    1. UMUM / General 

    TEMPAT DAN HARI PERCOBAAN : SURABAYA, 13 AUGUST 2008

    Place and Day of Test

    GALANGAN / Berth : PT PAL INDONESIA

    PENAMBATAN / Mooring : FREE MOORING

     ARAH DAN KECEPATAN ANGIN : FROM AFT, 2 M/SEC.

    Direction and Force of Wind

    DAFTAR BEBAN KOREKSI : -

    List of Corrected Weight

    TEMPERATURE AIR : 27o

     C

    Temperature of Water 

    BERAT JENIS AIR : 1.023 t / m3

    Specific Weight of Water 

    CATATAN / Remarks : READING DRAFT : 14.00 - 14.15 WIB

    : SHIFTING WEIGHT : 14.15 - 14.45 WIB

    2. PEMBACAAN SARAT DARI TANDA SARAT

     Draft Reading from Draft Marks

    HARGA SARAT TERMASUK BEBAN PERCOBAAN

    In the value of draft the inclining test weights are included

    TITIK 0 PADA SEMUA KETERANGAN ADALAH 0.010 M DI BAWAH GARIS DASAR

    The 0 - point of all remarks is 0.010 m below baseline

    SARAT / Draft KIRI KANAN RATA-RATA DARI AP

    in Meter Port Side Stb. Side Mean From AP

    SARAT BELAKANG 0.970 0.970 0.970 1.000

     Aft Draft Marks

    SARAT DEPAN 0.670 0.670 0.670 5.770

    Fore Draft Marks

  • 8/17/2019 Result Inclining Test Tank Before

    2/10

    3. PERHITUNGAN KOREKSI SARAT / Draft Correction Calculation

    FORE DRAFT MARK

     AFT DRAFT MARK

     AP FP

    TRIM AWAL /  Apperend Trim ( to) = da' - df '

    = 0.970 - 0.670

    = 0.300 m

    BELAKANG / Aft ( δda ) = (to / La) x 1.000 = ( 0.300 /4.770 ) x1.000

    = 0.063 meter  

    DEPAN / Fore ( δdf ) = (to / La) x 0.866 = ( 0.300 /4.770 ) x 0.866

    = 0.054 meter  

    La =4.770 0.8661.000

       d  a   ' 

             δ   d  a

    LPP = 6.636

       d   f   '

       d   A

  • 8/17/2019 Result Inclining Test Tank Before

    3/10

    4. PERHITUNGAN DISPLACEMENT / Displacement Calculation

    PORT SIDE

    dA dF

    STARBOARD SIDE

    PEMBACAAN SARAT BELAKANG DEPAN BERAT JENIS AIR

    Draft Reading Aft Fore S.G. of Water =

    KIRI / Port 0.970 0.670 1.023 t / m3

    KANAN / Starboard 0.970 0.670 TRIM AWAL

    RATA-RATA / Mean 0.970 0.670  Apperend Trim (to) =

    KOREKSI SARAT  δda δdf  0.300 m

    Draft Correction 0.063 0.054 SARAT RATA-RATA

    SARAT TERKOREKSI dA dF Mean Draft ( dM ) =

    Corrected Draft 1.033 0.616 0.824 m

    PERBEDAAN SARAT (-) KE DEPAN / by bow

    Trim 0.417 m (+) KE BELAKANG / by stern

    DISPLACEMENT ( DARI TABEL HIDROSTATIK ) (Δo )

    Displacement ( from Hydrostatic Table ) 12.920 t

    MID-F ( DARI TABEL HIDROSTATIK ) BERPEDOMAN PADAMID-F ( from Hydrostatic Table ) 0.055 m Correpond. to dM

    TPC ( DARI TABEL HIDROSTATIK ) 0.824 m

    TPC ( from Hydrostatic Table ) 0.190 t

    KOREKSI DISPLACEMENT TERHADAP TRIM ( δΔ1 ) = ( Mid-F x TPC x Trim x 100 ) / LPP

    Displacement Correction due to Trim 0.066 t

    DISPLACEMENT KESELURUHAN ( Δ ' ) = Δo + δΔ1

    Total Displacement 12.986 t

    DISPLACEMENT KENYATAAN ( Δ  ) = ( Δ ' ) x S.G / 1.025

     Actual Displacement 12.961 t

    MID-B ( DARI TABEL HIDROSTATIK ) BERPEDOMAN PADA

    MID-B ( from Hydrostatic Table ) 0.107 m Correpond. to ( Δ  ' )

    MTC ( DARI TABEL HIDROSTATIK ) 12.986 t

    MTC ( from Hydrostatic Table ) 0.100 tm

    MID-G = MID-B + ( MTC x Trim x 100 ) /Δ  ' 0.428 m

    LCG = ( LPP / 2 ) - MID-G 2.890 m

  • 8/17/2019 Result Inclining Test Tank Before

    4/10

    5. GoM PADA SAAT PERCOBAAN

      GoM at The Inclining Test

    SETIAP SISI SETENGAH BEBAN PERCOBAAN

    Half Test Weight Each Side

    SHIFTING 0 1 2 3 4 5 6

    ITEM P S P S P S P S P S P S P S

    1   1 1 1 1   1

    SUSUNAN PENGGESERAN 2 2   2 2 2 2  

    BEBAN / Shifting Weight 3 3 3   3 3 3

     Arrangement 4 4 4 4   4 4

    BEBAN YANG DIGESER

    Shifting Weight - 0.1035 0.1035 0.1035 0.1035 0.1035 0.1035

    JARAK PERGESERAN

    Shifting Space - 1.840 2.320 2.580 2.580 1.840 2.320

    MOMEN PERGESERANShifting Moment 0.190 0.240 0.267 0.267 0.190 0.240

    TOTAL KOMULATIF - 0.190 0.431 0.164 -0.104 -0.294 -0.534

    PENDULUM PEMBACAAN

    DEPAN Reading 0 22 55 21 -14 -36 -68

    Fore Pendulum PENYIMPANGAN

    1550 Deviation - 22 33 34 35 22 32

    ( mm ) Tg. θ - 0.014194 0.021290 0.021935 0.022581 0.014194 0.02064

    PENDULUM PEMBACAAN

    BELAKANG Reading 0 22 55 21 -14 -37 -69

     Aft Pendulum PENYIMPANGAN

    1560 Deviation - 22 33 34 35 23 32( mm ) Tg. θ - 0.014103 0.021154 0.021795 0.022436 0.014744 0.02051

    Tg.θ RATA-RATA / Mean of Tg. θ  0.014148 0.021222 0.021865 0.022508 0.014469 0.02057

    TOTAL KOMULATIF 0.014148 0.035370 0.013505 -0.009003 -0.023472 -0.04405

    Shifting Moment 1.039 0.873 0.942 0.915 1.016 0.900

    Tg.θ x Displ. Mean = 0.955 meter  GoM =

  • 8/17/2019 Result Inclining Test Tank Before

    5/10

    6. CHECK DIAGRAM

    -0.050

    -0.045

    -0.040

    -0.035

    -0.030

    -0.025

    -0.020

    -0.015

    -0.010

    -0.005

    0.000

    0.005

    0.010

    0.015

    0.020

    0.025

    0.030

    0.035

    0.040

    0.045

    0.050

    -0.80 -0.60 -0.40 -0.20 0.00 0.20 0.40 0.60 0.80

    STARBOARD MOMENT

       S   T   A   R   B   O   A   R   D

       T   A   N   G   E   N   T

    1

    4

    5

    2

    3

    8

    6

    7   P   O

       R   T   T   A   N   G   E   N   T

    PORT MOMENT

  • 8/17/2019 Result Inclining Test Tank Before

    6/10

    7. SUSUNAN PERGESERAN BEBAN PERCOBAAN DAN POSISI PENDULUM

      Arrangement of Shifting Test Weights and Pendulum Position

    BEBAN PERCOBAAN / Test Weight

    1 2

    No Weight No Weight

    ( ton ) ( ton )

    1 0.1035 1 0.1035

    Sum 0.1035 Sum 0.1035

    3 4

    No Weight No Weight

    ( ton ) ( ton )

    1 0.1035 1 0.1035

    Sum 0.1035 Sum 0.1035

    34

    21

     Aft Pendulum (1560 mm)Fore Pendulum (1550 mm)

    test weights

  • 8/17/2019 Result Inclining Test Tank Before

    7/10

    8. TITIK BERAT KAPAL PADA SAAT TEST

      Centre of Gravity at the Inclining Test

    DISPLACEMENT DENGAN KULIT DAN POROS = 12.961 t

    Displacement with Shell and Shafts

    K M = TINGGI METASENTRIC DI ATAS LUNAS = 1.422 m

      Metacentric Height above Keel

    GM = GoM + GGo = 0.956 m

    KG = KM - GM = 0.466 m

    = TITIK BERAT VERTIKAL DI ATAS LUNAS

      Vertical Centre of Gravity above Keel

    LCG = TITIK BERAT MEMANJANG DARI AP = 2.890 m

      Longitudinal Centre of Gravity from AP

    9. KOREKSI TERHADAP PERMUKAAN BEBA

      Correction due to Free Surface ( GGo )

    TANKS Transv. Inert. (m4) F. S. Moment (tm)

    FUEL TANK 0.010 0.009

    TOTAL OF FREE SURFACE MOMENT IN TON.METER 0.009

    G G o (METER) 0.001

  • 8/17/2019 Result Inclining Test Tank Before

    8/10

    10. KONDISI KAPAL KOSONG

      Light Ship Condition

    I T E M WEIGHT LCG L. MOMENT VCG V. MOMENT

    ( t ) ( m ) ( tm ) ( m ) ( tm )

    KONDISI KAPAL SAAT TEST

    Ship Condition at the Inclining Test 12.961 2.890 37.452 0.466 6.038

    MUATAN YANG DITAMBAHKAN ( + ) ( + ) ( + )

    Weights to be added 0.000 0.000 0.000 0.000 0.000

    J U M L A H

    S u m 12.961 2.890 37.452 0.466 6.038

    MUATAN YANG DIKELUARKAN ( - ) ( - ) ( - )Weights to be deducted 1.068 4.555 4.864 1.051 1.122

    KAPAL KOSONG

    Light Ship 11.893 2.740 32.588 0.413 4.916

    DISPLACEMENT = 11.893 t

    Displacement

    KG = TITIK BERAT VERTIKAL DI ATAS LUNAS = 0.413 m

    Vertical Centre of Gravity above Keel

    K M = TINGGI METASENTRIC DI ATAS LUNAS = 1.475 m

    Metacentric Height above Keel

    GM = K M - K G = 1.062 m

    TINGGI METACENTRIC DARI TITIK BERAT

    Metacentric Height Above Centre of Gravity

    LCG = TITIK BERAT MEMANJANG DARI AP = 2.740 m

    Longitudinal Centre of Gravity from AP

  • 8/17/2019 Result Inclining Test Tank Before

    9/10

    11. MUATAN YANG DIKELUARKAN / Weights to be deducted 

    I T E M WEIGHT LCG . MOMEN VCG V. MOMENT

    ( t ) ( m ) ( tm ) ( m ) ( tm )

    T A N K S

    1 FUEL TANK    0.1037 2.650 0.275 0.750 0.078

    2 PERSON   0.4900 5.054 2.477 0.929 0.455

    3 TEST WEIGHT 1   0.1035 6.325 0 .655 0.960 0.099

    4 TEST WEIGHT 2   0.1035 4.440 0 .460 1.500 0.155

    5 TEST WEIGHT 3   0.1035 3.960 0 .410 1.500 0.155

    6 TEST WEIGHT 4   0.1035 3.220 0 .333 1.500 0.155

    7 PENDULUM FORE   0.0300 4.950 0.149 0.400 0.012

    8 PENDULUM AFT   0.0300 3.550 0.107 0.400 0.012

    TOTAL OF WEIGHTS TO BE DEDUCTED   1.068 4.555 4.86 1.051 1.122

  • 8/17/2019 Result Inclining Test Tank Before

    10/10

    12. MUATAN YANG DITAMBAHKAN / Weights to be added 

    I T E M WEIGHT LCG L. MOMENT VCG V. MOMENT

    ( t ) ( m ) ( tm ) ( m ) ( tm )

    TOTAL OF WEIGHTS TO BE ADDED   0.000 0.000 0.000 0.000 0.000