Revision: 02-14-06 - BEFORE YOU BEGIN - STAIN REQUIREMENTS FOR GAZEBO GAZEBO FLOOR SCREEN # OF GALLONS 2 1 .5 Optional - TREATING YOUR GAZEBO - Staining... This Gazebo is constructed of a long-lasting western cedar. Untreated cedar exposed to sunlight will eventually weather to a silver-grey color. Apply Stain or Sealers per manufacturers instructions WITHIN 30 DAYS (required to validate warranty) and caulking the roof seams before shingling will improve the water resistance of your Gazebo. Some sanding to remove rough edges and natural wood stains may be required prior to staining. Always wear OSHA-APPROVED safety glasses throughout assembly process First... Read these instructions thoroughly before you begin assembly. Assembly is easiest if you follow the steps in the order shown. In a drawing, a dotted line represents a part hidden from view (like a part under a panel). Check all parts Compare parts you have to the list on page 2. If a part is missing, circle the part in question in the parts list and call us toll-free at 1-800-437-0784. Assistance required We recommend that you assemble this Gazebo on level ground in the location it will be used. Assistance is necessary to handle, fit, and secure some components. Two people are needed for most steps. Check local Building Departments Before starting construction, check with your local building code official for any required permits, variances, etc. #16682 Santa Cruz 10’- 8 sided Gazebo shown with optional Floor Kit (Not Included) Tools required Hammer #2 Phillips Screwdriver 6’ Step Ladder Tape Measure Pencil Staple Gun with 1/4” or 3/8” staples Optional tools Electric Screwdriver/Drill w/ #2 Phillips Tip Nail Pouch 1/8” Drill bit-for predrilled holes Exterior Wood Glue 10’ Gazebo Made in the U.S.A.

Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

Embed Size (px)

Citation preview

Page 1: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

Revision: 02-14-06

- BEFORE YOU BEGIN -

STAIN REQUIREMENTS FOR GAZEBO

GAZEBO FLOOR SCREEN # OF GALLONS 2 1 .5

Optional

- TREATING YOUR GAZEBO -Staining...

This Gazebo is constructed of a long-lasting westerncedar. Untreated cedar exposed to sunlight will eventuallyweather to a silver-grey color. Apply Stain or Sealers permanufacturers instructions WITHIN 30 DAYS (required tovalidate warranty) and caulking the roof seams beforeshingling will improve the water resistance of yourGazebo. Some sanding to remove rough edges andnatural wood stains may be required prior to staining.

Always wear OSHA-APPROVED safetyglasses throughout assembly process

First...Read these instructions thoroughly before you beginassembly. Assembly is easiest if you follow the steps inthe order shown.In a drawing, a dotted line represents a part hidden fromview (like a part under a panel).

Check all partsCompare parts you have to the list on page 2. If a part ismissing, circle the part in question in the parts list and callus toll-free at 1-800-437-0784.

Assistance requiredWe recommend that you assemble this Gazebo on levelground in the location it will be used. Assistance isnecessary to handle, fit, and secure some components.Two people are needed for most steps.

Check local Building DepartmentsBefore starting construction, check with yourlocal building code official for any requiredpermits, variances, etc.

#16682

Santa Cruz 10’- 8 sided Gazebo shown with optional Floor Kit (Not Included)

Tools required Hammer #2 Phillips Screwdriver 6’ Step Ladder Tape Measure Pencil Staple Gun with 1/4” or 3/8” staples

Optional tools Electric Screwdriver/Drill w/ #2 Phillips Tip Nail Pouch 1/8” Drill bit-for predrilled holes Exterior Wood Glue

10’ GazeboMade in the U.S.A.

Page 2: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

2 Santa Cruz

SILL PLATE

8 SIDEDRIDGE BLOCK

PRE-ASSEMBLEDDOOR PANEL

SPACER

GAZEBOPRE-ASSEMBLED

WALL PANEL

METAL ROOF CAP

FASCIA TRIM

TWO TIERPRE-ASSEMBLED

WALL PANEL

GAZEBOPLYWOOD GUSSETS

FINIAL

PLYWOOD FASCIA

ROOF PANELCORBEL

TWO TIERGUSSET

Santa Cruz 10’ Gazebo

Hardware Kit

#8 3” Screw, #8 1-5/8” Screw, #8 2-1/2” Screw, 6d-2” Nail, 4d-1-1/2”Finish Nail, 3/4” Roofing Nail, 1” Roofing Nail

Nominal size Actual size

NATIONAL STANDARD LUMBER SIZES

1 x 4 = 3/4" x 3-1/2"2 x 4 = 1-1/2" x 3-1/2"2 x 2 = 1-1/2" x 1-1/2"2 x 6 = 1-1/2" x 5-1/2"

8-Sided

Parts List Santa Cruz 10’ 7 pcs. Pre-assembled Wall Panels 44-3/4” x 82-1/2” 1 pc. Pre-assembled Door Panel 44-3/4” x 82-1/2” with Temporary Spacer

1 pc. Ridge Block 8-Sided 8 pcs. Plywood Triangular Roof Panels 8 pcs. Rafters 2 x 4 x 62-3/4” 8 pcs. Plywood Gussets 7 pcs. Sill Plates (Notched) 2 x 4 x 40-1/4” 8 pcs. Plywood Fascia (Angled) 5/8” x 3-1/2” x 46-7/8” Plywood 8 pcs. Fascia Trim (Hardware kit) 3/8” x 1-1/2” x 3-3/4” 14 pcs. Corbel 2 x 4 x 14”

Hardware Kit

#8 3” Screw, #8 1-5/8” Screw, , 6d-2” Nail,4d-1-1/2” Finish Nail, 1” Roofing Nail

Parts List 2nd Tier 8 pcs. Pre-assembled Wall Panels 1 pc. Ridge Block 8-Sided 1 pc. Metal Roof Cap 8 pcs. 3/8” OSB Triangular Roof Panels 8 pcs. Rafters 2 x 4 x 27” 4 pcs. Plywood Gussets 8 pcs. Plywood Fascia sq.ends 5/8” x 2-1/2 x 21-1/16 8 pcs. Fascia Trim (Hardware kit) 3/4” x 1-1/2” x 2-3/4” 1 pc. Finial 1 pc. 13” Roll of Screen

Optional accessories available for your Gazeboinclude Cupola and Screen Kit shown below.

Page 3: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

3Santa Cruz

WOOD FLOOR KIT

1-1/2"Base Plate

Center of Floor Kit

4 x 4 Treated Postor 12"x12"

Concrete Pier

4 x 4 Treated Postor 12"x12"

Concrete Pier

GRADE

42" or Code

CONCRETE PAD FOOTING

8" x 4" Diameterfor Treated Post

Minimum of 6" of Air Space

NOTE:1. All below grade material

to be treated for below grade application.

2. All above grade material is Cedar.

WOOD FLOOR KIT

4 x 4 Treated Postor 12"x12"

Concrete Pier

GRADE

J3J2 J2

111"Flat to

Flat

10' CONCRETE SLAB

60"Point toCenter

46"

The top of your concrete padshould be 1" minimium above grade.

4" Concrete pad

12"x12"Continuous

Footing

4" Sand or Gravel

1-1/2" Largerthan Gazebo

SITE PREPARATION

UNEVEN GROUND INSTALLATIONUse treated 4 x 4 posts or concrete piers on each corner and incenter of deck. Hole depth will vary according to local buildingcodes. Cut center post 1-1/2” shorter to allow for Base Plate asshown. Nail or screw Deck to top of 4 x 4 posts. Use Simpson TiePA18 or similar for each Concrete pier.

CONCRETE SLAB OR HARDSURFACE INSTALLATIONBase Plate is not needed. Measurementsgiven on the concrete slab illustration are1-1/2” larger than the outside dimensionsof the Gazebo. You may choose to makeyour concrete slab larger than thedimensions given. Step 5 page 11 showsyou how to anchor your gazebo.(Hardware not included in Kit.)

Dig out 4” of ground for concrete and 4”for sand/gravel (per local code) so it islevel. Finish digging 12” wide by 12”deep (per local code) continuous footingaround the perimeter of the pad. Usewood forms around the perimeter ofgazebo foundation area. Use rebar asneeded. Pour concrete and make sureall points of the concrete top are level.

LEVEL GROUND INSTALLATIONRemove dirt to allow for Base Plate. First Set J3 CenterBlock for height. Then, using a carpenter’s level, check J2’sfrom Center Block to outside corners. Shim outside cornersas needed. Step 5B page 11 illustrates how to anchor yourgazebo to level ground using stakes.

It is important to have a solid, flat and level foundation for your Gazebo.Carefully consider the recommendations listed below prior to choosing your ideal foundation.

44-1/8"

22-1/16"

106-9/16"

115-3/8"

57-5/8"

53-1/4"

Pier Locations

1

Page 4: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

4 Santa Cruz

Door Spacer DO NOTREMOVE

Widest Bevelon Ground

2 ASSEMBLINGWALL PANELS

7 pcs. Pre-assembled Wall Panels 1 pc. Pre-assembled Door Panels

2-A Select desired Door location and position WallPanels on ground around foundation as shownin Fig. 2-A.

NOTE: Wall Panels have beveled edges.The widest bevel will face the ground andis the outside of the Gazebo wall as shownin Fig. 1.

2-A:

Flush at top

5-3" Screws

2-B

Fig.2

Stand up two adjoining Wall Panels andattach them together using five 3” screwsas shown in illustration 2-B. HINT: Start atthe Top and work Down to the Bottom ofPanel. Make sure that the two Wall Panelsare flush at the top as shown in Fig. 2.Connect all Wall Panels in this same man-ner, making sure not to remove the Doorspacer at this time.

Note: Use wood glue (not included)between Wall Panels for added strength.

2-B:

Fig.1

PARTS LIST 10’ GAZEBO

Page 5: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

5Santa Cruz

FLUSH

Gusset Bracket

(8) 1-5/8"Screws into each Gusset

VIEW FROM OUTSIDE

VIEW FROM INSIDE

Gap may vary in between Gussets

2-1/2"(6.3cm)

Rough sawn Cedar side facing down

3 INSTALLINGGUSSETS

8 pcs. Plywood Gusset Bracket

3-A

Install Gussets with Rough sawn Cedar sidefacing down using eight 1-5/8” screws for eachGusset. Make sure that the Gusset is flush tothe inside of the Wall Panel and that the insidecorner is directly over inside corner of WallPanel as shown in Fig. 1. The Gusset shouldoverhang the outside edge of the Wall Panel by2-1/2” as shown in Fig. 2. This step may re-quire some pulling of the Wall Panel to bring itinto proper position. The gap between Gussetsmay vary.

3-A:

Fig.1

Fig.2

PARTS LIST 10’ GAZEBO

Note: Use exterior wood glue (notincluded) between Wall Panels andGussets for added strength. Tempo-rarily install all gussets with 1-5/8”screws to align walls. Remove onegusset, apply glue, install all screws.Continue for all Gussets.

Page 6: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

6 Santa Cruz

VIEW FROM BOTTOMVIEW FROM TOP

Two 3"Screws at

slight angleCentered over cornerof Gusset Bracket

BOTTOM VIEW

3" Screw

10' GAZEBOTOP VIEW

3" Screw

Ridge Block EightPre-Drilled Holes

Facing Down

RafterRafter

Flushat top

4 RAFTER AND RIDGEBLOCK ASSEMBLY ANDERECTING RAFTERS

8 pcs. Rafters 2 x 4 x 62-3/4” 1 pc. Ridge Block-8 Sided

4-AAssemble Rafters (with predrilled holes facingup) by joining two Rafters on opposite sides toRidge Block (with predrilled holes in RidgeBlock facing down) using two 3” screwsthrough predrilled hole in top of Rafter.Once two Rafters are connected to RidgeBlock, carefully turn over and attach two 3”screws through predrilled holes in Ridge Blockinto Rafter.

Fig.1 Fig.2

Carefully lift the Rafter andRidge Block assembly on top ofthe Gussets at opposite cornersof the Gazebo. Place RafterEnds at center of outside cornerof Gusset Bracket as shown inFig. 1. Once Rafter is in place,attach to Gusset with two 3”screws through predrilled holesfrom underside of GussetBracket into bottom of Rafter asshown in Fig. 2.

NOTE: Adjust Wall corners inor out to fit.

4-B:

PARTS LIST 10’ GAZEBO

4-B

4-A:

Page 7: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

7Santa Cruz

Rafter

Rafter

3" Screw3" Screw

3" Screws

4 ASSEMBLING ANDERECTING RAFTERSCONTINUED

4-C Install remaining Rafters by inserting screwsthrough Gusset, as shown in 4-B Fig. 2, whileholding Rafter in position. Install 3” screwthrough top of Rafter into Ridge Block as shownin Fig. 1. Once all Rafters are in place, install 3”screws in underside of Ridge Block into Raftersas shown in Fig. 2.

4-C:

Fig.1

Fig.2

Page 8: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

8 Santa Cruz

VIEW FROM INSIDE

Metal "L"Bracket

Cement Anchor and Screws

1-1/4" Screws

5 ANCHORING GAZEBOCONTINUED

5-B

5-A:

Install a 2” 90 degree metal angle bracket (available at most Home Centers and hardware stores)inside each corner post, using a cement anchor, and affixing it to the base with 1-1/4” screws into thepost as shown in Fig. 3.

5-B:

Fig.3

ANCHORING YOUR GAZEBO (Recommended)

OPTIONAL ANCHORING ON CON-CRETE SLAB OR HARD SURFACE

5-A

Local building departments require some sort of anchoring system to meet wind requirements. Werecommend Simpson HD2A (not included) or similar for a anchor. You will also need (2) 5/8”x3” bolts(not included) with a rating of 500 lbs. of tension or greater each bolt, (2) washers and nuts also forthe wall to anchor connection. Also you will need a Simpson 5/8” Wedge-All anchor or similar (notincluded) for the anchor to concrete connection. If you have a wood floor you would need a 12” longWedge-All and a 6” long for a Concrete slab. Anchors need to be imbedded at least 4-1/2” into con-crete.

12"

PLAN DETAIL

12"

12"

PRESSURE TREATED2"x4" (nominal)

FLOOR FRAMING

#5 BAR 6" O.C. MAX

12"

PRE-ASSEMBLED WALL PANEL

4" COMPACTED

4" CONCRETE

SAND OR GRAVEL

6" BELOW LOCAL FROSTDEPTH PER

LOCAL CODES

PRE-ASSEMBLED WALL PANEL

3" Min. CLEAR COVER TOP & BOTTOM#5 BAR 6" O.C. MAX

3" Min. CLEAR COVER TOP & BOTTOM

6" BELOW LOCAL FROSTDEPTH PER

LOCAL CODES

2"Min.

2"Min.

SIMPSON STRONG TIE HD2AREQ. @ ALL WALL LOCATIONSWITH 1/2"x12" WEDGE ANCHOREMBEDDED 4-1/2" INTO CONCRETE and (2) 5/8"x3" Bolts

REQ. @ ALL WALL LOCATIONSWITH 1/2"x6" WEDGE ANCHOREMBEDDED 4-1/2" INTO CONCRETE and (2) 5/8"x3" Bolts

REQ. @ ALL WALL LOCATIONSWITH 1/2"x12" WEDGE ANCHOREMBEDDED 4-1/2" INTO CONCRETE and (2) 5/8"x3" Bolts

SIMPSON STRONG TIE HD2A

SIMPSON STRONG TIE HD2A

Page 9: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

9Santa Cruz

5-C

5 ANCHORINGGAZEBO

1 pc. Assembled Side Wall and Rafters 8 pcs. Stakes (if attaching to ground)2 x 2 x 14” 8 pcs. Metal “L” Brackets and Screws

(Not included in Kit)

VIEW FROM OUTSIDE10' Floor shownWOOD FLOOR OR DECK

108" for 10' Gazebo

2-1/2" ScrewsPredrill holeswith 1/8" bit

Equal space on all 8 sides

Approx. 1-1/2"

Fig.1

Anchor by predrilling holes andinstalling two 2-1/2” screws at anangle through corner post intowood floor as shown in Fig. 1.You may also use metal “L” Brack-ets (not included) as described inanchoring to concrete slab andshown in 5-C. There should beequal distance between outsideof Gazebo and outside edge offloor all around Gazebo as shownin Fig. 1.

5-C: ANCHORING ON WOODFLOOR OR WOOD DECK

PARTS LIST 10’ GAZEBO

Page 10: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

10 Santa Cruz

2" Nail

3/4"

3/4"

3/4" Marks

Plywood side

Rough sawn Cedar side

2" NailCenter Panels on or in between 3/4" Marks

3/4"

10' Roof Panel

Roof Panels ShouldOverhang End of Rafter about 1"

6 INSTALLING ROOF PANELSFOR 10’ GAZEBO

8 pcs. Plywood Triangular Roof Panels

When installing the Roof Panels, the rough sawn cedar side should be facing to the inside of yourGazebo. Along each Rafter, place a mark 3/4” in on each Rafter to help center Roof Panels as shownin Fig. 1 and Fig. 2. Set first Roof Panel in place on top of Rafters, making top of Roof Panels line upwhere Rafter and Ridge Block meet and nail with one 2” nail at the top of Roof Panel. Once top isnailed, make sure Roof Panel at bottom is centered between 3/4” marks on both Rafters. Once Roofpanel is aligned nail with two 2” nails at bottom corners. Do not drive nails al the way for possibleremoval later.

6-A:

6-A

NOTE: Make certain the rough sawn side of each Roof Panel is facing down during assembly.

Fig.2

Fig.1

PARTS LIST 10’ GAZEBO

Page 11: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

11Santa Cruz

1

2

3

45

6

7

82

2" Nails every 8"once all Roof Panels are in place

6 INSTALLING ROOFPANELS CONTINUED

Follow the same steps as in 6-A to install allremaining Roof Panels, only temporarily nail-ing in place. Once all Roof Panels are in placeand fit properly on your Gazebo, then nail every8” with 2” nails.

6-B:

6-B

Page 12: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

12 Santa Cruz

3/4"

3/4"Mark

Fascia

Two-1-1/2" Finish Nails to hold all Fascia in place

then, once all Fascia in place,

add five more1-1/2" Finish Nails.

Fascia

Fascia butts up to Roof Panel

Raf

ter

En

d

Rough sawnCedar side

7 INSTALLINGFASCIA

8 pcs. Fascia 5/8” x 3-1/2” x 46-7/8” Plywood (angled) 8 pcs. Fascia Trim 3/8” x 1-1/2” x 3-3/4”

7-A:

7-A

Fig.1

PARTS LIST 10’ GAZEBO

Fascia Fascia

Roof PanelRoof Panel

Attach Fascia Trim with two 1-1/2" Finish Nails

Fig.2

Place a mark 3/4” in on end of Rafter as shownin Fig. 1. Center Angled Fascia on Wall Panelsin between corners and 3/4” marks and buttFascia to bottom of Roof Panels. Tack on theFascia to the Gusset Brackets at each cornerwith one 1-1/2” Finish Nails. Continue attach-ing remaining seven pieces of Fascia for 10’Gazebos. Once all Fascia are in place, finishnailing along bottom edge and top of roof panelwith five more 1-1/2” Finish Nails.Attach Fascia Trim over seam where two Fasciapanel pieces meet and attach with two 1-1/2”Finish nails through Fascia Trim into FasciaPanel as shown in Fig. 2.

Note: Pre-drill to eliminatesplitting the wood

when nailing Fasciaand Fascia Trim.

Page 13: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

13Santa Cruz

2-1/2" Screws

8 INSTALLINGSILL PLATE

7 pcs. Sill Plates 2 x 4 x 40-1/4” 14 pcs. Corner Brace 2 x 4 x 14”

Install Window Sill Plates with ears projecting to the inside of the Gazebo. Attach with four 2-1/2”screws as shown in 8-A.

8-A:

INSIDE

8-A

PARTS LIST 10’ GAZEBO

9 INSTALLINGLOWER CORBELS

Lower Corbels are positionedand attached to wall post and sillas shown. Position 3/4” backfrom outside edge of Sill Plate.

3" Screws

3/4"

Note: If installing a Screen Kit, skip Steps 8 and refer to Screen Kit instruction manual before going to Step 9.

Note: If installing sill from op-tional Screen Kit, Lower Corbelswill be flush to outside edge ofSill Plate.

Page 14: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

14 Santa Cruz

10 INSTALLING DRIP EDGE,SHINGLES, METAL CAPAND FINIAL

5 Bundles Shingles (not included) for 10’ 40 feet Drip Edge (not included) for 10’

Drip Edge

Upside downstarter course

3/4" Roofing Nail

First courseUtility Knife

Making Ridge Cap Cutting angle

on Ridge Cap Ridge Cap

Installing Ridge Cap

1" Roofing Nail on Ridge Cap

3/4" Roof nails

Snip at corner

10-A

Fig.1

Fig.2 Fig.3

Fig.4

Caulking the Roof Seams beforeshingling will improve the waterresistance of your Gazebo.

CAUTION: Use 3/4” Roofing Nailswhen installing layers of shingles.

Install the recommended Drip Edge around theperimeter of the Roof Panels before shingling theRoof. Use 3/4” Roofing Nails to install Drip Edge.Snip the top of the Drip Edge at corners andbend to meet next Roof Panel.

Install a starter course of Shingles consisting of arow of Shingles with tabs facing up as shown in10-A. Attach with 3/4” Roofing Nails that aresupplied with kit. After starter course is com-pleted, cut excess shingles off along seam ofRoof Panels with Utility Knife as shown in 10-A.Next, place first course of shingles directly overstarter course in normal position and nail with 3/4” roof nails. Cut excess material off in the samemanner as starter course. Continue up RoofPanel, overlapping Shingles as you go andcutting off excess.

To create Ridge Caps, take a shingle and cut itinto six equal pieces as shown in Fig. 1. Cutabout 1/3 of Shingle at top on an angle as shownin Fig. 2. Install Ridge Caps (Fig. 3) over seamswhere the excess Shingle material was cut off,making sure to cover each of the angled cutends of the Ridge Cap. Attach each Ridge Capwith two 1” roof nails supplied with kit (Fig. 4).

Completely shingle before installing second tier.

10-A:

Page 15: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

15Santa Cruz

Cut 17"x 13" piece of screen.Apply Screen to inside of Second Tier.

Outsideof Two

Tier

Screen Staple every 2"

Side View

17"

RolloverScreen 1/2"at Top and

Sides

Leave 2" of Screen at bottom to Staple to Roof in step 11F

Rafter

Rafter

3" Screw3" Screw

3" Screws

ASSEMBLINGSECOND TIER ROOF

8 pcs. Pre-assembled Wall Panels 1 pc. Ridge Block 8-Sided 8 pcs. Rafters 2 x 4 x 27” 4 pcs. Plywood Gusset Brackets 1 pc. 13” Roll of Screen

Stand up two Side Wall Panels and attach themtogether using two 3” screws as shown inillustration. Make sure that the two Wall Panelsare flush at the top with Angle end down asshown. Connect all Wall Panels in this samemanner.

3" Screws

Flush at top

AngleDown

11-A

11-A

Install 4 Gussets

Flush to inside edge

SmoothSideUp

Cedar SideDown

Six 1-5/8" Screwsper Gussett

11-C

Install Gussets with Rough sawn Cedar side facing downusing seven 1-5/8” screws for each Gusset. Make sure thatthe Gusset is flush to the inside of the Wall Panel and that theinside corner is directly over inside corner of Wall Panel asshown. The Gusset should overhang the outside edge of theWall Panel by 2-1/2”. This step may require some shifting ofthe Wall Panel to bring it into proper position. The gapbetween Gussets may vary.

11-C

Install 3” screws through top of Rafter into RidgeBlock as shown in Fig. 1. Install 3” screws in under-side of Ridge Block into Rafters as shown in Fig. 2.

11-D

Fig.1

Fig.211-D

11-B

Cut 8 sections of screen17”x13” and apply tothe inside of the Second Tier panel withstaples every 2”.

11-B

(Optional for some models)11

Page 16: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

16 Santa Cruz

ASSEMBLING SECONDTIER ROOF CONTINUED

8 pcs. 3/8” OSB Triangular Roof Panels

Staple toRoof

3" Screw

Rafter

Rafter

3" Screw3" Screw

3" Screws

11-ERafterRafter

Centered over corner

VIEW FROM TOP 1-5/8"Screwsat angleScreen

Carefully lift the Rafter and Ridge Block assembly ontop of the Gusset Brackets at opposite corners of theGazebo second tier. Place Rafter Ends at center ofoutside corner of Gusset Bracket as shown. OnceRafter is in place, attach to Gusset Bracket with two1-5/8” screws through predrilled holes from undersideof Gusset Bracket into bottom of Rafters as shown.

Install 3” screw through top of remaining Rafters intoRidge Block as shown in Fig. 1. Once all Rafters arein place, install 3” screws in underside of Ridge Blockinto Rafters as shown in Fig. 2. Attach to Gussetswith 3” screws as in 11-E.

11-F

11-F:

1

2

3

45

6

7

82

2" Nails every 8"once all Roof Panels are in place

3/4"

3/4"

3/4"

3/4" Marks

2" Nail

Center Panels on or in between 3/4" Marks

Roof Panels ShouldOverhang Rafter End

Fig.1

Fig.2

11-E:

Fig.1

Fig.2

11-G

11-G:

Carefully place the Second Tier on top of your Gazebo aligning seam toGazebo Seam. Fasten into roof with (8) 3” screws through Wall Panel intoRafter below as shown in Fig. 1. Staple screen to roof every 2” as shownin Fig. 2.

Fig.1

Fig.2

Along each Rafter, place a mark 3/4” in on each Rafter to help center Roof Panels as shown in Fig. 1 and Fig. 2. Set firstRoof Panel in place on top as shown in Fig. 2 and temporarily nail with one 2” nail at the top of Roof Panel. Continue withremaining roof panels. Shift slightly left to right to line up bottom edge of roof panels. Install all remaining Roof Panels,only temporarily nailing in place, with two 2” nails at bottom corners. Once all Roof Panels are in place and fit properly onyour Second Tier, then nail through Roof Panel into Rafters every 8” with 2” nails.

11

Page 17: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

17Santa Cruz

ASSEMBLING SECONDTIER ROOF CONTINUED

1 pc. Metal Roof Cap 8 pcs. Fascia sq.ends 2-1/2 x 21-1/16” 8 pcs. Fascia Trim 3/4” x 1-1/2” x 2-3/4” 1 pc. Finial

3/4"

3/4"Mark

FasciaFasci

a

Fascia butts upto RoofPanel

Raf

ter

End

Rough sawnCedar side

Two-1-1/2" Finish Nails to hold all Fascia in place

then, once all Fascia in place,

add five more1-1/2" Finish Nails.

11-H

Fig.2

Fig.1

Fascia Fascia

Roof PanelRoof Panel

Attach Fascia Trim with two 1-1/2" Finish Nail

Place a mark 3/4” in on end of Rafter as shown in Fig. 1. Center Fascia on Wall Panels in between corners and 3/4”marks and butt Fascia to bottom of Roof Panels. Tack on the Fascia to the Gussets at each corner with one 1-1/2”Finish Nails. Continue attaching remaining seven pieces of Fascia for Second Tier. Once all Fascia are in place, finishalong bottom edge nailing with three more 1-1/2” Finish Nails and two nails through Roof Panel into Fascia.Attach Fascia Trim over seam where two Fascia panel pieces meet and attach with two 1-1/2” Finish nails through FasciaTrim into Fascia Panel as shown in Fig. 2.

11-I:

Metal CapFinial

Fig.1

Shingle your two tier in the same manor as your Gazebo.Refer to Step 10 on Page 16 for more information.

Place Metal Roof Cap on top of shingled Second Tier andinstall Finial through hole in cap and screw down snugly(Fig. 1).

Note: Pre-drill to eliminatesplitting the wood

when nailing Fasciaand Fascia Trim.

11-H:

11-I

11

Page 18: Revision: 02-14-06 10’ Gazebo - The Home Depot · PDF filerevision: 02-14-06 - before you begin - stain requirements for gazebo gazebo floor screen # of gallons ... plan detail 12"

Limited ConditionalWarranty *

WARRANTYWe warrant the following:

1. Every product is warranted from defects in workmanship and manufacturing for one year.2. All hardware and metal components are warranted for two years.3. Cedar lumber is warranted for 15 years.

We will repair, replace or pay for the affected part. In no event shall we pay the cost of labor or installation or any other costs relatedthereto. All warranties are from date of purchase. If a cash refund is paid on an affected part, it will be prorated from the date ofpurchase.

CONDITIONSThe warranty is effective only when:

1. The unit has been erected in accordance with the assembly instructions.2. The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter.3. The failure occurs when the unit is owned by the original purchaser.4. We have received the warranty registration card within thirty (30) days of purchase and notification of the failure in

writing within the warranty period specified above.5. We have had reasonable opportunity during the sixty (60) days following receipt of notification to inspect and verify the

failure prior to commencement of any repair work.

REQUIREMENTSTo validate your warranty, it is necessary to properly maintain your gazebo. This includes treating/sealing all of the exposed cedarsurfaces on your gazebo with an exterior grade wood preservative/sealer, an exterior oil-based semi-transparent stain, exterior paintor solid color exterior stain, per manufacturer’s instructions, within 30 days of assembly and as needed thereafter to maintain yourwarranty.

Other RequirementsKeep vegetation trimmed away from Gazebo. Water from sprinklers must be kept off unit. In no event will we be responsible for anyindirect, incidental, consequential or special damages nor for failure(s) that are caused by events, acts or omissions beyond ourcontrol including, but not limited to, misuse or improper assembly, improper maintenance (which eventually leads to rot or decay)and acts of God. We will not be held responsible for any labor costs incurred to construct your unit. This warranty gives you certainspecific rights that vary from state to state.

CLAIM PROCEDURETo make a claim under this warranty, call (800) 437-0784. Please have ready the information below when you call:

1. The model and size of the product.2. A list of the part(s) for which the claim is made.3. Proof of purchase of the item, as shown on the original invoice.4. Run code, as listed on the yellow warranty card enclosed in the product package.