5
CURRICULUM VITAE VAIBHAV G. PAYDELWAR Mobile: +91-9579110702, +91-7841825972 E-mail: [email protected] CAREER OBJECTIVE To accomplish the pinnacle of success and be placed in a commensurate position, where my erudite dexterity and technical acumen can be used to proliferate the accretion of name and fame of my company. PROFESSIONAL SUMMARY I Have Dynamic Experience of 4 years in Mechanical engineering Working in the areas of Boiler Pressure part, Boiler Structure including Primary and Secondary Structure, Coal Mill Maintenance, Pressure Part Maintenance, Axial Fan Maintenance, Welding Inspection and Project Planning and Control. SCHOLASTICS B.E. (Mechanical Engineering) from R.T.M. Nagpur University with 66.18% in 2011 H.S.S.C from SKP Junior College Maharashtra State Board with 57.50% in 2007 S.S.C from Beharilal Khandelwal Comprehensive School Maharashtra State Board with 63.33% in 2005 SOFTWARE SKILLS MS Office Microsoft Project 2007 Primavera P6 ORGANIZATIONAL EXPERIENCE Company Name : Encotec Energy (India) Pvt.Limited Designation : Senior Engineer Duration : Since 1 July 2015 till Present

Resume

Embed Size (px)

Citation preview

Page 1: Resume

CURRICULUM VITAE

VAIBHAV G. PAYDELWAR

Mobile: +91-9579110702, +91-7841825972E-mail: [email protected]

CAREER OBJECTIVE

To accomplish the pinnacle of success and be placed in a commensurate position,

where my erudite dexterity and technical acumen can be used to proliferate the

accretion of name and fame of my company.

PROFESSIONAL SUMMARY

I Have Dynamic Experience of 4 years in Mechanical engineering

Working in the areas of Boiler Pressure part, Boiler Structure including Primary and Secondary Structure, Coal Mill Maintenance, Pressure Part Maintenance, Axial Fan Maintenance, Welding Inspection and Project Planning and Control.

SCHOLASTICS

B.E. (Mechanical Engineering) from R.T.M. Nagpur University with 66.18% in 2011

H.S.S.C from SKP Junior College Maharashtra State Board with 57.50% in 2007 S.S.C from Beharilal Khandelwal Comprehensive School Maharashtra State

Board with 63.33% in 2005SOFTWARE SKILLS

MS Office Microsoft Project 2007 Primavera P6

ORGANIZATIONAL EXPERIENCE

Company Name : Encotec Energy (India) Pvt.LimitedDesignation : Senior Engineer

Duration : Since 1 July 2015 till Present

Company Name : L&T Power Limited (TPPC)Designation : EngineerDuration : 9 Dec 2013 till 10 June 2015

Company Name : Sunil Hi-Tech Engineers LimitedDesignation : EngineerDuration : 4 Oct 2011- 20 July 2013

Page 2: Resume

LIST OF PROJECTS

Vidharbha Industries Power Limited ( 2x 300 MW) Unit- 1 & 2 Mahagenco Koradi Thermal Power Expansion Project (3x 660 MW) for L&T MHI

Boilers Pvt. Limited Site Boiler Unit- 8, 9 & 10. Mahagenco Chandrapur Super Thermal Expansion Power Project (2 x 500 MW) for

BHEL Site Boiler Unit- 8 & 9.

PROJECT DETAILS

Company Name : Encotec Energy (India) Pvt.Limited

Duration : 1 July 2015 till Present Project : Vidharbha Industries Power Limited ( 2x300

MW) Client : Reliance Power Limited Project Location : Butibori, Maharashtra

Roles & Responsibilities:

Maintain a Preventive Maintenance on day to day basis. Involved in Coal Mill, Pressure Part, Axial Fans, Pump and valves

Maintenance. Attending Boiler tube leakages. Repairing Oil gun, Soot blower.

Company Name : L&T Power Limited (TPPC)

Duration : 9 Dec 2013 to 10 June 2015

Project : Koradi TPS Expansion Power Project (3x660 MW)Client : M/s Mahagenco, KoradiEPC Contractor : M/s L&T Power LimitedBoiler Contractor : M/s L&T MHI Boilers Pvt.LimitedProject Location : Koradi, Maharashtra Project Value : 325 Crores

Roles & Responsibilities :

Mechanical Project: Involved in Pre-assembly, erection, alignment, welding activity including the

inspection of Boiler pressure parts, Boiler Structure Accountable for reading all construction related drawing, explaining it to the

supervisors and solving any problems thereof. Key player in scheduling, planning and implementing preventive & defect

free practices to ensure smooth functioning of all equipments in the plant and played a key role in hydro-testing of 3 x 660MW boiler

Preparing punch points prior to Hydraulic test of Mechanical system

Page 3: Resume

Planning & Monitoring: Creation of WBS (Work breakdown Structure) Tracking and monitoring of activities during the project execution stage and

updating the project schedule in Primavera/Excel/MSP Scenario highlighting of critical/near critical activities Comparison of current schedule with the baseline schedule Preparation of daily report, weekly progress report, Monthly Target Sheet

etc. Evaluation of Forecast Cost and Forecast Duration of Project using Earn

Value Method. Organizing and managing resources while creating estimates for the project,

work breakdown structure, project plan, contingency plan & schedules, identifying risks within defined scope, quality, time and cost constraints.

Development of Reports and Graphics: Calculating the actual project progress percentage achieved on a month to

month basis and comparing with planned project progress i.e. preparing the S-Curve

Periodic status report Project float management sheet Updated schedule Project analysis report

Company Name : Sunil Hi-Tech Engineers Limited

Duration : 4 Oct 2011 to 20 July 2013

Project : Chandrapur Expansion Power Project (2x500 MW)Client : M/s Mahagenco, ChandrapurEPC Contractor : M/s BHELProject Location : Chandrapur, Maharashtra Project Value : Rs 48 Crores

Roles & Responsibilities:

Managing day to day activities at site. Involved in checking alignment of pressure parts and inspection of welding

quality Preparation of site work diary and record measurements Responsible for making Daily Progress Report and submitting to Planning

Department Study of drawings and analyses work quantum Coordinate & maintain records of material procured & used on site Involved in inspection of Welding Quality of Boiler structure and ensure to

complete LPT (NDT) examination. Involved in Erection & Checking alignment of Air Preheater (Rotary Part)

Page 4: Resume

Structuring detail budget for Mechanical project, planning schedule of activities, mobilize resources - materials and manpower for successful execution.

Organizing, monitoring and reviewing the progress of project against the baseline plan and timely submit the progress project progress report.

PERSONAL SINNIPTS

Father’s Name : Gulabrao Nathuji Paydelwar Working as Instructor in Govt. ITI KampteeDate of Birth : 30th June 1989Gender : MaleAddress : 262, Gurudeo Nagar, Nandanvan road,

Nandanvan dist- Nagpur, Maharashtra 440009Nationality : IndianMarital Status : SingleLanguage Known : English, Hindi, Marathi

DECLARATION

I hereby declare that the particulars in the curriculum vitae are true and correct to the Best of my knowledge and belief.

Place: Nagpur

Date: 03-07-2015 (Vaibhav

Paydelwar)