    NYS Dam Safety Permit RequirementsNYS Dam Safety Permit Requirements

    Basic components of a Dam and how they functionBasic components of a Dam and how they function

    To Have a better Understanding of:To Have a better Understanding of:

    The decision making process involved inThe decision making process involved in

    Dam Removals and Aquatic Passage at DamsDam Removals and Aquatic Passage at Dams

    Restoring Migratory Fish HabitatRestoring Migratory Fish Habitat

    Dam Safety ConsiderationsDam Safety Considerations

    Workshop ObjectiveWorkshop Objective

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    2/39

    NYS Department of Environmental Conservation

    Is Dam Removal an Option?Is Dam Removal an Option?

    Issues to Consider:Issues to Consider:

    -- EcologicalEcological

    -- EconomicEconomic

    -- SocialSocial

    -- Technical/EngineeringTechnical/Engineering TodaysTodays

    FocusFocus

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    3/39

    Is Dam Removal an Option?Is Dam Removal an Option?

    Issue Considered:Issue Considered:-- Technical/EngineeringTechnical/Engineering

    -- Feasibility of Repairing andFeasibility of Repairing andMaintaining a DamMaintaining a Dam

    -- Feasibility and Design ofFeasibility and Design of

    Dam RemovalDam Removal

    -- Feasibility of providing Aquatic PassageFeasibility of providing Aquatic Passage

    over or around the Damover or around the Dam

    FocusFocus

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    4/39

    NYS Department of Environmental Conservation

    Common Dam Types in the Hudson ValleyEmbankment DamsEmbankment Dams

    Earthen Embankment Dams aremade up of compacted earth usuallyobtained from a source near the

    dam.The dam sides are banked toprovide a stable slope.

    They are permeable and are

    sometimes constructed in zoneswith a concrete or clay core.

    Concrete and MasonryConcrete and Masonry

    gravity damsgravity dams

    They rely on their own weight tohold them in place and are referredto as gravity dams

    Masonry and concrete are moreor less impermeable.

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    5/39

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    6/39

    EXAMPLE DAMEXAMPLE DAM

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    7/39

    NYS Department of Environmental Conservation

    Avoid DamAvoid Dam

    Modify DamModify Dam

    PassagePassage

    StrategyStrategyDam SafetyDam Safety

    Concern?Concern?

    YesYes

    MaybeMaybe

    FocusFocus

    -- Feasibility of providing Aquatic PassageFeasibility of providing Aquatic Passage

    over or around the Damover or around the Dam

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    8/39

    Photos and schematic courtesy of the USGSPhotos and schematic courtesy of the USGS

    Eel PassageEel Passage

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    9/39

    Approach Too ShallowApproach Too Shallow

    Too HighToo High

    Too littleToo little

    flowflowToo FastToo Fast

    Too SmallToo Small

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    10/39

    NYS Department of Environmental Conservation

    EnergyEnergy DissipatorsDissipators

    Auxiliary SpillwayAuxiliary SpillwayPrimary Spillway and lowPrimary Spillway and low

    level drainlevel drain

    Can the Existing Dam Provide Aquatic Passage?Can the Existing Dam Provide Aquatic Passage?

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    11/39

    NYS Department of Environmental Conservation

    HighervelocityShootingflow

    HighervelocityShootingflow

    Lower velocity flowLower velocity flow

    EXAMPLE DAMEXAMPLE DAM

    How a grass lined auxiliary Spillway worksHow a grass lined auxiliary Spillway works

    Assess: Auxiliary Spillways potentialAssess: Auxiliary Spillways potential

    For Passage ?For Passage ?

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    12/39

    EXAMPLE DAMEXAMPLE DAM

    Strategy:Strategy: Use a portion of the Spillway to install a stepped passageUse a portion of the Spillway to install a stepped passagefor the trip up stream.for the trip up stream.

    Safety Concern:Safety Concern: If the passage significantly decreases spillwayIf the passage significantly decreases spillwaycapacity, the dam may overcapacity, the dam may over--top during a storm.top during a storm.

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    13/39

    NYS Department of Environmental Conservation

    How an In line Spillway works.How an In line Spillway works.

    Assess:Assess: Primary spillwaysPrimary spillways

    potential For Fish Passage ?potential For Fish Passage ?

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    14/39

    NYS Department of Environmental Conservation

    EXAMPLE DAMEXAMPLE DAM

    How a Drop Box Low Level Drain WorksHow a Drop Box Low Level Drain Works

    Primary Spillways potential for fish passage ?Primary Spillways potential for fish passage ?

    Plunge Pool EnergyPlunge Pool Energy DissipatorDissipator

    Remove boards and drain the pondRemove boards and drain the pond

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    15/39

    EXAMPLE DAMEXAMPLE DAM

    Another Strategy:Another Strategy: Install a new culvert through theInstall a new culvert through theembankment that is large enough to install velocity refugesembankment that is large enough to install velocity refugesin the bottomin the bottom

    Safety Concern:Safety Concern: If the soil isnt compacted properly around theIf the soil isnt compacted properly around thenew culvert soil may pipe and fail the damnew culvert soil may pipe and fail the dam

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    16/39

    NYS Department of Environmental Conservation

    6 NYCRR Part 673

    In 1999 ECL Section 15-0507 was amended and the

    thresholds for requiring a dam safety permit

    changed

    Part 673, the current regulations are being changed

    to reflect the new thresholds regarding height and

    volume impounded by a dam.

    Will a Dam Safety Permit beWill a Dam Safety Permit be

    Required?Required?

    FIRST QUESTIONFIRST QUESTION

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    17/39

    NYS Department of Environmental Conservation

    Answer:

    YES, therefore a NYS Dam SafetyPermit is required if proposed

    work goes beyond maintenance

    Is the Dam above Volume and

    Height Thresholds?

    XX

    XXXX

    FIRST QUESTIONFIRST QUESTION

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    18/39

    NYS Department of Environmental Conservation

    SECOND QUESTIONSECOND QUESTION

    Does the proposed construction go beyondmaintenance?

    Or

    Could improper construction lead to dam failure?

    DAM SAFETY PERMIT PROCESSDAM SAFETY PERMIT PROCESS

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    19/39

    NYS Department of Environmental Conservation

    6 NYCRR Part 608.66 NYCRR Part 608.6

    Application form with Supplemental D-1 attached. FormD-1 lists critical information regarding the dam

    A design report along with construction documents (i.e.plans and specifications) prepared by or under thedirection of a NYS licensed Professional Engineer.

    If a Permit is Required:You need to submit a complete

    Application and wait for a permit.

    DAM SAFETY PERMIT PROCESSDAM SAFETY PERMIT PROCESS

    DAM SAFETY PERMIT PROCESSDAM SAFETY PERMIT PROCESS

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    20/39

    NYS Department of Environmental Conservation

    The Engineer will provide a final design inThe Engineer will provide a final design in

    accordance with good engineering practice thataccordance with good engineering practice that

    considers New York State guidelines for the designconsiders New York State guidelines for the design

    of damsof dams

    DAM SAFETY PERMIT PROCESSDAM SAFETY PERMIT PROCESS

    Addressed in Guidelines

    Hazard Classification

    Hydrologic Analysis

    Hydraulic Design

    Outlet works and Conduits

    Subsurface investigation

    Structural Stability

    D i G id liDesign G idelines

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    21/39

    NYS Department of Environmental Conservation

    a. Hazard Classificationb. Hydrologic Analysis

    c. Hydraulic Design

    d. Outlet works and Conduits

    e. Subsurface investigation

    f. Structural Stability

    g. Subsurface Investigation

    Design GuidelinesDesign Guidelines

    Assess the degree ofAssess the degree of

    hazard failure, of thehazard failure, of the

    dam, poses to downdam, poses to down

    stream infrastream infra--structurestructureand populationand population

    The procedure used to assessThe procedure used to assess

    Hazard Class assumes that theHazard Class assumes that the

    dam will fail .dam will fail .

    The dams height and impounded volume determinesThe dams height and impounded volume determines

    how big the initial flood wave is when the Dam failshow big the initial flood wave is when the Dam fails

    suddenly.suddenly.

    Design G idelinesDesign Guidelines

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    22/39

    NYS Department of Environmental Conservation

    NYSNYS Class AClass A

    Low HazardLow HazardPotential damage to:Potential damage to:

    isolated farmisolated farm

    buildingsbuildings undeveloped landundeveloped land

    township or countytownship or county

    roadsroads

    NYSNYS Class CClass C

    High HazardHigh Hazard

    Potential:Potential:

    loss of lifeloss of life

    damage todamage to

    main highwaysmain highways

    railroadsrailroads

    important utilitiesimportant utilities

    Potential damage to:Potential damage to:

    homeshomes

    main highwaysmain highways

    minor railroadsminor railroads

    relatively importantrelatively important

    utilitiesutilities

    NYSNYS Class BClass B

    IntermediateIntermediate

    HazardHazard

    NOTE: Hazards can changeNOTE: Hazards can change

    Design GuidelinesDesign GuidelinesMoreMoreFactsFacts::

    Dam Safety Permitting Process

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    23/39

    NYS Department of Environmental Conservation

    Dam Safety Permitting Process

    Permit for the Construction, Reconstruction, Removalor Repair of a Dam

    Project Schedule

    Design

    Bid

    ConstructOperate

    HazardC

    lassificatio

    n

    Form

    D-1and

    TechnicalReview

    FinalSubmittaland

    PermitApproval

    Inspectionand

    Approvalto

    Fill

    maybe

    required

    IdentifyD

    eficiencies

    &

    Remed

    ialOptions

    Inspectio

    nby

    Const.En

    gineer

    Engineers

    Cert.&

    As-builtDocs

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    24/39

    NYS Department of Environmental Conservation

    Is Dam Removal anIs Dam Removal an

    Option?Option?

    -- Feasibility of RepairingFeasibility of Repairing

    and Maintaining a Damand Maintaining a Dam

    -- Feasibility and DesignFeasibility and Design

    of Dam Removalof Dam Removal

    -- Feasibility of providing AquaticFeasibility of providing Aquatic

    Passage over or around the DamPassage over or around the Dam

    FocusFocus

    Technical/EngineeringTechnical/Engineering

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    25/39

    NYS Department of Environmental Conservation

    -- Technical/EngineeringTechnical/Engineering

    -- B. Feasibility and Design of Dam RemovalB. Feasibility and Design of Dam RemovalB1. Obtaining Dam Removal PermitsB1. Obtaining Dam Removal Permits

    B2. Protecting Against Environmental ImpactsB2. Protecting Against Environmental ImpactsB3. Managing SedimentB3. Managing Sediment

    B4. Removing StructuresB4. Removing StructuresB5. Protecting Infrastructure.B5. Protecting Infrastructure.

    B6. Restoring the ChannelB6. Restoring the ChannelB7. Restoring Recovered LandB7. Restoring Recovered Land

    FocusFocusNYS DAM SAFETY PERMITNYS DAM SAFETY PERMIT

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    26/39

    NYS Department of Environmental Conservation

    a. Hazard Classification

    b. Hydrologic Analysis

    c. Hydraulic Design

    d. Outlet works and

    Conduits

    e. Subsurface investigation

    f. Structural Stability

    Factors that influence Hydrology

    Watershed Geometry

    Size, Shape, Storage

    Hydrologic Characteristics

    Soils, Slopes, Cover Type, Land use

    Curve Number, Time of Concentration

    Rainfall- Depth, Intensity, Duration

    Routing Stage vs Discharge

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    27/39

    NYS Department of Environmental ConservationHurricane Floyd1999 September 14 20:29 UT1999 September 14 20:29 UTNOAANOAA--14 satellite14 satellite

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    28/39

    Example DamExample Dam

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    29/39

    NYS Department of Environmental Conservation

    TROPICAL STORM TAMMY OCTOBER 2005TROPICAL STORM TAMMY OCTOBER 2005

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    30/39

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    31/39

    NYS Department of Environmental Conservation

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    32/39

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    33/39

    NYS Department of Environmental Conservation

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    34/39

    NYS Department of Environmental Conservation

    Addressed in Guidelines

    Hazard Classification

    Hydrologic Analysis

    Hydraulic Design

    Outlet works and Conduits

    Subsurface investigation

    Structural Stability

    FocusFocus

    FocusFocus

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    35/39

    Stability of the Structure as it is being deStability of the Structure as it is being de--constructed and afterconstructed and after

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    36/39

    NYS Department of Environmental Conservation

    Stability of the Structure as it is being deStability of the Structure as it is being de--constructed and afterconstructed and after

    Hydraulic capacity of the finished channel to pass a design storHydraulic capacity of the finished channel to pass a design stormm

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    37/39

    Hydraulic capacity of the finished channel to pass a design storHydraulic capacity of the finished channel to pass a design stormm

    Emergency AuthorizationEmergency Authorization

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    38/39

    NYS Department of Environmental Conservation

    g yg y

    THE ENDTHE ENDXX dingE ding

  • 8/11/2019 Restoring Migratory Fish Habitat Dam Safety Considerations

    39/39

    NYS Department of Environmental Conservation

    THE ENDTHE END

    I Made it !!!!I Made it !!!!

    XX

    HappyEndi

    ng

    HappyEndi

    ng