Upload
vivek-pathak
View
100
Download
4
Embed Size (px)
Citation preview
PERMANENT ADDRESS: VIVEK PATHAK CONTACT NO: Mob (1):7869516911
CURRICULUM VITAE
18/365,Indira nagar, Lucknow-226016 Mob (2):7389939050 Email id (1):[email protected] Email id (2): [email protected]
Position Holding: Senior Manager -Steam turbine, Generator& Auxiliaries ( at SKS Power, Raigarh, Chattisgarh-4X300 MW).
Objective:
A mechanical Graduate Engineer possessing 10 years experience in the field of thermal power project
management group. With flair to excel, get updated with the latest technology in the field of mechanical En-
gineering / Power System, Seeking a challenging and professionally rewarding position in a reputed organi-
zation in the field of Power Sector to apply all the aforesaid expertise towards the enhancement of the com-
pany giving priority to Quality, safety and cost.
Educational Qualification:Uttar Pradesh technical university (UPTU) 2006B.Tech. (Engg.) in Mechanical Engineering.
Aggregate 59.88 %, 2006
City Montessori school, Lucknow1999ICSE (10th) 63% 1999ISCE (12th) 55% 20012001
Present Professional Experience(1): SKS POWER 4x300 MW(HERBIN TURBINE CORPORATION) . .Raigarh (Chhattisgarh).
Senior Manager 14 th June 2014-till date Execute proper installation of Turbine-Generator and Aux. with proper quality and safety.
Experience in the field of Erection of Turbine, HIP-LP Turbines, Sole Plate Setting, leveling, erection
of nozzles and diaphragms, alignment of Turbine, rotors .
Main steam valve/Control valve/reheat stop/control valve assembly.
Erection and flushing of lube oil systems, hydraulic oil systems and exposure to testing & pre-com-
missioning activities inclusive of material handling.
Experience in the field of Generator sole plate setting, On base of generator, rotor threading, align-
ment of generator, turbine rotors , exciter and its accessories erection & flushing like, stator cooling
water system, seal oil system.
Condenser erection ,flood test, water box hydro test ,turbine to condenser neck welding.
Motor driven BFP,CEP& other turbine auxiliaries erection and commissioning.HP/LP Heaters erec-
tion and alignment.
Coordinate daily/weekly/monthly meeting with vendors and contractors. Coordinate with
Chinese(HTC) vendor for shipping sequentially and priority requirement of Equipment
from china
Planning &monitoring and managing of material and manpower for the proper execution
at site
Reviewing of Blue print drawings of all the above equipment’s in plant. Preparation of Daily progress report and other required presentation(PPT) for top management.
Professional Experience(2): Working with GMR Energy ,Raipur,Chattisgarh-2X685 MWSUPER CRITICAL(Doosan –GE Turbine & Generator)
Associate Manager 10 Feb2012-14 june2014
Erection and commissioning of Steam Turbine &Auxiliaries.
Installation of Steam turbine &Generator(685MW). Experience in the field of Erection of Turbine,
HP/IP /2-LP Turbines, Sole Plate Setting, leveling, erection of nozzles and diaphragms, alignment of
Turbine, rotors
Main steam valve/Control valve/reheat stop/control valve assembly.
Erection and flushing of lube oil systems, hydraulic oil systems and exposure to testing & pre-com-
missioning activities inclusive of material handling.
Experience in the field of Generator sole plate setting, On base of generator, rotor threading, align-
ment of generator, turbine rotors , exciter and its accessories erection & flushing like, stator cooling
water system, seal oil system.
Condenser erection ,flood test, water box hydro test ,turbine to condenser neck welding.
Motor driven BFP,CEP& other turbine auxiliaries erection and commissioning
HP/LP Heaters and Deaerator erection and alignment.
Professional Experience(3): Project Execution & management - Lanco infratech ltd. Amarkantak thermal power project-2X660 MW(SUPER CRITICAL)–HERBIN TURBINE CORPORATION(CHINA). And Anpara thermal power plant(2X600)-Dongfang Electric corporation( Turbine and Generator).
Assistant Manager: 10 th May2010- 10thFeb2012
Erection of Steam turbine &Generator(685MW). Experience in the field of Erection of Turbine,
HIP ,2-LP Turbines, Sole Plate Setting, leveling, erection of nozzles and diaphragms, alignment of
Turbine, rotors
Main steam valve/Control valve/reheat stop/control valve assembly.
Erection and flushing of lube oil systems, hydraulic oil systems and exposure to testing & pre-com-
missioning activities inclusive of material handling.Experience in the field of Generator sole plate
setting, On base of generator, rotor threading, alignment of generator, turbine rotors , exciter and its
accessories erection & flushing like, stator cooling water system, seal oil system
Professional Experience(4): Project Execution & management, RELIANCE POWER (Rosa thermal power project-2X300MW(SUB -CRITICAL)shanghai Electric CORPORATION(CHINA)
ExecutiveSr.Engineer: 11th, May 2006 – 10 thMay2010
Successfully completed the synchronization of (2X300 MW) plant
TURBINE ERCTION AND COMMISSIONING
Erection & commissioning of Multistage centrifugal pumps(CEP,CWR pumps).
Monitoring the Erection activities such as Fabrication welding of Fuel oil Tank (LDO&HFO).
Planning, monitoring, laying and welding and preparation of Mitre, CW Piping and LP piping.
Planning and monitoring and managing of manpower to meet the target of execution.
Reviewing of Blue print drawings of all the above equipments and plant
Additional Experience :
Participate in Management development programme on Project Management at INDIAN INSTI-
TUTE OF MANAGEMENT (IIM ,Lucknow ).
Attend Workshop on Welding technology and non destructive testing of materials at JSNT Technical
services.
Linguistic ability-Hindi, English . Worked in IBM, Call centre (for Personality Grooming).
Computer Skills: Microsoft excel ,word, power point, Microsoft project.
Personal Details:
Birth-Date : 10-01-1982Sex : MaleNationality / Religion : Indian / Hindu Language Known : English, Hindi.Marital Status : Married.
Salary Package:
Present Salary : 18 Lacs per annum. Expected salary : Negotiable.
Personal Declaration:
I do hereby declare that the above statements are true to the best of myKnowledge and belief.
Date: Vivek Pathak