A2.2

1/32" = 1'-0"1 West Elevation

1/8" = 1'-0"2 Partial West Elevation

Page 10: Revit Work Sample

A2.32

1A3.1

Level 441' - 3"

Level 555' - 0"

Roof68' - 9"

Structure82' - 6"

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

North Elevation

A2.3

1/32" = 1'-0"1 North Elevation

1/8" = 1'-0"2 Callout of North Elevation

Page 11: Revit Work Sample

A2.42

Level 327' - 6"

Level 213' - 9"

Level 441' - 3"

Level 555' - 0"

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

East Elevation

A2.4

1/32" = 1'-0"1 East Elevation

1/8" = 1'-0"2 Callout of East Elevation

Page 12: Revit Work Sample

Level 327' - 6"

Level 213' - 9"

Level 441' - 3"

Level 555' - 0"

Roof68' - 9"

Structure82' - 6"

A3.31

1A3.2

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

Building Section

A3.1 1/8" = 1'-0"1 North South Building Section

Page 13: Revit Work Sample

Level 327' - 6"

Level 213' - 9"

Level 441' - 3"

Level 555' - 0"

Roof68' - 9"

Structure82' - 6"

1A3.1

A3.32

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

Building Section

A3.2 1/8" = 1'-0"1 West East Building Section

Page 14: Revit Work Sample

Level 441' - 3"

Level 555' - 0"

Roof68' - 9"

Level 441' - 3"

Level 555' - 0"

Roof68' - 9"

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

EnlargedSections

A3.3 1/4" = 1'-0"1 North Facade Section 1/4" = 1'-0"2 West Facade Section

Page 15: Revit Work Sample

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

FacadeAxonometric

A4.11 Facade Axonometric 2 Section Perspective

Page 16: Revit Work Sample

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

Facade Families

A4.21 Curtain Wall Base Corner and Roof 2 Curtain Screen Base & Office Conditions

3 Special Conditon Wing Wall

4 Special Condition Corner

Page 17: Revit Work Sample

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

Facade Families

A4.3

Page 18: Revit Work Sample

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

ExteriorRendering

A5.1

Page 19: Revit Work Sample

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

ExteriorRenderings

A5.2

Exterior Sun & Artificial Light Exterior Artificial Light

Exterior Sun Light

Page 20: Revit Work Sample

Nic

k Fa

ulco

ner

AR

CH 4

97Fi

nal S

ubm

ittal

July

20,

200

9 P

rof

M T

eer

620

8th

Ave

New

Yor

k, N

ew Y

ork

Ren

zo P

iano

Bui

ldin

g W

orks

hop

& FX

Fow

le A

rchi

tect

s

InteriorRenderings

A5.3Interior Sun Light

Interior Artificial Light Interior Artificial & Daylight

Page 21: Revit Work Sample

Nic

k Fa

ulco

ner

A

RCH

497

Fina

l Sub

mitt

alJu

ly 2

0, 2

009

Pro

f M

Tee

r62

0 8t

h Av

e N

ew Y

ork,

New

Yor

kR

enzo

Pia

no B

uild

ing

Wor

ksho

p &

FXFo

wle

Arc

hite

cts

Schedules

A6.1

Room ScheduleName Occupancy Area

PartnerOffice

Office 293 SF

AssociateOffice

Office 120 SF

AssociateOffice

Office 120 SF

AssociateOffice

Office 155 SF

AssociateOffice

Office 155 SF

AssociateOffice

Office 165 SF

AssociateOffice

Office 165 SF

PartnerOffice

Office 210 SF

Secretary OpenWorkspace

92 SF

Secretary OpenWorkspace

75 SF

Paralegal OpenWorkspace

100 SF

Secretary OpenWorkspace

75 SF

Copy Area OpenWorkspace

100 SF

Circulation Circulation 787 SFSupportArea

Service 3952 SF

Curtain Panel Material Takeoff

Family and TypeMaterial:

NameMaterial:

Area

Curtain_Wall_Corner_Right: Base

Aluminum 878 SF

Curtain_Wall_Corner_Right: Base

Glass 4608 SF

Curtain_Wall_Corner_Right: Base

Spandrel 2250 SF

Screen: Base Aluminum 1539 SFScreen: Base Ceramic 11832 SFScreen:Base_5inRod

Aluminum 9233 SF

Screen:Base_5inRod

Ceramic 70993 SF

Screen:Base_End_Left

Aluminum 458 SF

Screen:Base_End_Left

Ceramic 2366 SF

Screen:Base_End_Right

Aluminum 458 SF

Screen:Base_End_Right

Ceramic 2366 SF

Screen: Wing Aluminum 1308 SFScreen: Wing Ceramic 7099 SFScreen:Wing_End_Left

Aluminum 650 SF

Screen:Wing_End_Left

Ceramic 2366 SF

Screen:Wing_End_Right

Aluminum 650 SF

Screen:Wing_End_Right

Ceramic 2366 SF

Curtain Panel Material Takeoff

Family and TypeMaterial:

NameMaterial:

Area

Curtain_Roof: Roof Aluminum 6192 SFCurtain_Roof: Roof Spandrel 4776 SFCurtain_Roof:Roof_C_L

Aluminum 298 SF

Curtain_Roof:Roof_C_L

Spandrel 166 SF

Curtain_Roof:Roof_C_R

Aluminum 297 SF

Curtain_Roof:Roof_C_R

Spandrel 162 SF

Curtain_Roof_Corner_Left: Roof

Aluminum 157 SF

Curtain_Roof_Corner_Left: Roof

Spandrel 446 SF

Curtain_Roof_Corner_Right: Roof

Aluminum 157 SF

Curtain_Roof_Corner_Right: Roof

Spandrel 442 SF

Curtain_Wall: Base Aluminum 35811 SFCurtain_Wall: Base Glass 49815 SFCurtain_Wall: Base Spandrel 24327 SFCurtain_Wall:Base_C_L

Aluminum 1525 SF

Curtain_Wall:Base_C_L

Glass 1733 SF

Curtain_Wall:Base_C_L

Spandrel 847 SF

Curtain_Wall:Base_C_R

Aluminum 1512 SF

Curtain_Wall:Base_C_R

Glass 1688 SF

Curtain_Wall:Base_C_R

Spandrel 824 SF

Curtain_Wall_Corner_Left: Base

Aluminum 879 SF

Curtain_Wall_Corner_Left: Base

Glass 4653 SF

Curtain_Wall_Corner_Left: Base

Spandrel 2273 SF

Page 22: Revit Work Sample

A6.2

34

A6.2

Floor Plan0' - 0"

Level 215' - 0"

Level 420' - 0"

Floor Plan0' - 0"

Level 215' - 0"

Level 420' - 0"

Nic

k Fa

ulco

ner

A

RCH

497

Fina

l Sub

mitt

alJu

ly 2

0, 2

009

Pro

f M

Tee

r62

0 8t

h Av

e N

ew Y

ork,

New

Yor

kR

enzo

Pia

no B

uild

ing

Wor

ksho

p &

FXFo

wle

Arc

hite

cts

Mass Sculpture

A6.2

1/8" = 1'-0"1 Floor Plan

1/8" = 1'-0"4 Cross Section 1/8" = 1'-0"3 South Elevation

2 Axon

Page 23: Revit Work Sample

Nic

k Fa

ulco

ner

A

RCH

497

Fina

l Sub

mitt

alJu

ly 2

0, 2

009

Pro

f M

Tee

r62

0 8t

h Av

e N

ew Y

ork,

New

Yor

kR

enzo

Pia

no B

uild

ing

Wor

ksho

p &

FXFo

wle

Arc

hite

cts

Translations

A6.3

Page 24: Revit Work Sample
Page 25: Revit Work Sample
Page 26: Revit Work Sample