Upload
others
View
14
Download
0
Embed Size (px)
Citation preview
My Background
An Electrical designer with over 10 years
experience working in the construction
industry on electrical installation, design
management and construction
supervision throughout the UK.
Working on a selection of projects
including, Education, Retail, Office Fit
out, Industrial and Residential.
Telecomm
TE
Information
Systems
Energy Industrial
Engineering
Environment Building
Engineering
Civil
Engineering
Architecture Advanced
Design and
Analysis
Urban Design/
Masterplanning
Telecoms
& Security Turnkey
Service
Transport Petrochemical Project
Management
Management
Consultancy
Logistics
Multidisciplinary
Spain
BARCELONA
BILBAO
GRANADA
LAS PALMAS DE GRAN CANARIA
MADRID
MURCIA
PALMA DE MALLORCA
PAMPLONA
SAN SEBASTIAN
SANTIAGO DE COMPOSTELA
SEVILLE
VALENCIA
VITORIA
ZARAGOZA
United Kingdom LONDON
MANCHESTER
DERBYSHIRE
KENT
CARDIFF
Romania BUCHAREST
Belgium BRUSSELS
Mexico MEXICO DF
Canada CALGARY
USA MINNEAPOLIS
RICHMOND
Venezuela VALENCIA
Portugal LISBON
Offices
Brazil SAO PAULO
Poland WROCLAW
Morocco CASABLANCA
Libya TRIPOLI
United Arab Emirates ABU DHABI
IDOM Merebrook
80 staff
London, Manchester, Cardiff, Kent and Derbyshire
• Civil Engineering
• Environmental Engineering
• Industrial Engineering
• Energy
• Building Services Engineering
• Architecture
• Planning
• Project Management
Idom in the UK
As a design engineer working for a
contractor I knew …
• Increasing demand for BIM
• Winning new business
• Increasing profitability
And it could …
RESELLER GAVE ME THE IDEA THAT REVIT
WOULD CREATE AN INTGRATED APPROACH
TO ELECTRICAL SERVICES DESIGN
No more .. 1. INTIAL HAND MARK UP
2. CAD
3. IMPUT IN CIRCUIT DATA TO DESIGN
SOFTWARE
4. RE MARK UP ADDING CIRCUIT REF ETC
5. RE CAD
REVIT MEP METHOD
1. ADD ELECTRICAL ITEMS TO REVIT MODEL
CONNECT ING BACK TO BOARD SIMUTANEOUSLY
CREATING DB SCHEDULE AND SIZING EQUIPMENT
NOT QUITE
http://www.capitasymonds.co.uk/news__events/talking_point/getting_the_e_in_mep_to_work.aspx
Professional services
Architecture, Engineering, Consultancy
Since 1957
2,300 Professionals
Turnover 2011: £300M
International
Independent
Partnership
Smithfield Phase 6 - Case Study
MY PROJECT CONCLUSIONS
+ POSITIVES
• CO-ORDINATION OF
CONTAINMENT
• BEING THROWN IN AT
‘THE DEEP END’
• WORKING IN THE
THIRD DIMENSION
• SIMPLISTIC
PRODUCTION OF
DRAWINGS USING
REVIT
- NEGATIVES
• LACK OF
MANUFACTURERS
DATA AVALIBLE
• LACK OF SUPPORT
FROM COLLEGUES
• ‘WORK AROUNDS’
• PRESSURE OF LEARN
A SOFTWARE
COUPLED WITH
PROJECT DEADLINES
Heathrow Terminal 2A HEATHROW, UK
•Structural engineering design and supervision
•Architecture services
•Management of sub-consultants and architects
•Project management
Revit
Structures