Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Beams for EuropeanNeutrino Experiments
(BENE) subtitle:
A Network aiming at a consensual road map for accelerator based neutrino programs in Europe
A complex multi-parameter problem
International Scoping Study of a future Neutrino Factory and Superbeam facility
(ISS)
FP7 Design Study of a future superior Accelerator Neutrino Facility
“Euroν” DSin world wide collaboration
WorldDS
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Pee=1- ….. Pe=
P=1- …..
P=1- …..
P =
Pe = …….
Pe =
Pe=
P= …..
The matrix of neutrino transition probability
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Pee=1- ….. Pe= - 4 Re Je12sin2
- 4 Re Je13sin2
- 4 Re Je23sin2
± 8J sinsinsin
P=1- …..
P=1- …..
P = - 4 Re J12sin2
- 4 Re J13sin2
- 4 Re J23sin2
± 8J sinsinsin
Pe = …….
Pe = - 4 … - 4 … - 4 … - (± 8J….
Pe= - 4 Re Je12sin2
- 4 Re Je13sin2
- 4 Re Je23sin2
± 8J sinsinsin
P= …..
The matrix of neutrino transition probability
J’s mixingsmass splittings three, but two
J CPV phase
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Pee=1- ….. Pe= - 4 Re Je12sin2
- 4 Re Je13sin2
- 4 Re Je23sin2
± 8J sinsinsin
P=1- …..
P=1- …..
P = - 4 Re J12sin2
- 4 Re J13sin2
- 4 Re J23sin2
± 8J sinsinsin
Pe = …….
Pe = - 4 … - 4 … - 4 … - (± 8J….
Pe= - 4 Re Je12sin2
- 4 Re Je13sin2
- 4 Re Je23sin2
± 8J sinsinsin
P= …..
T & CP violating term e-iδ
universal
The matrix of neutrino transition probability
Experiments ahead of us, for decades ……..
Solar (SuperK,SNO)LBL Reactors (Kamland)
AtmoK2K, NuMI, CNGS
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
We must reinforce BENE to match the challenges
Deputy Leader vacant
Physics Mezzetto/INFN
Driver Cavata/CEA … enfin must reinforce initiative
SPL, RCS, FFAG ?
Target Bennett/RAL … retiring, at some point, CERN CNGS?
Collector Dumarchez/IN2P3 but, can he & we count on IN2P3?
Novel beams MuFront Long/ICL welcome!
MuEnd Meot/CEA Betabeam Lindroos/CERN
SPL Superbeam 3.5 GeV A.Cazes et al Nufact 6-10 GeV S. Brooks et al
Contacts in progress with various candidates will find a place for all the ones available, we need all the forces we can have
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Status Report from BENEV. Palladino, CARESG, College de France, Sep 5 2005
• 2004 BENE established on the EU scene
• MMW workshop May 2004: the MMW frontier Villars SPSC meeting Sep 04, where
we cashed
renewed attention to a Eu ν program (R&D)
emergence of a ν “construction window” !!!!!!!!!!! Betabeam DS approved !• 2005 BENE consolidated on the EU & international scene
– NNN05 in April and NuFact05 in June
physics case further established in the two workshops
R&D advancing (HARP data out, MERIT+MICE approved, ISS launched) full recognition of BENE at CERN as the ν center of initiative
the ν voice in the strategic discussion ahead
CARE-Report-04-034-BENE.docCARE-Report-05-021-BENE.doc
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
proud to have gotten this far
Matching our two crucial 2005 milestones • Physics case developped as far as possible today
in the most international context possiblebecoming a polished BENE Interim report
• Design Study road traced by ISS
in spite of outstanding difficulties small size of our community & its core of active people
cern contribution being resurrected only now (slowly)
division that makes at times consensus unnecessarily difficult
NB legitimate different scientific interests do exist
collapse of FP6 calls and more
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
After a few nice forward jumps1 step back and ½ step forward
approval of BENENA within I3 (CARE)
MMW Workshop
Villars & beyond
FP6 Design Study?
I3ν? Mar 05 Niet!
1 year ISS
FP7&WDS Design Study
2003-2004 Nov 04 Niet!
Jun 05-Aug 06
Mar 07
Mar 05
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
positive signals , after meager years of LHC crisis
1) EU approval (HIPPI and BENE)
Main conclusion
MMW and ’sback on the EU map, maybe
2) attention of CERN & National Agencies …. more vigourous R&D soon maybe
can CERN envisage a high intensity (M-MW) frontier
besides its high energy (M-TeV) frontier ? undisputed mandate
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Second conclusion
A rich program appears possible around a SPL (Superconductive Proton Linac)
but it may with other proton drivers too, like a RCS, most likely (Rapid Cycling Synchrotron)
two options
1) high energy ……. NuFact (& Superbeam)
2) low energy …….. Betabeam (& Superbeam)
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Third conclusion …. a question
LHC (& upgrade) will be the first priority
Next HE project .. CLIC
Will there be a window for a MMW investment?
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Two main physics strategies
use of the high neutrino rate (>1020/year) and energy (10-50 GeV) of Neutrino Factory + LMD detector of large but not huge mass (50-100 Kt), necessarily magnetic (a dense magnetized Iron detector, or, possibly, Li-Argon), a few 1000 Km away.
use of the lower neutrino rate (1018-19/year) and energy (sub-GeV) of Betabeam + Megaton low density detector of very large mass (0.5-1 Mt) and volume (0.5-1 Mm3) non magnetic (a Water Cerenkov detector, or possibly, again Li-Argon), a few 100 Km away.
νe + ν
νe
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
BetaRingMuon Complex
G.Sasso LMD0.1 Mton
Frejus 1 MtonWater C
Garoby HaserothLindroos
EU Neutrino Complex
Proton complex
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Superbeam (high power conventional beams)
is less performing, per se
but does have technical synergy with the NuFact largely coincides with the front end of a Factory
solving the technical challenges of a several MegaWatt proton driver and target & collection system, on the way to build a factory, yields a superbeam facility essentially for free (not its detector, however!)
and does have scientific synergy with the Betabeam can use the same detector combination has some truely unique features: 1) oscillation signal is νe→νμ in the first, νμ→νe. in the second, one calibrates the signal (and background) of the other !
2) T-reversal and CPT asymmetries can be measured likely to be integrated in both strategies
ν
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Esample of comparison of physics reach: CP violating phase
Figure 7 : 99%CL sensitivity of the beta-beam, of the SPL-SuperBeam, and of their combination, see text. Dotted line is the combined Superbeam+beta-beam sensitivity computed for sign(m2)=-1. Sensitivities are compared with a 50 GeV Neutrino Factory producing 21020 decays/straight section/year, and two 40 kton detectors at 3000 and 7000 km
Comparable merits : NuFact somewhat better and more versatile for ν oscillations Megaton offers sinergy with N decay and more
NB conclusions highly preliminary based on still not well agreed yardsticks must now be re-scrutinized much more in depth (ISS)
!!!
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Betabeam + Megaton NuFact + LMD
are complementary !!!!!!!!!!! each has merits unaccesible to the other (matter effects, CP, T , CPT violation, p decay, astroph. & cosmology .. )
by means of truely international collaboration we could and should aim at having both facilities
A general remark
and
we must push both very actively catch opportunities wherever they emerge
seriously aim at building one in Europe in the “construction window”
!!
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Further caveat
Intermediate solutions also emerging !
Higher energy and higher rate betabeams heading to detectors at intermediate distances
thou technically more difficult ( beta acceleration in new higher energy SPS or LHC !) do deserve very careful attention
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
100 participants
HyperKUNOMemphys
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
All aspectsof Megaton physics revised and updated
state of the art material for full elaboration of BENE physics case
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Strong reinforcement of international cooperation achieved
…………………………………………………………
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
200 participants All aspects of future ν physics revised and updated
state of the art material for full elaboration of BENE physics case
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
NuFact Scientific Program
• To be inserted
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Sunday June 26 9:00-13:00
1) Physics Studies : Status & priorities
1) Accelerator R&D : Status & priorities
2) Neutrino Detectors: Status & priorities
WW R&D Session
PANEL & OPEN DISCUSSION Launch International Scoping Study … to report at NuFact06
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
A Summer School accompanied the workshop: 22 students, 12 lecturers
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
The International Scoping Study
(ISS)
on Neutrino Factories and Superbeams
A joint venture, jointly set up by the coordinators of the US Neutrino Factory Collaboration the Japanese NuFact-J Work Group
the Eu BENE Network and the host (RAL) UKNF Collaboration
to lay the foundation of a full blown International Design Study
that must advance to same level of progress as Betabeams
S. Geer
Y. Kuno
V. Palladino
K. Peach
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
started in March-April by RAL
All aspects included, except accelerator Betabeam studies
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
International Scoping Study : agenda for one year
22-24 Sep CERN a success !!!
Late January KEK
Mid April RAL
Late August NuFact06 in Irvine
hopefully, NuFact06 will
launch International Design Study and FP7 Eu Design Study
Matching funds
+ topical intermediate workshopsPhysics, London, 14-21 Nov.
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Detectors (NEW!)
Water Cherenkov (1000kton)Magnetized Iron Calorimeter (50kton)Low Z scintillator (100 kton)Liquid Argon TPC (100 kton)Hybrid Emulsion (4 kton)
Near detectors (and instrumentation)
Physics
compare performance of various options on equal footing of parameters and conventionsand agreed standards of resolutions, simulation etc.
identify tools needed to do so (e.g. Globes upgraded?)
propose « best values » of baselines, beam energies etc..
Accelerator: -- proton driver (energy, time structure and consequences)-- target and capture (chose target and capture system) -- phase rotation and cooling -- acceleration and storage
evaluate economic interplays and risksinclude a measure of costing and safety assessment
(A.Blondel)(Y. Nagashima)
(M. Zisman)
P. Dornan
NB BetaBeam included
The three sectors of SS (andDS)
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
2005 06 07 08 09 10 11 19
Int. Scoping Study(*)
Design Study
BENE : the longer term plan
CDR … at the time of end of LHC paymentfirst LHC resultsILC decision
be ready to catchany construction window
Physics
feasibility
Feasibility & TPW
HIPPI, HARP
MERIT
MICE
PRISM, EMMA
NB Betabeam CDR End 2009 !
Construction window
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
The HARP experiment
TPC
Forward Spectrometer
Total Acceptance Scan CERN PS energy range … RCS is an option
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
(US, Japan, CERN&RAL) holds the key to any superbeam !!! tests the single shot behavior at MMW driver
of target and collection (solenoid, horn?)
should make that more known better supported and manned should evolve that into a MMW target and collector Test Area?
The most crucial experiment for the future of the ν
can we master the MMW?
The MERIT ( nTof 11) experiment
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Liquid jet target in 15T mag. field
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
MICE …. crucial demonstration esperiment for the feasibility of a Neutrino Factory
Phase I completely funded by now- Datataking starts April 1 2007
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
One crucial task of BENE in the ISS year
assemble a real EDS (Eu DesignStudy) collaboration !!!!! that will sign and provide the manpower & largest part of the funds, matching funds, for a FP7 bid able to have the blessing of ECFA and good odds of approval in Brussels.
find the synthesis of so far not obviously converging interests CERN, INFN, CCLRC, IN2P3, CEA, PPARC, CSIC, Germany?,
Belgium, NIKHEF, everybody
CERN positive attitude towards the ISS and BENE’s initiative willingness to assemble a small ISS task force (R. Garoby) will no doubt greatly help
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Plans for the rest of 2005
Heading towards CARE/BENE05 22-25 November
CERN Seminar September 13 on NuFact05
ISS meeting Sep 22-24 …. well focused work did start
Interim BENE Report, based on NNN05 and NuFact05, ready mid-November requested explicitely also by the CERN DG
in view of Council in December Input to the strategic discussion in progress at CERN
FPAPOFPA SPC road map for HEP in Europe
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
PAF Proton Accelerator Future study group (R. Garoby)
(J. Ellis)
The optimal Eu p-complex for LHC upgrades ν, K μ + other fix targ Eurisol more?
POFPA Physics Opportunities of Future Proton Accelerators
CERN Council Task Force (Peach/SPC+Akesson/ECFA) Road Map for HEP in Europe, special SPC Lisbon July 06
A decisive debate ahead of us
BENE has its voices in all of them
Open SymposiumAt CERN early 06
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
BENEBeams for European Neutrino Experiments
Coordinator: V. PalladinoDeputy coordinator: E. Gschwendtner
BENE is a Networking Activity (N3) in the framework of CARE
(Coordinated Accelerator R&D in Europe).
Main Objectives
The aim of this Networking Activity is to integrate and coordinate the activities of the accelerator and particle physics communities working together, in a worldwide context, towards achieving superior neutrino beam facilities for Europe. The final objectives are:to establish a road map for upgrade of our present facility and the design and construction of new ones; to assemble a community capable of sustaining the technical realisation and scientific exploitation of these facilities; to establish and propose the necessary R&D efforts to achieve these goals.
Work Packages Meetings
1.PHYSICS (M. Mezzetto) 2.DRIVER (C. Cavata) 3.TARGET (R. Bennett) 4.COLLECTOR (J. Dumarchez) 5.NOVEL NEUTRINO BEAMS:
MUFRONT (R. Edgecock) MUEND (F. Meot) BETABEAM (M. Lindroos)
1st Workshop of the Physics WG of the International Scoping Study (ISS), Imperial College, London, Nov 14-21 ECFA/BENE Week, (BENE05), Nov 22-25, CERN, Switzerland, yearly workshop held within the annual general meeting of CARE (CARE05). 2nd general meeting of the International Scoping Study (ISS), KEK, Japan, Jan 23-25. more....
Publications General Links
OverviewAnnual Report 2004BENE Quaterly Reports Publications from the Work PackagesOther Publications
CARENeutrino and Muon Activities at CERNEuropean Neutrino GroupThe International Scoping Study (ISS) of a future Neutrino Factory and Superbeam facility Old BENE web-page
bene.web.cern.ch
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
• 14:00-17:30 Plenary ECFA/BENE meetings, CERN IT Amphi 31/3-004 • Design and Scoping Studies Session
• 14:00 FP6 Betabeam Design Study (M. Lindroos)• Agenda in preparation• 15:00 International NuFact & Superbeam Scoping Study (P. Dornan)• Agenda in preparation, likely to resemble to • Physics- including Report from the IC Workshop - Accelerator
Detectors
16:30 International & FP7 Design Study: preparing for them (R. Aleksan))• The FP6 Eurisol experience Y. Blumenfeld
The FP6 EuroTev experience E. Hensen
• The FP7 Neutrino Factory and Superbeam Design Study (DS) • General discussion on: Scientific and Technical Strategy of the DS Structure of the DS European Collaboration Milestones in 2006
BENE05 @ CARE05 22-25 November at CERN
In particular Thursday 24 Nov
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
We must reinforce BENE to match the challenges
Deputy Leader vacant
Physics Mezzetto/INFN
Driver Cavata/CEA … enfin must reinforce initiative
SPL, RCS, FFAG ?
Target Bennett/RAL … retiring, at some point, CERN?
Collector Dumarchez/IN2P3 but, can he & we count on IN2P3?
Novel beams MuFront Long/ICL welcome!
MuEnd Meot/CEA Betabeam Lindroos/CERN
SPL Superbeam 3.5 GeV A.Cazes et al Nufact 6-10 GeV S. Brooks et al
Contacts in progress with various candidates will find a place for all the ones available, we need all the forces we can have
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
BENE-I
input alla Road Map INFN
Reunion GDRν, College de France,Paris,\20Oct05 V. Palladino BENE and the ISS
Interno Estero
Frascati 1.5 1.5 Milano 2.0 2.5 Napoli 4.0 7.0 Padova 3.0 6.5 Roma III 1.5 3.0 Trieste 3.0 4.0 (*)
(*) con Claudio Montanari, in CSN5, abbiamo scorporato le richieste di Trieste per BENE, presentate ei moduli MICE per volere del loro direttore, nonostante le nostre resistenze e la presenza di Romanino e Schwetz, e di riportarle su BENE-DZ. Era l' ultimo step necessario per una chiarificazione e separazione completa.
Fondi BENE 2006
+ attenzione del coordinatore
+ attenzione del coordinatore
INFN matching funds for BENE & ISS