TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: UNION PRECINCT STATUS REPORT UPDATE ON CONSTRUCTION INFORMATION ITEM RECOMMENDATION It is recommended that the Board receive a presentation titled, Union Precinct Status Report Update on Construction, for information. The presentation provides the Board with an overview of all work currently underway in the Union Station area with particular attention to the TTC’s Union Station Second Platform Project. - - - - - - - - - - - - March 4, 2014 50-71-82 03075-135-178 Attachment: Presentation Revised: March/13

Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

TORONTO TRANSIT COMMISSION REPORT NO.

MEETING DATE: March 26, 2014 SUBJECT: UNION PRECINCT STATUS REPORT

− UPDATE ON CONSTRUCTION INFORMATION ITEM RECOMMENDATION It is recommended that the Board receive a presentation titled, Union Precinct Status Report − Update on Construction, for information. The presentation provides the Board with an overview of all work currently underway in the Union Station area with particular attention to the TTC’s Union Station Second Platform Project. - - - - - - - - - - - - March 4, 2014 50-71-82 03075-135-178 Attachment: Presentation

Revised: March/13

Page 2: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

UNION PRECINCT STATUS REPORT

Update on Construction – March 2014

Construction Department

03075-135-176

Page 3: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

1858 - Toronto’s first Union Station was built. 1873 - Grand Trunk Railway (GTR) built a new second Union Station. 1906 – Toronto Terminals Railway (TTR) (owned by Canadian Pacific Railway (CPR) and Canadian National Railway (CNR) formerly Grand Truck Railway) incorporated to build third Union Station.

UNION RAILWAY STATION

2

Page 4: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

1913 Excavation

UNION RAILWAY STATION

3 Construction Department

03075-135-176

Page 5: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

1927 Union Station Opens

UNION RAILWAY STATION

4 Construction Department

03075-135-176

Page 6: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

1975 Designated a National Historic Site

UNION RAILWAY STATION

5 Construction Department

03075-135-176

Page 7: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

2000 Purchase of Union Station – City of Toronto / GO Transit

UNION RAILWAY STATION

6

Page 8: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

The first subway proposals suggested running trains

beneath or near this main thoroughfare. A number of

proposals emerged between 1909 and 1912, but

the public rejected subways in a plebiscite in 1912,

forcing the issue into dormancy for another thirty

years.

The TTC formed a Rapid Transit Department and

worked on a proposal between 1942 and 1946.

Finally, the TTC proposed a “rapid transit subway”

beneath Yonge Street running from Eglinton Avenue

south to Front Street and then west along Front to

Union Station.

The matter was put to voters on a January 1, 1946,

plebiscite and overwhelmingly approved. Toronto

City Council approved construction four months

later.

Construction began on September 8, 1949

MASS TRANSIT (SUBWAY) PLANNING

7

Page 9: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

Union to Eglinton

YONGE SUBWAY CONSTRUCTION 1949-1954

8

Page 10: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

Union to Eglinton – March 30, 1954

YONGE SUBWAY OPENING

9

Page 11: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

Daily Trips (System) – 2,683,000

Daily Trips (Rail) – 1,329,000

# of Stations – 69

2012 Passenger Trips (System) – 510,007,000

TTC SUBWAY (LOCAL)

10

Page 12: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

GO Transit is an inter-regional public transit system

in Southern Ontario, Canada. The GO network

carries over 57 million passengers a year using an

extensive network consisting of diesel train and

coach bus service.

GO Transit began regular passenger service on May

23, 1967.

Since then, it has grown from a mere two train lines

to seven, and numerous bus routes.

GO TRANSIT (REGIONAL)

11

Page 13: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

From the mid 1800’s - Passenger rail transport offered by

Canadian Pacific Railway and Canadian National Railway

1978 - Via Rail Canada is formed as an independent crown

corporation offering intercity passenger rail services in

Canada.

Via Rail operates 480 trains in eight Canadian provinces over

a network of 14,000 kilometres (8,700 mi) of track.

Via carries approximately 4.3 million passengers annually, the

majority on routes between Quebec City and Windsor.

VIA RAIL CANADA (INTER-CITY)

12

Page 14: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

UNION PRECINCT - TRANSIT HUB

13

+20M - Subway Passengers/year

+2.6 M – Commuter Bus Passengers/year

+41.4M – Commuter Rail Passengers/year

2.4 M - Intercity Rail Passengers/year

Page 15: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

UNION STATION PRECINCT

Fast Facts:

• TTC Union Station Ridership +100,000/day (3rd busiest)

• GO Transit Union Ridership+200,000/day

• Busiest transportation hub in Canada

• Approximately twice as busy as Toronto Pearson

International Airport

• Gateway to the Network and Waterfront

• Over $1.6B in construction currently underway

14

Page 16: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

City of Toronto

Union Station

Revitalization Project

City of Toronto

Union Station

Revitalization Project

GO Transit

Train Shed Roof

Revitalization

GO Transit

Train Shed Roof

Revitalization

TTC 2nd Platform TTC 2nd Platform

City of Toronto

Northwest PATH

City of Toronto

Northwest PATH

Union Station – Precinct Projects

Front St. EA Front St. EA

UNION PRECINCT PROJECTS

15 Construction Department

03075-135-176

Page 17: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

City of Toronto

Union Station

Revitalization Project

City of Toronto

Union Station

Revitalization Project

City of Toronto

Northwest PATH

City of Toronto

Northwest PATH

Union Station – Precinct Projects

Front St. EA Front St. EA

CITY OF TORONTO PROJECTS

16 Construction Department

03075-135-176

Page 18: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

• Transportation Hub

• Heritage Destination

• Pedestrian Flow

• Environmental Benefits

• Retail/Revenue Enhancement

Public

Objectives

UNION STATION REVITALIZATION

17

Page 19: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

UNION STATION REVITALIZATION

Existing Typical Building Section

Existing Train Platform Level

Existing Floor Level

18

Page 20: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

UNION STATION REVITALIZATION

Proposed Typical Building Section

Existing Train Platform Level

New Lowered Floor Level

New GO Transit Concourse

Existing Train Platform Level

19

Page 21: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

Dig Down construction process

before during construction after

UNION STATION REVITALIZATION

20 Construction Department

03075-135-176

Page 22: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

UNION STATION REVITALIZATION

21

Page 23: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

UNION STATION REVITALIZATION

Existing

Future

22

Page 24: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

UNION STATION REVITALIZATION

Existing

Future

23

Page 25: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

GO Transit

Train Shed Roof

Revitalization

GO Transit

Train Shed Roof

Revitalization

Union Station – Precinct Projects

GO TRANSIT PROJECT

24 Construction Department

03075-135-176

Page 26: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

8.6 acre roof

GO TRANSIT - TRAIN SHED REFURBISHMENT

25

Page 27: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

Restore heritage sections

Rehabilitate/replace sections

New atrium section- Green

roof - Solar panels

GO TRANSIT - TRAIN SHED REFURBISHMENT

26

Page 28: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

GO TRANSIT - TRAIN SHED REFURBISHMENT

27

Page 29: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

GO TRANSIT - TRAIN SHED REFURBISHMENT

28

Page 30: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

TTC 2nd Platform TTC 2nd Platform

Union Station – Precinct Projects

UNION STATION SECOND PLATFORM

29 Construction Department

03075-135-176

Page 31: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

GENESIS OF SECOND PLATFORM PROJECT

30

Page 32: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

3rd Busiest Station in the system w/ 100,000 TTC daily trips and

200,000 daily GO transit trips and primary link to the PATH network

Narrowest platform in the system

GENESIS OF SECOND PLATFORM PROJECT

31

Page 33: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

Increase platform capacity by separating eastbound and

westbound passenger flow with a new second platform

At concourse level combine two paid fare areas into one

with two bypasses connecting to the City PATH system

New east automatic entrance

UNION SUBWAY STATION - SCOPE

32

Page 34: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

NEW PLATFORM STRUCTURE (BLUE)

33

U N I O N S U B W AY S TAT I O N Second Platform & Concourse Improvements Project

Page 35: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

Single Centre Platform Capacity Doubled By Added

New Second Platform

PLATFORM LEVEL SCOPE

EXISTING

PROPOSED

34 Construction Department

03075-135-176

Page 36: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

PLATFORM LEVEL OPERATIONS

35

University Bound Train

Yonge Bound Train

University Bound Train

Yonge Bound Train

Continuous Full Height Glass Art Wall

EXISTING

PROPOSED

Construction Department

03075-135-176 35

Page 37: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

Two Paid Fare Areas Consolidated Into

One Paid Fare Area

CONCOURSE LEVEL SCOPE

EXISTING

PROPOSED

36 Construction Department

03075-135-176

Page 38: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

Multi-Level Concourse Re-Designed Into

Single Level Concourse

CONCOURSE LEVEL SCOPE

EXISTING

PROPOSED

New Auto-Entrance

37 Construction Department

03075-135-176

Page 39: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

MAJOR MILESTONES

38

May 2011 – Start of Construction

May 2013 – Opening of First Phase of Concourse

October 2013 – Completion of Bulk Excavation

February 2014 – Permanent Power Connected

February 2014 – Commencement of Front Street Restoration

March 2014 – Completion of Major Concrete Work

Summer 2014 – Open New Second Platform

Summer/Fall 2014 – Rehabilitate Centre Platform

Early 2015 – Completion of Project

Page 40: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

TOTAL PROJECT BUDGET

Waterfront

Toronto*

City of

Toronto** TTC*** Total

Budget $137.5M $26.7M $64.2M $228.4M

Construction

Award Value $96.5M $7.8M $41.1M $145.4M

Contract

Changes to

Date $7.0M $16.3 $2.8M $26.1M

*Includes:

Second Platform and Concourse Improvements

**Includes:

Union Rail Station Revitalization Early Works Package

300mm & 600mm Water Main Replacement

Front Street Improvements (York to Bay)

***Includes:

Fire Ventilation

Bridge and Structures

Elev/Escal Rebuild

Elevator A/C

Collector Booth Improvements

ATC

Office Space Improvements

Subway Pumps

39

Page 41: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

MOAT STAIRS – MAY 2013 (STAGE 4C)

40

New Stair Area

Concourse Level

Page 42: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

MOAT STAIRS – NOVEMBER 2013 (STAGE 4C)

41

New Stair Area

Concourse Level

Demolished and

Excavated

Page 43: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

MOAT STAIRS – FEBRUARY 2014 (STAGE 4C)

42

New Stair Area

Concourse Level

New Station

Page 44: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

COMPLETED MOAT W/CANOPY

43

Page 45: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

Final Preparation for Finishes

NEW SECOND PLATFORM

Subway Trains Behind Barrier

44

Page 46: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

NEW SECOND PLATFORM

45

Page 47: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

NEW PLATFORM & CENTRE PLATFORM

46

New Platform

Centre Platform

Page 48: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

REFURBISHED CENTRE PLATFORM

47

Page 49: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

During Construction

•Barrier Free Accessibility is maintained to Platform level at all times

•Changes are signed, marketed, and electronically communicated

•Station Managers are engaged fully with barrier accessibility needs

•Wayfinding is clear and prominent

PLATFORM LEVEL ACCESSIBILITY

Elevators

Future

48

Page 50: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

During Construction

•Barrier Free Accessibility is maintained to Concourse level at all times

•Changes are signed, marketed, and electronically communicated

•Station Managers are engaged fully with barrier free accessibility needs

•Wayfinding is clear and prominent

CONCOURSE LEVEL ACCESSIBILITY

Lift

Future

Elevators

Future

Ramps Ramp

49

Page 51: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

ART WALL

50

Page 52: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176 51

Page 53: Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. · Finally, the TTC proposed a “rapid transit subway” beneath Yonge Street running from Eglinton Avenue south to Front

Construction Department

03075-135-176

QUESTIONS AND ANSWERS

52

Thank you

• Project Funding from: