Results and plans of the new commissioning of the AC mole system AC mole review meeting AC mole review meeting 11 February 2005 11 February 2005 Mirco Coccoli

Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

Embed Size (px)

Citation preview

Page 1: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

Results and plans of the new commissioning of the AC mole system

AC mole review meetingAC mole review meeting

11 February 200511 February 2005

Mirco Coccoli

Page 2: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 211 February 2005

Outline

Status: the starting point Upgrade steps Further upgrade plan Bytheway: why not before? Results Do we need to repeat old measurements? Conclusions

Page 3: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 311 February 2005

Status: the starting point August 2004

Request for SSS measurement at Bldg 904 Dipole geometry measurement software needed operation by expert Each magnet should be connected separately (stop at the beginning

of each aperture) My request to switch to a more user-friendly control software because:

The software has collected a series of “irreversible” bugs along its modifications

The measurements are often interrupted due to communications problems between softwares

Subcontractor will perform measurements The polarity tester (Mouse) has proven that the level of automation can be

drastically increased The analysis is performed off-line by one person (>1day per analysis)

The team of C.Charrondiere suggests to change the control software (to GEAX) (many thanks for the excellent work)

Quick shift to a newly conceived system with a new control software with the aim to provide a fast and accurated system

Page 4: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 411 February 2005

Foreword: famous quotes

Never discourage anyone...who continually makes progress, no matter how slow - Plato (427 BC - 347 BC)

Plato is boring - Friedrich Nietzsche (1844 – 1900) An eye for an eye makes the whole world blind - Mahatma Gandhi,

(attributed) (1869 – 1948) Beware of the young doctor and the old barber - Benjamin Franklin (1706

– 1790) Success is not the result of spontaneous combustion. You must set

yourself on fire – Reggie Leach Well begun is half done – Aristotle (384 BC – 322 BC) Your descendants shall gather your fruits – Virgil (70 BC – 19 BC) It is rash to condemn where you are ignorant – Seneca (3 BC – 65 AD) It is pleasant at times to play the madman – Seneca (3 BC – 65 AD) The accuracy? It’s better than 0.1mm – J.Garcia-Perez We can do a full SSS measurement in 4 hours or less… - J.Garcia-Perez

Page 5: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 511 February 2005

Upgrade steps

My statements: 1 year ago: “I’m a magnet guy: I can design and build a 12T

Nb3Sn field quality magnet in 8 months…” (too many beers?) Mid-August: “I will need 1 month to get the AC mole system

roughly working” Beginning of September: “If I follow closely the analysis done by

hand, I will take a long long time to establish automation. Nonetheless an automatic analysis will take few minutes”

October: “In two weeks the system will be able to measure in 5-6 hours”

November: “For the first week with 5 measurements I will pay a drink for the “release” of the system”

3 December: “The mountain of SSS in Bldg. 904 has finished… I can’t believe it! I’ll pay a drink!” (comment: no drink yet!)

Page 6: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 611 February 2005

Results Total of 40SSS

measured System preparation

at a 1.1SSS/week rate (non automatic)

System running at 3.8SSS/week (data qualification)

Shut-down System running at

4.5SSS/week (axis data qualified, ~angle and polarity)

2SSS/day !!!

SSS measurement overview in 904

0

5

10

15

20

25

30

35

40

45

0 20 40 60 80 100 120

Days (1Aug04-11Feb05)

Nu

mb

er o

f S

SS

3Dec 20Jan

Page 7: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 711 February 2005

Upgrade Plan

The mole-camera relative position will be checked at each measurement step Stop the measurement and change mole or algorithm to correct

in the soft (0.1FTE/month) The field angle is included in the measurement and a

solution to the poor accuracy has been solved at a first stage Angle data will be quick to check right after the next

measurements (~0 FTE) Polarity test

Based on full harmonic acquisition (0.5FTE/month) All the previous points depends on software

development team availability

Page 8: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 811 February 2005

Bytheway: why not before?

00.5

1

1.52

2.53

3.5

aug sept oct nov dec jan feb

Needed FTEs

Available FTEs

0

2

4

6

8

10

aug sept oct nov dec jan feb

Theoric Backlog

Theoric Backlog(FTE+50%)

Activity aug sept oct nov dec jan febMeasurement 1 1 1 0.5 1 1 1Analysis 1 1 1 1 1 1 0.5Validation/Calibration 1 1 1 0.5 0.5 0.5 0.5MCS activity (with MAS) 0 0 0 0.5 0 0 0Documentation 0.25 0.25 0.25 0.25 0.25 0.25 0.5

Total needed (FTEs) 3.25 3.25 3.25 2.75 2.75 2.75 2.5

Available FTE on Axis meas aug sept oct nov dec jan febM.Coccoli 0.8 0.8 0.8 0.8 0.8 0.8 0.8E.Laface (Technical Student) 0 0 0 0.2 0.6 0.6 0.6A.Ruccio (Stage) 0 0 0 0 0.6 0.6 0.6J.Garcia-Perez 0.4 0.4 0.4 0.4 0.4 0.4 0.4

Total available (FTEs) 1.2 1.2 1.2 1.4 2.4 2.4 2.4

+2 Students

+2 Students

Total FTE/availableFTE 2.71 2.71 2.71 1.96 1.15 1.15 1.04Estimated Backlog 2.05 4.1 6.15 7.5 7.85 8.2 8.3

Total FTE/availableFTE(+50%) 1.81 1.81 1.81 1.31 0.76 0.76 0.69Estimated Backlog (FTE+50%) 1.45 2.9 4.35 5 4.15 3.3 2.2

Page 9: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 911 February 2005

Results

Optics method (mechanical axis) Saw tooth solved Accuracy of 0.1mm proven with calibrations (and, yes,

cross-checks with geo-mole) Harmonics method (magnetic axis)

Saw tooth to be checked to go below 0.2mm with a confidence margin

Accuracy/repeatability proven many times to 0.1mm But sometimes…

Page 10: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 1011 February 2005

Do we need to repeat old measurements? “Old” measurements have been corrected offline with a

realistic method The subcontracting measurement team will have very

soon a table with the parameters to enter for analysis Follow-up to check if this organization works

At present the SSS: 1,4,16,20,24,31 data have been submitted to the MEB indicating that the accuracy is 0.2mm

All the others are measured with accuracy within 0.1mm Note that vertical gives you the repeatability In case something looks wrong we will flag it

Page 11: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 1111 February 2005

Conclusions

The organization of the system upgrade has been focused on the development itself rather than on measuring measuring measuring.

The organization of the analysis has been focused on developing the analysis software rather than utilizing sometimes days for the analysis of an SSS.

3 months full commissioning of the system for operation Additional 3 months for finalization of the analysis tool

(mainly done by C.Charrondiere and R.Gorbonosov) and to find/prove a realistic reliability of the data (team work)

Page 12: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 1211 February 2005

End

Page 13: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 1311 February 2005

SSS011 - DH : DX= f(Y)

-1.0

-0.8

-0.6

-0.4

-0.2

0.0

0.2

0.4

0.6

0.8

1.0

0 1000 2000 3000 4000 5000 6000

en mm

en

mm

V1 Tube Mec

V2 Tube Mec

V1 Tube Mag

V2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 14: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 1411 February 2005

SSS013 - DH : DX= f(Y)

-1.0

-0.5

0.0

0.5

1.0

1.5

2.0

0 1000 2000 3000 4000 5000 6000

en mm

en m

m

V1 Tube Mec

V2 Tube Mec

V1 Tube Mag

V2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 15: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 1511 February 2005

SSS014 - DH : DX= f(Y)

-1.0

-0.8

-0.6

-0.4

-0.2

0.0

0.2

0.4

0.6

0.8

1.0

0 1000 2000 3000 4000 5000 6000

en mm

en m

m

V1 Tube MecV2 Tube MecV1 Tube MagV2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 16: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 1611 February 2005

SSS018 - DH : DX= f(Y)

-1.0

-0.8

-0.6

-0.4

-0.2

0.0

0.2

0.4

0.6

0.8

1.0

0 1000 2000 3000 4000 5000 6000

en mm

en m

m

V1 Tube MecV2 Tube MecV1 Tube MagV2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 17: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 1711 February 2005

SSS021 - DH : DX= f(Y)

-1.0

-0.8

-0.6

-0.4

-0.2

0.0

0.2

0.4

0.6

0.8

1.0

0 1000 2000 3000 4000 5000 6000

en mm

en m

m

V1 Tube MecV2 Tube MecV1 Tube MagV2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 18: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 1811 February 2005

SSS023 - DH : DX= f(Y)

-1.0

-0.8

-0.6

-0.4

-0.2

0.0

0.2

0.4

0.6

0.8

1.0

0 1000 2000 3000 4000 5000 6000

en mm

en m

m

V1 Tube MecV2 Tube MecV1 Tube MagV2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 19: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 1911 February 2005

SSS030 - DH : DX= f(Y)

-1.0

-0.8

-0.6

-0.4

-0.2

0.0

0.2

0.4

0.6

0.8

1.0

0 1000 2000 3000 4000 5000 6000

en mm

en m

m

V1 Tube MecV2 Tube MecV1 Tube MagV2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 20: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 2011 February 2005

SSS037 - DH : DX= f(Y)

-1.0

-0.8

-0.6

-0.4

-0.2

0.0

0.2

0.4

0.6

0.8

1.0

0 1000 2000 3000 4000 5000 6000

en mm

en m

m

V1 Tube MecV2 Tube MecV1 Tube MagV2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 21: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 2111 February 2005

SSS039 - DH : DX= f(Y)

-1.0

-0.8

-0.6

-0.4

-0.2

0.0

0.2

0.4

0.6

0.8

1.0

0 1000 2000 3000 4000 5000 6000

en mm

en m

m

V1 Tube MecV2 Tube MecV1 Tube MagV2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 22: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 2211 February 2005

SSS040 - DH : DX= f(Y)

-2.0

-1.5

-1.0

-0.5

0.0

0.5

1.0

0 1000 2000 3000 4000 5000 6000

en mm

en m

m

V1 Tube MecV2 Tube MecV1 Tube MagV2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 23: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 2311 February 2005

SSS043 - DH : DX= f(Y)

-1.0

-0.8

-0.6

-0.4

-0.2

0.0

0.2

0.4

0.6

0.8

1.0

0 1000 2000 3000 4000 5000 6000

en mm

en m

m

V1 Tube MecV2 Tube MecV1 Tube MagV2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 24: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 2411 February 2005

SSS053 - DH : DX= f(Y)

-1.0

-0.8

-0.6

-0.4

-0.2

0.0

0.2

0.4

0.6

0.8

1.0

0 1000 2000 3000 4000 5000 6000

en mm

en

mm

V1 Tube Mec

V2 Tube Mec

V1 Tube Mag

V2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 25: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 2511 February 2005

SSS065 - DH : DX= f(Y)

-1.0

-0.5

0.0

0.5

1.0

1.5

0 1000 2000 3000 4000 5000 6000

en mm

en m

m

V1 Tube MecV2 Tube MecV1 Tube MagV2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 26: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 2611 February 2005

SSS066 - DH : DX= f(Y)

-1.0

-0.5

0.0

0.5

1.0

1.5

0 1000 2000 3000 4000 5000 6000

en mm

en m

m

V1 Tube MecV2 Tube MecV1 Tube MagV2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 27: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 2711 February 2005

SSS069 - DH : DX= f(Y)

-1.0

-0.8

-0.6

-0.4

-0.2

0.0

0.2

0.4

0.6

0.8

1.0

0 1000 2000 3000 4000 5000 6000

en mm

en m

m

V1 Tube MecV2 Tube MecV1 Tube MagV2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 28: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 2811 February 2005

SSS071 - DH : DX= f(Y)

-1.0

-0.8

-0.6

-0.4

-0.2

0.0

0.2

0.4

0.6

0.8

1.0

0 1000 2000 3000 4000 5000 6000

en mm

en m

m

V1 Tube MecV2 Tube MecV1 Tube MagV2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 29: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 2911 February 2005

SSS101 - DH : DZ = f(Y)

-1.0

-0.8

-0.6

-0.4

-0.2

0.0

0.2

0.4

0.6

0.8

1.0

0 1000 2000 3000 4000 5000 6000

en mm

en m

m

V1 Tube MecV2 Tube MecV1 Tube MagV2 Tube Mag

MOor

MQT/MQSMQ MS MCB

Magnets Schematic View

Page 30: Results and plans of the new commissioning of the AC mole system AC mole review meeting 11 February 2005 Mirco Coccoli

[email protected] 3011 February 2005