Page 1: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Review of BGREI Review of BGREI 2014-152014-15

State : AssamState : Assam

Date : 31Date : 31stst October, 2014 October, 2014

Page 2: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

BGREI, 2013-14BGREI, 2013-14

AchievementAchievement

(Rs. In lakh)(Rs. In lakh)

Sl. Sl. No.No.

ComponentComponent UnitUnit TargetTarget AchievementAchievement

Phy.Phy. Fin.Fin. Phy.Phy. Fin.Fin.

1.1. Rice DemonstrationRice Demonstration No.No. 273273 4869.0344869.034 273273 3661.83661.8

2.2. Asset BuildingAsset Building

STWSTW No.No. 1000010000 1200.001200.00 13251325 159.00159.00

LLPLLP No.No. 74757475 747.50747.50 -- --

3.3. Site Specific NeedsSite Specific Needs

(i) PP Sprayer at 70% (i) PP Sprayer at 70% subsidysubsidy

No.No. 2857128571 370.00370.00 2857128571 370.00370.00

(ii) Tarpaulin (5m x 5m) at (ii) Tarpaulin (5m x 5m) at 90% subsidy90% subsidy

No.No. 1511115111 516.80516.80 1511115111 516.80516.80

(iii)Conveyance pipe for (iii)Conveyance pipe for LLP & STW at 50% subsidyLLP & STW at 50% subsidy

Mtr.Mtr. 811200811200 1014.001014.00 811200811200 1014.001014.00

(iv)Paddy Weeder at 90% (iv)Paddy Weeder at 90% Subsidy Subsidy

No.No. 66666666 46.8046.80 66666666 46.8046.80

Page 3: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

(Rs. In lakh)(Rs. In lakh)

Sl. Sl. No.No.

ComponentComponent UnitUnit TargetTarget AchievementAchievement

Phy.Phy. Fin.Fin. Phy.Phy. Fin.Fin.

4.4. Marketing SupportMarketing Support

i) Farm Level Storage Unit i) Farm Level Storage Unit (11m x 8m) size , 100 MT (11m x 8m) size , 100 MT capacity. capacity.

No.No. 4747 973.37973.37

ii) Organizing farmers in ii) Organizing farmers in groups at field / groups at field / orientation . orientation .

0.420.42 0.100.10

Total :Total : 9737.929737.92 5768.505768.50

Total Fund Received = Rs. (4869.00 + 1140.00 ) = Rs 6009.00 lakhTotal Fund Received = Rs. (4869.00 + 1140.00 ) = Rs 6009.00 lakh

Total fund utilized , 2013-14 = Rs. (4628.50 + 1140.00) = Rs 5768.50 lakh Total fund utilized , 2013-14 = Rs. (4628.50 + 1140.00) = Rs 5768.50 lakh

Balance Amount = Rs. 240.50 lakh Balance Amount = Rs. 240.50 lakh

UC (2013-14) submitted on 10UC (2013-14) submitted on 10thth April, 2014. April, 2014.

BGREI, 2013-14BGREI, 2013-14

AchievementAchievement

Page 4: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Impact of implementation of BGREIImpact of implementation of BGREI

Increasing trend of Rice production. Farmers taking up Rice cultivation more Increasing trend of Rice production. Farmers taking up Rice cultivation more

extensively with HYV / Hybrid seeds, with appropriate technology. extensively with HYV / Hybrid seeds, with appropriate technology.

(Production in lakh MT & Yield in Kg. per hectare)(Production in lakh MT & Yield in Kg. per hectare)

Types of RiceTypes of Rice Production & Yield Production & Yield during pre BGREI during pre BGREI

(2009-10)(2009-10)

Production & Yield Production & Yield after 4 years of after 4 years of

BGREI (2013-14)BGREI (2013-14)

Percentage increase Percentage increase after 4 years of after 4 years of

BGREIBGREI

ProductionProduction YieldYield ProductionProduction YieldYield ProductionProduction YieldYield

Winter RiceWinter Rice 32.1432.14 18241824 37.0937.09 20022002 15%15% 10%10%

Summer RiceSummer Rice 8.608.60 21802180 11.9011.90 29812981 38%38% 37%37%

TotalTotal 40.7440.74 18891889 48.9948.99 21762176 20%20% 15%15%

Area covered

Production with State’s overall yield (Winter + Summer)

Production with yield in BGREI areas

Yield per ha. Production Yield per ha. Production

72659 ha. 2175 Kg. 1.57 lakh MT 3742 2.70 lakh MT

Increase in production due to implementation of BGREI : 1.13 lakh MT.

Increase in production due to implementation of BGREI (Winter + Summer)

Page 5: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Share of BGREI in total assured irrigation facility created by Agriculture Department

Source of irrigationSource of irrigation All schemes / programmes All schemes / programmes including BGREIincluding BGREI

BGREI alone BGREI alone

No. No. installedinstalled

Assured Assured irrigation irrigation

facility created facility created (lakh ha.) (lakh ha.)

No. No. installedinstalled

Assured Assured irrigation irrigation

facility created facility created (lakh ha.) (lakh ha.)

Shallow Tube Well (STW)Shallow Tube Well (STW) 209583209583 4.194.19 1632516325 0.330.33

Low Lift Pump (LLP)Low Lift Pump (LLP) 2473524735 0.490.49 7,5007,500 0.150.15

Total :Total : 234318234318 4.684.68 23,82523,825 0.480.48

Percentage of Net Cropped AreaPercentage of Net Cropped Area 17%17% 2%2%

Total assured irrigation facility created by Agriculture Department till 2013-14 :Total assured irrigation facility created by Agriculture Department till 2013-14 :

7.05 lakh ha. (25% of Net Cropped Area)7.05 lakh ha. (25% of Net Cropped Area)

Under “Assets Building Component” – 23825 nos. of Pump Sets installed Under “Assets Building Component” – 23825 nos. of Pump Sets installed creating 47,650 ha. additional assured irrigated area paving way for double creating 47,650 ha. additional assured irrigated area paving way for double cropping.cropping.

Impact of implementation of BGREIImpact of implementation of BGREI

Page 6: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Impact of implementation of BGREIImpact of implementation of BGREI

Under “Site Specific Component” - Under “Site Specific Component” -

Covered Threshing Floors mitigating the Covered Threshing Floors mitigating the

problem of threshing of Summer paddy problem of threshing of Summer paddy

helped directly 116 no. GPs, 178 WHS helped directly 116 no. GPs, 178 WHS

creating 1780 ha. of irrigation potential creating 1780 ha. of irrigation potential

area in villages where boring of STW are area in villages where boring of STW are

not feasible.not feasible.

Extensive use of Line Sowing with better Extensive use of Line Sowing with better intercultural operation helped in intercultural operation helped in increasing productivity.increasing productivity.

Page 7: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Implementation Strategy Implementation Strategy

Implementation of Rice demo. and interventions under “Site Specific” is Implementation of Rice demo. and interventions under “Site Specific” is

done through involving PPS (Field Management Committee of farmers).done through involving PPS (Field Management Committee of farmers).

Organising farmers, inputs handling, close monitoring of these programs Organising farmers, inputs handling, close monitoring of these programs

are through PPS under the supervision of VLEW / ADO at field level.are through PPS under the supervision of VLEW / ADO at field level.

Enhancing minor irrigation facility for rainfed areas. Provision for Enhancing minor irrigation facility for rainfed areas. Provision for

conveyance pipe for effective irrigation.conveyance pipe for effective irrigation.

Construction of covered threshing floor to address threshing problem of Construction of covered threshing floor to address threshing problem of

Summer Paddy.Summer Paddy.

Community based interventions especially for small & marginal farmers.Community based interventions especially for small & marginal farmers.

Enhancing farm mechanization to counter labour shortage problem for Enhancing farm mechanization to counter labour shortage problem for

smooth field operations.smooth field operations.

23 nos. of farm level storage units are being established under the technical 23 nos. of farm level storage units are being established under the technical

guidance of SAU with the involvement of community. Community of the guidance of SAU with the involvement of community. Community of the

concerned demo plot will be custodian of the unit. concerned demo plot will be custodian of the unit.

Marketing intervention through community storage facilities and value Marketing intervention through community storage facilities and value

addition through involvement of Women SHG.addition through involvement of Women SHG.

Page 8: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Physical & Financial Achievement , 2014-15Physical & Financial Achievement , 2014-15

(Rs. In lakh)(Rs. In lakh)

Sl. Sl.

No.No.

ComponentComponent UnitUnit Target as Target as

approved by SLSC approved by SLSC

AchievementAchievement

Phy.Phy. Fin.Fin. Phy.Phy. Fin.Fin.

1.1. Rice Demonstration:Rice Demonstration: Ha. 7066770667 5300.005300.00 5132751327 3849.525 (C)3849.525 (C)

2.2. Asset BuildingAsset Building

(i) Dug well(i) Dug well No.No. 644644 193.20193.20 -- --

(ii) STW(ii) STW No.No. 43574357 522.840522.840 18001800 216.00(C )216.00(C )

(iii)Self propelled paddy (iii)Self propelled paddy

transplantertransplanter

No.No. 7575 56.2556.25 1414 10.50 (C)10.50 (C)

(iv) Pump set(iv) Pump set No.No. 77677767 776.70776.70 18001800 180.00 (C)180.00 (C)

(v) Conoweeder(v) Conoweeder No.No. 1717317173 103.038103.038 1002910029 60.174 (C)60.174 (C)

(vi) Manual sprayer(vi) Manual sprayer No.No. 2887728877 173.262173.262 2000020000 120.00 (C)120.00 (C)

(vii) Power Knap Sack (vii) Power Knap Sack

SprayerSprayer

No.No. 607607 18.2118.21 -- --

Page 9: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Physical & Financial Achievement , 2014-15Physical & Financial Achievement , 2014-15

(Rs. In lakh)(Rs. In lakh)

Sl. Sl.

No.No.

ComponentComponent UnitUnit Target as Target as

approved by SLSC approved by SLSC

AchievementAchievement

Phy.Phy. Fin.Fin. Phy.Phy. Fin.Fin.

2.2. (viii) Power weeder(viii) Power weeder No.No. 7070 10.5010.50 -- --

(ix) Paddy Thresher(ix) Paddy Thresher No.No. 625625 250.00250.00 -- --

(x) Multi Thresher(x) Multi Thresher No.No. 4040 16.0016.00 -- --

Total (2) :Total (2) : 2120.002120.00 -- 586.674(C)586.674(C)

3.3. Site Specific Needs :Site Specific Needs :

(i) Installation of STW with (i) Installation of STW with

5 HP diesel pump set5 HP diesel pump set

No.No. 42274227 929.94929.94 24902490 547.80 (C)547.80 (C)

(ii) STW with Electric (ii) STW with Electric

motors motors

No.No. 38813881 388.10388.10 27202720 272.00 (C)272.00 (C)

(iii) Water Conveyance (iii) Water Conveyance

pipe pipe

Lakh Lakh

metermeter

14.07614.076 353.900353.900 -- --

(iv) LLP(iv) LLP No.No. 30003000 450.00450.00 -- --

Total (3) :Total (3) : 2119.942119.94 819.80(C) 819.80(C)

Page 10: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

(Rs. In lakh)(Rs. In lakh)Sl. Sl. No.No.

ComponentComponent UnitUnit Target as Target as approved by approved by

SLSC SLSC

AchievementAchievement

Phy.Phy. Fin.Fin. Phy.Phy. Fin.Fin.44 Marketing SupportMarketing Support

i) Community storage unit at i) Community storage unit at

PPS level(200MT cap)PPS level(200MT cap)No.No. 1010 200.00200.00 -- --

(ii) Covered Threshing Floor(ii) Covered Threshing Floor No.No. 2323 368.00368.00 -- --

(iii) Financial support to (iii) Financial support to

women SHGwomen SHGNo.No. 184184 92.0092.00 8888 44.00(C)44.00(C)

(iv) Paddy cutter machine(iv) Paddy cutter machine No.No. 520520 39.0039.00 -- --

(v) Paddy winnower(v) Paddy winnower No.No. 600600 45.0045.00 -- --

(vi) Self propelled power (vi) Self propelled power

reaperreaper

No.No. 250250 132.50132.50 -- --

(vii) Bag sealing machine(vii) Bag sealing machine No.No. 17861786 89.3089.30 -- --

(viii) Moisture meter(viii) Moisture meter No.No. 18501850 83.2583.25 -- --

(ix) IRRI super grain bag(ix) IRRI super grain bag No.No. 2197021970 10.98510.985 -- --

Total (4) :Total (4) : 1060.001060.00 8888 44.00(C)44.00(C)

Grand Total :Grand Total : 10600.0010600.00 5300.00 (C)5300.00 (C)

Physical & Financial Achievement , 2014-15Physical & Financial Achievement , 2014-15

Page 11: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Procurement done through FCI and ASAMB. Last year procurement Procurement done through FCI and ASAMB. Last year procurement

initiatives by State Govt. through ASAMB ensured remunerative price of initiatives by State Govt. through ASAMB ensured remunerative price of

paddy and regulate local market prices.paddy and regulate local market prices.

This effort to be continued. At present local market price of Paddy is This effort to be continued. At present local market price of Paddy is

almost at par with MSP.almost at par with MSP.

Storage facility of 23 nos. farm level storage units to be utilised by the Storage facility of 23 nos. farm level storage units to be utilised by the

concerned community.concerned community.

Efforts in increasing Procurement & Storage FacilityEfforts in increasing Procurement & Storage Facility

Page 12: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Paddy demonstrations conducted under BGREI, 2013-14Paddy demonstrations conducted under BGREI, 2013-14 (implemented during Kharif, 2014) (implemented during Kharif, 2014)

No. of demonstrations & areaNo. of demonstrations & area TotalTotal Paddy VarietyPaddy Variety

Shallow low landShallow low land HybridHybrid

No. of No. of

Demo.Demo.

Area (ha.)Area (ha.) No. of No. of

Demo.Demo.

Area Area

(ha.)(ha.)

No. of No. of

Demo.Demo.

Area Area

(ha.)(ha.)

4444 11000.5011000.50 7474 18496.3018496.30 118118 29496.8029496.80 Shallow low landShallow low land : :

Swarna Sub 1Swarna Sub 1

HybridHybrid : :

JKRH -401JKRH -401

US -312US -312

Crop condition : Satisfactory.Crop condition : Satisfactory.

Results of Crop Cutting Experiments awaited.Results of Crop Cutting Experiments awaited.

Page 13: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Result of Crop Cutting Experiments under BGREIResult of Crop Cutting Experiments under BGREI (Crop Winter Paddy & Summer Paddy)(Crop Winter Paddy & Summer Paddy),, 2013-142013-14

Rice Rice SeasonSeason

Rice Rice TypeType

VarietyVariety No. of CC No. of CC ExperimentsExperiments

Average yield of Average yield of Paddy as per Paddy as per

CC ExperimentCC Experiment(Kg. per ha.)(Kg. per ha.)

Average Average yield of Rice yield of Rice

as per CC as per CC ExperimentExperiment(Kg. per ha.)(Kg. per ha.)

WinterWinter HYVHYV Swarna Sub-1Swarna Sub-1 8888 48784878 31713171

Summer Summer HYVHYV IR 64, Ranjit, IR 64, Ranjit, MTU 1010MTU 1010

131131 54065406 33793379

HybridHybrid Arize 6444, Arize 6444, PAC 835, PAC 835,

JKRH 401, JKRH 401, DRRH 2, DRRH 2,

RajlakhmiRajlakhmi

125125 67866786 42414241

Total (Summer)Total (Summer) 256256 60806080 38003800

Total (Winter + Summer) :Total (Winter + Summer) : 344344 57735773 36403640

Page 14: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Considering the no. of Small & Marginal farmers (85.6% of total farmers) Considering the no. of Small & Marginal farmers (85.6% of total farmers) existing subsidy norms on inputs needs upward revision as cost of all existing subsidy norms on inputs needs upward revision as cost of all inputs are increasing.inputs are increasing.

Implementation of time bound programmes (Demonstrations) may be Implementation of time bound programmes (Demonstrations) may be allowed immediately after approval of SLSC.allowed immediately after approval of SLSC.

Scarcity of less than 10 year old Rice varieties is an area of concern. A Scarcity of less than 10 year old Rice varieties is an area of concern. A system needs to be developed for availability of such varieties along with system needs to be developed for availability of such varieties along with its certification.its certification.

Provision for Power Tiller may be made under BGREI as mechanization is Provision for Power Tiller may be made under BGREI as mechanization is a must for increasing productivitya must for increasing productivity.

Issues Issues && Constraints Constraints

Page 15: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Demonstration on Hybrid Rice cultivation under BGREI at Sonapur, Kamrup

(Variety : Sahyadri 4)

Page 16: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Demonstration on Hybrid Paddy cultivation under BGREI at Barpeta

(Variety : ARIZE 6444)

Page 17: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Transplanter used in BGREI Demonstration , Bokakhat

Page 18: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Water Harvesting Structure under BGREI

Page 19: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Hon’ble Minister, Agril. Assam at ceremonial transplantion, BGREI at Kanarpur Pathar, Satgaon (Dist. Kamrup)

Page 20: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

ThanksThanks

Page 21: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

DistrictDistrict No. of CC No. of CC Expt. Expt.

conductedconducted

Yield of Paddy in Experimental Plot (5mX5m) (in Yield of Paddy in Experimental Plot (5mX5m) (in Kg.)Kg.)

Average yield Average yield of Rice per of Rice per

hectare (Kg.)hectare (Kg.)Total Total yield yield

Average dry yield Average dry yield (driage 9.52%)(driage 9.52%)

Average dry yield Average dry yield per hectareper hectare

BongaigaonBongaigaon 77 84.3484.34 10.901510.9015 43614361 28342834ChirangChirang 1414 159.5159.500 10.308310.3083 41234123 26802680DarrangDarrang 55 73.8973.89 13.371113.3711 53485348 34763476DibrugarhDibrugarh 44 54.4554.45 12.316612.3166 49274927 32023202GolaghatGolaghat 22 27.927.900 12.62212.62200 50495049 32823282KamrupKamrup 1212 174174.00.00 13.119613.1196 52485248 34113411KokrajharKokrajhar 77 88.888.800 11.47811.47800 45914591 29842984LakhimpurLakhimpur 44 69.4569.45 15.709615.7096 62846284 40844084SibsagarSibsagar 44 53.24553.245 12.04412.04400 48184818 31313131SonitpurSonitpur 22 27.3527.35 12.373112.3731 49494949 32173217UdalguriUdalguri 44 54.1754.17 12.253312.2533 49014901 31863186KarimganjKarimganj 22 1313.00.00 5.88125.8812 23522352 15291529JorhatJorhat 1212 175.65175.65 13.24413.24400 52985298 34433443BarpetaBarpeta 99 130.2130.266 13.09513.09500 52385238 34053405 TotalTotal 8888 11861186.00.00 12.194212.1942 48784878 31713171

Result of Crop Cutting Experiments under BGREIResult of Crop Cutting Experiments under BGREI (Crop Winter Paddy : Variety : Swarna Sub 1)(Crop Winter Paddy : Variety : Swarna Sub 1),, 2013-142013-14

Page 22: Review of BGREI 2014-15 State : Assam Date : 31 st October, 2014

Contribution of BGREI to total Rice Production, 2013-14Contribution of BGREI to total Rice Production, 2013-14

Increase in production due to implementation of BGREIIncrease in production due to implementation of BGREI

BGREI, 2013-14BGREI, 2013-14 State’s State’s

productionproduction

BGREI’s BGREI’s

contributioncontributionVarietyVariety Area Area

(ha.)(ha.)

Yield per Yield per

ha. (Kg.)ha. (Kg.)

Production Production

(lakh MT)(lakh MT)

Winter Winter

RiceRice

HYVHYV 1400014000 31713171 0.440.44

37.0937.09 3%3%HybridHybrid 2000020000 38783878 0.760.76

Total (Winter Rice) :Total (Winter Rice) : 3400034000 35873587 1.201.20

Summer Summer

RiceRice

HYVHYV 1645916459 33793379 0.560.56

11.9011.90 13%13%HybridHybrid 2220022200 42414241 0.940.94

Total (Summer Rice) :Total (Summer Rice) : 3865938659 1.501.50

Grand Total Grand Total

(Winter + Summer)(Winter + Summer)

7265972659 37423742 2.702.70 48.9948.99 6%6%