OOS INTERNATIONAL B.V. OOS PROMETHEUS SEMI SUBMERSIBLE ACCOMMODATION / CRANE UNIT revision 4.0

revision 4.0 OOS PROMETHEUS...The OOS Prometheus is built to meet the highest accommodation requirements for offshore operations, with a vast open deck space for storage- and maintenance

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: revision 4.0 OOS PROMETHEUS...The OOS Prometheus is built to meet the highest accommodation requirements for offshore operations, with a vast open deck space for storage- and maintenance

OOS INTERNATIONAL B.V.

OOS PROMETHEUS

SEMI SUBMERSIBLE ACCOMMODATION / CRANE UNIT

revision 4.0

Page 2: revision 4.0 OOS PROMETHEUS...The OOS Prometheus is built to meet the highest accommodation requirements for offshore operations, with a vast open deck space for storage- and maintenance

OVERVIEW SEMI-SUBMERSIBLE SPECIFICATIONSThe SSCV OOS Prometheus is a large, state-of-the-art, multifunctional constructional semi-submersible crane and accommodation unit.

Highly competitive advantages such as a low day rate, high uptime and excellently graded by client’s periodical Contractor Performance Evaluation.

The OOS Prometheus is built to meet the highest accommodation requirements for offshore operations, with a vast open deck space for storage- and maintenance purposes.

• Hotel capacity is 500 persons on board

• Large open deck space

• Gangway of 36.5m length

Page 3: revision 4.0 OOS PROMETHEUS...The OOS Prometheus is built to meet the highest accommodation requirements for offshore operations, with a vast open deck space for storage- and maintenance

OOS PROMETHEUS

SSCV SPECIFICATION

GENERAL

PRINCIPAL DIMENSIONS

DESIGN ENVIRONMENT

DRAUGHTS

CAPACITIES

HELIDECK

DECK MACHINERY

MOORING & TOWING

VARIABLE LOADS

ACCOMMODATION

SAFETY EQUIPMENT

MAIN AND AUXILIARY MACHINERY

OFFSHORE MAST CRANE

Class : ABSNotation : A1 Column- Stabilized Unit, Acommodation Service, Crane Service, UWILD

Main DeckLenght : 80mWidth : 70m

PontoonsLength : 118mWidth : 15m

Survival condition : Hs=12.0mHotel Operation condition : Hs=6.0mTransit condition : Hs=3.0mSea water temperature : 0°C to 32°COutside air temperature : 0°C to 40°CStructure design : -10°Ctemperature Fatigue life : 20 years

Transit Draught : 7.8mHotel/Crane Draught : 23mSurvival Draught : 20m

Fresh Water : Approx 2100 m³MDO : Approx 1800 m³Endurance : 58.3 days with 90% bunkers, 3x engines in 89% load/ Deck LoadNet Deck Area : 2000m²Port Hull Deck Load : 3 ton/m²STBD Hull Deck Load : 3 ton/m²

1 x Helideck suitable for Westland EH101 or equivalent helicopter

Deck Crane : 1 x 25T @ 10m, 10 T @ 30 m (Diesel-Hydraulic, A-Frame, with Man Ridding certification) : 2 x 10T @ 25m (Provision Crane)Gangway : 1 x Telescopic hydraulic gangway with base of approx 36.5m ( 6m) length

12 Point Mooring System : 12x Single Drum winchesPre-lay mooring mode : Water depth 200m up to; 1000m 12 mooring linesAnchor mooring mode : Water depth from 35m to; 200ml 12 mooring lines12 sets mooring lines : Each steel wire @76x2500, breaking load (MBL) 5000KNAnchor : 12 x 15T anchors and 2 x 15T Spare AnchorsTowing : 4 x SMIT Tow BracketsTugger Winches : 8 setsBollard : 8 sets

Hotel Variable : 5000 mT @23mOperational DraftCrane Variable : 2970 mT @23mCrane DraftSurvival Variable : 5000 mT @20mSurvival DraftTransit Variable : 5000 mT @7.8mTransit Draft

500 PoB : 1-Man Cabin : 2 : 2-Man Cabin : 15 : 3-Man Cabin : 68 : 4-Man Cabin : 66Mess room : 312 personsFood in Provision : 8 days for 500 manRooms (or layout refrigerated on main deck up to 45 days)

Life Boats : 10 x 100 persons with davitsRescue boat : 1 x 6 Motor Resue BoatLife Rafts : 25 x 25 persons

Main Generator : 4 x 1825 kWEmergency Generator : 1 x 1300 kWF. W generator : 3 x 70 tones/daySewage Plant : 2 x 270 man capacityvacuum type

Main Hook : 1x 1,100tonFixed Lifting Max. : 1,100T@18m~36mCapacitySlewing 360° lifting : 600T~51.1mcapacityMax.Lifting height : Approx 79m above sea level at 23m draftAuxiliary hook : 1 x 200tonsSlewing lifting capacity : 200T @ 22.4~84mMax. Lifting height : Approx. 94m above sea level at 23m draft

Page 4: revision 4.0 OOS PROMETHEUS...The OOS Prometheus is built to meet the highest accommodation requirements for offshore operations, with a vast open deck space for storage- and maintenance

HOLDING OOS INTERNATIONAL GROUP B.V.

www.oosinternational.com

The Netherlands

Head Office The Netherlands

OOS International B.V.Oostkapelseweg 44353 EH SerooskerkeP.O. Box 404353 ZG Serooskerke

E: [email protected]: +31 (0) 118 726 200

Chamber of Commerce No. 20149791VAT No. NL8204.64.624.B.01

The Netherlands

OOS Asia Pacific Pte. Ltd.

OOS Singapore

Office 3791 Jalan Bukit Merah#09-24 (E-Centre @ Redhill)Singapore 159471T: +65 6732 1983

OOS China

No.1 Xin An Jiang Road, Bin Jiang StreetHaimen, Jiangsu ProvinceP.R. ChinaP.C. 226116T: +86 0513 8128 7430

OOS International do Brazil Servicos Maritimos Ltda.

Rua Internacional261 - Vale Encantado Macaé - Rio de Janeiro, BrazilCEP 27.933-377T: +55 22 2020 0500