21
4/6/2009 1 The Anatomy of a Historic Preservation Project (PART II): Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough SWR Institute 2009 – Winter Technical Meeting March 1-4, St. Thomas, Virgin Islands Presented by T. Gunny Harboe, AIA Harboe Architects, PC and Bill Leonhard, Allied Waterproofing, Inc. K R U E C K S E X T O N Harboe Architects, PC COTTER CONSULTING, INC.

Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

  • Upload
    vancong

  • View
    222

  • Download
    3

Embed Size (px)

Citation preview

Page 1: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

1

The Anatomy of a Historic Preservation Project (PART II):

Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough

SWR Institute 2009 – Winter Technical MeetingMarch 1-4, St. Thomas, Virgin Islands

Presented by T. Gunny Harboe, AIAHarboe Architects, PC and

Bill Leonhard, Allied Waterproofing, Inc.

K R U E C K S E X T O N

Harboe Architects, PC

COTTER CONSULTING, INC.

Page 2: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

2

Mies van der Rohe 1886-1969

Mies Mania

Page 3: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

3

Barcelona Pavilion - 1929

Bauhaus

Page 4: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

4

860-880 North Lake Shore Drive - 1951

860-880 North Lake Shore Drive - 1951

Page 5: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

5

860-880 North Lake Shore Drive - 1951

860-880 North Lake Shore Drive - 1951

Page 6: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

6

860-880 North Lake Shore Drive - 2006

860-880 Investigation of Paint

Page 7: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

7

860-880 Investigation

860-880 Investigation and Testing

Page 8: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

8

860-880 Mockups

860-880 Plaza Travertine

Page 9: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

9

860-880 Ponding of Water Due to Lack of Slope

860-880 Deteriorating Concrete

DELAMINATION OF CONCRETE STRUCTURAL SLAB CRACKED TRAVERTINE

PLAZA STRUCUTURE DETERIORATION CONCRETE SPALL DUE TO MOISTURE INFILTRATION

Page 10: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

10

860-880 Deterioration

Cracked TravertinePonding of Water Due to Lack of Slope

Delaminated of Concrete Structural SlabSaturated Setting Bed

860-880 Travertine Selection

Page 11: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

11

860-880 New Drainage Plan

CONCEALED OPEN JOINT PAVER DRAINCONCEALED OPEN JOINT PAVER DRAIN

ORIGINAL SURFACE DRAIN

¼” OPEN JOINT

860-880 New Drainage

PEDESTAL PAVING SYSTEM AT DRAIN LOCATION

OPEN JOINT PLAZA PAVING DRAIN DETAIL

OPEN JOINT PAVER PRECEDENT

Page 12: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

12

EXISTING TRAVERTINE CUT IN HALF & REHONED

EXISTING LOBBY FLOOR

Travertine Selection

ESTE LIGHT ESTE LAILA EXISTING LOBBY

FLOOR CLEANED

Este Laila at Quarry During Team Stone Selection Visit

Samples on Existing Stone at 880 Lobby Este Light at Quarry

860-880 Storefront Details – Original 1951 and Modified 1981

MIES / PACE ORIGINALLY DESIGNED STOREFRONT BASE DETAIL

FROM WORKING DRAWINGS (1951)

HOLABIRD & ROOT MODIFIED STOREFRONT BASE DETAIL

FROM WORKING DRAWINGS (1981)

Page 13: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

13

860-880 Original Design

MIES / PACE ORIGINALLY DESIGNED

STOREFRONT BASE DETAIL WITH

RECESSED SEALANT LOCATION

860-880 Storefront Existing Condition - 2006

EXISTING CONDITION AT STOREFRONT BASE DETAIL

DOCUMENTED 2006

Page 14: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

14

860-880 Storefront Existing Condition - 2006

860-880 Storefront Existing Condition - 2006

Page 15: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

15

EXTERIORLOBBY

6”

+/-

7”

5 ½

” 5 ½

Proposed Design

1/8” PER FOOT SLOPE

1/2”

+/-

1 ½

PROPOSED PLAZA/STOREFRONT BASE DETAIL

EXISTING SLOPE OF PLAZA APPROX: 1/2” OVER 7’-0”

PROPOSED SLOPE OF PLAZA APPROX: 3/4” OVER 7’-0”

CONDITION AT STOREFRONT BASE 860 SOUTH STOREFRONT AT REVOLVING DOOR SHOWN ABOVE880 WEST STOREFRONT AT REVOLVING DOOR SIMILARSLOPE BASED ON EXISTING SURVEY

Page 16: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

16

860-880 Lake Shore Drive 2009

860-880 Lake Shore Drive 2009

Page 17: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

17

860-880 Travertine Reinstallation

860-880 Travertine Installation

Page 18: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

18

860-880 Lake Shore Drive 2009

860-880 Lake Shore Drive 2009

Page 19: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

19

860-880 Glass Installation

860-880 Honing the Travertine

Page 20: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

20

860-880 Winter Conditions

860-880 Winter Conditions

Page 21: Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was ... Institute 2009... · Restoring the Work of Mies van der Rohe ~ When ‘Less’ Was Not Always Enough ... COTTER CONSULTING,

4/6/2009

21

860-880 Winter Conditions

860-880 Lake Shore Drive 2009