1

Click here to load reader

Resume

Embed Size (px)

Citation preview

Page 1: Resume

Megan McLaughl in A s s i s ta n t P ro j e c t M anag e r (860) 302-8290 – [email protected] – 715 Parker Street, Roxbury Crossing MA 02120

E X P E R I E N C E A s s i s t a n t P r o j e c t M a n a g e r C o - o p : G. Greene Construction

(Allston, MA), May 2015- August 2015 Processed RFI’s, Submittals, Change Orders, Procurement Logs, Purchase Orders, LOI, Meeting Minutes, DPH and ISD paperwork, Closeout documents, RFP, Microsoft Project Schedules, Record of Completion documents and Internal Budgets. Maintained Project Directory and compared specs with drawings to identify discrepancies.

Programs Used: Microsoft Project, Timberline, Excel, Word, CDM

A s s i s t a n t P r o j e c t M a n a g e r C o - o p : Universal Preservation Group

(Middletown, CT), March 2014- August 2014 Assisted PM with On-Screen Take-Off. Prepared Proposal forms, Submittals, and drawing sets. Attended construction meetings with PM, Architect, and Subcontractors. Communicated with Superintendent on production rates, unit pricing, and bid documentation.

Programs Used : On-Screen Take-Off, Sage, Adobe Suite

A s s i s t a n t P r o j e c t M a n a g e r C o - o p : Structure Tone Inc.

(Boston, MA), January 2014- March 2014 Recorded Submittals, RFI, Potential Change Items, and Daily Logs. Attended construction meetings with PM, Architect, Engineer, and Owner. Communicated with Subcontractors on site to ensure project remained on schedule.

Programs Used: CMIC

E D U C A T I O N / A W A R D S

B S C C o n s t r u c t i o n M a n a g e m e n t Wentworth Institute of Technology (Boston), 2012-2016 Expected Graduation: August 2016 GPA: 3.7 Deans List: Fall 2012, Fall 2014, Spring 2015 A w a r d s : Mechanical Contractors Association Student Competition- Ranked 2nd nationally, Sigma Lambda Chi, Chi Alpha Sigma, AGC-MCAP Scholarship, MCA Scholarship, Tau Alpha Pi candidate, CMiT Certification

P R O J E C T S G . G r e e n e C o n s t r u c t i o n : Boston Children’s Hospital MA285 CT Imaging Equipment Replacement, Boston Children’s Hospital MA277 EOS Equipment Replacement, Tufts University Cabot Complex Upgrades, Boston Children’s Hospital Sub-Basement Pharmacy Renovation, Boston Children’s Hospital Cardiology Renovations Level 6, Boston Children’s Lexington OR Equipment Coordination, Beth Israel Deaconess Medical Center Stoneman 8 U n i v e r s a l P r e s e r v a t i o n G r o u p : Yale University New Residential Colleges, Yale University Payne Whitney Gym Exterior Restoration, Yale University Lanman Wright Hall Exterior Restoration, Yale University Sterling Memorial Library Interior Restoration S t r u c t u r e T o n e I n c : John Hancock Tower- 58th Floor Convexity Capital Management Fit-Out, Liberty Mutual 222 Berkeley Street 8th Floor Demo, John Hancock Tower 33rd Floor Berkshire Partners Fit-Out, Prudential Center 36th Floor Ropes & Gray Fit-Out

S K I L L S / E X T R A C U R R I C U L A R / L E A D E R S H I P

S O F T W A R E / C O U R S E W O R K : On-Screen Take-Off, Microsoft Project, Revit 2013, AutoCAD 2012, Adobe Photoshop & InDesign, Microsoft Word & Excel, Estimating, Surveying, Statics and Strengths of Materials, Electrical/Mechanical Building Systems, Heavy Equipment and Construction, Construction Safety & Risk Management, Scheduling, Construction Business & Finance, Construction Project Control, Project Management E X T R A C U R R I C U L A R : Wentworth Women’s Basketball (Captain) (2012-2016), Mechanical Contractors Association, Student Chapter (Treasurer) (2015), CM Club, Construction Management Peer Tutor