SYNOPSIS
This project entitled as “Resource Management System “(RMS) is
Developed using Microsoft Visual Basic 6.0 as Front end and Microsoft
SqlServer2000 as back end.
The ultimate aim of this project is to allocate the resources for the
organization. This project is mainly developed to automate the process between
the human resource manager and the project manager such as applying for
resource request, accepting the request or rejecting or holding the request,
applying request for relieving from the resource, entering, updating the details and
skills of the employee.
It contains an administrator login for the human resource manager in which
any new degree, domain and role for an employee can be updated. Several data
reports are created to display the current records.
This project is oriented with full user interface and easy to operate the
system. RMS is an automated process, so it reduces the paper works.
2.1 PROBLEM DEFINITION
The project is developed to automate the Resource Management System
(RMS). This project is mainly developed to automate the process between the
human resource manager and the project manager such as applying the resource
request, accepting the request or rejecting or holding the request, applying request
for reveling from the resource, entering updating the details and skills of the
employee.
METHODOLOGY
This project consists of three modules namely
HUMAN RESOURCE
PROJECT MANAGER
SKILL UPDATER
HUMAN RESOURCE:
This module consists of operations performed by the HR such as
adding new degree, role, and domain for the concern. It also acts as an indicator,
which indicates the message when a request is received from the project manager.
Here human resource manager acts as an Administrator. Human resource manager
can also perform the operation such as accepting, rejecting or holding the request
for the request made by the project manager. The HR enters the details such as
personal, educational, skill, project details and assigns unique id, unique username
and password for each employee who newly joins into the concern.
PROJECT MANAGER:
This module consists of the operations made by the project manager
such as requesting for resource; release the resource. After the allocation of the
resource by the human resource manager the project manager starts the project
work. Releasing of the resource is done after the completion of project or
allocation of resource to other project.
SKILL UPDATER:
This is a common module used by all such as human resource
managers, project manager, employees to update their skills during any period.
Each employee can alter and update their skills. In this module there is a provision
to change the password, which is used for login purpose HR can alter and update
the skills for all employees.
3.1 Requirement analysis & Specification
OPERATING ENVIRONMENT
3.1.1SOFTWARE ENVIRONMENT
Front End - Microsoft Visual Basic
Back End - SqlServer2000
3.1.2.HARDWARE ENVIRONMENT
Client Side
Operating System – Windows 95 & lateral
Processor - 200Mhz or faster processor
Primary - 64 or more MB RAM
Monitor - Monitor capable of 16-bit or better with
800 * 600 pixel setting.
Hard Disk - 10 GB or more.
Server Side
Windows 2000 NT .The server must be connected in good
condition.
Acronyms and Abbreviations
HR Human resource ManagerPM Project ManagerEMP Employee
3.1.4 DATA FLOW DIAGRAM
LEVEL –0
Login
Role based authentication
Report
EXISTINGUSER
RMS
REQUESTPROCESS
LEVEL -1
Storing employee details
Storing requestdetails
EXISTING USER
LOGIN ROLE BASED AUTHENTICATION
CHECK USER
EMPLOYEE
REQUESTPROCESS
RESOURCEREQUEST
ANALYSISSKILLUPDATER
Reports
1.1OBJECTIVES
The main objective of this project is to automate the things happens between Human Resource Manager and Project Manager.
• Only the HR can do new employee registration and provide the user id.
• After entering the data the save button is clicked to save the details into the database.
• Employee can login through given user id.• The user can also change the password.• PM can request the HR for the resources needed for a new
project.• HR will allocate the resource if it is available otherwise HR
can simply Hold or Reject the request.• Allocated resources are schedule in Man Power Allocation
Sheet. • Employers can view their own details.• HR is the only person can alter details of all employees.• The users easily store the inputs and view the details because
user interaction is provided throughout this project.
2.2 EXISTING SYSTEM
The existing system is a manual system in which the PM has to
inform about the request manually. The HR has to allocate the resources by
searching employees manually and to allocate to the resource, which was request.
2.3 LIMITATIONS OF EXISTING SYSTEM
Since the current system is the manual, it suffers mainly in the way
that information is organized, stored and later presented in the form of reports and
queries.
In the existing system the time consumption is high.
Large number of Files to be maintained for storing the details.
Lot of paper works is needed for requesting for resources.
It is tedious to search for the resources manually.
NEED FOR COMPUTRIZATION
With the technology being enhanced new provisions are added to
people. To cite an example, RMS is the best resource that the people avail of it.
PM in any corner of the world can access the system and request for the resource
needed. This system will attract the people because of reducing their precious
time. Thus the need for computerization comes into the picture.
2.4 PROPOSED SYSTEM
This system RMS has been specially developed to overcome the
problems faced in the existing system. The proposed system does not require any
manual processing. This system has the feature to store all the request details that
are made by the PM. It also features the search for the resource in a easy way.
Since, the propose system involves the automation of the existing
system, the functional aspects logically follow the existing system. The proposed
system aims to overcome the disadvantages of the current manual system
satisfying the specification requirements.
ADVANTAGES OF PROPOSED SYSTEM
Increasing the time efficiency reduces human factor to a bigger
extent.
The system is developed after considering the user’s needs and
analyzing as to how fat it is feasible.
This system focuses on the user interaction and the periodic reports
that have to be generated to satisfy user reports.
3.1.3 DATA DICTIONARYThe dictionary contains the data about data i.e. metadata. The
following tables clearly explain the fields used in this project with their type and description.
Table Name EMPPER
Field Name Data Type Size DescriptionEid Varchar 10 To store the
employee idUname Varchar 30 To store the
user namePass Varchar 30 To store the
passwordEmpFirst Varchar 30 To store the
first nameEmpLast Varchar 30 To store the last
nameAddress Varchar 50 To store the
addressCity Varchar 25 To store the
cityPhone Number 15 To store the
phone numberMobile Number 15 To store the
mobile numberAge Number 3 To view the ageBlood group Varchar 10 To store the
blood groupMail Varchar 25 To store the
Email idState Varchar 40 To store the
stateDdate Number 2 To store the
dateDmon Varchar 5 To store the
monthDyear Varchar 4 To store the date
Table Name LOGIN
Field Name Data Type Size DescriptionUname Varchar 30 To store the
user namePass Varchar 30 To store the
password
Table Name EMPEDU
Field Name Data Type Size DescriptionEid Varchar 10 To store the
employee idDegree Varchar 10 To select the
degreeSpecial Varchar 20 To enter the
specializationPercent Number 2 To enter the
percentageDurfrm Number 4 To select the
from durationDurto Number 5 To select the to
duration
Table Name SKILL_MAS
Field Name Data Type Size DescriptionEid Varchar 10 To store the
employee idSkill name Varchar 30 To store the skill
nameSkill type Varchar 30 To store the typeProficiency Varchar 30 To store the
proficiency
Table Name EDU_MAS
Field Name Data Type Size DescriptionDegree Varchar 30 To store the
degreeDomain Varchar 50 To store the type
of domainRole Varchar 50 To store the role
Table Name EMPPROJ
Field Name Data Type Size DescriptionEid Varchar 10 To store the
employee idDomain Varchar 50 To store the
domainTitle Varchar 50 To store the
title of the project
Role Varchar 50 To store the role in the project
Descry Varchar 50 To store the description of the project
Styr Int 4 To store the starting year
Endyr Int 4 To store the ending year
Soft Varchar 50 To store the software environment
Hardware Varchar 50 To store the hardware environment
Table Name RESREQ
s
Thus the above are the tables and data used in the database.
Field Name Data Type Size DescriptionResource id Varchar 30 To store the
resource idPtitle Varchar 50 To store the
project titleReqname Varchar 50 To store the
requested person name
Datereq Date 8 To store the date of request
Stat Varchar 15 To store the status of the request
3.2. SYSTEM DESIGN
3.2.1. DATABASE DESIGN
Database management system defines a file a database and calls it as
a collection of interrelated records. A table is a collection of data about a specific
topic. The information can be stored in a single database file. Within the file, the
data can be divided into separate storage containers called tables, view, add and
update table data by using online forms; find and retrieve just a data want by
using queries; and analysis and print data in a specific layout by using reports.
Users are allowed to view, update or analyze the databases data from the file
Internet or an intranet by creating data access pages.
The basic steps in designing a database
Determine the purpose of database
Determine the tables needed in databases
Determine the fields needed in the tables
Identify fields with unique values in each record
Refine the design
Store data and create other database objects
Tables used in this project are
EMPPER:
To store the personal details of the employee
EMPEDU:
To store the educational details of the employee
EMPSKILL:
To store the skills and their corresponding proficiency of the
employee
EMPPROJ:
To store the project details of the employee
RESREQ:
To store the status and the resource details for a project
SKILL_MAS:
To store the skills newly add to the software field.
EDU_MAS:
To store the new degree, domain, Role in the environment
LOGIN:
To Store The Login Details
3.2.2.INPUT DESIGN
As per the theories of system analysis and design the reliability of a user
about a system is increased only through the proper design of the input and output
forms.
• Only the HR can do new employee registration and provide the user id.
• Storing the details and checking the save button user details into the database.
• Employee can login through given user id.• PM can request the HR for the resources needed for a new
project.• HR will allocate the resource if it is available otherwise HR
can simply Hold or Reject the request.• Allocate resources are schedule in Man Power Allocation
Sheet. • Employers can view their own details.• HR is the only person can alter details of all employees.• The users easily store the inputs and view the details because
user interaction is provided throughout this project.
Suppose for example
While Not RS1.EOFIf Trim (UNAME.Text) = RS1 (0) And PASS.Text = "" Then
Set MYOLAPP = Create Object ("Outlook.Application") Set MYITEM = MYOLAPP.CreateItem (olMailItem) MYITEM.To = RS (0) MYITEM.Subject = " PASSWORD REMEMEBERANCE" MYITEM.Body = "Your password is " & RS1 (0) &
MsgBox " Password Send To Your Mail Box " Rs1.close Exit sub
End ifWend
USER NAME
PASSWORD
FORGET PASSWORD
CANCELOK
In the above example user can retrieve the password by just entering the user name
and checks the forget password check box then user can receive the password
through mail.
Suppose for example
If OLDPASS.Text = pas ThenRS.Open " UPDATE LOGIN SET PASS = '" & CPASS.Text & "‘ where UNAME = '" & LOGIN.UNAME.Text & "' ", CON, 1, 2RS1.Open "UPDATE EMPPER SET PASS = '" & CPASS.Text & "‘ UNAME = '" & LOGIN.UNAME.Text & "' ", CON, 1, 2MsgBox " Password Changed ", vbInformation
ElseMsgBox " Incorrect Old Password ", vbCriticalOLDPASS.SelStart = 0OLDPASS.SelLength = Len (OLDPASS.Text)OLDPASS.SetFocusNEWPASS.Text = ""CPASS = ""
End If
In the above example the user have the provision to change the password. In the
example the user has to enter the old password, then the new password and retype
the password so as to confirm the password for their login.
Change passw
Old Password
New Password
Confirm
Save
3.2.3 OUTPUT DESIGN
One of the most important features of any information system for
users is the output it produces. The right output must developed while ensure that
each output element is designed so that people will find the system easy to use
efficiently.
RESULT REPORT
This will be provided immediately after the allocation of resources
for a project that is requested by PM.
These following types of reports can be generated in this project. They are
SKILL WISE
This type of reports is used to generate the details of the employee using
skill wise.
EMPLOYEE WISE
This type of reports is used to generate the details of a particular employee.
PROJECT WISE
This type of reports is used to generate the details of the employee through
project work done by the employee.
YEAR WISE
This type of reports is used to generate the details of a particular employee
about the performance throughout the year.
3.4. TESTING
Testing is a process of executing a program with the intent of finding an
error. This process also ensures that defined input will produce actual results that
agree with required results. The amount of testing required is related to the size
and complexity of the application. A good test is one that has to high probability
of finding an undiscovered error.
UNIT TESTING
This test checks each individual module ensure that it functions properly as
a unit. Unit test exercise specific path in a module to ensure complete coverage
and maximum error detection.
All independent paths in a module through the control structure to
ensure that all statements in the module are executed at least once.
All loops have been executed at their boundaries with their
operational bounds.
All logical decisions have been exercised on their side.
For example the user name is HR and password is secretly want to
be checked. At the start “ If Statement “is used to check the above
constraint.
If the condition goes true the required menus will be displayed
Otherwise, it will display an error message.
From this, it is confirmed, if condition functions correctly.
Suppose for example
If Trim (UCase (UNAME.Text)) = "HR" And PASS.Text = RS (1) ThenMDIForm1.MM_PM.Enabled = FalseMDIForm1.ShowMe.Hide
ElseMsgbox “Invalid user name “, vbcritical
end if
Here if condition checks for the user name and password are equal to the database field name in some table.
If the condition is true then it will show the Mdiform with respected menus.
Otherwise it will display a message box.
Various tests can be generated to uncover the errors in the following categories.
Improper or inconsistent of default values
Inconsistent data types
Underflow or overflow
All error-handling paths were tested.
INTEGRATION TEST
Integration test is the systematic technique or constructing this
program structure while at the same time conducting test to uncover errors
associated build a program structure that has been dictated by design.
The modules are integrated to from the compute software package. It
addresses the issues associated with dual problems of verification and program
construction. It mainly deals with testing whether the links are passed between
modules without any error.
In this project the integration testing is done to check whether the links
between the forms are passing correctly.
For example, suppose the user forget the password then he can retrieve it using
RS1.MoveFirst
While Not RS1.EOF
If Trim(UNAME.Text) = RS1(0) And PASS.Text = "" Then
Me.Hide
FORGET.Show
Exit Sub
End If
RS1.MoveNext
Wend
Suppose in the above coding if the state mention is true then the
forget form will be shown.
Other wise the existing form will be hided and the Mdiform is
displayed.
Similarly ever passing is tested and corrected when error occurred.
WHITE BOX TEST
White box testing, sometimes called glass box testing, is a test case design
method that uses the control structure of the procedural design that uses the control
structure of the procedural design to derive test cases. Using the white box testing
methods, the software engineer can derive test cases that
1. Guarantee that all independent paths within a module have been
exercised once
2. Exercise all logical decisions on their true or false sides.
3. Execute all loops at their boundaries and within their operational
bounds
4. Exercise internal data structure to assure their validity.
Suppose for example
With vas1Do While Not rs.EOF
vas1.MaxRows = vas1.MaxRows + 1vas1.Row = vas1.MaxRows .Col = 1 .Text = rs(0) .Col = 2 .Text = rs(1) .Col = 3 .Text = rs(2) .Col = 4 .Text = rs(3) .Col = 5 .Text = rs(4) .Col = 6 .Text = rs(5)
loopend with
This routine is used to store the data to the spreadsheet from the database. So that he routine is used.
BLACK BOX TEST
It focuses on the functional requirements of the software. That is, black box
testing enables the software engineer to derive of input conditions that fully
exercise all functional requirements for a program. Black box testing is not an
alternative to white box techniques. Rather, it is a complementary approach that is
likely to uncover a different classes of errors that white box method.
Black box testing attempts to find errors in the following categories
1. Incorrect or missing functions
2. Interface errors
3. Error in data structure or external data ware access
4. Performance Errors
5. Initialization and termination errors
Suppose for example
Private Sub SETLENTGH()TXT_ID.MaxLength = 20txt_first.MaxLength = 30txt_last.MaxLength = 30txt_add.MaxLength = 50txt_ph.MaxLength = 15txt_mob.MaxLength = 15TXT_MAIL.MaxLength = 30TXT_BG.MaxLength = 15End Sub
In the above coding function SETLENTGH sets the maximum length for each
textboxes. Hence it has been tested using the black box text.
NORMALIZATION
Normalization procedure involves breaking down or decomposing the
given table into other table. The decomposition is required to be reversible. So that
no information is lost in the process.
NORMAL FORM
Table name empedu
Uname Pass Degree Special Percent Dur frm Dur toPran Pran MCA Computer
applications75 2001 2004
DIL DIL M.Sc IT&M 72 2002 2004Pran Pran Mtech VLSI 78 2004 2006
First Normal Form
A relation scheme is said to be in first normal form (1 NF) if the
values in the domain of each attribute of the relation are atomic. In other words
only one value is associated with each attribute. From the above example the table
gives atomic values.
Second Normal FormA second normal form doesn’t permit partial dependency between a
non-prime attribute and the relation keys.
Definition A relation scheme is in second normal form (2 NF) if it is in 1 NF
and if all non-prime attributes are fully functionally dependent on the relation
keys.
ExampleIn this project the pass details are kept in 2 NF.
Parsing of empedu
Table name login
Uname pass
pran pran
DIL DIL
Uname Degree Special Percent Dur frm Dur toPran MCA Computer
applications75 2001 2004
DIL M.Sc IT&M 72 2002 2004Pran Mtech VLSI 78 2004 2006
Thus the tables are partitioned into login, empedu, skillmas, empproj, resreq and
empper table.
3.3. IMPLEMENTATION
Implementation is the conversion of logical design into source code.
The implementation phase of software developed is concerned with translated
design specification into source code. Source code clarity is enhanced by
structured coding techniques, by supporting documents and by good internal
comments.
During the implementation stages the client will never leave the
existing system until the client is fully satisfied with the proposed system. Unit,
integration, black and white box tests test this project.
In this project the server is implemented in one place and the client
systems are also implemented in various places. This server system should be in
well configured to meet the constraints. This project is implemented in the intranet
environment.
The server must be in running and the client pulls the information to
the server and in turn the server responds to the client. For this purpose data
streaming concept is used.
Less time consumption and more efficient.
Information required is obtained very quickly.
Less expensive
In this project several components are used but there are some special controls
used for some specific purpose they will be as follows
1.MAPI control
This control is Mail Access Programming Interface. This control is
used to send mails to the users for the purpose as incase of the user has forget the
password. The password will be send to the mail using this control for the
particular employee requested for the remembrance of password.
2.FAR POINT SPREAD SHEET
In spite of using Grid controls for viewing any type of details here
the spreadsheet control is used for viewing or displaying the details. Using this
control the user can edit the details and update into the database.
For the database connectivity ADODB control is used so that the
backend process is done easily.
3.5. MAINTENANCE ISSUES
The software maintenance is the important phase in the software
development and requires more effort. The software maintenance means to
improve our software quality according to current positions.
This software uses reverse engineering to develop this software from
scratch, because existing system is done by manually. This is more expensive and
non-reliability so this software makes the capability of online process by the client.
So it is possible to cover lot of customer more than the existing system.
Developing the software is characterized by the following activity
Adaptive Maintenance
This maintenance means changing the software to some new
environment such as different hardware platform or for use with a different
operating system. The software functionality does not radically change. This
software can be run under minimum configuration as Windows 95 and lateral
operating system. Processor can be 200 MHz or faster processor. The primary
memory will be 64 or more MB RAM. The hard disk with minimum of 10 GB or
more the monitor capable of 16-bit or better with 800 * 600 pixel setting is a
minimum requirement
4. CONCLUSION.
The main objective of this project is to automate the things happens
between Human Resource Manager and Project Manager. They are by making
way for complete paperless working environment. Various helpdesk services that
ware handled manually are now managed at never impact pace. The increased
standard of the services will definitely have an impact on the efficiency of the
system. In future many additional task such as, analyzing the project duration for
each phase in the software development life cycle (SDLC) through the system. It
can be improved as per user’s requirement by getting their suggestions. This will
surely help the people who are in software concerns.
5 BIBLIOGRAPHY
1. Mastering Visual Basic 6.0
• Evangeous Petroutsos
2.Using Visual Basic 6.0
• Mike Mickly, Brain Siley
3.Visual Basic 6.0
• Noel Jerke
4.Beginning Sql Server 2000 For VB Developers
• Thearon Willis
5.Data Base Management System
• C.J. Date
6.Software Engineering
• Roger.S.Pressman
7.System Analysis And Design
• Elias.M.Awards
B.Lakshmi, M.C.A.,Lecturer,Department of Computer Science,Nehru Memorial College,Puthanampatti – 621 007.
CERTIFICATE
This is to certify that the project titled “ RESOURCE MANAGEMENT
SYSTEM (RMS)” is a bonafide work done
By
P.R.PRANESH
Register Number: 01280128
during the 6th semester in partial fulfillment of the award of the Master of
Computer Applications of Bharathidasan University, Tiruchirappalli.
I certify that the project work carried out by him is an independent
work done under my supervision and guidance.
HEAD OF THE DEPARTMENT PROJECT ADVISOR (M.MURALIDHARAN) (B.LAKSHMI)
EXAMINERS
1.____________________
2.____________________
ACKNOWLEDGEMENT
I am very happy to reward my sincere thanks to Mr.M.Ponnambalam,M.A.,M.Sc., Secretary and Dr.S.Ramalingam,M.A.,PhD., principal, Nehru Memorial College, Puthanampatti for the encouragement during the course of my study.
I express my sincere thanks to Mr.M.Muralidaran,M.Sc.,PGDCA , Head, Department of Computer Science , Nehru Memorial College, Puthanampatti for making all necessary arrangements for the successful completion of this project work.
I am greatly indebted to my project guide Mrs.B.Lakshmi, M.C.A Lecturer, Department Of Computer Science for her thought provoking lectures and invaluable guidance.
I am greatly indebted to the company Take Solutions for providing me this great opportunity to do the project in their concern. I greatly express my thanks to Mrs.R.Shanthi process consultant of the concern for her thought provoking lectures and invaluable guidance.
I am very much thankful to Mrs.B.Neera HR of the concern for her thought provoking lectures and invaluable guidance. I am very much thankful to Mr.Sathish Krishnan Project Manager of the concern who has given his provoking invaluable guidance throughout this project. I express my hearty and special thanks to Mr.B.Soundara Rajan for his guidance throughout this project.
I express my heartily and special thanks to my parents, friends and all staff members who helped me a lot in various way directly or indirectly throughout this project work.
PRANESH.P.R
TABLE OF CONTENTS
S.No Content Page. No.
1. Introduction 1.1 Objectives
1.2 Organization Profile 2. Problem Definition and Methodology
2.1 Definition 2.2. Existing System
2.3 Limitation of Existing System 2.4. Proposed System
3. Developmental Process and Documentation 3.1 Requirement analysis & Specification
3.1.1 Software Requirements3.1.2 Hardware Requirements3.1.3 Data Dictionary3.1.4 Data Flow Diagram
3.2 System Design 3.2.1. Database Design
3.2.2 Input Design 3.2.3 Output Design
3.3 Implementation 3.4 Testing
3.5 Maintenance Issues
4. Conclusion
5. Bibliography
6. Appendix6.1 Software Profile6.2. Source code6.3 Table Structure6.4 Screen Layout
6.5 Reports
6.4. SCREEN LAYOUT
Form Name Login
Form Name Admin
Form Name Empper
Form Name Empedu
Form Name Empskill
Form Name Empproj
Form Name HR_REQ
Form Name HR_SER
Form Name REQ_SEND
Form Name HR_MPRA
Form Name pass_chan
Form Name PM_REQ
Form Name REQ_STAT
Form Name PM_RLF
6.5 REPORTS
Report Name EMPREP
Report Name MPRA
Report Name PDREP
Report Name SKILLREP