Upload
usman-zafar
View
725
Download
0
Embed Size (px)
DESCRIPTION
I am Graduate B-Tech Civil Engineer. I have 4+Years Working Experience in Quality Control of Building Construction Architectural Design WorkRoad & Infrastructure Quantity SurveyorRoad & Infrastructure Design work Road Cross Section & Infrastructure Shop Drawing Work
Citation preview
1
Muhammad Usman Zafar S/O Zafar AhmadEmail engr.usman 1 @ymail.com Residence Location Old Mozahmi, Al- Buraimi Oman Temporary Location Jamal Abdul Nasir Street,Al-Khan, - Sharja, U.A.ECell No. (U.A.E) +971-556478195Cell No. (Oman) +968-93295268Resident Card No. 87976898 Passport No AM5525591 Religion IslamJob Target: Civil Engineer | QA/QC Engineer | Civil Draftsman
Objectives:To be a complete human resource for my employers in the field of construction.Summary:I am Graduate B-Tech Civil Engineer. I have 4+Years Working Experience in Quality Control of Building Construction Architectural Design Work Road & Infrastructure Quantity Surveyor Road & Infrastructure Design work Road Cross Section & Infrastructure Shop Drawing Work
Education: Pimset Institute
B-Tech, Civil Engineering GPA: 3.3 / 4.0Activities and Societies:
ASCE - American Society of Civil Engineers
Professional Experience| Building Work
| Civil Engineer Sep-2011 – To Date Saif Kindi Construction Company Private Villa’s Work in Al-Buraimi, Oman.
| Basic Tasks Quality Control & Site Inspection Work
Mu
ham
mad
Usm
an
Zafa
r
2
Billing of Sub-contractors Controlling all activities at site and management of labor
Professional Experience
| Road Work & Infrastructure
| Quantity Surveyor Jun-2011 – Sep-2011 Inland Construction Company Infrastructural Development Work of DHA Phase-VII Lahore.
| Special Tasks
Preparation of IPC Tracks & Monitor Project Preparation of Site Execution Plan Preparation Of Work Schedule
| Basic Tasks
Inspection of Road Cross Sections Inspection of all type Road Drawings Inspection of all type Infrastructure Drawings
| Design Engineer March-2010 – June-2011 MCC RUBA International Private Limited Infrastructural Development Work of DHA Phase-VII Lahore.
| Special Tasks
Working on IPC Preparation of Road Cross Sections Preparation of Shop Drawings
| Basic Tasks
Preparation of As Per Built Drawings Preparation of all type Road Drawings Preparation of all type Electrical Drawings Preparation of all type Infrastructure Drawings
Achievements:
Fastest way to Design Road Cross section & Other QS Tasks*AutoCAD Optimization with Auto lisp Programming
Note: The above all mentioned detail is true as my knowledge and experience.
Mu
ham
mad
Usm
an
Zafa
r
2
Professional Experience| Building Work
| Site EngineerFeb-2009 – March-2010 Eden Housing Limited Eden Residencia, Eden Lane Villas II Housing Project Lahore.
| Special Tasks Quality Control of Model Houses Inspection of Strom Water Drain Inspection of concrete work
| Basic Tasks Construction of Model Houses Responsible for billing of Sub-contractors Controlling all activities at site and management of labor
| Site Supervisor Sep-2007 – Feb-2009 Trident Construct Private Limited Pace Woodlands Housing Badian Road Lahore.
| Special Tasks Quality Control of Model Houses Preparation Project Reports for Head office perusal
| Basic Tasks Construction of Houses Preparation of Bar Bending Schedule Responsible for billing of Sub-contractors Controlling all activities at site and management of labor
Career Level Mid LevelVisa Status (UAE) Visit Visa Visa Status (OMAN) Residency Visa (Transferable)Date of Birth 21 December 1989Marital Status Single Gender Male Interests Research Languages | English | Urdu | Arabic (Basic)
Note: The above all mentioned detail is true as my knowledge and experience.
Mu
ham
mad
Usm
an
Zafa
r
2
Computer Skills
2007 | AutoCAD 2D & 3D|Skill Level : High
Preparation of Architectural Drawings Preparation of Presentation Drawings Preparation of As Per Built Drawings Preparation of Layout Plans & Landscape
|Skill Up Gradation: Auto Lisp Programming For AutoCAD Preparation of Road Cross Section Preparation of Road & Infrastructural Drawings Preparation of Road Layout Plan & Junction Drawings
2007 | Microsoft Office|Skill Level : High
Basic Office Working Excel Power Sheets for IPC & Billing Work
|Skill Up Gradation: Preparation of execution Plan with advance Excel Techniques Advance Excel for Calculation & Formulation Preparation shop drawings of Infrastructure & Road work
And More…
2011 | Adobe Photoshop Cs 4|Skill Level : High
Basic Photoshop|Skill Up Gradation:
Uses of Photoshop in Architectural Drawings Uses of Photoshop in Exterior & Interior
And More…
2004 | Advance Computer Operating|Skill Level : Higher
Note: The above all mentioned detail is true as my knowledge and experience.