1
1 Buchholz DE Session 4 – Block 4.4 – Paper 4.59 Barcelona 12-15 May 2003 Before restructuring Restructured, Power factor control V oltage course,Net3 (O utage line 1)) -5,00 -4,00 -3,00 -2,00 -1,00 0,00 1,00 2,00 0 5 10 15 20 Tim e/h V/V 1 Var.1 Var.2 Var.3 MVDC Couple r Network parts Remote network part Net3 Neighbour network ~ ~ ~ Restructured, Voltage control Converter connected DG – Synchronisation after fault! Automated sequences required! Synchronous DG – stable continuation Fault simulation with DG w Voltage course Net3 (worst case) Results of 20 kV network restructuring: Results of 20 kV network restructuring: Dispersed generation Dispersed generation (DG) and MVDC Coupler (DG) and MVDC Coupler Outage time Net 3 Before restructuring 1,2 h/a Restructured 0,24 h/a Restr. & automated 0,03 h/a DG

Results of 20 kV network restructuring: Dispersed generation (DG) and MVDC Coupler

  • Upload
    elton

  • View
    30

  • Download
    3

Embed Size (px)

DESCRIPTION

~. ~. ~. Results of 20 kV network restructuring: Dispersed generation (DG) and MVDC Coupler. MVDC Coupler. Remote network part Net3. DG. Network parts. Neighbour network. Voltage course Net3 (worst case). w. Before restructuring. Restructured, Power factor control. - PowerPoint PPT Presentation

Citation preview

Page 1: Results of  20 kV network restructuring:   Dispersed generation (DG) and MVDC Coupler

1Buchholz DE Session 4 – Block 4.4 – Paper 4.59

Barcelona 12-15 May 2003

Before restructuring

Restructured, Power factor control

Voltage course, Net3 ( Outage line 1) )

-5,00

-4,00

-3,00

-2,00

-1,00

0,00

1,00

2,00

0 5 10 15 20

Time/ h

V/V

r,%

1

Var.1Var.2Var.3

MVDC Coupler

Network parts

Remote network

part

Net3 Neighbour network ~

~

~

Restructured, Voltage control

Converter connected DG –

Synchronisation after fault!

Automated sequences required!

Synchronous DG – stable continuation

Fault simulation with DG

wVoltage course Net3 (worst case)

Results of 20 kV network restructuring:Results of 20 kV network restructuring: Dispersed generation (DG) and MVDC CouplerDispersed generation (DG) and MVDC Coupler

Outage time Net 3

•Before restructuring 1,2 h/a

•Restructured 0,24 h/a

•Restr. & automated 0,03 h/a

DG