Acknowledgements and Author’s Note
Any mistakes which appear in this report are to be regretted and are due to errors and
omissions on behalf of the author and in no way can be attributed to those interviewed. The
analysis and views expressed are the views of the author only and based on a limited period
of study between September and November 2012. It is hoped that the report will provide a
stimulus to West Sussex County Council to develop further their approach and capacity in
Facilities Management.
West Sussex County Council
Review of Facilities Management
Contents
Executive Summary 1
1 Introduction 2
1.1 Purpose of Document 2
1.2 Format & Content of Report 2
1.3 Review Scope & Methodology 3
2 Overall Context 3
2.1 WSCC Strategic Policies and Objectives 3
2.2 Resource Context 4
3 Summary of Current Situation 4
3.1 Overall Purpose of FM 4
3.2 FM Delivery Model 5
3.3 Organisation, Establishment & Operating Costs 7
3.4 Problems & Pressures 8
4.0 Audit of FM Function 10
4.1 The Audit Process 10
4.2 Overall Findings 11
4.3 Strengths & Weaknesses 11
4.4 Detailed Audit 14
5.0 Comparative Analysis 23
5.1 Outline of Approach 23
5.2 Profile of ‘Comparator’ Organisations 23
6.0 Looking Forward - Options for The Future 25
6.1 Immediate Short-Term Priorities 25
6.2 Articulating Options for the Medium-Term 25
6.3 Summary Evaluation of Options 29
Appendices
A FM Team Structure Chart 32
B Profiles of Comparator Organisations 33
West Sussex County Council
Review of Facilities Management
1
Executive Summary NPS Property Consultants Ltd (NPS) were asked to undertake a review of West Sussex
County Council (WSCC) facilities management (FM) function with some limited comparative
analysis and to identify broad options for the future development of the service. The study
was undertaken between September and November 2012. The review of the FM Team was
undertaken as an ‘audit’ at an individual activity level drawing together available data on
volumes, costs and funding sources.
The FM Team has an establishment of over 90 staff with an annual revenue cost of £2.48M
for the year 2012/13. It undertakes the broad range of FM activities; including both ‘hard’
and ‘soft’ FM with a delivery model which can be described as a ‘mixed economy’ with a
strong internal client capacity and use of external contracts where these represent value for
money. WSCC has recently implemented a ‘corporate landlord model’ and there is
centralisation of all buildings related expenditure managed through the FM Team.
The capacity and experience of the FM Team is commensurate with its role and most
activities are operating well; with perhaps only a few areas of risk – FM information and
catering – both of which are recognised and where work is in hand to secure improvement.
There may be a lack of resilience as individual teams within the FM function are working at
full capacity and any extended absences could cause problems. The FM Team has a strong
senior management leadership across all its activities; the area-based delivery model and
close liaison with building users is effective and the service is generally well regarded.
In the immediate short-term there is a requirement to consolidate existing arrangements
and to ensure all aspects of the FM function are working effectively. In the longer term there
are a broader range of options. The choice of these is dependant on WSCC’s attitude to
three key questions – the size of the retained FM capacity; the extent and nature of
externalisation and the willingness to work with other partner organisations in the public
sector. The response to these questions is as much a ‘philosophical’ as an ‘efficiency’ one
and will shape the broad direction in which to develop the FM service.
West Sussex County Council
Review of Facilities Management
2
1.0 Introduction
1.1 Purpose of Document
This report has been prepared by NPS Property Consultants Ltd (NPS) on behalf of
West Sussex County Council (WSCC). It is intended to provide a response to an
agreed brief to provide a review of the council’s Facilities Management (FM) Team in
the Service Operations Directorate looking forward from January 2013. This report
deals specifically with the overall skills and capacity required to underpin facilities
management and is presented as an organisational audit. The report is designed to:-
• Give a definitive current statement of the activities of the FM Team
• Provide an external perspective of its capacity and expertise
• Provide some initial comparative analysis
• Give a narrative commentary of its Value for Money (VFM)
• Inform consideration of future options for the service
1.2 Format and Content of Report
The report is arranged in 6 sections with appendices containing supporting material:
• This section explains the purpose and scope of the review and outlines the
overall methodology.
• Section 2 provides some broad overall context in which to position the review
• Section 3 describes existing arrangements for FM within WSCC and positions
the activities undertaken by the FM Team in a generalised framework for FM.
• Section 4 gives an overall ‘health check’ of the FM Team identifying strengths
and weaknesses and gives an ‘audit’ summary for each individual activity
through a brief narrative commentary and an assessment using a Red-Amber-
Green notation to identify potential areas of risk.
• Section 5 provides some data to enable WSCC to compare itself with other
organisations with varying delivery models for FM. This is essentially qualitative
data which describes how activities are organised and undertaken in a mix of
other councils, chosen to illustrate the richness in delivery approaches.
West Sussex County Council
Review of Facilities Management
3
• Section 6 outlines some broad options for future development of the FM
service and gives some specific recommendations for improvement.
1.3 Review Scope and Methodology
The review has been undertaken as six discrete sequential stages over an elapsed
time of 10 weeks as shown in the diagram below.
Diagram 1 – Overall Review Methodology
Stages 1 to 4 focussed internally on the FM Team at WSCC to provide a ‘position
statement’ on the FM service; whereas stages 5 to 6 looked externally in order to
provide a limited comparative perspective to the review.
2.0 Overall Context
2.1 WSCC Strategic Policies & Objectives
The council is undergoing a period of change and re-organisation. A large scale
outsourcing of support service staff to Capita under a 10 year contract was
undertaken in mid 2012 and as continuation of the council’s shift from a ‘provider’ to
a ‘commissioner’ of services. The philosophy underpinning this change is a ‘customer
first’ focus and ensuring scarce resources are allocated in the best way to meet
residents needs. The current reorganisation, effective from 1st
Jan 2013 implements
a tri-part model based on policy - commissioning - delivery. The reorganisation is
intended to ensure VFM and takes a pragmatic view on the ‘sourcing’ of activities
From January 2013 there will be 9 directorates, with FM in the Service Operations
Directorate.
West Sussex County Council
Review of Facilities Management
4
2.2 Resource Context
The outlook for public finances in the medium term suggest that funding for local
government in real terms will continue to shrink meaning there will be pressure to
do more for less and differently. WSCC is facing significant budget pressures; an
efficiency savings target of £79M set for a 3 year medium term ending in April 2014
has been renewed with a new target to be set for the period beyond 2013/14. Whilst
there has been no specific efficiency target set for FM there is an expectation it will
contribute to savings and emphasis needs to be placed on ensuring VFM. There is a
need within the FM Team to be aware of, and seek to reduce costs
3.0 Summary of Current Situation
3.1 Overall Purpose of FM
There is no simple, single definition of the role of FM as it varies across organisations
according to their specific needs and culture. At WSCC the FM Team have adopted
an essentially pragmatic working definition which can be summarised as ‘ensuring a
working environment in its buildings portfolio which enables the council (and its
partners) to deliver effective and responsive services’. This can be amplified further
in terms of a hierarchy of priorities to:-
• Ensure statutory compliance
• Ensure buildings are clean, safe & secure
• Promote a welcoming & comfortable space for staff, clients & visitors
• Promote a positive image of the council through the interaction of people with
the council’s buildings
The FM Team place a specific priority in their work for services with vulnerable
clients; both adults and children, as in these service areas the interaction of people
with the physical space and associated services is important. As FM is an integrative
discipline involving many disparate activities there is no simple measure of
performance. The FM Team view the critical success factors for their service as:-
West Sussex County Council
Review of Facilities Management
5
• Minimising risks to WSCC from breaches of statutory compliance – as these are
a potential liability to the council both in terms of cost and reputation
• Providing a ‘comfortable’ environment for staff, clients and users – measured
both formally and informally through building user feedback.
3.2 Delivery Model for FM
The current service delivery model for FM could be described as ‘a mixed economy
with a strong informed client role with use of external contracts where these
represent value for money’. The emphasis of the FM Team is on policy, specification,
management and monitoring; but with light touch monitoring supplemented by
building users feedback on service quality and incipient issues.
An area based approach has been adopted with 5 areas. In each area a
comprehensive, integrated service is provided through a dedicated Lead Building
Surveyor, Engineer & Facilities Manager. These roles are pivotal in the service
providing the expertise and capacity across the broad range of FM activities and
strong ‘on-the-ground’ customer focus through to building users to understand
service needs, quality, and responsiveness and to help to identify any emerging
issues. The area teams make use of the council’s office hubs in the respective areas
as well as working flexibility. The Area Facilities Managers (AFMs) undertake a
multiplicity of roles and there is also an intention for them to act in a capacity to
resolve problems and undertake small, immediate work jobs as appropriate.
The council has adopted a ‘Corporate Landlord Model’ with centralised budgets for
premises related expenditure managed through the FM Team. There are plans for a
‘nominated building contact’ for each building which is due to be implemented prior
to March 2013. The FM service applies generally to all council buildings but in some
specific instances there are differing arrangements for schools because of their
degree of autonomy. The Fire Service retains a small FM capacity and some of their
building management arrangements are not within the scope of the WSCC FM Team.
West Sussex County Council
Review of Facilities Management
6
The broad ‘direction of travel’ for the FM service is to seek to reduce the number of
contracts and to move towards fewer corporate contracts with common standards
for major areas of activities which schools can ‘op-in to’.
Positioning of FM in Wider Organisational Structure
The FM Team is located in the Service Operations Directorate which from January
2013 will be one of 9 directorates within the council. The FM team has strong
working linkages with the Capital and Infrastructure Team which is located within a
separate directorate. The FM Team report to the Member for Finance and
Performance and also from time to time to the council’s senior management team;
as subject matters dictate. The Team also reports through to the Capital Investment
Appraisal Group which is responsible for allocating scarce capital resources to major
projects.
Diagram 2 – Positing of FM Team within WSCC Structure
Profile and Understanding of FM
The recent re-organisation within the council is providing a greater focus to FM
activities as a single, integrative support discipline. Whilst FM is recognised as a
support activity through its positioning in the Directorate of Service Operations, the
strategic dimension of FM is also being increasingly recognised. Although the
purpose and benefits of strategic FM are not yet widely understood across the
organisation this is changing and its profile within the council is rising. There is
interest in FM by specific members (such as the Member for Finance & Performance)
West Sussex County Council
Review of Facilities Management
7
as well as members in general and the work of the FM Team underpins some of the
council’s key priorities such as carbon reduction.
Scope of FM
There is no single definition of FM and no specific model of its scope and activities.
Organisations typically tend to organise and undertake FM activities on the basis of
historic ways of doing things, organisational culture and pragmatic experience of
what works well. A simplified model of the potential scope of ‘premises related’ FM
activities is shown below and used as a framework to identify what WSCC currently
undertakes through its FM function. Whilst FM does tend to have a primarily
operational focus there is also an important strategic element to it as FM needs to be
consistent to, and supportive of, wider organisational objectives.
Diagram 3 – Scope of Activities under taken by FM Team
Space Planning
ADDITIONAL FM
Office Furniture
Meeting Room Services
Cleaning
SOFT FM
Security
Waste Disposal
& Recycling
Reception
Caretaking
Post Services
Utilities Management
Condition Surveys
HARD FM
Building Maintenance
M & E Services
Statutory Compliance
Project Management
Carbon Management
Grounds Maintenance
Scope of FM Activities
Activities undertake by WSCC FM Team
Other potential FM activities
Member & Senior
Officer Liaison
Policy Development
FM Strategy & Support
Performance
Management
FM Information
OperationalStrategic
Minor Improvements
Suitability Assessments
Catering
Property Review
Courier services
Move Management
FM ‘Help Desk’
Health & safety
PA & Admin Support
Events
Training
Porters
3.3 Organisation, Establishment & Operating Costs
The FM Team has a total establishment of 90 posts plus 4 apprentices with a total
revenue cost of £2.48M for 2012/13. A simple summary structure chart of the Team
is provided as Appendix A. Within the FM Team the age and sex profile shows a team
which is broadly well balanced and with an age profile which is relatively
West Sussex County Council
Review of Facilities Management
8
experienced. With recent organisational changes the average age of the FM Team
has reduced significantly. Table 1 below provides a summary age and sex profile of
some of the main functions within the FM Team. Indicative annual spend, based on
2001/12 outturn was £2.38M for maintenance spend (revenue); £4.8M for
maintenance spend (capital) – reducing to £2.6M for 2013/14 and £2.7M spend on
soft FM.
Table 1 - Profile of organisation (age – sex mix)
Function Average Age Males Females
Building Surveying 43 12 4
Carbon Engineering 45 10 2
Soft FM 46 23 7
Grounds Maintenance 48 1 1
Caretaking (schools) 49 4 0
Engineering Apprentices 21 0 2
Catering 1 7
Note: The above table does not account for all staff but is used to illustrate the age and sex profile of the FM Team
The FM Team has implemented apprenticeships as part of a ‘grow our own
approach’ to staff. The scheme covers M & E surveyors (2) and soft FM (3). The
apprenticeships are essentially day-release courses over 3 years alongside on-job
training. Apprentices are assessed on an on-going basis and prior to their final year
to see if they are to be offered a career post within WSCC. On the soft FM side the
apprenticeships are essentially on-the job training. So far the scheme has been
successful in bringing through staff capable of working in a full-time capacity and has
also help to create an improved working environment.
3.4 Problems & Pressures
The FM Team has a number of problems and pressures to which it needs to respond.
These related problems are generally well known and understood, with actions in
hand to address them:
West Sussex County Council
Review of Facilities Management
9
• Implementing the Corporate Landlord Model – There is a legacy of work
associated with the centralisation of property budgets. As full ‘property costs’
were not transferred across to the FM Team current budgets do not match
activity levels. This issue is being teased-out on a building by building basis but
this painstaking work can be detrimental on relationships with building users
and service managers. It also has an impact in the short term on spend on
buildings which has to be restricted with a consequential detrimental effect on
buildings, service image and council image.
• Relationship continuity – WSCC has gone, and continues to go through, a
period of significant organisational change. This inevitably causes disruption to
established internal working relationships and lines of communication. Whilst
the FM Team has shown a strong degree of flexibility in adapting to this change
this issue of establishing and sustaining effective working relationships is a key
priority looking forward. The FM Team has recently undertaken a stakeholder
analysis in order to identify existing strengths and weaknesses in internal
relationships and this provides a basis for identifying priorities for action.
• Business Continuity – organisational change can also have a detrimental effect
on business continuity. This can be seen in several areas. This includes
sustaining staff morale and motivation in a period of uncertainty over jobs and
how the FM service might be provided in the future. This is also disruptive to
planning for the future (due to uncertainty) and can undermine the consistency
of ‘messages’ about the service and there is also a risk of paralysis from a
feeling of a lack of influence over wider organisational changes.
• Quality of FM data – There are concerns over the quality (currency, accuracy &
completeness) of data as this may impact on the quality of decision making.
There is a strong drive to implement Atrium as the council’s corporate property
database and recognition that there is a need to improve FM information so
that the FM Team can fulfil its role properly.
West Sussex County Council
Review of Facilities Management
10
4.0 Audit of FM Function
4.1 The Audit Process
The audit was based on a high level analysis which tried to answer four questions:-
• What activities are the FM Team responsible for; how are these organised and
delivered?
• What is the level of capacity (FTEs) and skills for each of these activities and are
there any issues related to this?
• What are the broad dimensions associated with each activity (volumes and
spend)?
• What are the costs1 of each activity and how is each activity funded?
The ‘organisational audit’ is reported in a simple colour coded way (green through
amber to red) for the main activities within the scope of the FM function. The
analysis is presented in a form which is easy to use and understand. From the
analysis two further questions can be posed:-
• What are the areas of risk in terms of the existing arrangements?
• Are there alternative arrangements which could be put in place to improve any
of the activities; either individually or collectively?
A degree of caution needs to be taken in reviewing the audit as time did not permit
anything more than a high level audit.
1 The basis for the financial figures used through this report is as follows. The cost of staff (FTEs) is based on the
organisational structure looking forward based on budget allocations for 2012/13. Staff costs are actual costs
plus a 15% to account for on-costs (office space, supplies & services etc.). For posts being covered by external
consultants the costs of the funded post has been used rather than the costs of the engaged consultant. The
costs for activities undertaken (other than staff costs) are based on actual spend during 2011/12. In both cases
there is a level of estimation used and so some care needs to be taken in interpreting the data. The overall
approach through the analysis has to be provided the ‘best estimation’ of costs based on available data.
West Sussex County Council
Review of Facilities Management
11
4.2 Overall Findings
The capacity and experience of the FM Team seems commensurate with the size of
the WSCC portfolio and the scope of its responsibilities. There may however, be a
lack of overall resilience with some recognition that as individual teams are working
at full capacity any extended absences (such as periods of sickness) may cause
problems. There is a strong emphasis on day to day operational matters; in
developing relationships with building users and service managers and in ensuring
arrangements around the Corporate Landlord Model are working effectively. This
short term operational focus may be being undertaken at the expense of the more
strategic considerations of FM. The all round capacity and experience of the FM Team
does mask some ‘bind spots’ in capacity; but these are felt to be relatively minor.
4.3 Key Strengths & Weaknesses
A number of key strengths and weaknesses have been identified through the review
and these are summarised briefly below. The areas of weakness are recognised
within the FM team and in some cases work is in hand or planned to resolve them.
Strengths
• The overall capacity and expertise of the FM team seems consistent with its
responsibilities with relatively few areas of risk.
• The age profile of the group is well balanced with no incipient risks from an
aging workforce.
• There is experienced leadership of the FM function through the Principal
Facilities Manager and the 4 senior team leaders.
• The apprenticeship scheme has allowed the council to ‘grow its own’ in
response to an historical problem of finding suitably qualified and experienced
staff. Although still in its relative infancy the scheme has proved successful.
• The FM Team has strong working relationships with service managers and
building users through its area structure. This approach has allowed building
surveyors and Area Facilities Managers to develop a good understanding of the
individual buildings they are responsible for.
West Sussex County Council
Review of Facilities Management
12
Weaknesses
• The fragmented nature of contracts may mean that economies of scale are not
being achieved and that contract management is more complex than it need
otherwise be.
• There are some potential discrepancies around the organisational placement of
some (parts of) FM activities (such as responsibility for condition surveys)
which may give rise to a disjointed elements of service. In large measures these
appear to be historical legacy issues and the FM Team work with the existing
arrangements in a pragmatic way.
• As a legacy of organisational re-structures in WSCC and the implementation of
the Corporate Landlord Model there is currently a mismatch between funding
and required activity levels. This is being resolved on a building by building
basis.
• The quality of data to underpin decision making on FM matters may be lacking
for some activities – this is an area of concern but there is also a recognition
that ‘perfect information’ is difficult to achieve. Whilst there has been an
intention to consolidate data onto Atrium as the WSCC’s preferred corporate
property system progress on this has stalled and this remains an important
priority to resolve.
• There is a disconnect between the property review process undertaken by the
Capital & Infrastructure Team which identifies whether buildings should be
retained or released by the council and activities undertaken by the FM Team.
This may mean that there is risk of maintenance or improvement spend being
misdirected on buildings likely to be no longer required by the council.
West Sussex County Council
Review of Facilities Management
13
Diagram 3 - Overall Audit Assessment of FM Function
Space
Planning
ADDITIONAL FM
Move
Management
Meeting Room Services
Cleaning
SOFT FM
Security
Waste Disposal
& Recycling
Reception
Caretaking
Post Services
Condition
Surveys
HARD FM
Building Maintenance
M & E Services
Statutory Compliance
Project
Management
Carbon
Management
Grounds
Maintenance
Activities undertake by WSCC FM Team
Other potential FM activities
Member &
Officer Liaison
Policy
Development
FM Strategy & Support
Performance
Management
FM Information
OperationalStrategic
Minor
ImprovementsCatering* Courier Services
Suitability Assessments
Property
Review
Office FurnitureFM ‘Help Desk’
Utilities Management
Health & Safety
PortersPA & Admin.
Support
Activity FTEsCost(£ooos) Audit
0.85 46.0
0.65
1.65
2.40
0.1
0.30
5.95
36.5
97.0
85.5
4.7
7.6
277.3
Activity FTEsCost(£ooos) Audit
0.55
0.60
3.85
2.15
22.9
6.65
4.90
3.35
N/A
132.4
181.0
240.0
627.4
83.5
107.8
26.6
25.5
1424.2
Activity FTEsCost(£ooos) Audit
N/A N/A
N/A
N/A
Activity FTEsCost(£ooos) Audit
N/A
N/A
N/A
2.65
0.90
8.1
170.7
27.7
0.80 23.7
174.6
4.4 83.8
4.30 119.0
2.00 55.0
N/A N/A
N/A N/A
1.55 32.1
2.00 34.6
0.10 5.5
0.15 8.2
N/A N/A
N/A N/A
N/A N/A
23.15 654.5
Events
Training
0.75 14.8
1.30 33.0
5.85 128.244.95
2484.279.90
Total FTEsTotal Cost
(£000s)
* This is corporate catering only. 6.5 staff
are involved in management & 45 staff
with delivery (as supervisors & kitchen
assistants) for schools catering which is
recharged back to schools
West Sussex County Council
Review of Facilities Management
14
4.4 Detailed Audit
FM Strategy & Support
Activity Audit
Member & Senior Officer Liaison
The work of the FM Team is reported through to the Member for Finance
& Performance and variously to Chief Officer Groups depending on the
specific subject matter in hand. The team also reports through to the
Capital Investment Appraisal Group. The nature of the work is essentially
meeting attendance and report writing.
Policy Development
The FM Team takes a lead on several aspects of policy development
relating to the WSCC portfolio. These include developing overall
maintenance strategy, carbon reduction policy and development of the
council’s Asset Management Plan (AMP). The FM Team also contributes
(from an FM perspective) to corporate initiatives and policy development.
Most of this work is undertaken by the Head of the FM Team supported as
appropriate by the relevant senior professional managers. This policy work
requires liaison with managers across the council. The AMP is refreshed
annually and signed-off by members. It is not entirely clear what the
respective responsibilities are between the Capital & Assets and FM Team
are in relation to the AMP and whether the FM lead means that the AMP
has a predominantly maintenance focus.
Performance Management
The FM Team has an annual service plan which sets out priorities and
targets and these are monitored through the year and through staff
individual performance reviews. The FM Team has some responsibility for
corporate targets such as the WSCC carbon footprint reduction target.
They key performance metric that the FM Team focuses on is service
continuity and quality as measured through client complaints. The FM
Team adopts a pragmatic and informal approach to this through outreach
to building users from activity leads and the Area Facilities Managers.
There maybe scope for a more systematic approach to performance
management using a range of techniques (periodic structured peer
reviews; regular client surveys and use of ‘benchmarking’ clubs such as the
Sheffield Hallam Public Sector FM Network) – although it is recognised that
there is balance between costs and reward from such activities. There is an
intention to undertake comparisons with private sector organisations.
FM Information
There is no specific focus on information; rather it is perceived as part of
‘everyone’s job’ according to their individual activity needs. There is no
specific FM database but the FM Team tend to use the corporate property
database (Atrium) which is ‘owned’ and maintained by the Business
West Sussex County Council
Review of Facilities Management
15
Information Team. Where appropriate FM data will be migrated to; and
held on Atrium. There are some concerns over data quality (currency,
completeness & accuracy) – although it is also recognised that ‘perfect’
data is both time consuming and expensive to achieve. There is a risk of
less than optimum decision making because of this poor quality data. A
specific concern is the up-dating of floor-plans (undertaken in the Capital
& Assets Team) as this impinges directly on defining cleaning areas. There
maybe some value in having a clear ‘road map’ of data needs for FM and in
ensuring robust links with the corporate property database administrator
to ensure FM data needs are understood.
FM ‘Help Desk’
There is no internal help desk for FM. During working hours building users
are encouraged to call their area based FM staff; whilst outside of office
hours they call SSE (Scottish & Southern Electric) who handle emergency
maintenance, M & E, or security problems. SSE will assess calls and provide
a short term response pending resolution of any problems. The SSE ‘help
desk’ is provided through 2 FTEs at a cost of £50k. The contract with SSE is
part of a long term contract, initially established in 2008 and which has
recently been extended for an additional year taking it until 2014. It covers
corporate properties and those schools who opt-in to the service through
an SLA. The likelihood after 2014 is that the contract will be retained for
corporate buildings but SSE will deal directly with schools. For out of hours
emergencies the number and nature of calls are captured through SSE’s
own systems; whereas for normal working hours there is no formal
recording of calls – rather there is a ‘once & done’ approach. There are
plans to systematically capture normal office hour calls through the ‘Help
Desk’ module of Atrium once it is implemented. Overall the service is
highly regarded and responsive. There maybe potential to integrate the
FM ‘Help Desk’ with a wider corporate help desk service but this is not
seen as either a preferred or necessarily effective solution (as it may dilute
the existing service which works well).
PA & Admin. Support
Dedicated PA, clerical and administrative support has been considerably
diminished due to re-organisations and subsequent out-sourcing of office
services. However the FM Team has adopted a self-help attitude and this
has meant there are no significant capacity issues around PA and
administrative support.
There is also PA & Admin support provided through Capita under a long
term contract between WSCC & Capita. The FTEs and cost estimates for
this part of the activity are not included in the summary cost totals.
West Sussex County Council
Review of Facilities Management
16
Hard FM
Activity Audit
Condition Surveys
Condition surveys are outsourced and undertaken through multiple area
based contracts. The contracts include both schools and non-schools and
full surveys both building fabric and M & E equipment. The whole portfolio
is reviewed over a 5 year period (approximately 20% of portfolio per
annum). The condition surveys are overseen by the Business Information
Team in Capital & Infrastructure Assets Directorate; with data being held
in the council’s corporate property database which can be accessed by the
FM Team. The positioning of the overview of this activity with the
Business Information Team is an organisational quirk and it should more
appropriately sit with the FM Team where the building surveying expertise
resides. It may be relevant to review the basis of the service and to see
whether a single contract or a change to a full portfolio service every 4 or 5
years may be better value for money. However the service is likely to
remain as an externally provided activity.
Building Maintenance
The building maintenance activity (both planned and reactive) is lead by
the Building Surveyor and area teams supporting both the schools and
non-schools portfolio. For the non-schools team there is one building
surveyor for each of the 5 FM areas; whereas for the schools portfolio
there is one surveyor for each of the 6 school areas. The Schools Team is
funded by SLA income whilst the Non-schools Team is funded through
base budget. The teams develop and deliver the annual building
programme in liaison with service departments and building users. The
teams are also responsible for managing reactive maintenance work. The
current organisation and delivery model has only been recently
established and there are no plans to change. The service works well in
part due to the experience and capacity of the team members, their
inherited knowledge of the buildings and good working relationships with
building users. In addition the area based model provides a greater variety
of work for the surveyors.
M & E Services
There is an M & E contract with SSE (Scottish and Southern Electricity)
which covers inspection, testing and reactive services. The FM Teams also
has area-based engineers looking after both schools and non-schools. In
the past WSCC has struggled to get building services engineers and has
now adopted the approach of ‘growing our own’ through an
apprenticeship scheme. Whilst the existing FM Team M & E staff are busy
broadly the balance between capacity and work-load is about right plus
there is the option to use agency staff to handle peaks in work (although
past experience of using agency staff has not been good). The activity is
part base funded and part funded through the Schools SLA.
West Sussex County Council
Review of Facilities Management
17
Statutory Compliance
This activity over-arches both Hard and Soft FM and is a key priority for the
FM Team. There is no specific organisational focus for the activity through
a defined team / post; rather it is an activity undertaken by the area based
surveyors, engineers and facilities managers as part of their mix of
responsibilities. There is a compliance ‘checklist’ which identifies specific
requirements and frequencies for individual buildings. Data will eventually
be held in the Atrium database which will be used through ‘alerts’ to
prompt for required actions. Overall there are no issues around capacity of
expertise and the activity works well in practice.
Project Management
This activity covers mostly capital maintenance projects including some
schools projects. Generally they are small projects and programmes of
work which tend to be less than £300k (larger projects sit with the Capital
& Infrastructure Team). The activity is funded through base budget; except
for schools projects which are typically charged on a fixed fee or hourly
charge basis. The project management role is carried out by the area
based by surveyors & engineers. Generally there are no capacity issues but
if there is then external consultants are used. There is no formal
requirement to use a specific project management methodology. There is
a possibility that under the wider reorganisation of the council this activity
could end up as a ‘commissioned’ activity.
Carbon Management
This team has two dedicated posts (one is currently vacant) covering
specific areas of expertise (notably energy and water). The team is
supported by the area based building surveyors and M & E Engineers. They
cover the broad mix of work for energy and water management. The team
are responsible for policy development, raising awareness, training and for
developing and implementing programmes of work (such as renewable
energy). The team provided a dedicated focus for the activity which is a
key priority for the council. Overall capacity and balance is about right.
Display Energy Certificates (DECs) are done through the Business
Information Team and there may be an argument that this element of
work should be more appropriately placed with the Carbon Team.
Minor Improvements
Minor improvements works are managed by the area building surveyors
and M & E Engineers as part of their broad mix of responsibilities. The Area
Teams liaise with services to determine priorities and establish the
programme of works. Typically these projects are small to medium sized in
terms of value but for the 2012/13 there is no specific budget provision.
Property Review
This element of activity sits with the Estates Team within Capital and
Infrastructure. The Estates Team lead the review activity and the FM Team
N/A
West Sussex County Council
Review of Facilities Management
18
provide support as required. It is not entirely clear how robust the process
is and to what extent it ‘challenges’ the need for and performance of
assets. There may be a need to improve coordination with the FM Team in
part to act as an early warning mechanism for possible release of buildings
(for which FM are responsible) and in part to secure FM perspectives on
issues such as energy performance, running cost performance, condition
and functional suitability of buildings.
Suitability Assessment
The FM Team undertake suitability assessments of the non-schools estate
on a 5 year rolling programme (20% of portfolio per annum). This is
undertaken as one element of the building surveyors’ role using a WSCC
developed methodology and pro-forma. The philosophical approach is to
do the assessments ‘with’ services rather than ‘to’ services. The
assessments cover a broad range of themes (environment / accessibility /
performance / sustainability etc.) and the information is used to inform
development of the capital programme & investment prioritisation. The
assessments are currently held on spreadsheets but there is an intention
to hold them on the new corporate property database (Atrium) in due
course. The activity is base funded. There is a lack of clarity over the wider
linkage to property review and a potential deficiency in that the
assessments do not provide a robust ‘challenge’ to property need,
utilisation or performance and that they are not used to inform ‘retain’ or
‘release’ decisions on the portfolio. There is a different approach to
schools suitability assessments which not undertaken by the FM Team.
Soft FM
Activity Audit
Cleaning
The FM team undertake the client management activity for cleaning
services (specification, letting & monitoring) which are delivered through 2
contracts (for schools and non-schools) each having differing renewal
dates, contract lengths, cleaning frequencies and standards. The intention
is to have a single, coordinated, approach which streamlines the existing
fragmented, legacy arrangements the FM team has inherited. The FM
Team undertakes ‘light touch’ monitoring to supplement building user
feedback on quality issues. The non-schools cleaning is centrally funded
through base budget whereas in the case of schools there is a part
recharge mechanism. There may be a ‘time lag’ issue between changes in
the portfolio (down-sizing) and how these impacts on the cleaning
contract and potential for reduced payments. There may be the scope to
improve linkage with capital projects to understand how floor finishes
could impact on cleaning frequencies and costs.
West Sussex County Council
Review of Facilities Management
19
Security
The 5 hub office buildings have caretakers responsible for opening and
closing and general security of the building. Elsewhere in the corporate
estate local building users (through local arrangements and nominated
staff) are responsible for locking and un-locking on a daily basis with an
emergency security call out service provided through a single contractor.
Schools have their own individual arrangements according to their needs
outside of any corporate arrangements. In practice these arrangements
work well and are cost effective.
Waste Disposal & Recycling
The waste disposal activity undertaken by the FM Team is essentially at a
budget management level. Services departments raise their own orders for
specific waste services against a budget held by the FM Team. Services are
responsible for the waste activity procured and the FM Team for the
associated budget issues. There are no specific capacity issues around this
element of this work.
Reception
Reception in main office buildings is not managed from within the FM
Team but by Office Services which is a separate team. There is no strong
rationale for this to be considered within the scope of FM.
N/A
Caretaking
FM has a caretaking team comprising a manager + 3 staff who look after
schools (support the schools in terms of cleaning & other contract issues).
These have recently been incorporated into the FM Team and their
traditional focuses on school could be broadened to non-schools. They are
based centrally but have a county-wide remit. Currently the cost of the
service is re-charged back to schools. School based caretakers are
provided by individual schools with the FM Team providing a support role.
Facilities Officers and FM Operatives are the first point of contact for
services / building users – each having responsibility for about 10
buildings. There are no capacity or expertise issues, a mix in terms of age
profile and adequate service resilience. As all the WSCC buildings come
under FM control and the service more fully established there may be
scope to extend the service.
Utilities Management
This activity covering the whole portfolio and all utilities (water, electricity
and gas) is currently carried out by the Business Information Team within
Capital and Infrastructure Directorate. The activity is seen largely as a data
issue – collecting reading data and paying bills; although the FM Team
provide the scrutiny role to monitor utility usage. There is an argument
that the activity sits more logically with the FM Team because of its
scrutiny role and responsibility for overall energy policy and practice. The
current arrangements mean that the focus and management of full
property running costs does not sit entirely within FM and this is
N/A
West Sussex County Council
Review of Facilities Management
20
inconsistent with the corporate landlord model that council is seeking to
operate.
Catering
The FM Team provides catering services at 3 of the WSCC hub buildings
through part in-house and part contracted out arrangements. In County
Hall catering is provided through an in-house service; at Durban House in
Bognor Regis the service is provided by the Aldingbourne Trust (for people
with learning difficulties) on a semi-contract basis and at the northern hub
(Horsham) through a catering contract. There are no catering facilities at
Crawley or Worthing. There is strong member view on retaining these
facilities which are highly regarded. This corporate catering element is
required to be cost neutral with the service ‘netting off’ from charges. The
non-offices catering service covers school; run a ‘meals on wheels’ service
alongside the WRVS & employ catering staff in special schools. They also
undertake training. The funding base of this element of the catering
activity lacks clarity – some work is unfunded; there are differing funding
arrangements for different contractors and overall the service is part
funding through the schools SLA and part re-charge. There is potential to
unify these disparate approaches to ensure overall cost recovery. There is
some limited catering for outside functions (such as weddings) on a cost
recovery basis and there maybe a longer term prospect to generate
income as the team has some commercial acumen. There maybe potential
to consider external catering provision in key offices using ‘a profit-share
franchise model’ with a private sector partner.
Health & safety
The FM Team have a responsibility for H & S for buildings related matters.
This is done by the Area Facilities Managers, M & E Engineers and Area
Building Surveyors as a significant part of their jobs. This activity is base
funded. H & S incidents and actions are recorded in a log. There is also an
Asbestos Officer, which is a dedicated post attached to the Building
Surveying Team. This post provides specific subject matter expertise, and
is responsible for asbestos management policy within the council. It is a
full-time post required to meet WSCC needs but there is some limited
selling of expertise services to academies. In addition to the FM Team H &
S activities there is a corporate H & S function for the council which has
recently been outsourced.
Grounds maintenance
There is an experienced, dedicated team of 2 which focuses on this aspect
of the FM service. The service they provide is highly regarded and overall
capacity provides adequate resilience to manage the activity which is
undertaken exclusively on WSCC sites. There are currently two contracts
covering the estate (corporate buildings and schools – to which schools
can opt in on a voluntary basis) plus some minor cases of services making
their own local arrangements. The intention is to rationalise these into a
single contract to be re-let in January 2013. The activity is base funded
West Sussex County Council
Review of Facilities Management
21
from WSCC revenue with schools paying for services they receive directly
to the contractors. There is an SLA with schools for FM Team’s grounds
maintenance work which is re-charged on a fee basis.
Additional FM
Activity Audit
Space Planning
Undertaken as part of the Corporate Facilities Team within FM. Currently
very busy because WSCC is going through a period of office rationalisation
and implementing new ways of working. The work requires close liaison
with service departments. There is adequate capacity, expertise and
resilience through the Area FM Teams. Space planning is undertaken using
AutoCAD Lite which requires some significant expertise to use well.
Move Management
This is undertaken by the same staff as the space planning. Essentially it
can be seen as a project management activity. Although currently a busy
period for the team the overall capacity, expertise and resilience is
adequate.
Meeting Room Services
This activity is not within the scope of the FM Team. It is part of the Office
Services Team + there is a post within the WSCC Communications Team
which is focussed on reducing use of external meeting rooms as part of an
efficiency drive. It could be perceived as an FM activity and in the future
could possibly have an emphasis on income generation through letting of
space for external users (Although the prevailing philosophy of the council
is that if space is not being used it should be disposed of).
N/A
Post Services
This is not currently undertaken as part of the FM Team activities but is
provided by the Office Services Team.
N/A
Office Furniture
The FM Team undertake the administrative function of ordering office
furniture which service departments pay for from their own budgets.
Whilst there is a presumption in re-using furniture where possible the
move to a new corporate model supporting flexible working also requires
new furniture. The delivery of furniture however sits outside of the FM
Team with the Capital & Infrastructure Team. There does not appear to be
a clear rationale for the separation between ordering and delivery parts of
this activity (which can from time to time lead to problems); rather it is a
legacy of earlier organisational decisions. There are no specific views on
this element of FM activity but it could be readily outsourced.
West Sussex County Council
Review of Facilities Management
22
Porters
The FM Team has two porters at County Hall + a grounds maintenance
person who keeps the area tidy. These three posts focus on ‘front of
house’ at County Hall and there are no others porters at other buildings.
All posts are based funded and there are no capacity issues.
Courier Services
This is not currently undertaken as part of the FM Team activities but is
provided by the Office Services Team.
N/A
Events
The FM Team provide services, such as catering for events which are held
from time to time at the facilities within Chichester (County Hall and Eades
House) and at County Hall ‘North’. These are ad hoc, rather than regular,
and the services are provided as an adjunct to staff main duties. These
events include, for example, weddings and member receptions. This is
currently seen as an incidental activity which is undertaken on a cost
recovery basis but there maybe some scope to develop it as an income
generating activity.
Training
The FM team provide on a systematic basis training on building matters.
These training sessions are typically for caretakers; school bursars and
occasionally school governors. The focus for this activity is through the
catering team but other staff are drawn into to provide specialist expertise
as required.
West Sussex County Council
Review of Facilities Management
23
5.0 Comparative Analysis
5.1 Outline of Approach
In order to provide WSCC with a robust reference point to support consideration of
any proposals for the future of the service a comparative benchmarking exercise was
undertaken with 8 other councils. These included 4 county councils and 4 unitary
authorities.
The 8 councils were chosen to provide richness in terms of their size and existing
organisational arrangements for FM. Collected data was presented so as to allow
easy comparison of WSCC in terms of their organisation and delivery model. As a
consequence of the differing interpretations of activities amongst the other
authorities, a certain degree of pragmatism and convenience was used in the data
collection stage with an emphasis on using what data was available.
5.2 Profile of Comparator Organisations
For the purposes of this review, comparisons were made with 8 other councils. These
were grouped into county councils and unitary authorities. The county councils are
referenced 1 to 4, and the unitary authorities A to D. Authorities have not been
identified by name. A ‘pen picture’ of each authority in terms of their broad
dimensions and current FM arrangements is given in diagram 4.
In general there are common themes amongst all comparator organisations – the
fact that the FM function has been involved in a ‘journey of development’ and that
this journey is continuing; budget pressures and the move towards a more
integrated ‘Total FM model’. However there are also some significant differences
even amongst the small number of comparator organisations and this includes the
types of organisational models being used for FM delivery. The narrative of the
comparator organisations in Appendix B illustrates some of the diversity of existing
arrangements.
West Sussex County Council
Review of Facilities Management
24
Diagram 4 – ‘Pen Picture’ of Comparator Organisations
Decision taken in terms of future FM options
West Sussex County Council
Review of Facilities Management
25
6.0 Looking Forward – Options for the Future
6.1 Immediate Short-Term Priorities
The FM Team has recently been established in its current form as part of WSCC’s
recent and on-going restructuring. As a consequence the immediate priority of the
FM is to consolidate; assume the Corporate Landlord Role; clarify existing roles and
responsibilities and to make ‘it work’. This in itself requires some significant work to
resolve FM costs at an individual building level (so as to ensure activity levels are
commensurate with funding); the development of effective working relationships
with building users and service managers and the streamlining of existing contract
arrangements with external service providers. Specific short-term priorities for
action include:-
• Review of existing contracts to consolidate into fewer unified corporate
contracts in which schools can participate (on a voluntary basis).
• Clarify and resolve operating costs to ensure these are consistent with required
activity levels (legacy issue from implementing the Corporate Landlord Model)
• Support the implementation of Atrium as the corporate property database and
‘audit’ data quality to identify areas where data availability may be
compromising FM performance.
• Resolve any legacy issues from recent organisational changes such as
misplacement of activities.
6.2 Articulating Options for the Medium-Term
The options for developing FM services are dependant on three broad questions and
WSCC’s view of the key factors influencing these questions. These are:-
• The size and role of the retained FM capacity
• The scale and nature of any externalisation of activities
• The extent of engagement with other public bodies
West Sussex County Council
Review of Facilities Management
26
Diagram 5 – Key Questions Shaping Future Options for FM Service
Diagram 6 below presents a broad framework for identifying a range of options for
the development of the FM service. This is based on the extent to which FM activities
(and their management) are retained internally or outsourced and the scale of
properties to which the FM service is applied.
Diagram 6 – Outline of Future Options
Sin
gle
bu
ildin
g
Ma
ny
po
rtfolio
s
3
Totally in-
house
Totally
outsourcedCurrent
FM
Model
Wh
ole
po
rtfolio
2
4
1B1A
Internal
External
Ex
tern
al
Inte
rna
l
Placement of Activities
Sco
pe
of
Bu
ild
ing
s
5
West Sussex County Council
Review of Facilities Management
27
Within this framework the current positioning of the WSCC FM Team is identified as
well its historic positioning and a range of future development options. The
identified future options are consistent with the broad direction of travel for the FM
service which is focussed on improving value for money (quality and cost blend).
These are illustrative of future delivery models and are not an exhaustive list of
options and the options are not necessarily mutually exclusive. They are presented
as a simple mechanism to aid thinking about the issues around potential options for
the future.
The positioning of potential future options against the twin axis of ‘scope of
buildings’ and ‘placement of activities’ has some general implications. These are
summarised in the diagram below. Widening the scope of buildings within the FM
function increases the economies of scale but also increases management
complexity and may reduce local control and flexibility. Outsourcing of activities
whilst securing improved access to capacity and expertise and increasing certainty
and resilience can also mean a loss of flexibility and internal ‘intelligence’.
Diagram 7 – Implications of changing Scope of Buildings & Placement of Activities
Sin
gle
bu
ild
ing
Ma
ny
po
rtfo
lios
To
tall
y in
-ho
use
To
tall
y o
uts
ou
rce
d
A broad description of the future options for the FM function identified in Diagram 4
are summarised in the table 2 below.
West Sussex County Council
Review of Facilities Management
28
Table 2 – Description of Broad Options
Option Description
1A ‘Thin Client’ function for WSCC only FM service – with FM activities
largely outsourced
1B ‘Thick Client’ function for WSCC only FM service – as 1 above but with
greater internal capacity to provide improved resilience and expertise.
2 Joint FM arrangements (few) – with one or few other public bodies
(such as a District Council) with WSCC acting as ‘lead’ authority
3 Joint FM arrangements (many) – with several or many other public
bodies with WSCC acting as ‘lead’ authority
4 County-wide FM Framework for a ‘pooled’ FM service for public
bodies in the county with WSCC as ‘lead’ authority
5 Sub-Regional Framework for a ‘pooled’ FM service with WSCC as
‘recipient’ rather than ‘lead’ authority
Note: Option 1 (1A & 1B) relate to WSCC only and are concerned with the relative degree of
externalisation of FM activities; whereas options 2-5 are concerned with WSCC operating with partner
organisation(s) to secure efficiencies of scale. The existing delivery model for FM at WSCC although it
has externalised some activities is best described as a ‘mixed economy’ with some activities
undertaken in-house and others externalised.
The relative merits of each of these options will in large measure depend on WSCC’s
views on the:
• Willingness to cede control to another body for management of the service.
• Potential efficiency savings to be derived from securing economies of scale
• Willingness to work in partnership with other public or private sector bodies
• Need for some retained ‘intelligence’ capacity
• Need to retain flexibility to respond to changes (e.g. portfolio reduction)
• Requirement to retain its own identity
• Access to wider capacity & expertise (both public & private)
• Promotion of local knowledge, expertise & prosperity
West Sussex County Council
Review of Facilities Management
29
6.3 Summary Evaluation of Future Options
The relative merit of the options against these ‘evaluation criteria’ is presented
below. This analysis should be treated with caution as it has been undertaken at a
high level (without relative weighting of criteria) and is intended to highlight key
issues relevant to each option rather than to identify a recommended option.
Table 4 – Broad Evaluation of Options for the Future
Options Evaluation
Criteria 1A 1B 2 3 4 5
Control
Efficiency
Partnership
Retained ‘Intelligence’
Flexibility
Identity
Access to expertise
• ‘Thin Client’ Function for WSCC only – This option would see further
externalisation of existing FM activities. This could be undertaken on an
incremental, activity by activity basis, to assess VFM or through a ‘big bang’
approach where a set of identified activities which could be outsourced are
defined and externalised through a single block contract. This would leave
WSCC with a largely service specification and monitoring role with external
service provider(s) focussing on delivery and day to day client liaison.
• ‘Thick Client’ Function for WSCC only – This is similar to the ‘Thin Client’
Function above but would see WSCC retain greater internal capacity to
West Sussex County Council
Review of Facilities Management
30
undertake some limited FM activities in-house and thus provide WSCC with a
degree of resilience and flexibility (through its retained capacity).
Both these options can be implemented through standard contractual
arrangements using a ‘specified service for cost’ approach or on a ‘partnership
basis’ where there are agreed shared business objectives which could relate to
some form of profit sharing.
• Joint FM Arrangements (few partners) – There is potential for WSCC to develop
joint FM arrangements with a single or few partners to achieve the economies
of scale from ‘bulking-up’ activities. This can be done in an incremental way; for
some activities with initially one partner organisation and extended over time.
WSCC could also position itself to act as ‘lead’ authority for any joint
arrangements. Such arrangements are complex to deliver; in large measure
because of the separate identities of the participating organisations, potentially
different requirements and differing starting points (in terms of cost base,
existing contracts etc.). However financial pressures and the prevailing
government policy context is pointing towards greater ‘joining-up’ up of
services across public sector bodies and this option has the potential to secure
significant efficiency savings.
• Joint FM Arrangements (many partners) – This is an extension of the option of
joint arrangements (few partners) identified above. The above option could be
a stepping stone towards even greater economies of scale from joining with a
larger number of partners – although it is recognised that this also involves a
greater degree of complexity in terms of management arrangements and
operation.
• County-wide Framework for a Pooled FM Service – Through this option a
collective approach is taken to managing the FM activities of the public estate
within the county. This is consistent with government policy direction which is
West Sussex County Council
Review of Facilities Management
31
promoting the management of public property in defined geographical areas as
a single, unified portfolio. This is a complex option to implement because of the
difficulty in securing engagement with other public bodies but also has the
potential to secure significant efficiency savings arising from the ‘bulking-up’ of
activities. This option can however be implemented on an incremental basis
and WSCC could, if it wishes to, position itself as the ‘intelligent FM client’ for
the wider public sector.
• Sub-Regional Framework for a Pooled FM Service – This option is presented for
completeness although it is not considered a realistic medium term solution.
This is because whilst such an arrangement provides the opportunity to
maximise the economies of scale and is consistent with broad policy and
resource influences which are encouraging ‘shared services’ such a framework
does not currently exist and maybe be complex to establish. However it could
be considered as a long term option with either WSCC creating an appropriate
framework through which others could participate or with WSCC opting in to a
framework created by another body. None of the adjoining County Councils
have established such a framework although Hampshire County Council are
well placed to create one.
.
West Sussex County Council
Review of Facilities Management
33
Appendix B – Profiles of Comparator Organisations
Organisation 1
• Organisation of the FM function
FM function is split into two organisational units. One is focussed around
corporate accommodation which has a ‘thin client’ organisation primarily
concerned with contract and performance management and the other a ‘thick
client’ organisation concerned with Children’s’ Services and a range of FM
contracts focussed on schools.
• Scope of FM
The contract provides services to all corporate sites and includes cleaning,
portering, grounds maintenance, courier, security and furniture moves.
Property maintenance and repairs plus M & E are outside the scope of the
current contract and these services are managed by the Property Team and
provided through term contracts and frameworks.
• Nature of FM Contracts
The new FM contact is a traditionally procured contract let in 2012 for a long-
term. It replaces a previous contract initially let in 2005. At the time of
preparing for the contract Organisation 1 sought to involve other public bodies.
This collaboration proved difficult – in terms of decision making, time,
negotiation and the political will to engage. The current contract does involve
some limited partners (district council and Fire Authority). Although a
collaborative approach was difficult to achieve Organisation 1 sees the issue of
a joint public approach one to explore in the future because of the potential for
further savings through economies of scale.
The contract is generally well received by building users and service managers
who have been used to working with external consultants. An accommodation
West Sussex County Council
Review of Facilities Management
34
board involving department representatives, the service provider and client
team meets regularly to review performance and identify any incipient issues
in contract delivery. There is a focus on ensuring the service provider is
‘embedded’ into the organisation. The FM service provider uses its own
information system which the client side of Organisation 1 can access.
• Treatment of Schools
Schools were explicitly kept out of new FM contract. This was in large part due
to complications over internal decision making and because of the level of
autonomy enjoyed by schools. A pragmatic approach was taken to create a
contract for corporate properties although it is likely that in the future
arrangements there will be a renewed attempt to create a unified contract to
which schools can opt-in to. At the moment there are separate arrangements
for schools and these tend to be a mix of contracts with differing start dates,
lengths and quality standard.
• Current Issues
Implementing corporate landlord model – Organisation 1 has been
implementing a Corporate Landlord Model with a centralisation of activities.
One of the issues to implement in support of the model is the centralisation of
budgets which are currently held by service departments.
Bulking-up contracts – as other contracts for FM services are due for renewal
there is an intention to allow these to be incorporated into the new FM
contract.
• Future intentions for FM
The current contract has only recently been let. The immediate priority is to
make sure that it is working well and to resolve any ‘teething’ problems. In the
medium term there is an intention to move towards a ‘Total FM Service’
covering the broad range of hard and soft FM for the entire portfolio. Move
West Sussex County Council
Review of Facilities Management
35
towards this will be made by ‘bulking-up’ the existing contract. This will be
done by offering expiring contracts which are due for renewal to the
incumbent FM service provider to bid for on an exclusive basis.
Over the longer term there is an intention to seek to collaborate with other
public bodies (such as adjoining authorities or district councils) to secure the
potential savings from the economies of scale and to reduce the overall
requirements for contract management on the collective public sector client
side. There is recognition, however, that this will not be an easy process as
different bodies have different needs.
West Sussex County Council
Review of Facilities Management
36
Organisation 2
• Organisation of the FM function
Organisation 2 initiated the development of a shared services joint venture
partnership involving a strategic private sector partner. FM services are now
provided through this long-term joint venture as part of a broader range of
back-office activities. The joint venture was initially established in 2007 with
three public bodies (the county council; district council & the Police Authority)
and a private sector partner. The joint venture is structured as a strategic
framework agreement so that other public bodies in the region can opt-in if
they choose to do so
Staff from the participating public bodies have been seconded into the joint
venture with ‘assured employment’ status and the joint venture also has some
additional directly employed staff. There is a small retained thin client capacity
for all partners 2 – principally for governance and contract management. Each
partner also retains its own intelligent client capacity rather than there being a
single unified one on behalf of all the public bodies.
• Scope of FM
Hard FM services are provided to the whole operational portfolio whereas soft
FM services are provided to the HQ and principal office sites. There are
different service and output specifications for each of the participating public
bodies which reflect their differing needs. These are monitored through regular
review meetings and defined performance measures.
• Nature of FM Contracts
The joint venture has an initial time frame of 10 years from 2007 with an option
of a 2 year extension. The joint venture is currently at its mid-point. Whilst the
private sector partner has significant financial and operating control of the joint
venture through its share holding of 70% of the Limited Liability Partnership
West Sussex County Council
Review of Facilities Management
37
(LLP); Organisation 2 and its partners exercise a degree of control through
senior officer and member participation on the joint venture Board and
through the output specification and contract governance arrangements for the
services provided.
• Treatment of Schools
The overall service specification has been written to allow schools to opt-in to
FM services. Approximately 70% of schools currently opt-in to the agreement
for their maintenance requirements with the others making their own local
arrangements.
• Current Issues
Budgetary pressures – The partner organisations are facing significant budget
pressures as a result of wider public expenditure constraints. With initial
savings from the joint venture largely secured it is becoming more difficult to
realize savings from FM activities. The approach to the budget pressures is to
look for opportunities to streamline on an activity by activity basis.
Spike in capital spend – After a period of restricted capital expenditure
Organisation 2 is facing a short term (2-3 years) spike in capital spending. This
is causing capacity and resilience issues around the capital programme.
Prioritization of maintenance spend – At the current time it is difficult to
determine the best options for maintenance spend. This is in part due to the
broader context in which the FM service is working with partner bodies seeking
to rationalise their property holding through disposals or shared asset use in
response to savings pressures. Whilst the FM service can prioritize spend on
‘life & limb’ issues it is more difficult to allocate spend against buildings which
may in the future be closed. There is a degree of uncertainty over the release
or retention of buildings which hinders capital and maintenance spend.
West Sussex County Council
Review of Facilities Management
38
Legacy IT systems – the creation of the joint venture brought together some
legacy IT systems. This has caused some operational problems due to their
inability to communicate together or share data and because of some differing
data security needs. Work has been undertaken to specify a new, replacement
systems which is due to be procured in the immediate future.
• Future intentions for FM
The immediate priority for Organisation 2 is ‘business as usual’ – making sure
that the service is operating effectively and taking opportunities to streamline
activities to secure savings. In the longer term there will be a need to review
the operation of the joint venture and to consider implementing the extension
option. There is an acceptance that over the course of the life of the joint
venture that both the political (new Police Commissioner and changes in
political balance across the public sector bodies) and financial landscape has
changed and these factors may have a bearing on the consideration of the long
term direction.
Broadly the joint venture is working well although there are mixed views from
the participating bodies over the service quality – related to their differing
needs.
West Sussex County Council
Review of Facilities Management
39
Organisation 3
• Organisation of the FM function
Organisation 3 has fragmented client-side arrangements (with a separate focus
for corporate offices; schools and other non-schools buildings excluding
offices) but with a single joint venture supplier for the full range of FM services
through a long-term arrangement underpinned by a Service Level Agreement
(SLA). There is no single, corporate, client focus but rather a fragmented client
spread across the main service departments. This means there are some
disjointed and confusing arrangements over service standards and
performance.
• Scope of FM
The Service Level Agreement covers the broad range of both hard and soft FM
services with a few minor exceptions retained in-house. The joint venture
partner also provides much of the ‘intelligent client’ function on behalf of
Organisation 3.
• Nature of FM Contracts
The joint venture has been established for several years and has been working
partly on an ‘informal basis’. The SLA is being re-written and sharpened-up
with perhaps a more stringent focus being placed on service performance. This
has been partly driven by budget pressures and partly as part of work to
implement the Corporate Landlord Model.
• Treatment of Schools
Schools are able to opt-in to the existing joint venture FM arrangements on a
voluntary basis. There is a high degree, but not universal take up of the service.
The Children Services Directorate have their own client function for property
matters in support of schools.
West Sussex County Council
Review of Facilities Management
40
• Current Issues
Budget pressures – There are significant budget pressures facing Organisation
3. To date these have not impacted to a significant degree in how the FM
service operates. However large organisation-wide savings targets have
recently been announced and it is anticipated that all core corporate functions
will be subject to critical review on the basis of their provision and costs. It is
anticipated that FM will be within the scope of this review with initial work
starting in the new calendar year.
Corporate Landlord model – Organisation 3 has recently undertaken work to
implement a Corporate Landlord Model with the centralisation of property
related staff in service departments and centralising property budgets.
However this has yet to be implemented and there is some resistance from
service managers and a lack of corporate will to direct its implementation.
Office rationalisation – there is a significant programme of work to implement
flexible working. There is likely to be a reduction in the number of
administrative buildings and changes to where and how staff work. This may
have significant implications for FM services.
• Future intentions for FM
There are no specific plans to change the FM service as it currently operates as
this is a long-standing joint venture arrangement that is generally perceived to
be working well. However there are immediate budget pressures which will
require some streamlining of processes and possible changes to service quality
standards and frequencies in order to reduce costs. Over the medium term
Organisation 3 will seek to implement the corporate landlord model on an
incremental basis. There are no specific intentions with regard to joining up FM
services across the wider public sector; although there is some recognition that
Organisation 3 is well placed to take a lead role in this because of the scale of
its portfolio and its existing joint venture arrangements.
West Sussex County Council
Review of Facilities Management
41
Organisation 4
• Organisation of the FM function
Organisation 4 has a lean corporate property client team covering estates, FM
and asset management. This team covers strategy, provides the technical lead
for Hard & Soft FM and undertakes contract and performance management.
The broad range of FM services are provided as part of a long term contract
with a large service provider as a subset of a larger corporate contract for a full
range of back-office services.
The impetus for the contract was for cost savings, service resilience and to
secure the more commercial, entrepreneurial skills provided by a large private
sector company. Certainty of costs looking forward, quality of services provided
and issues relating to job security and career progression for transferring staff
were also significant factors.
• Scope of FM
The contract covers the full range of hard and soft FM services (with some
limited exceptions) for the full property portfolio with the exception of schools
(for which there are alternative arrangements which allow them to opt-in to
the services provided).
• Nature of FM Contracts
The contract was let in 2012 for a 10 year period with an option for a further 10
year extension. FM services were one part of a much larger corporate contract
covering all ‘back office’ functions of Organisation 4. Alongside this contract a
framework agreement was established to allow other public bodies and
schools to opt-in to the contract arrangements if they choose to. There is a
guarantee of savings and certainty of costs over the life of the contract. The
new contract replaced the provision of services from another external
provider.
West Sussex County Council
Review of Facilities Management
42
• Treatment of Schools
Schools are not specifically included in the contract but a framework created to
work alongside the contract allows schools to opt-in to FM services. It is
anticipated that as the service provided and the contract become embedded
and fully operational then the service provider will be in position to offer
services directly to schools.
• Current Issues
Transition phase - Organisation 4 has undertaken a significant piece of work in
the course of the procurement, negotiation and mobilisation of this new
contract. It is now in a transition phase during the initial period of the contract
with a strong emphasis on ‘making it work’ and ensuring process and working
arrangement are streamlined and well embedded.
Front facing services – Whilst the contract is working well there are some initial
teething problems for some of the ‘front-facing soft FM services such as
cleaning. Work is in hand to resolve these.
Asset rationalisation / joint asset - There is a significant programme of work
around the rationalisation of Organisation 4’s portfolio and joint-use of
properties with other public agencies. In the future the scale, nature and
distribution of the portfolio will be different and this will have implications for
the volume of FM services provided through the contract.
Flexible working –Organisation 4 is implementing a significant flexible working
programme changing where and how staff work and adopting flexible work
standards around ‘hot desking’; work-station space and personal storage
space. In the future the FM arrangements will need to underpin a more agile
workforce.
West Sussex County Council
Review of Facilities Management
43
• Future intentions for FM
The immediate priority for Organisation 4 is to ensure that the transitional
phase of the contract proceeds smoothly with any teething problems resolved
quickly. Thereafter the FM response to asset rationalisation and flexible
working will need to be addressed. In the medium term monitoring of contract
performance will become increasingly important and KPIs have been identified
for this purpose.
West Sussex County Council
Review of Facilities Management
44
Organisation A
• Organisation of the FM function
Organisation A has adopted a ‘commissioning model’ with the broad range of
FM functions outsourced through a single long-term prime contract. This was
due to expire in 2013 and has recently been renegotiated and extended (for a
short period) pending a decision over the longer term. As part of this
renegotiation further FM activities have transferred from organisation A to the
FM service provider and the costs of the contract have been reduced to
provide savings. The retained client capacity is very lean with approximately 5
FTEs who undertake the contract management role and provide some internal
professional capacity and specialist expertise (for M & E services and carbon
management). Although organisation A has not fully implemented a ‘Corporate
Landlord Model’ there has been a strong degree of centralisation of property
budgets associated with the implementation of the FM services contract with
an external provider.
• Scope of FM
The broad range of hard FM and soft FM are undertaken through the contract
with the exception of H & S (undertaken by an in-house corporate team) and
grounds maintenance (provided through a separate contract with another
service provider). Move management, post services, office furniture ordering
and courier services are all provided in-house. The small retained client
capacity is also responsible for the strategic elements of FM including member
and officer liaison, policy development and performance management.
Organisation A has adopted a new corporate property system with links to the
data from the FM service provider’s own propriety database system.
• Nature of FM Contracts
The existing FM contract covers all ‘corporate’ buildings – but the housing
stock and investment portfolio is excluded with some specific buildings also
West Sussex County Council
Review of Facilities Management
45
excluded for historical reasons. The contract also covers the broad range of
hard and soft FM functions with some limited exceptions and there have been
no undue performance issues during its operation.
• Treatment of Schools
Schools have a strong degree of autonomy and a tradition of making their own
arrangements with limited central support. Schools have the ability to ‘opt-in’
to the corporate FM contract but the majority choose not to do so (as it is
considered too expensive). Schools generally make their own arrangements
with local contracts to suit their specific needs.
• Current Issues
Budget pressures – the council needs to improve VFM through its FM contract
arrangements. These arrangements will continue to be scrutinised to identify
whether there are opportunities to streamline processes, reduce costs and
generally improve VFM.
Clarification of roles – there is a need to clarify roles and responsibilities in
relation to specific types of assets – essentially ‘who pays for what’ discussions
that need to be agreed with service directorates.
• Future intentions for FM
Organisation A is committed to a ‘commissioning’ model so that in the longer
term it is likely that FM services will continue to ‘bought in’. There will be a
review of options prior to the expiry of the latest contract. Whilst the scope for
‘shared services’ with adjoining authorities has been considered; it was felt,
because of organisation’s A current position as largely commissioned function
with pre-existing long-term contracts that this was not necessarily a practical
option to take forward.
West Sussex County Council
Review of Facilities Management
46
Organisation B
• Organisation of the FM function
The broad range of FM services are provided through a ‘mixed economy’
arrangement with (in simple terms) most hard FM services and most soft FM
services provided externally through 2 separate long-term joint venture
arrangements and with other selected services (such as carbon management)
provided in-house. Existing council FM staff were transferred into the joint
venture under TUPE arrangements. The retained client side is centralised and is
relatively lean comprising approx. 24 FTEs with the ‘partnership management’
role exercised by 2 FTEs. Whilst the geographical area served by organisation B
is relatively wide it only has two principal, city centre based offices and in the
wider operational portfolio some FM activities (closing & opening of buildings)
are undertaken through caretaking arrangements.
• Scope of FM
Hard FM services excluding carbon management are provided through a long-
term joint venture arrangement. The Soft FM services of catering, cleaning and
couriers are provided through another separate long-term joint venture. Other
services, such as porters, reception services and FM information are provided
through the in-house client-side team.
• Nature of FM Contracts
The partnership arrangements cover the whole portfolio. Both long-term joint
ventures have a common time-span with a remaining life of 23 years. They are
viewed as ‘partnerships’; with a shared annual business plan and priorities,
rather than as simple contractual arrangements; although they are
underpinned by a Service Level Agreement which details activities provided
and performance expectations. Services are provided by the partnership
organisations staff with specific specialised expertise bought in to supplement
West Sussex County Council
Review of Facilities Management
47
their own resources as required. The annual revenue spend through the
partnerships is approximately £10.5M. There is an expectation that the
partnership organisations will seek to grow their business through securing
other contracts and in doing so contribute to improved cost effectiveness of
services provided to organisation B.
• Treatment of Schools
The partnership arrangements have been created so that schools can ‘opt into’
them at their discretion. The majority of schools do opt-in; but some also make
their own arrangements. There are also in some cases separate contractual
arrangements between the council’s partnership organisations and individual
school with the council’s partnership organisations providing services directly
to these schools.
• Current Issues
Budgetary pressures – the council is facing acute budget pressures over the
immediate short-term. This will require a reduction in the council’s revenue
budget of 14% over the next 2 years and will impact on all council activities.
The principal issue for the FM service therefore is to improve overall cost-
efficiency activities. This is being undertaken on an individual activity basis with
the council client-side working with its partner organisations to stream-line
processes and reduce costs.
Capacity & expertise to respond to strategic issues - whilst the partnership
arrangements have worked well for operational matters there has been a lack
of an adequate response to more strategic issues the council is facing. This is
considered as perhaps an issue of ‘local’ capacity and expertise of the
partnership organisation(s), rather than any specific concern over
performance; although there is some disappointment that the expertise of the
West Sussex County Council
Review of Facilities Management
48
wider partnership organisation has not been brought to bear for organisation
B’s needs.
Communication – generally communication between both the council and the
partnership organisations and the partnership organisations and the end users
(service managers and building users) could be improved. There are regular
monthly meetings between the council’s client side and the partnership
organisations to review performance and a periodic ‘Client Forum’ to engage
with service managers which is chaired by the internal client. This discusses
issues relating to the operation of the partnership arrangements (quality and
responsiveness of services provided). Communication on day to day matters is
handled by the partnership organisations directly with building users and
managers with the council’s client side only involved on an exceptional basis.
.
• Future intentions for FM
There are no specific intentions in the short term over and above responding to
the immediate financial pressures facing the council and ensuring the
partnership arrangements, which are still relatively embryonic in nature, are
working well. Prior to establishing the current joint venture arrangements a
range of options were explored and alternatives such as creating ‘shared
services’ with adjoining authorities were discounted as not viable due to
complexities. Following the appointment of a new Chief Executive the council
is currently going through a re-structuring process. This may lead to the
creation of a split between commissioning and delivery and the potential for
the council to commission a broader range of services - which could be
provided through its existing joint partner arrangements or with other
providers.
West Sussex County Council
Review of Facilities Management
49
Organisation C
• Organisation of the FM function
Organisation C is a newly established unitary authority. The former county
council inherited property and FM staff from former district councils on the
creation of the new authority. It also inherited a mix of FM contracts of varying
nature and timescales. There is a principally in-house service and an area based
approach to FM with the area divided into 3 areas with a broadly similar
number of properties in each
• Scope of FM
The FM service covers the broad range of hard and soft FM activities. Whilst
hard FM is provided for the whole of the portfolio the soft FM is focussed
principally on the main administrative buildings.
• Nature of FM Contracts
Organisation C has recently undertaken a programme to rationalise its non-
schools FM contractual arrangements. Prior to this each contract had its own
individual service specification and contract terms; inherited from legacy
arrangements that were in place prior to the creation of the unitary authority.
It was thus difficult to manage performance, cost and risk across a high number
of disparate contractual arrangements. Three separate contracts (for cleaning,
security and catering) have recently bee let. Each of these contracts is for a
short-term of two years, with an option for extension. There is scope to
rationalise these and other contracts further in the future.
• Treatment of Schools
Schools have a significant degree of autonomy of how they procure their
support activities. Organisation C has a ‘buy-back’ scheme allowing schools to
opt-in to the FM arrangements for their building maintenance needs using
delegated funding. Approximately 70% of schools currently use this opt-in
scheme.
West Sussex County Council
Review of Facilities Management
50
• Current Issues
Budget pressures – Organisation C is facing significant revenue budget
pressures. The FM response to this in the short term is to seek to look for
opportunities to streamline activities and to secure improved value for money
from the rationalisation of existing FM contracts.
Office rationalisation – Organisation C has been undertaking a large-scale
flexible working initiative in conjunction with modernisation of county hall. This
is changing the pattern of where and how staff work and this requires a
significant cultural change programme to underpin it. This cultural change has
an impact on FM services, in particular soft FM services which itself has to
adapt to the changing nature of work patterns.
Multi-agency hubs – plans are in place to create a network of 20 multi-agency
campus buildings across organisation C’s administrative area. Whilst these will
be occupied by a mix of organisations it is likely they will be served by a unified
FM function but this has yet to be defined or established.
• Future intentions for FM
The immediate short-term priority is to make the existing arrangements work
well. Looking further ahead there is scope for further contract rationalisation;
the potential to integrate a multiplicity of activities through a single contract
with a service provider using a long-term contract.
West Sussex County Council
Review of Facilities Management
51
Organisation D
• Organisation of the FM function
Currently the management of the FM function is largely in-house with a mix of
contractual arrangements for service delivery. A recent review of procurement
activity under taken within Organisation D identified potential savings on FM
spend. As a result work has been undertaken to review options for the FM
service (both hard and soft FM) going forward. The impetus to the review was
to secure improved value for money, a better quality FM service and to have
access to improved commercial expertise and the resilience that a larger FM
organisation could provide.
• Scope of FM
The FM service is part of a wider organisational unit covering property and
asset management. It covers the broad range of hard and soft FM activities
through a single unified function for the whole of the operational portfolio.
• Nature of FM Contracts
There are a variety of pre-existing contracts for FM activities. Some of these
contracts have been extended on a short term basis to allow them to be
incorporated into a future joint venture on their expiration.
• Treatment of Schools
Schools have a large degree of autonomy. Some FM services are offered to
schools on an opt-in basis against a ‘fixed price’ Service Level Agreement with
take-up by schools currently in the region of 70%. Other schools make their
own local arrangements. With the option of a public-public joint venture
currently being explored (see below) there is an expectation that the joint
venture will be able to offer services to schools in the future.
West Sussex County Council
Review of Facilities Management
52
• Current Issues
Budgetary pressures - There are significant revenue budget pressures and the
review of FM activity leading to the decision recently taken on future direction
for the FM service has been influenced by the potential of achieving some
significant savings from FM activities. There is work looking forward to ensure
that the identified scale of potential savings are realised through the
implementation of the proposed joint venture arrangement.
Ensuring building compliance – there is a priority to ensure that all buildings
meet statutory obligations and that appropriate inspection and servicing is
undertaken in order to ensure both safety and compliance.
Due Diligence - there is an immediate priority to undertake due diligence work
in conjunction with Organisation D’s preferred option of a joint venture. There
is also a need to determine the exact mix of activities and scope of services that
might be included within the joint venture – with an assumption that over time
at least most hard and soft services will be within scope of the joint venture
creating a ‘Total FM service’.
• Future intentions for FM
The council has just reviewed the options for its FM function as part of a new
approach to procurement. The relative advantages and disadvantages of two
total facilities management options were considered. These were undertaking
an OJEU procurement exercise for a Total FM solution through a traditional
procurement of an FM partner through a traditional contracting arrangement
or establishing a public-public joint venture through a ‘negotiated’ process
taking advantage of the TEKAL exemption. At the time of writing the council
are in the process of developing a business case for the preferred option of a
joint venture and undertaking due diligence in regard to the proposed joint
venture.
West Sussex County Council
Review of Facilities Management
53
Factors influencing the selection of a joint venture include the ability to
exercise control (through the joint venture governance arrangements);
ensuring an adequate level of service resilience and the degree of flexibility to
modify and develop services in conjunction with the chosen FM joint venture
partner. There are expectations that savings in the order of 10% can be secured
through the joint venture option (slightly less than that which might be
achieved through a traditionally OJEU procured service). There is also an
expectation that the joint venture will be able to offer its services to the wider
public sector in the area with both partners benefitting from future cost
savings.