Page 2 Index Sl. No. Particulars Page No. 1. Notice – Inviting EOI 3 2 Letter of invitation 4 3 Important instructions for the applicants 5 4 Eligibility Criteria 7 5 List of documents to be attached with EOI 8 6 Submission, Opening, Evaluation of Bids & Award of Contract 9 7 Covering letter for bid submission (Format-I) 13 8 Terms of Reference (TOR) (Format-II) 14 9 Technical Bid ( Format-III) 18 10 Key Personnel Details ( format-IV) 19 11 Schedule of Price Bid (Format-V) 20 12 Project Specific Conditions of the contract 21 13 General Conditions of the Contract 23 14 Earnest Money 26 15 Validity of EOI/Withdrawal of EOI 27 16 Stages of work activities 28 17 Variation for quoted price 30 18 Agreement of the contract 31 19 Termination of contract 32 20 Form of Agreement (Annexure-I) 33

Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page 2

Index

Sl. No. Particulars Page No. 1. Notice – Inviting EOI 3

2 Letter of invitation 4

3 Important instructions for the applicants 5

4 Eligibility Criteria 7

5 List of documents to be attached with EOI 8

6 Submission, Opening, Evaluation of Bids & Award of Contract 9

7 Covering letter for bid submission (Format-I) 13

8 Terms of Reference (TOR) (Format-II) 14

9 Technical Bid ( Format-III) 18

10 Key Personnel Details ( format-IV)

19

11 Schedule of Price Bid (Format-V) 20

12 Project Specific Conditions of the contract 21

13 General Conditions of the Contract 23

14 Earnest Money 26

15 Validity of EOI/Withdrawal of EOI 27

16 Stages of work activities 28

17 Variation for quoted price 30

18 Agreement of the contract 31

19 Termination of contract 32

20 Form of Agreement (Annexure-I) 33

Page 2: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page 3

NOTICE INVITING EOI

Ref .No. CMA/ADMIN/DELHI/2015 10thDecember 2015

The Institute of Cost Accountants of India (ICAI) invites EOI inprescribed formatsfrom bona-fide

Architectural firms/consultantfirms having requisite experience and

financialcapacityforexecutionofthefollowingworks :-

Sl. No.

Description Time of signing of Agreement

EMD (Rs.)

Tender fee (Rs.)

The last date of submission of Tender

Time and date of Opening

1 Selection of

Architectural ConsultantFirms asprojects consultantfor

preparation ofConceptualPlan, Drawings&Design, Estimation,DPR/Bid Documents/ Tendering/ FinalizationofBiddocument for the HVAC. Stage Craft, Stage Light, SoundSystem,Proje

ct System, e t c . of ICAI at

Sitapur,Jaipur.

Agreement shall be signed within 05 from date of issue of award letter.

Rs 30,000/-

Rs 2,500/-

_31st December 2015 Upto 3.00 pm

_31st December 2015 at 4.30 pm

EOIdocumentsshouldbesubmitted inseparatesealedenvelopealongwiththe costof tender

documentsand Earnest Money as mentioned abovethrough ademand draft drawn in favor of “The

Institute of Cost Accountants of India , New Delhi” from any Nationalized Bank .

Detailed notice with terms &conditions may beseen at our web site www.icmai.in

Page 3: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page 4

Letter of invitation

Architectural Firms/Consultant Firms are hereby invited to submit technical and financial

bids for Consultancy services required for Construction of Office Complex at

Sitapura,Jaipur for The Institute of Cost Accountants of India, which could form the basis

for future negotiations and conclusion of agreement of contract between the firm and the

Director (Administration), The Institute of Cost Accountants of India.

The purpose of this assignment is to obtain Architectural and Engineering services for

Layout preparation and Architectural Drawings for a structure of office space, to be located

in the city of Jaipur, covering plinth area of approx. 10,000sq. ft. including plans and

elevations,Structural Designs, Working drawings(civil, electrical, sanitary and water

supply),landscaping and the Estimates (detailed and Abstract). The Terms of Reference

(TOR) is enclosed in (format-I).

A pre-bid meeting will be held on 23rdDecember 2015 at 3.00PM in the Chamber of

Director (Administration), The Institute of Cost Accountants of India, CMA Bhawan , 3,

Institutional Area, Lodhi Road, New Delhi 110 003

Date and time for submission of sealed bids is 31stDecember 2015 (upto3.00 pm)

Sealed envelope bid super scribed with “Ref .No. CMA/ADMIN/DELHI/2015”

must be dropped in the tender box at the address mentioned below:

The Convener, Tender Committee The Institute of Cost Accountants of India CMA Bhawan, 3rd floor, 3, Institutional Area,

Lodhi Road, New Delhi – 110003

Sd/-

Director (Administration),

The Institute of Cost Accountants of India,

CMA Bhavan , 3, Institutional Area,

Lodhi Road, New Delhi 110 003

Page 4: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page 5

IMPORTANT INSTRUCTIONS FOR THE APPLICANTS

Unless the context otherwise requires, the term ‘Institute’wherever used in this

document, shall mean ‘The Institute of Cost Accountants of India’ or ‘ICAI’.

1. Proposed Institutional Building of ICAI (10,000 sq. ft.approx) at Jaipur.

2. The application form, the eligibility criteria and the detailed time schedule is available in the “Tender/EOI” section on ICAI’s web site www.icmai.in

3. Intending applicants are required to submit in duplicate their full bio-data giving details about their organization, experience, technical personnel in their organization, spare capacity, proven competence to handle major works, in-house computer aided design facilities etc. in the enclosed Formats.

4. The tender fee is Rs. 2,500/- non-refundable through a Demand Draft in favour of “The Institute of Cost Accountants of India, New Delhi” along with application form. Without tender fee, the application form will not be considered.

5. The ICAI reserves the right to accept any or reject all the applications without assigning any reasons whatsoever.

6. It is not obligatory on the part of management to accept the lowest offer. The ICAI may summarily reject any or all the offers against tender without

assigning any reason to the bidders participating in the tender.

7. As time is the essence of a contract, the ability and competence of the

applicants to render required services within the specified time frame, will be a major factor while deciding the selection of the Architects.

8. The application shall be signed by the person(s) on behalf of the organization having necessary Authorization/ Power of Attorney to do so. Each page of the application shall be signed.

9. If the space in the proforma is insufficient for furnishing full details, such information may be supplemented on separate sheet stating therein the part of the proforma and serial number. Separate sheets shall be used for each

part of the application.

10. Both the forms of applications (original and duplicate copy) shall contain copies of all the enclosures separately. In case of discrepancy between original & duplicate, the contents of the original shall be treated as correct.

Page 5: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page 6

The application forms issued by the ICAI/ downloaded from the website only shall be used for signature

11. The scale of fees payable for Comprehensive Architectural services shall include all the works i.e. Architectural Services including PMC, site development, Interior Architecture, Landscape Architecture, Graphic design & signage etc.

12. The Architect shall visit the site as and when required to inspect and render

necessary advice for the ongoing works. The fee payable to architect shall include charges for the visit to the site of the Project and / or for any meetings at branches/Regional Councils/Offices of ICAI, all travelling expenses, lodging & boarding expenses, local travel / transport charges up to the extent of minimum two visits per fortnight by architect.

13. Applications containing false and/or incomplete information are liable for rejection. The ICAI shall obtain the Confidential Reports from the clients of the applicants and inspect the works to verify the various details and the credentials.

14. Decision of the ICAI in regard to selection of the Architect shall be final. The ICAI is not bound to assign any reasons therefore.

15. Pre-qualified Architects will be allowed to participate in the commercial offers/bids for the proposed office Building work as per the instructions and brief to be issued subsequently. Selection of Architect for the project will be based on the evaluation criteria fixed by the ICAI.

16. Quotation/Bids must be valid till 90 days from last date of receipt of application forms i.e. 31st December 2015.

17. The Institute has right to increase/decrease the scope and size of work.

18. For any queries, the applicants may contact with Mr. S. C. Gupta, Director (Administration), Phone 011-24666108 or e-mail [email protected]

Page 6: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page 7

ELIGIBILITY CRITERIA The firms satisfying the following requirements only shall become eligible to bid the assignment. Clear evidences like photographs, certificates, documents should be submitted along with this bid. 1. Experience of consultancy services in Architectural drawings, structural designs and preparation of estimates for Building Complex of not less than 10,000 sq. ft. of plinth area in India 2. Positioning of Company/Firm with in India.

a) The Architect should have been registered and a Member of Council of Architects.

b) Income Tax returns for last 3 years

c) The firm should submit the evidence of employing at least the following personnel in last 2 years with specified qualifications.

i. One Senior Architect (B.Arch) having experience of not less than 5 years ii. One Junior Architect (B. Arch)–1

d) Should have an office ( branch/HQ) in Jaipur

3. The firm should have a minimum annual turnover of Rs. 30 lakhs.

Page 7: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page 8

List of documents to be attached with EOI

1.Firm/OrganizationInformation

a.FirmsLegalEntityandName

b.TypeofOrganization(Individual/Partnership/Pvt.Ltd./Limited/Corporation/

other[Pl.Specify(EnclosecopyofMemorandumandArticleofAssociation/Partnership

Deed, ifapplicable].

c.CountryofIncorporation/Registration

d.DateofIncorporation/Registration

e. Incorporation document orRegistration Number (Enclose copy of Registration

Document).

2. AnnualTurnoverduringeachofthelastthreeyearswithsupporting documents.

3. RegistrationofCompany.

4. Partnership deed/MemorandumandArticlesofAssociationofthefirmand theirdetails.

5.ServiceTaxRegistrationCertificate.

6. ISO9001-2000certificate(ifany).

7. OriginalPowerofAttorneyofthe personsigningthe EOIdocumentsorphotocopyduly

attestedbyNotaryPublic.

8. Details of similar works completed in last 5 years as per Format - III.

9.Detailsofon-goingworks.

10.CompleteEOIdocumentsincluding Formof bid etc.Duly stampedandsignedby

theConsultantoneachpage.

N.B:-Tenderingfirmswhichfailstosatisfythee ligibility criteriawill

bedisqualified for opening of their Price Bid.

Submission of Bids

Page 8: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page 9

a) The Proposal shall be in two parts i.e Technical Bid (Format-III) in cover-A and

Financial Bid (Format-V) in cover-B shall be submitted in two separate wax sealed

envelopes (with respective marking in bold letters) in the formats.

b) A demand draft for Rs.30,000 drawn in favor of The Institute of Cost Accountants of

India , New Delhi from any Nationalized Bank towards E M D shall be enclosed to

the Technical bid alognwith Demand Draft of Rs.2500/- on account of tender fee.

c) Both the sealed envelopes cover-A and cover-B should again be placed in a cover-

C and the same shall be sealed with wax and dropped in tender box at the Institute

of Cost Accountants of India, CMA Bhavan, 3rd Floor, 3, Institutional Area, Lodhi

Road, New Delhi 110 003 before 3.00 pm of 31st December 2015

d) The documents as mentioned earlier, shall be furnished along with the technical

bid.

e) The formats I, II, III, IV duly signed by the firm with stamp, shall be furnished in

Cover-A.

Opening of Bids

The Cover-A containing Technical Bid will be opened by the Director (Administration),

ICAI,4.30 pm on 31stDecember 2015 in presence of all bidders who ever participated in

bidding or their authorized representatives having brought proper letters of authorization to

participate in the bid opening event.

Page 9: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

10

Evaluation of Bids

The evaluation will be done on the basis of 100 points each for Technical bid and

Financial bid.

The following is the breakup of 100 points in respect of technical evaluation :

i) 10 points per project will be assigned for completed Projects (subject to maximum of 50

points).

The project is defined as the office building having not less than Built up area of 10,000sq.ft.

ii) 30 points will be assigned for creativity (the firms shall produce the creative drawings

they have generated so far) .The buildings having 10000 sq. ft.will be evaluated by a

senior of the Department and the Evaluation Committee will assign the points as per the

actual photographs.

iii) 3 points for each Architect (B.Arch.) employed by the firm (subject to maximum of 15

points).

iv) 5 points will be assigned for Location of office at the place of work / project site.

QualifyingMarks :

TheConsultantfirmwhichshallsecureminimum50marks outof100marksasfixedfor

qualificationin"Technical evaluation"willbeconsideredeligible.However,forthepurposeof

openingoffinancialbidtherewillbeashortlistingofqualifyingfirmstoatleastthreeorany

numberdeemedsuitablebytheinstitute'sauthority.

The financial bids of the technically qualified bidders will be opened after intimating

to all the qualified bidders.The first lowest (L1) will be assigned 30 points (i.e., the

highest points allocated to price bid) , and the other bidders will be assigned marks

on pro-rata /percentile basis.

Basedon the combinedTechnical&Financialscores( i.e. 70 % of Technical score & 30 % of Financial score) finalselectionwillbe made.

Page 10: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

11

For example, five consultant firms A, B, C, D & E are technically qualified and out of 100

pointsof technical bid, they have obtained 70, 75, 80, 85 & 90 marks respectively.

Now, they have quoted their price bids5%, 6%, 7%, 8% & 9% respectively for their

consultancy charges.

Out of 100 points of price bid, marks of the consultants will be ascertained as under :

Sl. No. Name of the Consultants Rate quoted Marks obtained

1 A 5% 100 X 5/5 = 100.00

2 B 6% 100 X 5/6 = 83.33

3 C 7% 100 X 5/7 = 71.43

4 D 8% 100 X 5/8 = 62.50

5 E 9% 100 X 5/9 = 55.56

Total marks will be calculated as under : Sl. No. Name of the

Consultants

Technical marks (a) Financial marks (b) Total marks (a+b)

1 A 70.00 X 70% = 49.00 100.00 X 30% = 30.00 79.00

2 B 75.00 X 70% = 52.50 83.33 X 30% = 25.00 77.50

3 C 80.00 X 70% = 56.00 71.43 X 30% = 21.43 77.43

4 D 85.00 X 70% = 59.50 62.50 X 30% = 18.75 78.25

5 E 90.00 X 70% = 63.00 55.56 X 30% = 16.67 79.67

As per the above table, Consultant E will get the final order, being the highest

scorer.

Note :In case of any tie in the score ( Technical + Financial ) the higher

technical scorer of the among will be selected.

Page 11: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

12

Award of Contract The firm which gets highest points (Both points obtained in technical and commercial bid put together) will be decided as the prospective bidder for further decision on awarding of contract. The Director (Administration), ICAI may reject any / all of the bids received without assigning any reasons whatsoever. Validity period of Bid and of Agreement :

• 90 days shall be the validity period of bid from the date of opening of the technical bid.

• 14 months shall be the validity period of agreement from the date of concluding agreement.

On award of the contract, the Firm will be expected to take up/commence the assignment within 5 days.

Page 12: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

13

Covering letter for bid submission (Format-I)

Ref. No._______________________

From

To

The Director (Administration),

The Institute of Cost Accountants of India,

CMA Bhavan , 3, Institutional Area, Lodhi Road, New Delhi 110 003

Sir,

Sub:- Architectural and Engineering Consultancy Services- forthe Construction of

Office Complex for The Institute of Cost Accountants of India at Jaipur

tender submission –Reg

Ref : Notice No. _______________________________________

I / We _______________________________________ Consultant /Consultancy firm /

organization herewith enclose technical & financial bids of my/ our firm as Architectural

and Engineering consultant for the Construction of Office Complex at Jaipur

Yours faithfully,

Signature

Full Name

Rubber stamp

Address with contact no:

Page 13: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

14

TERMS OF REFERENCE (TOR) (Format-II) Sealed tenders are invited for the work “ Providing architectural andengineering services to

Construction of Office Complex at Jaipur for The Institute of Cost Accountants of India

1. Background:

The Institute of Cost Accountants of India has a land parcel of 1500 sq. mt. land for

construction of the office of The Institute of Cost Accountants of India. 10000

square feetapprox Built Up Area and the project shall be completed within 12

Months. The Institute of Cost Accountants ofIndiaintends to engage consultants

forrendering Architectural and Engineering Services.

2. Scope of work :

a) The Consultant is required to prepare detailed plans followingprinciples of building

science , working drawings forconstruction, fire fighting details, estimates, and

structural designsand drawings for all civil, electrical, water supply and

sanitaryarrangements and site development plans for the sites including landscaping .

b) The plans shall include Eco-friendly, Green Buildings, costeffective, fast constructive

technology concepts and it shall satisfy theN B C and all relevant IS codes.

c) Preparation of sketch plans:

i) Take details from The Institute of Cost Accountants of India

ii) Prepare Architectural sketches within the zone / area limitationsprescribed and

also prepare notes sufficient to explain theArchitects general understanding of

the requirements furnished tothem so as to ensure economical, functional,

unique and eco-friendlygreen buildings.

iii) Discuss the draft sketches with the departmentand make such modifications as

suggested.

e) Preliminary drawings:

i) Prepare a detailed plan showing contours, invert levels wherevernecessary and

roads proposed. The detailed plan shall include allnecessary data relating to the

existing public utility services,streets, pavements, adjoining properties and

boundaries.

Page 14: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

15

ii) Prepare preliminary architectural designs for the proposed newconstruction.

iii) Participate in the discussions for clearing the preliminary designsand carry out

the modifications required .

f) Working drawings:

i) Architectural drawings: After obtaining clearance from The Institute of Cost Accountants

of India for the preliminary designs,theconsultant shall submit the detailed Architectural

drawings withelevations, sections and all the relevant details necessary forexecution of

work.

ii) Municipal Drawings: The Consultant shall also prepare theMunicipal Corporation

drawings for obtaining permissions from theconcerned Municipality.

iii) Electrical layout: Preparation of electrical layouts showing theentire distribution system

including internal and externalelectrification details and designs of substation etc.

iv) Sanitation and water supply layouts: preparation and Supplyof layout plans of internal

and externalwater supply and sanitary arrangements.

v) Fire Fighting: Preparation of schematic proposals showingprovision to meet

requirements for the fire fighting regulations andobtain permission from the competent

authority.

vi)Land use Drawings: Drawings showing areas to be landscaped,water bodies, buildings

etc., shall be indicated. All the requireddetails should be shown in the site development

plans / land usedrawings, water harvesting, soil conservation.

3. Schedule for Completion of Works:

i) Entering into Agreement: The selected Firm shall enter into contractwith The Institute of

Cost Accountants of India within 5 days from the dateof award of assignment

ii) Survey, Net levelling 7 days from the date of award ofincluding contour plan:

consultancy.

iii) Preliminary Design: 10 days from the date of obtainingclearance for the sketch plans.

iv) Working Drawings, 10 days from the date of approval andEstimates final drawings: of

preliminary drawings

iv) After the preliminary designs have been evolved, the same will bediscussed with the

Municipal Corporation/Rural Development Department in respect offunctional

requirements and aesthetical requirements of theproposed structure.

Page 15: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

16

v) The consultants should revise the preliminary designs dulyincorporating any

suggestions/ modifications made in the meeting.

4. Deliverables :

The following final outputs shall be furnished to The Institute of Cost Accountants of India.

i) A concise design report duly mentioning the arrangement ofvarious rooms,

office rooms, toilets, conference halls, staircaseetc., HVAC, firefighting,

Engineering Services, site developmentworks including internal and external

amenities such as watersupply and sanitary arrangements and sewerage, Air

conditionsand garbage disposal and electrical services provided,underground

drainage system and Earthing etc.

ii) Preparation of preliminary drawings, initial site visits before start ofwork, site

survey, preparation of site plan, net levels, contourmaps, discussions with user

group, preparation of detail finalArchitectural, structural, water supply and

sanitary arrangement(internal & external) drawings.

iii) Minimum of 20site visits works during assignment and theexecution of works at

appropriate intervals and as and whenrequested by The Institute of Cost

Accountants of India. The site visits mentioned aboveare minimum and

consultant is expected to visit to give clearanceto all structural foundation

problems which cannot anticipatedin advance and all major RCC items such as

beams, slabs,footings and porticos.

iv) Five sets of approved preliminary drawings showing the layoutsand floor plans

along with a site development plan showing thelayout of building, internal

roads, electrical, water supply sanitaryand drainage lines etc.which shall be

used for execution of work

5. Review Meetings:

The consultant shall attend Review meetings that will be conductedperiodically by the

Department in the present office of the Director (Administration), ICAI or at the worksite.

6. Penalty for delay:

For any delays in completing the tasks statedin para( 3) – Schedule for completion of work

above by the consultant, a penalty of Rs. 500/- perday shall be levied.

7. Terms of Payment:

Page 16: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

17

i) 5% of total fee: On submission of preliminary architectural drawings. indicating

the outlines of the existing site includingstructures

ii) 10% of total fee: On approval of the preliminary architecturaldesigns by the RDD

and on submission of final architecturaldrawings, site development plan and

architectural design report.

iii) 30% of total fee: On approval of final architectural drawing andon submission of

final architectural working drawings along withthe water supply and sanitary, Air

conditioning, fire fighting,electrical and municipal drawings.

iv) 30% of total fee: On submission of detailed structural analysis,designs, drawings

along with water supply and sanitary design calculations and on approval of

drawing & designs and on submission of detailed estimates for civil, electrical,

water supply and sanitary arrangements (Internal & external) fire fighting and

other developments work.

v) 25% of total fee: On completion of the entire work. This part payment will be

made only when the building gets completed in all respects.

vi) All payments shall be made on furnishing of invoices by the consultant in

duplicate for respective stages.

Technical Bid ( Format-III)

Page 17: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

18

Ref.No. _______________

Details of Assignments of 10,000 Sq. ft. Building complexes successfully Completed

During Last 5 Years

Note: 1) Please attach certificates issued by the client and the photographs of each

assignment with this format.

Signature

Full Name

Rubber stamp

Address with contact no:

Sl.

No

Name of

the

Assign

ment

Location

of the

Assign

ment

Total cost

of

Assignme

nt

Type of

services

rendered

Name,

address

&

contract

nos. of

clients

Date of

commenc

ement of

the

project

Date of

completion

of the

project

Remarks

Page 18: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

19

Key Personnel Details ( format-IV)

(This shall be enclosed to Technical Bid)

Ref .No._________________________

1) Brief Description of the Firm:

2) Technical Staff :

Sl. No. Full Name Designation/

Position

Age Educational

qualifications

Contact

number

Remarks

Signature

Full Name

Rubber stamp

Address with contact no:

Page 19: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

20

SCHEDULE OF PRICE BID (Format-V)

Ref. No._______________________

Name of work: Providing Architectural/ Engineering Consultancy services for

The Office Complex of The Institute of Cost Accountants of India at Jaipur

Sl. No

Assignment/task Amount quoted for consultancy services ( in Rs)________________ ( in

Figures) per square feet Area

Amount quoted for consultancy services (in Rs.)

______________________________________________________ in words per square

feet Area

1 Providing architectural and Engineering services for Layout preparation and Architectural

Drawings for the Office Complex of The Institute of Cost Accountants of India at Jaipur

with a Built Up Area of 10000sq. ft. approx. including plansand elevations , Structural

Designs, structural drawings and Working drawings (civil, electrical, sanitary and water

supply),landscaping and the Estimates (detailed and Abstract)including preparation of

Municipal plans, all site visits prior to commencement of work and during execution of work

and all tasks, deliverables mentioned inThe terms of reference (TOR) etc. complete.

Signature

Full Name

Rubber stamp

Address with contact no:

Page 20: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

21

PROJECT SPECIFICCONDITIONSOFTHE CONTRACT

1.TheConsultantshallprepareapreliminary planwhichshall befurther modifiedondiscussion

withICAI.Concept ProjectReport(CPR) shallenvisagetheconceptual requirements

oftheProject in totality. Consultant shall prepare Concept Project Report(CPR)

comprising of conceptual plan/designbasis.Takingcareofamalgamating

withexistingfacility,ifrequired.

2.PreparationofPlanforvariousfacilitiesasperdiscussion withtheofficialsofICAIin connection

with the HVAC,StageCraft, StageLight, SoundSystem,ProjectSystem.

3. The Detailed Project Report (DPR)willcomprise of all the elements covered under

approved CPR, and would be detailedtothemicrolevel.Anyadditions

requiredintheapprovedCPR,wouldalsobetakencareof intheDPR.

4.Preparationofdetailed design,detailed drawings forapproval ofICAI andworking drawings

for execution. All the design, details forseminar hall- architectural designing, services

scheme forfinishesetc.,shall beprovided withdetailed calculations intherequired

mode,inboth hardandsoftcopies.

5.Acomprehensive BillofQuantities (BOQ)including measurementscontaining the

description of item,referencetoscheduleofrate,unit,quantity, rateanalysisfornew

items,ifanyfordetailedexecution shallbeformulated forimplementation.Tenderdocument

inone set (one hardcopy duly signed and one soft copy in reproducible form) shall be

prepared and submitted inconsultation withICAI.

6. Onetracing ofeach drawing withsix whitecopies/blueprintsofeach drawing and Billof

Quantities, detailed specifications&relevant documentswithtworeproduciblesoft copies

shall be supplied bytheconsultant.

7.Theconsultant shall submit three hardcopies of the Final design calculationsandtwo

soft copiesintheCD-R.

8.The number of copies and the style/modusin which the drawings &documentsshall be

providedaredetailedhereininthedocumentforcompliance.

9.Theconsultantshallprovideinputsforchanges ifanyorderedduring thesequence

ofworkand other relateddetails toICAIwithout any additional fee. project workindicating

start and completionoftheworkshallalsobeprovidedanditsrevision ifrequired.Timely

releaseofdrawings aspersequenceincludingthosenotspecifically mentioned

Page 21: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

22

butrequiredforthecompletionofJoband alliedspecialized services, shallbeensured

bytheConsultant.Allcoordination,insertion, approvalfordata,drawingsubmitted

byvendorsofHVAC,StageCraft,StageLight,SoundSystem,Project

System,SittingArrangementshallalsobeaccomplishedbytheconsultant.

10.TheConsultant shallmake periodic visits.at leastf o u r t i m e s ineach month athiscost

during the workoraspermutually agreedschedule ofvisitsduring

theperiodofworkandanyvisitthereafter.Heshallalsodepute aexperienced

Architect/Engineerhaving seven yearexperienceinthefieldof

projectdevelopmentandshall bewellversedwithautocadandcomputersandshall

bestationed at ICAIduringthe periodofwork tointeract with ICAIofficials orotheragency

deployed by ICAIondaytoday basisathisowncost.In case the Architect deployed remains

absent for more than 15 days from site of work , a penalty of Rs. 2000 per day shall be

levied and which will be adjusted from the payment due.

11.These periodic visits exclude the visits required during preparation &approval stages

of CPR/DPR andpreparation ofcompletion report/drawings.Nothing extrashall

bepaidforanyvisits andICAIwillintimatethescheduleofvisitsfromtimeto time.Forco-

ordination/clarification/meetingsatworksites,ICAIoffice,nothingextrashallbepaid.

Page 22: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

23

GENERALCONDITIONSOFTHE CONTRACT

1.TheConsultant shallberesponsible forthecollection ofrequired

data,normsfortheworkfrom allconcernedsourcesasmaybeneededforsatisfactory

accomplishmentoftheproject.Consultant i s required todecide

necessarymodificationinthedesign &drawings.Consultantshall takethis into account

whilequotingtheirrates.

2.IncaseICAIdesirestocarryoutcertainstudies/modificationsforimproving thesystem,

economy andoptimizationetc.,theseshallbedeemed tobeincluded within

thescopeofConsultant withoutanyadditional fee.

3.TheConsultant shalltakeintoaccount andkeepallprovisions

forfutureexpansionasproposed by ICAI.

4.TheConsultantshallbefullyresponsibleforadequacy,accuracy,qualityandsafetyofentire

professionalservicesperformedandendorsesnecessarycertificationondrawingsandd

ocumentsthat allrequirementshave beenmetwith.

5.Allthestagesoftheconsultancy workshall becompleted bytheConsultant including its

approval bytheClientsaccordingtothetime schedulemutuallyagreed

upon.Consultancywork tillcompletion

shallbeaccomplishedasperscheduletreatingtimeasessenceofthe contract.

6.TheConsultantwilladvise ICAIonany changeneeded inthetimescheduleforworks as

preparedbytheexecutingagencyforthecompletionofthework,soastoachievethetargetsetfor

completion.

7.TheConsultantshallassumefull responsibilityforthedesign/drawingandtechnical

specification/BOOascoveredintheirscopeofwork.ICAIshallreservetherighttohave

accesstothecalculationsanddesigns pertainingto ElectricaloftheConsultant shall renderall

possibleassistance/accessto the ICAIinthis regardandendorse necessary certificates

specifyingtherelevantcodethatthesehavebeenmetwith.

Page 23: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

24

8.TheConsultantshalladviseICAIregardingtheworkunderexecutionduringvisits tothe

siteandsubmitperiodicreports.

9.TheConsultantshallnotmakeanydeviation,alterationoromissionfromthe

approveddrawings, involvingfinancialimplicationswithoutpriorconsentofICAI.

10.TheConsultantshallexerciseallreasonableexpertise,careanddiligenceinthedischargeofh

is

dutiesandshallexercisesuchgeneralsuperintendenceandinspectioninregardtosuchworksas

may be necessary to ensure that works are being executed in

accordance with drawings/designs/documentation.

11.TheConsultantshall makenecessaryrevisionsasmayberequired byICAIand/or

requiredduetositeconditions,inthedrawingsandotherdocumentssubmittedbyhimatthedraft

stage.Anysubsequentrevisionsinthedrawingsanddocumentsetc.onceapprovedbutrequired

tobe madebyICAIshallbeundertakenbytheConsultantwithoutanyadditionalfees/claims.

12.ICAIshall havetherightto postponeorabandonexecution ofany workandthe

consultantshallnotbeentitledtoanycompensationagainstitexceptthefeeswhicharepayableto

theConsultantuptothestageofservicesalreadyaccomplishedandcertifiedbyICAI.

13.ICAIhas therighttogetthedesignapproved/checkedbyreputedindependentagencies

atitsowncost.Inthatcase,itwillbe theresponsibilityoftheConsultanttodeputetheirexecutive

andfurnishnecessary

clarifications/calculation/assistancefortheapprovalofthedrawings/design

calculationsandnoextrapaymentshallbepayableonthisaccount.

14.AnymodificationasrequiredbyICAIinthebasemodelandconceptdesignshallbe

carriedoutbyConsultantandnoextrapaymentshallbe admissibleonthisaccount. Engineerin

charge of ICAIshall have powers to make any alterations, omission, addition to or

substitution from the original work and no claims whatsoever on account of above shall

be entertained,exceptthepaymentfortheworkdonedulyacceptedandcertifiedbyICAI.

Page 24: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

25

15.ObtainingapprovaloftheplansfromtheconcernedLocalAuthorities.ICAIshallpay

statutoryfeesonproductionofthedocumentfromrelevantauthorities;howeverobtainingapprov

al fromtheauthorityremainstheresponsibilityoftheConsultant,ifrequired.

16.TheConsultantshallprovidereviseddrawingsasandwhenrequired.

17.TheConsultantshallprovideliaisonwithconcernedstatutoryauthorities&gettingapproval,if

requiredfor

18. TheConsultantshouldbewellconversantwithCPWDSpecifications/Tender

procedures.The

Consultantshallobtainallstatutoryapproval,sanctionsetc.,asandwhenrequired/directedbyIC

AIwithoutcausinganydelaytothesmoothprogressofthework.Drawingspreparedbythe

Consultantshallshowallnecessarydetailssothatnothingislefttothediscretionoftheworking

contractor.

19.TheConsultantshallsubmitthelist andCVsoftheirEngineers/stafftobeposted/proposedfor

thework.Thestaffsoproposedshallcontinuetillthecompletionofwork.Changes/Replacement

due toResignation/RetirementonsuperannuationetcshouldbeintimatedtoICAIwellintime.

Competentand

experiencedpersonsshouldbeassignedfortheproposedjobafterobtainingapproval

inwritingfromICAI.

20.The

Consultantshallprepare/submitalltherelevantdrawingsateachstageofworkinrespectof

HVAC,Stage Craft,Stage

Light,SoundSystem,ProjectSystem,SittingArrangementasand whendesiredbyICAI.

21.Consultantshallattendat worksite/ICAIall meetingsasshall benotified

byICAIandincorporatetheamendmentsthereof.Priceisinclusiveoftheaboveandnothingextra

willbepayable.

22.Consultantshall ensurewhiledesigning thecampus to protectthe existing treesas far as

possible.

EarnestMoney

Page 25: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

26

TheConsultant mustfurnish the Earnest Moneyasspecified,failingwhichtheEOIshallbe

rejected.

NointerestshallbepaidonEarnestMoneyDeposit.

ForfeitureofEarnestMoney:

Earnest MoneyoftheConsultant shall beforfeited ifhewithdraws his EOIduring the

periodofEOI validityperiodasperappendixorextended validityperiodasagreedtoin writing

bytheConsultant.

TheEarnestMoneyofthesuccessfulConsultantisliabletobeforfeitedifhefailsto

signtheContractAgreementinaccordancewiththetermsoftheEOI

or

doesnotcommencetheworkwithinthetimeperiodstipulatedintheEOI.

IncaseofforfeitureofEMD,theConsultantfirmsshallbedebarredfrombiddingincaseofre-

invitationoftheEOIs.

ReturnofEarnestMoney:

TheEarnestMoneyoftheunsuccessfulConsultantsshallbereturnedaspromptlyaspossible.

TheEarnestMoneyDepositofthesuccessfulConsultantshallbedealtasunder:-

TheEarnest Moneyafter acceptance ofthe EOIshall beconverted inRetention

Money.EMDconverted into

Retentionmoneyshallberetainedtill12monthsbeyondthecompletiondateofthiswork

Page 26: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

27

Validityof EOI

IthastobekeptopenasperappendixtoEOlafterdateofopeningofEOI.notwithstandingthe

aboveclause,ICAImaysolicittheConsultant's consent toanextension ofthevalidity

periodoftheEOI.Therequestandtheresponseshallbemadeinwriting.

Work,Job,Consultantwork,issynonymous.

Withdrawalof EOI

NoEOIshallbewithdrawn bytheconsulting firmafter submission andduring EOIvalidity

period.

Page 27: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

28

STAGESOFWORK ACTIVITIES

1. PreparationandFinalizationoftheProjectsinconsultationwithICAI.

2.Toobtaincompletebriefregardingthedetailsofrequirementandsiteconditionsthrough

discussionwithICAIincludingsitesurveyetc.(where necessary), planning,designingand

preparationofthelayoutplanforArchitecturalworksincludingnecessaryrevision(s)tillthelayout

is finallyapprovedbytheClientand/orLocalStatutoryAuthorities.

3.Preparationofpreliminaryestimatebasedontheconceptualdrawingsonthebasisofplinth

arearatesavailablewithCPWDupdatedbyappropriatecostindexforthesaidarea.

4.PreparationofdrawingsforobtainingtheLocalAuthoritiesapproval,if required.

5. ICAIcan appoint an expert to check the design and allied services of the

consultantandany

variationsduetothishastobeincorporatedbyconsultantwithoutanyadditional

cost.Thedecision ofICAIauthorityshallbefinalandbindingontheconsultant.

6. Planning designingand preparation of workingdrawing for all worksfor

unhindered executionofproject after itsaward

totheContractorsforexecutingtheworks.

7.Planning designingand preparationofworkingdrawingsforall

worksincludingplanningoftheprotectionserviceswhereverrequired.

8. Issuing sixsets ofgood for working/detaileddrawingsforall works and

servicesand one setofdrawingsontracingpaperalong withthedesign

calculationsforthese works.

9.Anyotherdocument/drawingrequiredforexecutionandcompletionofwork.

10.Preparationofcompletetender documentand supply ofdraft tender

documentboth inhard andsoft reproduciblecopy.

11.The Consultantshall submit adetailedtechnicalreport for the scrutinyby

ICAIalong with preparationof conceptschemesof all the servicesto be

submittedin stagesat least 4 weeks in advance of concerned activity. In

thisreport, basis for adoption of various norms, calculationsheets etc.,shall

beenclosed.Atnostage,theexecutionofthework shouldbeheld

upforwantofdrawingsfrom theConsultant.

Page 28: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

29

12.Preparation of completion drawings for all the works completed (as built)

as above and submissionof03copiesofsuch drawingsand one transparency.

One soft copy of all the drawings should also besubmittedonCD-R foroffice

records.

13.Alldrawingsshall beprepared onupdated version ofauto-CADand

structuraldesigningbedone on computeralong with hand calculations. A

softcopy of the same shall be provided to ICAI.

14.Obtaining allthestatutoryclearanceorotherwiserequiredforexecutionofthe

proposedworks or foroccupationaftercompletionofworkshall

bethedutyoftheConsultant,ifrequire.

VARIATION INQUOTED PRICE

Page 29: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

30

1. The paymentshall be made to theconsultantinitiallybased on the estimatedcost

of works on percentagerate basis. This will beadjusted(+/-) based on awarded

value of work. The finalpaymentwillbeagain adjustedbasedoncompletedvalue

ofbuilding(withoutanyescalation).

2.TheConsultantshall bepaidonly theamountadjustedasperthe payment terms, as mentionedabove.

3.RATESTOBEALLINCLUSIVE: Theratesquoted bytheConsultant shall befinalandremained fixtillcompletion ofthe work.

Anydescription Ielaboration of itemof work not included inthescope ofworkor in

describing theBOQitemshall notbeaground foranyextra payment. TheConsultant

shouldnotethisaspectandquotetheirrateaccordingly.Payment shall strictly be made as

per the terms and beyond that nothing extra shall be paid.

Theratesquotedshallalsobeinclusiveofalltypesofdirectandindirecttaxes

imposedbyCentral/StateGovt.andlocalbodies.

However.anystatutory variation inand/orfresh impositionofsuchlevies/taxes relevant

tothiscontractshall bepaidonactual basisbyICAIaftersubmission ofdocumentary

proofsbytheconsultantandverificationofthesamebyICAI/Engineer in charge.

4. Nopricevariationwillbeadmissible

AGREEMENT

Page 30: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

31

TheConsultantshallenterintoandexecutetheagreement intheformofagreementas perAnnexure-

Iwithin 5days from thedate of issueof award Letter.The

stamppapersoftherequisitevalueaspertheprevailinglawsshallbeprovidedbytheConsultantathis

owncost.Original agreementshall beretained bytheICAI/Engineer inchargeanda

certifiedcopyshallbemadeavailableto theConsultant.

TERMINATION OF THE CONTRACT

Conditions leadingtotermination ofcontract :-

Page 31: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

32

IftheConsultant

a.Becomesbankruptorinsolvent,or,

b.Makesarrangements withorassignment infavour of hiscreditor, oragrees tocarry outthe

contract underacommitteeofinspectionofhiscreditorsor

c.Beingacompanyorcorporation goesintoliquidation byaresolution passed bytheBoardof

Directors/General Bodyoftheshare-holdersorasaresultofcourt order(other than voluntary

liquidation forthepurposeofamalgamation orreconstruction);or

d.Hasexecution leviedonhisgoodsorpropertyortheworks,or

e. Assigns or sublets the contract or any part thereof otherwise than as provided for under

conditions ofthiscontract,or

f.Abandonsthecontract,or

g. Persistentlydisregards instructions of the Engineer/ICAIor contravenesany provisionsof

the contract,or

h.Failstoadheretotheagreed programmeofworkorfailstocomplete theworksorpartsofthe

works within thestipulated or extended period of completion,or isunlikely tocomplete the

wholeworkorpartthereofwithintimebecauseofpoorrecordofprogress;or

i.Failstotakestepstoemploycompetent and/oradditional staffandlabour,or

j.Promises,offersorgivesany bribe,commission, giftoradvantage,eitherhimself orthrough

hispartners,agentsorservants toanyofficer oremployeeoftheEngineer ortheICAI,

ortoanypersonontheirbehalf,inrelationtoobtaining orexecution ofthisoranyothercontract

withtheICAI,or

k. Suppressesor gives wrong information while submitting the EOI. In any such case the

EngineeronbehalfoftheICAImayservetheConsultantwithanoticeinwritingtothat

effectandiftheConsultant doesnot,within7daysafterdelivery tohimofsuchnotice,proceed

tomakegoodhisdefault insofarasthesame iscapable ofbeing madegood,andcarryonthe

workorcomplywithsuchinstructionsasaforesaid

totheentiresatisfactionoftheEngineer,ICAIshall beentitled aftergiving48hours

noticeinwriting toterminatethecontract, asa wholeorinpartorparts(asmaybespecified

insuchnotice).

Annexure –I

FORMOFAGREEMENT (Tobe executedonrequisite valueofstamp papers)

AGREEMENT

Page 32: Revised EOI ICAI JAIPUR TC - competitionline · 2019. 4. 4. · Drawings &Design, Estimation, DPR/Bid Documents/ Tendering/ FinalizationofBiddoc ument for the HVAC. Stage Craft, Stage

Page

33

THISAGREEMENTmadeon dayof (Month/year)between,ICAI oftheonepartand_______________(nameandaddressoftheConsultant) (hereinafter called"theConsultant")oftheotherpart. WHEREASICAIisdesirousthatcertainworksshouldbeexecuted bytheConsultantviz. ContractNo. (hereinaftercalled"theWorks",andhasacceptedaBidby the Consultantfor theexecution and completion of such Works and the remedying of any defects therein. NOWTHISAGREEMENTWITNESSETH asfollows: 1. Inthis Agreement, words and expressions shall have the same meaning as are respectively assignedtothemintheConditionsofContracthereinafterreferredto. 2.Thefollowingdocumentsshall bedeemed toformand bereadandconstrued as partofthisAgreement: a)LetterofAcceptanceofEOI b)NoticeInviting EOI c)InstructionstotheConsultants d)Formsofbids d)ConditionsoftheContract e)BillofQuantities 3. InconsiderationofthepaymentstobemadebytheICAItotheConsultantashereinafter mentioned,theConsultant herebycovenants withtheICAItoexecute andcomplete the Worksand remedyany defects therein inconformity inall respects with the provisionsofthe Contract. 4. TheICAIherebycovenantstopaytheConsultantinconsiderationoftheexecutionand completionoftheWorksandtheremedyingofdefectsthereintheContractPriceorsuchothersum as may become payable under the provisionsof the Contract at the times and in the manner prescribedbytheContract. INWITNESSwhereofthe partieshereto havecaused this Agreementexecutedthedayandyearfirstbeforewritten. (Name,Designationandaddress(Name,Designationand address oftheauthorizedsignatory) oftheauthorizedsignatory)

Signedforand onbehalfofthe Signedforand onbehalfofthe Consultantinthepresenceof: ICAI in the presence of Witness: Witness:

1. 1.

2. 2.