TECHNICAL AND PROJECT SERVICES - Roads &
ESTIMATE CONCURRENCE REPORT ,� Maritime- - - - - -
PROJECT: Windsor Bridge Replacement over Hawkesbury River
ROAD No: Macquarie Street to Wilberforce Road PROJECT No: P.00 I 1444
LOCATION: Windsor, Hawkesbury PROJECT MANAGER: Gurjit Singh
REGION/ OFFICE: Greater Sydney PO ESTIMATE STATUS: Post-tender
ESTIMATE OF P90 COST: $131M ($ March 2018) DATE: (12/04/2018)
ESTIMATE OF P90 $OT COST: $ I 37M (construction June 2018 to August 2021)
Background
The project is located at. Windsor in the Hawkesbury local government area about 57 kilometres north- west of Sydney. Windsor is a major historic town, with European settlement dating back to the late 1700s. Today it is predominantly rural, although there is extensive and expanding urban development to the south and west of the town. The existing Windsor Bridge was opened in 1874 and is the oldest existing bridge across the Hawkesbury River. It provides an important local link for communities on each side of the river, as well as an important regional link between western Sydney, the Blue Mountains and the Hunter region. Around 19,000 vehicles use the bridge each day, with around seven per cent of these being heavy vehicles.
Parts of the existing bridge are over 140 years old and are deteriorating as a result of age and heavy use. Elements of the bridge have deteriorated substantially and it is not practical to replace or repair these elements. The existing bridge and adjacent intersections no longer meet the demands of current peak hour traffic volumes or current road standards. The level of maintenance required to maintain adequate road safety is no longer cost effective and it is therefore regarded that the bridge has reached the end of its economic life.
In June 2008, in recognition of the condition of the existing bridge and the volume of traffic it carried, the New South Wales (NSW) Government announced funding for its replacement. Preliminary investigations of potential bridge replacement options along with stakeholder consultations were completed in 2012, followed by completion and public display of the Environmental Impact Statement (EIS) exhibition. The Infrastructure Approval was provided by the NSW Minister for Planning in December 2013 but was then appealed at the NSW Land and Environmental Court on the grounds that it would impact on Thompson Square. This appeal was led by the Community Action Group for Windsor Bridge. However, in 2015 the appeal was denied and the court allowed the project to proceed.
final Concun-ence Repo1i - Windsor B1-idge.docx Page I of 8
RESOLVED TO BE PUBLISHED BY RESOLUTION OF THE COMMITTEE ON 13 AUGUST 2018
Status/Program
Milestone Forecast
Date* P50 Forecast
Date* P90 Forecast
Date*
Complete Concept Design Completed Completed Completed
REF Display Completed Completed Completed
REF Determination Completed Completed Completed
Complete Detail Design Completed Completed Completed
Invite Tenders Completed Completed Completed
Commence Construction June 2018 June 2018 June 2018
Complete Construction August 2021 August 2021 August 2021
Handing over September 2022 September 2022 September 2022
* The milestone dates are provided by the Project Manager based on the monthly forecast.
Scope
The project includes: • A 2,445 rn2 new bridge 35 metres downstream of the existing Windsor Bridge • New approach roads and intersections to connect the new bridge to the existing road
network • New traffic lights with pedestrian facilities at the intersection of Bridge Street and George
Street • A new dual lane roundabout at the intersection of Wilberforce Street and Freemans Reach
Road • Modifications to local roads and access arrangements, including changes to the Macquarie
Park access road and reconnection of The Terrace • Pedestrian and cyclist facilities, including a shared path connecting to and across the new
bridge • Removal and backfill of the existing bridge approach roads • Removal of the existing bridge once the new bridge is operational • Landscaping and urban design work, including within the Thompson Square parkland area and
adjacent to the northern intersection of Wilberforce Road, Freemans Reach Road and the Macquarie Park access road.
Review Methodology
Arithmetic checks were carried out on the estimate spreadsheets. 2. Cursory checks were carried out on some items for appropriateness of the quantities
and/or rates. 3. Reality check calculations were reviewed. 4. The estimate was discussed with the project manager and relevant adjustments were made. 5. Contingency was calculated from Monte Carlo simulation and deterministic approach was
used for assigning contingency for each estimate component. 6. Estimate compared to previous estimate and variances were analysed. 7. Outturn dollars have been calculated based on the program and cash flow provided by the
Project Manager.
final Concurrence Report - Windsor Bridge.docx Page 2 of 8
Assessment of Key Components
I. Development
For Strategic and Concept Development, a base allowance of $18.38million (excluding project management costs) has been allowed in the estimate. This is 31.5% of the total construction cost (approximately $58.38mi11ion) which is significantly higher than the achieved range of 3-4% with a construction cost between $50mi11ion and $150million.
The higher incurred expenditure has largely been due to heritage investigation works undertaken for the EIS, further investigations in multiple options (i.e. bypass and maintaining existing bridge options) and to comply with the particularly onerous conditions of approval that were placed on the project which increased both scope and complexity of the development phases.
It should be also noted that the higher allowance is due to the internal cost transfers from the previous phases including Strategic Route Options, Concept, Detail Design and Construction which stopped due to the legal case in the Land and Environment Court. When the decision in the Land and Environment Court was announced in RMS's favour in Late 2015, RMS had complex Minister's Conditions of Approval that it had to work through as well as an extensive redesign which had to be completed. This has led to higher than expected costs in the Development Phase, which could not have been foreseen due to the lack of understanding of the scope of works at the time.
After considering all the above project matters, it is difficult to identify the actual cost for strategic and concept development only and compare with the achieved range for a construction cost between $50mi11ion and $150million. As such it is considered reasonable.
2. Investigation, Detail Design and Documentation
For Investigation, Detail Design and Documentation, a base allowance of $16.65mi11ion (excluding project management costs) has been allowed in the estimate. This represents 28.5% of the total construction cost (approximately $58.38mi11ion) and is significantly higher than the achieved range of 3-6% for projects with a construction cost between $50mi11ion and $150million.
Prior to receiving the Infrastructure Approval, an alliance was formed to take the project from concept to completion of construction. As part of their work the design progressed past concept into detailed design.
The subsequent Infrastructure Approval included a condition that the southern bridge approach was to be lowered by one metre, which then required substantial redesign. Additional other conditions, in particular those associated with archaeological studies have also necessitated redesign work and increased the scope.
Further cost increases have occurred during this phase due to changes to the scope of works on the archaeological investigations that were previously unforeseen.
It is noted that during the progress of detail design, the project team had to go through a substantial redesign works due to change in infrastructure approval conditions and change in scope of works due to archaeological investigation. Considering the need to redesign the elements of the new bridge and associated works along the project corridor, it is considered reasonable.
final Concurrence Report - Windsor Bridge.docx Page 3 of 8
3. Property Acquisition
An allowance of $0.52mi11ion plus 10% contingency has been allowed for the property acquisition along the project corridor.
4. Utility Adjustment
A base allowance of $5.43mi11ion has been allocated for the following utilities works along the project corridor.
• Adjustments to electricity mains and street lighting
• Adjustments to water mains•
• Adjustments to Telstra and NBN infrastructure
• Adjustments to Hawkesbury City Council's existing infrastructure
5. Infrastructure Construction
(a) Earthworks The overall earthworks base rate is $61/m3 (for 13,600m3 of earthwork quantity). The earthwork in this case is cut/fill. The base rate is higher than the achieved rate in Sydney region for Cut/Fill between $40/m3 and $50/m3. The project scope in this case involves removal and backfill of existing bridge approach roads, improvements at the existing intersection, new dual lane roundabout and modification to existing local road arrangements. Considering the nature of works along the project corridor and sensitivity in terms of environmental and heritage requirements, it is considered acceptable.
(b) Pavement A base rate of $244/m2 is allowed for the new pavement (6650m2) on the main carriageway. The main pavement comprises of 240mm of heavily bound material, 7nnm of seal, 130mm of AC20 intermediate layer followed by 50mm of AC14 wearing course and the achieved rates for similar pavement in Sydney region varies between $140/m2 and $170/m2. The base rate is higher than the achieved rate in Sydney region. The pavement works in the project involves mill and re-sheet, level correction, pavement rehabilitation and new pavement on the Main carriageway and roundabout. As with earthworks, the pavement rates are higher due to the need to carry out smaller quantity of pavement works on different locations along the project corridor. With the possibility of lower production rates, it is considered reasonable.
(c) Structures
Description Area (m2) B ase 2
Rate/m
Achieved rate/m2 for similar structures
Five Span of 3 I.32m with the total length of I 56.6m, I 4.52m wide consist of 1850mm deep incrementally launched double T-girders
2,274m2 $ I 0,357/m2 17,000/m2- 7,900/m2
*BW004 bridge at Hunter Expressway and Cliff Bridge rates escalated to current dollars.
The base rate (excluding retaining walls, safety barrier and miscellaneous works) is $10,357/m2. The higher rate is due to the significant higher cost associated with piling and pier works and the complex methodology (incremental launching) for the construction of the new bridge. Also 'the availability of limited number of contractors on final tendering process may have increase the base rate significantly. As such it is considered reasonable.
final Concurrence Report - Windsor Bridge.docx Page 4 of 8
Note: It is noted from the tender analysis that the average rate for some of the pay items such as the demolition of the bridge, earthworks, casting bed (for the incremental launching), precast pile caps and piling is substantially higher than the achieved range for similar projects. Considering that the construction of an incremental bridge is a specialised activity and completion of such a small incrementally launched bridge in an urban area with the site constraints of community, heritage, DPI approvals and other factors has meant that the tenderers have added additional risk factors to their tender prices.
It is also noted that the current market environment may also have contributed in the higher than normal tendered prices.
6. Project Management
The overall base Project Management cost is $8.95mi11ion which is 8.65% of the total project cost. A typical Project Management range for a development project of this size (project cost between $100M and $250M) would be between 4% - 5.5% depending on the complexity, nature and location of the works. The above project management percentage is higher than the achieved range due to the need to have ongoing discussion/liaison with internal and external stakeholders to mitigate number of non-engineering residual risks such as to obtain all necessary environmental and heritage approval before the award, continue to work with local community on the opposition of the project and negotiate the agreement with local council on the future maintenance responsibilities of the assets. After taking into account all the above matters, the higher project management percentage is considered acceptable.
7. Reality Checks/Project Cost Summary
Item Unit Base $ Achieved Range for similar projects
I. Project Cost/km Km $103.44M
2. Project Cost/Lane-km Lane-km $51.72M
3. Infrastructure Cost/Lane-km (excl. Bridge/Structures)
Lane-km $12.41M
The Infrastructure construction cost per lane-km rate (excluding bridge/structures/utilities) is $12.41million. This is primarily a bridge project with the road upgrades on the bridge approach and departure to support the future movement of traffic through the area. The higher infrastructure cost is due to the high proportion of work associated with structure and the contractor allowing for additional risk and complexity involved with onerous Minister's condition of approval in specific in earthworks and pavement works in the project. Considering the current status of the estimate, it is considered acceptable.
final Concurrence Report - Windsor Bridge.docx Page 5 of 8
final Concurrence Report - Windsor Bridge.docx Page 6 of 8
final Concurrence Report - Windsor Bridge.docx Page 7 of 8
Conclusions and Recommendation
The rates and contingencies listed are considered to be appropriate for this stage of development.
It is recommended that concurrence now be given to the P50 Post-tender Cost of $124M ($ December 2017) with an outturn cost of $130M and P90 Post-tender Cost of $13 1 M ($ December 2017) with an outturn cost of $137M, assuming that the construction commences in June-2018 with completion being achieved in August-2021 with an escalation rate of 3% for the project Windsor Bridge Replacement over Hawkesbury River.
This concurrence is not an approval to the estimate. Approval must be obtained from the appropriate person in accordance with the Delegated Authorities.
Anki Sheth Estimating Officer
Nages Nageswaran Engineering Estimating Manager Project Services Technical and Project Services Da / 9 ,04 '49
Bruce art Direct .r Project Support Project Services Technical and Project Services Date: pi (ztie
final Concurrence Report - Windsor Bridge.docx Page 8 of 8
Appendix I
Location Map
Appendix 2
Estimate
- Project Cost Summary
- Deterministic/Empirical Estimate
— Probabilistic Estimate
— Outturn Calculation
— Probabilistic Outturn Calculation
Appendix 3
Risk Register
Appendix 4
Drawings
DRAWING DOCUMENTATION
VOLUME DISCIPLINE DESCRIPTION
01 GENERAL
02 ROADWORKS
03 DRAINAGE & WATER QUALITY
04 UTILITIES
05 PAVEMENT & KERBS
06 PAVEMENT MARKING, SIGNS, BARRIERS AND
STREET FURNITURE
07 PROPERTY WORKS
08 GEOTECHNICAL
09 SCOUR PROTECTION
10 MINOR STRUCTURES
11 MAJOR STRUCTURES
12 LANDSCAPE DESIGN
13 SUPPLEMENTARY DRAWINGS
LOCALITY SKETCH
NSW GOVERNMENT
Transport Roacs & Maritime Services
HAWKESBURY CITY COUNCIL AREA
MR182 - BRIDGE STREET, WINDSOR WINDSOR BRIDGE REPLACEMENT
FROM MACQUARIE STREET TO WILBERFORCE ROAD
DETAILED DESIGN VOLUME 05
PAVEMENT & KERBS
NOT TO SCALE
FOR TENDER
A3 DRAWING ALE LOCATION / NAME ClhoesifAskAppOelatooNNreptlxue'erna_mmods./23627,109.00SEGC-DG.OSOT00
LINEAR REFENT.VM
START.. 000182,1010,A1,0.02 FINISH 0001112,1030,A1,0.0208 PLOT DATE / TIME MAT BY 1911012017 11:1216 AM PARISH, JORDAN
CLIENT
116 NSW
Transport Roads & maritime Services
HAWKESBURY CITY COUNCIL AREA MR182 - BRIDGE STREET. WINDSOR
WINDSOR BRIDGE REPLACEMENT PAVEMENT & KERBS COVER SHEET
PREPARED BY
JACOBS" n Pak.
Norn Se, SYCNEY NSW /054 AUSTRAL.
Tel 104 912112103 (02, 9.211230.2 VNI,A,NdIN can
DESIGNEE
SIGNED .
NAME
DATE .
REVIEWED
SIGNED
MAW
TRU
DATE
VERIFIED
SIGNED
WV&
11111 .
DATE
RMS PROJECT MANAGER
.. GURJIT SINGH
ThrE PROJECT MANAGER RIAS PROJECT NO. DESIGN PROJECT No P.0011444 NB981105
VALIDATION AND ACCEPTANCE OF THESE DRAWINGS AND THE DESIGN SHOWN
THEREON IS TO BE CARRIED OUT UNDER SEPARATE PROCESS
PREMED FOR GREATER SYDNEY PROJECT OFFICE SYDNEY OUTER
5050505050150100 DS2012 /000289 05 ISSUE STATUS EONS No 0*05150 DETAILED DESIGN - TENDER ISSUE 0501 5's"€
0 Roads and Maritime Services
PAVEMENT & KERBS - DRAWING INDEX
DRAWING NUMBER DRAWING TITLE GENERAL
NB98005-ECC-DG-0501 PAVEMENT & KERBS COVER SHEET N898005-ECC-DG-0502 PAVEMENT & KERBS DRAWING INDEX NB98005-ECC-DG-0503 PAVEMENT & KERBS GENERAL NOTES
PAVEMENT PLANS , N598005-ECC-DG-0521 PAVEMENT & KERBS PLAN SHEET 1 NB98005-ECC-DG-0522 PAVEMENT & KERBS PLAN SHEET 2 NB98005-ECC-DG-0523 PAVEMENT & KERBS PLAN SHEET 3 NB98005-ECC-DG-0524 PAVEMENT & KERBS PLAN SHEET 4 NB98005-ECC-DG-0525 PAVEMENT & KERBS PLAN SHEETS 1
NB98005-ECC-DG-0526 PAVEMENT & KERBS PLAN SHEET 6 NB98005-ECC-DG-0527 PAVEMENT & KERBS PLAN SHEET? N898005-ECC-DG-0528 PAVEMENT & KERBS PLAN SHEET 8
PAVEMENT PROFILES NB98005-ECC-DG-0531 PAVEMENT & KERBS PROFILES SHEET 1 NB98005-ECC-DG-0532 PAVEMENT & KERBS PROFILES SHEET 2
INTERFACE DETAILS NB98005-ECC-DG-0541 PAVEMENT & KERBS INTERFACE DETAILS SHEET 1 NB98005-ECC-DG-0542 PAVEMENT & KERBS INTERFACE DETAILS SHEET 2 NB98005-ECC-DG-0543 PAVEMENT & KERBS INTERFACE DETAILS SHEET 3
EDGE DETAILS N898005-ECC-DG-0551 PAVEMENT & KERBS EDGE DETAILS SHEET 1 NB98005-ECC-DG-0552 PAVEMENT & KERBS EDGE DETAILS SHEET 2 NB98005-ECC-DG-0553 PAVEMENT & KERBS EDGE DETAILS SHEET 3 N1398005-ECC-DG-0554 PAVEMENT & KERBS EDGE DETAILS SHEET 4 N1398005-ECC-DG-0555 PAVEMENT & KERBS EDGE DETAILS SHEET 5 NB98005-ECC-DG-0556 PAVEMENT & KERBS EDGE DETAILS SHEET 6
NB98005-ECC-0G-0557 PAVEMENT & KERBS EDGE DETAILS SHEET 7
RIGID PAVEMENT DETAILS NB98005-ECC-DG-0561 PAVEMENT & KERBS RIGID PAVEMENT DETAILS SHEET 1 NB98005-ECOOG-0562 PAVEMENT & KERBS RIGID PAVEMENT DETAILS SHEET 2 NB98005-ECC-DG-0563 PAVEMENT & KERBS RIGID PAVEMENT DETAILS SHEET 3 NB98005-ECC-DG-0564 PAVEMENT & KERBS RIGID PAVEMENT DETAILS SHEET 4
PAVING DETAILS N698005-ECC-DG-0571 PAVEMENT & KERBS PAVING DETAILS SHEET 1
KERB DETAILS NB98005-ECC-DG-0581 PAVEMENT & KERBS KERB AND GUTTER DETAILS SHEET 1
SUBSURFACE DRAINAGE PLANS NB98005-ECC-DG-0591 SUBSURFACE DRAINAGE PLAN SHEET 1 NB98005-ECC-DG-0592 SUBSURFACE DRAINAGE PLAN SHEET 2 NB98005-ECC-DG-0593 SUBSURFACE DRAINAGE PLAN SHEET 3 NB98005-ECC-DG-0594 SUBSURFACE DRAINAGE PLAN SHEET 4 NB98005-ECC-DG-0595 SUBSURFACE DRAINAGE PLAN SHEETS NB98005-ECC-DG-0596 SUBSURFACE DRAINAGE PLAN SHEET 6 NB98005-ECC-DG-0597 SUBSURFACE DRAINAGE PLAN SHEET 7 NB98005-ECC-DG-0598 SUBSURFACE DRAINAGE PLAN SHEET 8
cum calm .23.11.17
11.IT 011.11.11 01 NM
ISSUED FOR TENTER ISSUED FOR MEER
TR TR
BCP
ROT USED 111.03.01.4441 0.11.11 003 LflaRPTION
5 70 115 120 125. ORM
3i31.4
VOLLNE
05
2 0..47311141.breS I 10314,001.4 /Jib
fl
0116.34/411/341 AI NS
'-311111 Transport maw Roads & Maritime
Services PREPARED FOR GREATER SYDNEY PROJECT OFFICE SYDNEY OUTER
HAWKESBURY CITY COUNCIL AREA MR182 -BRIDGE STREET, WINDSOR
WINDSOR BRIDGE REPLACEMENT PAVEMENT & KERBS
DRAWING INDEX
miour and
011441,3310E301.44/03V
JACOBS STONFI.11.1010
0.11STRALIA IS Eli WM 2100 Fe3 Winn MO
MM
FOR TENDER
--15g2012/000289 0.40Na
NB98005-ECC-DG-0502
TABLE 1 - GRADING FOR BEDDING MATERIAL
SIEVE SIZE % PASSING
9.52mm 100 4.75mm 95 - 100
2.36mm 80 - 100 1.18mm 50 - 85 600pm 25 - 60 300pm 10 - 30 150pm 5-15 75pm 0-10
TABLE 2- GRADING FOR JOINT FILLING MATERIAL
SIEVE SIZE % PASSING
2.36mm 100 1.18mm 90 - 100 600pm 60 - 90 300pm 30 - 60 150pm 15 - 30 75pm 5-10
Nsw sec/it:Remis
es& Maritime
Transport -
GENERAL
1. THE LIMITS OF WORK SHOWN ON THE PLANS REPRESENT THE EXTENT OF PAVEMENT WORKS. OTHER DESIGN ELEMENTS MAY EXTEND BEYOND THE LIMITS SHOWN AS DETAILED IN OTHER DRAWING VOLUMES.
2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. ALL LEVELS, STATIONS AND COORDINATES ARE IN METRES.
3. DO NOT OBTAIN DIMENSIONS BY SCALING FROM THE DRAWINGS.
4. REFER ANY DISCREPANCY TO THE PRINCIPAL BEFORE PROCEEDING WITH THE WORKS.
5. EXISTING PAVEMENT DETAILS ARE NOTIONAL WHERE SHOWN.
6. NOMINATION OF A PROPRIETARY ITEM INDICATES THE REQUIRED PROPERTIES OF THE ITEM AND NOT EXCLUSIVE PREFERENCE.
7. INTERMEDIATE AC20 COURSES OF DEEP STRENGTH ASPHALT PAVEMENTS MUST NOT BE USED AS TEMPORARY WEARING COURSES. WHERE A TEMPORARY WEARING COURSE IS
REQUIRED FOR SUCH PAVEMENTS TO SUIT CONSTRUCTION STAGING, SUBSTITUTE THE UPPER 65 MILLIMETRES OF AC20 WITH 65 MILLIMETRES ACI4 AR450.
8. ASPHALT WEARING COURSE MUST NOT BE PLACED WHERE TEMPORARY PAVEMENT MARKING IS REQUIRED. PLACE ASPHALT WEARING COURSE IMMEDIATELY PRIOR TO FINAL PAVEMENT MARKING.
9. ALL UTILITY SERVICE FITTINGS AND STORM WATER DRAINAGE PITS POSITIONED WITHIN THE PAVEMENT MUST BE INSTALLED FLUSH WITH FINISHED SURFACE LEVEL
CONSTRUCTION REQUIREMENTS
10. TEMPORARY PAVEMENTS TO BE CONSTRUCTED IN ACCORDANCE WITH RMS G10.
11. KERBS AND GUTTERS TO BE CONSTRUCTED IN ACCORDANCE WITH RMS R15.
12. TRENCH AND INTERFACE DRAINS TO BE CONSTRUCTED IN ACCORDANCE WITH RMS R33.
13. EARTHWORKS TO BE CONSTRUCTED IN ACCORDANCE WITH RMS R44.
14. UNBOUND PAVEMENT COURSE TO BE CONSTRUCTED IN ACCORDANCE WITH RMS R71.
15. HEAVILY BOUND PAVEMENT COURSE TO BE CONSTRUCTED IN ACCORDANCE WITH RMS R73.
16. PLAIN CONCRETE PAVEMENT (PCP) TO BE CONSTRUCTED IN ACCORDANCEWITH RMS R83.
17. SPRAYED SEALS TO BE CONSTRUCTED IN ACCORDANCE WITH RMS R106.
18. HEAVY DUTY DENSE GRADED ASPHALT COURSE TO BE CONSTRUCTED IN ACCORDANCE WITH RMS R116.
19. LIGHT DUTY DENSE GRADED ASPHALT COURSE TO BE CONSTRUCTED IN ACCORDANCE WITH RMS R117.
20. MEDIANS, APRONS, FOOTWAYS AND DRIVEWAYS TO BE CONSTRUCTED IN ACCORDANCE WITH RMS R173.
21. HEAVY PATCHING OF FLEXIBLE PAVEMENTS TO BE CONSTRUCTED IN ACCORDANCE WITH RMS M250.
MATERIAL REQUIREMENTS
22. VERGE MATERIAL TO BE IN ACCORDANCE WITH RMS R44.
23. CONCRETE FOR MEDIANS, APRONS, KERBS AND GUTTERS, FOOTWAYS, DRIVEWAYS AND BLINDING LAYERS TO BE IN ACCORDANCE WITH RMS R53.
24. CEMENT MORTAR TO BE IN ACCORDANCE WITH RMS R53.
25. WIRE MESH FABRIC TO BE IN ACCORDANCE WITH RMS R53.
26. GEOTEXTILE TO BE IN ACCORDANCE WITH RMS R63.
27. ASPHALT INFILL TO COMPRISE AC20 AR450 IN ACCORDANCE WITH RMS R117.
28. COLD APPLIED ELASTOMERIC JOINT SEALANT TO BE IN ACCORDANCE WITH RMS 8312.
29. SPRAYED BITUMINOUS WATERPROOFING MEMBRANE TO BE IN ACCORDANCE WITH RMS B344.
30. DGB20 MATERIAL TO BE IN ACCORDANCE WITH RMS 3051.
31. SELECTED MATERIAL TO BE IN ACCORDANCE WITH RMS 3071.
32. COVER AGGREGATE FOR SPRAYED SEALS TO BE IN ACCORDANCE WITH RMS 3151.
33. AGGREGATES FOR ASPHALT TO BE IN ACCORDANCE WITH RMS 3152.
34. PREFORMED JOINT FILLER TO BE IN ACCORDANCE WITH RMS 3204.
35. NO FINES CONCRETE TO BE IN ACCORDANCE WITH RMS 3222.
36. POLYMER MODIFIED BINDER TO BE IN ACCORDANCE WITH RMS 3252.
37. BITUMEN BINDER TO BE IN ACCORDANCE WITH RMS 3253.
38. CORRUGATED PERFORATED PLASTIC DRAINAGE PIPE TO BE IN ACCORDANCE WITH RMS 3552. CAPS AND OTHER FITTINGS TO CONFORM WITH AUSTRALIAN STANDARD A52439.1.
39. AGGREGATE FILTER MATERIAL TO BE IN ACCORDANCE WITH RMS 3580.
40. ASPHALT REINFORCEMENT GRID TO COMPRISE HATELIT C 40/17 MANUFACTURED BY
HUESKER OR APPROVED EQUIVALENT.
41. BRICKS TO COMPRISE BOWRAL BLUE MANUFACTURED BY AUSTRAL BRICKS OR APPROVED
EQUIVALENT. SUBMIT SAMPLE TO THE PRINCIPAL FOR APPROVAL BEFORE USE.
42. BEDDING MATERIAL TO BE IN ACCORDANCE WITH TABLE 1. MOISTURE CONTENT AT TIME OF PLACEMENT TO BE IN THE RANGE OF FOUR TO EIGHT PERCENT.
43. JOINT FILLING MATERIAL TO BE IN ACCORDANCE WITH TABLE 2. AT THE TIME OF PLACEMENT, BOTH JOINT FILLING MATERIAL AND BRICK UNITS MUST BE AS DRY AS PRACTICABLE.
STANDARD DRAWINGS
44. ASPHALT JOINTS TO BE IN ACCORDANCE WITH RMS PAVEMENT STANDARD DRAWINGS 0520121001329 (ED 1, REV 01.
45. SHARED PATH JOINT DETAILS TO BE IN ACCORDANCE WITH RMS PAVEMENT STANDARD DRAWING 0S2012/000293 SHEET 1 (ED 1, REVS).
46. PCP DETAILS TO BE IN ACCORDANCE WITH RMS PAVEMENT STANDARD DRAWINGS D52012/001191 (ED 4, REV 0).
47. STANDARD KERB AND GUTTER SHAPES TO BE IN ACCORDANCE WITH RMS STANDARD DRAWING R0300-01 SHEET 1 (REV 1).
48. VEHICULAR CHANNEL CROSSINGS TO BE IN ACCORDANCE WITH RMS STANDARD DRAWING R0300-04 SHEET 1 (REV 1).
49. KERB RAMPS TO BE IN ACCORDANCE WITH RMS STANDARD DRAWING R0300-11 SHEETS 1 TO 3 (REV 0).
50. BATTER OUTLET STRUCTURES TO BE IN ACCORDANCE WITH RMS STANDARD DRAWING MD.R33.A04 SHEETS 1 AND 2 (ED D, REV 0).
MEC! FM. WIZ ORIr.40•WITGATAi
0311 17
03.1117
03.11.17 0311.17
01 0017
1331200 FOR TEIOCEA
MED FOR TOMER
331 pp BOP IR
Dem Pm 000 03.11.1T
NOT u$313 0.1.11.17
(4.11.1,011 REVOKI, MOE. 0 1 110 115 1 20 123 re 011 A3 MGM& .103.00 nay N. Pen propY01 Wag 10000nd mayke 000000010 0.00
01....14411,0[401REPOPEOVI
JACOBS 177 RINK HOw,
110203ydney, M.P. 0020 0320 ALLSTRIIN
7(0200121001.04.2112.3 Wok wwfo *atom
fl
PREPMED FOR
GREATER SYDNEY PROJECT OFFICE SYDNEY OUTER
HAWKESBURY CITY COUNCIL AREA MR182 - BRIDGE STREET, WINDSOR
WINDSOR BRIDGE REPLACEMENT PAVEMENT & KERBS
GENERAL NOTES
VOLUME
05
VAN.
(FT
FOR TENDER
--Eg2012/000289 LOAN=
NB98005-ECC-DG-0503 2 ONNONVISYS11.1.,..11 I 204,00,11t 00.0
LOT 1 No.5
DP745036
LOT 1 Na3
DP196531
LOT B No.1
DP161643 No.7
9 6
REFER NOTE 2
9g0-00-003 sN\ 911 IL__
••••••••1
FROM SYDNEY
LOT 7007 DP1029964
•••••••111.
REFER INSET '/V FOR PAVEMENT UNDER BRIDGE
REFER VOLUME 10
REFER VOLUME 10
1-3
, D13 IN D
Di
1
I
t
t
-
D12 D14
REFER VOLUME 10
LW: 10 No.4
DP666894
K.:
LIMIT OF PAVEMENT
TIE INTO EXISTING FOOTPATH AT NEAREST JOINT
INSET 'A' PAVEMENT UNDER BRIDGE
No.81
09
REFER VOLUME 11
TO FREEMANS REACH
LEGEND FOR REFERENCE
EXISTING PROPERTY BOUNDARY CONSTRUCTION WORK ZONE WORKS SUBJECT TO FURTHER COUNCIL AND STAKEHOLDER CONSULTATION
— — — — ARCHAEOLOGICAL DEPOSIT ZONE
—1-----!— CONTROL LINE PAVEMENT AND KERBS
PAVEMENT TYPE 1 MAIN CARRIAGEWAY
PAVEMENT TYPE 2 - ROUNDABOUT
PAVEMENT TYPE 3 - WIDENING
PAVEMENT TYPE 4 - LOCAL ROAD
PAVEMENT TYPE 5 - REHABILITATION
PAVEMENT TYPE 6- LEVEL CORRECTION
PAVEMENT TYPE 7 - MILL AND RE-SHEET
PAVEMENT TYPE 8- BRIDGE DECK
PAVEMENT TYPE 9 - ROUNDABOUT APRON
PAVEMENT TYPE 10 - SHARED ZONE
PAVEMENT TYPE 11 - RAISED MEDIAN
PAVEMENT TYPE 12- DRIVEWAY
PAVEMENT TYPE 13- SHARED PATH
PAVEMENT TYPE 14- FOOTPATH
PAVEMENT TYPE 15- PAVED MEDIAN
PAVEMENT TYPE 16- PAVED PATH
EXISTING PAVEMENT TO BE REMOVED
PAVEMENT TYPE LABEL (REFER NB98005-ECC-DG-0531 10 0532)
INTERFACE DETAIL (REFER NB98005-ECC-DG-0541 10 05631
EDGE DETAIL START/END (REFER NB98005-ECC-DG-0551 TO 0557)
KERB/GUTTER TAG (REFER NB98005-ECC-DG-0581)
KERB/GUTTER STRING START/END (REFER N698005-ECC-DG-0581)
NOTES 1. FOR GENERAL NOTES REFER NB98005-ECC-DG-0503. 2. FOR PAVEMENT TYPE 10 INTERFACE DETAILS REFER
NB98005-ECC-DG-561 TO 562.
FAESAFNA REAcrt ADM
KEY PLAN DES6111400R 014111.1ARDEORKCIAIPM.31101. TRW/1M
0S2012-000289-DESANINDSOR-171103
0
oti-1 .171t1(
(KXXX)
=00.15CT
NOTUSED 11.11131•1M0
$ 110 11S 110 12Smm ONAlORIOIMAL
03.11.11
0114.1,11PAA.000.1010111
SCALE 1500
21.11.17
CW 01.11.1) ROP TR 01010.1101000 BOP 0111.17
11100C11.004.1 0111.11
COZOIRICESYS10011011700.56 I NER011. 0•111. ARO
daweg may N.* ptepos0 usn2 Wow and maby nompel. qpni
DRAMM.SIDE1141,11.W......*
JACOBS IIIPecipc1-1q11000,
90.21 Spenry SY011ET,5S002060
12 AUSTIN.
(92(002121*0700(02)02212920 11.12 00w lotits wen
fl
Transport Nsw Roads & Maritime de111•••••01 Services
PREPARED FOR GREATER SYDNEY PROJECT OFFICE SYDNEY OUTER
HAWKESBURY CITY COUNCIL AREA MR182 - BRIDGE STREET, WINDSOR
WINDSOR BRIDGE REPLACEMENT PAVEMENT & KERBS
PLAN SHEET 2
STAN.
FOR TENDER
05 —6g2012/000289 01001/110/4
WT NB98005-ECC-DG-0522
MAIM 01 01 17
Me FOR TEIPER ISSUED FORTNER
-41111i
2
MCB0
IS) Ca4 Coa NJ
N.)
09 4,
FROM SYDNEY TO FREEMANS REACH
13A1
21 M
fISS
3NM
VH
REFER VOLUME 11
0
WILBERFORCE ROAD A
R.V • .1* 0
1311-07(
(Km()
woo'
KEY PLAN
Fn. 11,511
03.$1.11
0154,44.015.5•1557•5555
S ii SCALE 1511 LI.61,21 JACOBS' '-4116
NSW Transport Roads & Maritime Services
011147
CW 0111.11
Np MUIR 177 PaTev
ROA Sydney STMT. NSW 2060 PREM. FOR AUSTR,LIA
TO 1021.21 2101 .x102)9911 2500 WY rem **cm
GREATER SYDNEY PROJECT OFFICE SYDNEY OUTER
TR MISR
1RNR•D?1flh0N 5.45.756 I KICK DOW ROD
fli
LEGEND FOR REFERENCE
EXISTING PROPERTY BOUNDARY CONSTRUCTION WORK ZONE
- WORKS SUBJECT TO FURTHER COUNCIL AND STAKEHOLDER CONSULTATION
- ARCHAEOLOGICAL DEPOSIT ZONE
-4----)- CONTROL LINE PAVEMENT AND KERBS
PAVEMENT TYPE 1 - MAIN CARRIAGEWAY
PAVEMENT TYPE 2 - ROUNDABOUT
PAVEMENT TYPE 3 - WIDENING
PAVEMENT TYPE 4 - LOCAL ROAD
PAVEMENT TYPE 5 - REHABILITATION
PAVEMENT TYPE 6- LEVEL CORRECTION
PAVEMENT TYPE 7 - MILL AND RE-SHEET
PAVEMENT TYPE 8 - BRIDGE DECK
PAVEMENT TYPE 9 - ROUNDABOUT APRON
PAVEMENT TYPE 10- SHARED ZONE
PAVEMENT TYPE 11 - RAISED MEDIAN
PAVEMENT TYPE 12- DRIVEWAY
PAVEMENT TYPE 13 - SHARED PATH
PAVEMENT TYPE 14- FOOTPATH
PAVEMENT TYPE 15- PAVED MEDIAN
PAVEMENT TYPE 16- PAVED PATH
EXISTING PAVEMENT TO BE REMOVED
PAVEMENT TYPE LABEL (REFER NB98005-ECC-DG-0531 TO 0532)
INTERFACE DETAIL (REFER NB98005-ECC-DG-0541 TO 0543)
EDGE DETAIL STARTIEND (REFER NB98005-ECC-DG-0551 TO 0557)
KERB/GUTTER TAG (REFER 5B98005-ECC-DG-0581)
KERB/GUTTER STRING START/END (REFER NB98005-ECC-DG-0581)
NOTES 1. FOR GENERAL NOTES REFER N998005-ECC-DG-0503.
5.13011/15055,155.551.174500.505WAT12N0771417,55.5
DS2012-000289-DESMINDSOR171103 .91077Cr
5C17 TR
RCP Plityltrl•WARII
1.5515.1° 10 15 20 35 fflavl OM. MUNN nue Drewor7.1.0151en 5,074755 5s, cebur and may Maple. • Vapall
HAWKESBURY CITY COUNCIL AREA MR182 - BRIDGE STREET, WINDSOR
WINDSOR BRIDGE REPLACEMENT PAVEMENT & KERBS
PLAN SHEET 3
57575X
FOR TENDER
05 --150g2012/000289 1:1555151L
WT NB98005-ECC-DG-0523
WOAD FOR FORCER 5e5.3.1055575
ISSIXO FOR 'FENCER TR NOT USIED
15550trivo
1 I 1 I I 2
LEGEND FOR REFERENCE
EXISTING PROPERTY BOUNDARY CONSTRUCTION WORK ZONE WORKS SUBJECT TO FURTHER COUNCIL AND STAKEHOLDER CONSULTATION ARCHAEOLOGICAL DEPOSIT ZONE
—1- — - —/— CONTROL LINE PAVEMENT AND KERBS
.!
I I I I
r 0
O.-xt (<xxx)
WILBERFORCE ROAD cr) LOT /0
DP1182305
ocas,I*5
FREEVAHS REACH 'ROAD
e , 111,\A
T1,
TT1
LIMIT OF
78,7
74...VEMENT Vyj_20
II
LOT 1 DP226141 _ _
•
65.781
60 0
FROM SYDNEY 40
- 07D I MCBO 0
2
m 0 0
=It ON
(Ea
gall T:127
3
—Il SE
INSET 'EV PAVEMENT UNDER BRIDGE
TO FREEMANS REACH
27 WILBERFORCE ROAD LOT A
DP370895 BRIDGE VIEW'
PAVEMENT TYPE 1 - MAIN CARRIAGEWAY
PAVEMENT TYPE 2 - ROUNDABOUT
PAVEMENT TYPE 3 - WIDENING
PAVEMENT TYPE 4 - LOCAL ROAD
PAVEMENT TYPE 5 - REHABILITATION
PAVEMENT TYPE 6- LEVEL CORRECTION
PAVEMENT TYPE 7 - MILL AND RE-SHEET
PAVEMENT TYPE 8 - BRIDGE DECK
PAVEMENT TYPE 9 - ROUNDABOUT APRON
PAVEMENT TYPE 10 - SHARED ZONE
PAVEMENT TYPE 11 - RAISED MEDIAN
PAVEMENT TYPE 12- DRIVEWAY
PAVEMENT TYPE 13- SHARED PATH
PAVEMENT TYPE 14- FOOTPATH
PAVEMENT TYPE 15- PAVED MEDIAN
PAVEMENT TYPE 16- PAVED PATH
EXISTING PAVEMENT TONE REMOVED
PAVEMENT TYPE LABEL (REFER N698005-ECC-DG-0531 TO 0532)
INTERFACE DETAIL (REFER 6B98005-ECC-DG-0541 TO 0543)
EDGE DETAIL START/END (REFER 6B98005-ECC-DG-0551 TO 0557)
KERB/GUTTER TAG (REFER NB98005-ECC-DG-0581)
KERB/GUTTER STRING START/END (REFER NB98005-ECC-DG-0581)
LOT 2 DP226141
NOTES 1. FOR GENERAL NOTES REFER NB98005-ECC-DG-0503.
KEY PLAN CUM KOE,LRE1 MOEDA 000.041TATOMOVNII PAWN
D52012-000289-DES-WINDSOR-171103
REFER INSET 'B' FOR PAVEMENT UNDER BRIDGE
X.
0111.17 1130E0 700100U0 01 00 17 ISSUED FOR TOPER
NOT USED DATE DESCRIPTKA
ON., DWANE 0/..131.
0111.17
Ift*T1010 0111.17 •
DOOM CW 0111.17 30000 10011
ROP TR oesCR ow= OOP 0111.17 A1,3
PIO0.(GT MOWER TR am, RMS., 0001n0,11101000 13(M I Kart WSW- MID
nA A.43 0(3.1411MF.A.VIIIT
JACOBS' 1e. P2)90012100 fax (02),920 2500
0A., p.O.
Transport Roads & Maritime Services
PREPARED FOR GREATER SYDNEY PROJECT OFFICE SYDNEY OUTER
HAWKESBURY CITY COUNCIL AREA MR182 - BRIDGE STREET, WINDSOR
WINDSOR BRIDGE REPLACEMENT PAVEMENT & KERBS
PLAN SHEET 4
STAVE
FOR TENDER
05 --6g2012/000289 OWMIC
WT NB98005-ECC-DG-0524 5 00 (15 pp I 2$ non 011 Pa °MGM. The....0,101w www00 0:100, and ray ta MORO. 0 aped
NSW
2
REFER VOLUME 12
•
LEGEND FOR REFERENCE
EXISTING PROPERTY BOUNDARY CONSTRUCTION WORK ZONE WORKS SUBJECT TO FURTHER COUNCIL AND STAKEHOLDER CONSULTATION
•-• — ARCHAEOLOGICAL DEPOSIT ZONE - CONTROL LINE
PAVEMENT AND KERBS
PAVEMENT TYPE 1 - MAIN CARRIAGEWAY
PAVEMENT TYPE 2- ROUNDABOUT
PAVEMENT TYPE 3 - WIDENING
PAVEMENT TYPE 4 - LOCAL ROAD
PAVEMENT TYPE 5- REHABILITATION
PAVEMENT TYPE 6- LEVEL CORRECTION
PAVEMENT TYPE 7 - MILL AND RE-SHEET
PAVEMENT TYPE 8 - BRIDGE DECK
PAVEMENT TYPE 9 - ROUNDABOUT APRON
PAVEMENT TYPE 10- SHARED ZONE
PAVEMENT TYPE 11 - RAISED MEDIAN
PAVEMENT TYPE 12- DRIVEWAY
PAVEMENT TYPE 13- SHARED PATH
PAVEMENT TYPE 14- FOOTPATH
PAVEMENT TYPE 15- PAVED MEDIAN
PAVEMENT TYPE 16- PAVED PATH
EXISTING PAVEMENT TO BE REMOVED
PAVEMENT TYPE LABEL (REFER NB98005-ECC-DG-0531 10 0532)
INTERFACE DETAIL (REFER N698005-ECC-DG-0541 10 0543)
TO FREEMANS REACH
DP226141
FROM SYDNEY
27 WILBERFORCE ROAD LOT A
DP370895 BRIDGE VIEW
0 -n
LOT 12 •DP1182305
023 0
cn
LOT2
W W.•2 • •'•'•'•'
a
ocoo0
EDGE DETAIL START/END (REFER NB98005-ECC-DG-0551 TO 0557)
KERB/GUTTER TAG (REFER NB98005-ECC-DG-0581)
KERB/GUTTER STRING START/END (REFER N698005-ECC-DG-0581)
NOTES t FOR GENERAL NOTES REFER NB98005-ECC-DG-0503.
KEY PLAN COCN REW MPL. 00.11.1MCMC. 1414 MM. ng9n17.nnnItta5rutnitn20no_1711ng
CO CO t=t 33 WILBERFORCE ROADct
LOT 10 DP1182305
ifl 0 5 III 15 I 20 I ZS nw OIIAIOAaOOIIL Two Dtswwt cat ttw Wet PK.. • ct ttWat*/ wet • ccon. tot.
CWWWCOC•I MCP/ 111.ME
03.11.17 OWWK MOM. /.3 JR.1.04 otrt WE.WCI
Transport C1404 0111.1T
SCALE Mt JACOBS' 177 Pac. Highway
R. St., M., NSW XOW
NSW Roads & Maritime Services CW 011117
sit ROP
TR DOWN 0.611. 0111.11 AT At PREPARED FOR AUSTRAL,
Tel (021 9923 2100 007 NO) NW MCC wont pm. cw,
GREATER SYDNEY PROJECT OFFICE SYDNEY OUTER
AVIV' W.IXt TR 03.11.1?
FIRWATO AMMAN. COCIOW0t WPM. Ma La SS 103,1CIN
0311.17
NOT USED DISPIPTAW
OWED FOR IENSER ISSUED FOR 1010Ot
HAINKESBURY CITY COUNCIL AREA MR182 - BRIDGE STREET, WINDSOR
WINDSOR BRIDGE REPLACEMENT PAVEMENT & KERBS
PLAN SHEET 5
WOW
FOR TENDER
15g2012/000289 MAW 10
NB98005-ECC-DG-0525
05
IFT
EC
GO
G-0
521-
0526
dw
y
LOT 11 DP1182305
0 TO li6LBERFORCE
0 LOT 13 oDPj 102305
LOT 20 DP119666
FROM SYDNEY II
2828M2.222m2s6LL(6),
L 33 KILSERFORCE ROAD
LOT 10 DP1182305
D7
Xr-(
r- 0 2
PAVEMENT TYPE 1 - MAIN CARRIAGEWAY
PAVEMENT TYPE 2- ROUNDABOUT
PAVEMENT TYPE 3 - WIDENING
PAVEMENT TYPE 4 - LOCAL ROAD
PAVEMENT TYPE 5 - REHABILITATION
PAVEMENT TYPE 6 - LEVEL CORRECTION
PAVEMENT TYPE 7 - MILL AND RE-SHEET
PAVEMENT TYPES- BRIDGE DECK
PAVEMENT TYPES- ROUNDABOUT APRON
PAVEMENT TYPE 10- SHARED ZONE
PAVEMENT TYPE 11 - RAISED MEDIAN •
PAVEMENT TYPE 12- DRIVEWAY
PAVEMENT TYPE 13- SHARED PATH
PAVEMENT TYPE 14- FOOTPATH
PAVEMENT TYPE 15- PAVED MEDIAN
PAVEMENT TYPE 16- PAVED PATH
EXISTING PAVEMENT TO BE REMOVED
PAVEMENT TYPE LABEL (REFER 6B98005-ECC-DG-0531 TO 0532)
INTERFACE DETAIL (REFER N598005-ECC-DG-0541 TO 0543)
EDGE DETAIL START/END (REFER 811398005-ECC-DG-0551 TO 0557)
KERB/GUTTER TAG (REFER NI398005-ECC-DG-0581)
KERB/GUTTER STRING START/END
NOTES (REFER NB98005-ECC-DG-0581)
1. FOR GENERAL NOTES REFER NB98005-ECC-DG•0503.
REFER VOLUME 07
LEGEND FOR REFERENCE
EXISTING PROPERTY BOUNDARY - CONSTRUCTION WORK ZONE
- - WORKS SUBJECT TO FURTHER COUNCIL AND STAKEHOLDER CONSULTATION ARCHAEOLOGICAL DEPOSIT ZONE
- CONTROL LINE PAVEMENT AND KERBS
1,3
LOT /1 DP1182305
1 I I
I I
L
1 I
K7=1
0
(loco()
LOT 21 " DP1196661
MEDIANS RFJO4 ROAD
KEY PLAN MON 110.1.M.Y1161.01100CIAPV110110r. OVA.
D52012-000289-DES-WINDSOR-171103 DAN COG.. DM.° nflrE
IVATIIRRON nil IT PVFMGORat 0311.11
2011 17 03.11.17
0100.11 =MM. TENDER IMO FC1281180ER OH
pp DERIMO*0‘ PCP 0311.17
NOT USW P/S100,101401.11 JR 02.11.12
8 8..9 9089 00100008 PIP0200 Vt0.0 0010,21,110 ,.y b. 10801082 008902
112,12100 ta.erx.010:42202.‘ ryas I 14FIGI,CATUM
C.M4102110fliNIFIWPOICINV
JACOBS' MATRA.
TS 021002112180 9081221.00. it wee. peas ow
fl
Transport Roads &Maritime Services
PREPARED FOR
GREATER SYDNEY PROJECT OFFICE SYDNEY OUTER
HAWKESBURY CITY COUNCIL AREA MR182 - BRIDGE STREET, WINDSOR'
WINDSOR BRIDGE REPLACEMENT PAVEMENT & KERBS
PLAN SHEET 6
VOX
FOR TENDER
05 --Dg2012/000289 aVAMG1ie
(FT NB98005-ECC-DG-0526 “KAITTON 110 115 120 125 ram OMA2018018.8
—41111 NSW
2
LOT 11 DP1182305
FROM SYDNEY TO WILBERFORCE
030
WILBERFORCE ROAD - MCWO H -
031
1
dira 117
0
14-1
PAVEMENT TYPE 1 - MAIN CARRIAGEWAY
PAVEMENT1YPE2-ROUNDABOUT
PAVEMENT TYPE 3 - WIDENING
PAVEMENTTYPE4-LOCALROAD
PAVEMENTTYPE5-REHABILITATION
PAVEMENT TYPE 6 - LEVEL CORRECTION
PAVEMENT TYPE 7 - MILL AND RE-SHEET
PAVEMENT TYPE 8 - BRIDGE DECK
PAVEMENTTYPE9-ROUNDABOUTAPRON
PAVEMENT TYPE 10- SHARED ZONE
PAVEMENT TYPE 11 - RAISED MEDIAN
PAVEMENT TYPE 12 - DRIVEWAY
PAVEMENT TYPE 13- SHARED PATH
PAVEMENT TYPE 14- FOOTPATH
PAVEMENT TYPE 15- PAVED MEDIAN
PAVEMENT TYPE 16- PAVED PATH
EXISTING PAVEMENT TO BE REMOVED
PAVEMENT TYPE LABEL (REFER 6698005-ECC-DG-0531 TO 0532)
INTERFACE DETAIL (REFER NB98005-ECC-DG-0541 TO 0543)
POWWOW....
DS2012/000289
FOR TENDER
rowwwww
N898005-ECC-DG-0527
05
(FT 2
WCW HAWKESBURY CITY COUNCIL AREA MR182 - BRIDGE STREET, WINDSOR
WINDSOR BRIDGE REPLACEMENT PAVEMENT & KERBS
PLAN SHEET 7
CW
501.55.01.wx0 0.5".
WIC Id" ; •
05F5
0111.17
011117
.11.17
0W•wwpoox
050,010 ow.
IS... FOR TENDER ISSUED FOR TENOR
0.5
swp KSIONCION .11.17
01. 1031115ED WICLECINAJVACII
WIC191.11A MEWED CCWWFWTSYSTEW,WWWEN. WWWWWW/ AND
5 110 lii I° 125 fro 011.0R100615. Wow, may.. Wen 0,10501 wog 5.0,re,, ivanpiel515515.1
fli
IRWNOIFWVONPADVAE3ST
JACOBS' NAM.
Wc Ww. wco 55B015210000 56 ww/15.5.550
Transport Roads & Maritime Services
PREPARED FOR
GREATER SYDNEY PROJECT OFFICE SYDNEY OUTER
-
NSW
LEGEND FOR REFERENCE
EXISTING PROPERTY BOUNDARY CONSTRUCTION WORK ZONE WORKS SUBJECT TO FURTHER COUNCIL AND STAKEHOLDER CONSULTATION
••••• •-• ARCHAEOLOGICAL DEPOSIT ZONE -+------I CONTROL LINE PAVEMENT AND KERBS
EDGE DETAIL START/END (REFER NB98005-ECC-DG-0551 TO 0557)
KERB1GUTTER TAG (REFER NB98005-ECC-DG-0581)
KERB/GUTTER STRING START/END (REFER NB98005-ECC-DG-0581)
N D30 031_ 1
CD CD CD
(loco° N) co r..) o I oo IV 0 NJ 0) 0 4 NOTES , =, 4, CD
1. FOR GENERAL NOTES REFER NB98005-ECC-DG-0503.
LOT 11 DP1182305
BOGEgREET
n 111:_
ii FRE
maid,?111 11111 is
ILI
S REACH ROAD
KEY PLAN 01.1006:00.55"LWOP555O5EWA750i145WWW
952012-000289-DES-WINDSOR-171103
HAWKESBURY RIVER \
[Or0 D23
p2
I= I2
LOT 7011 OP1030959
LAYING PATTERN TO BE 901 STRETCHER TO MATCH EXISTING FOOTPATH PATTERN
D20 D15
REFER NOTE 2
LOTS No.1
DP161643
LOT S No.3
DP196531
THE TERRACE
a
0
0 0
LOT 1 DP542705
01.0101.Ctorn. ra 3.0
11 SCALE STAR
Transport Roads & Maritime Seivices NSW
COONINVFOIRIN VCAZweif WOO-MVO Awn
raa.....A,F54.0•EMIED
JACOBS' 1" %CRC HON,
Won *Fey STONE, NSW MO AUSTRIAN
(02)13212100 rama zsoo Web wet,. cep
fli
PREP ANO FOR GREATER SYDNEY PROJECT OFFICE SYDNEY OUTER
HAWKESBURY CITY COUNCIL AREA MR182 - BRIDGE STREET, WINDSOR
WINDSOR BRIDGE REPLACEMENT PAVEMENT & KERBS
PLAN SHEET 8
0 5 1 10 15 1 20 125 RAI OR A3 MGM. Tna Draw, nuy Awe Wen pp,. us. NANA and rn•T namplele
01 0117
ea
NSW, FOR TENDER
ROT USED ISSUED TOR MOEN
LefrAITIOx FrecrAID
TR
ovrn•Nevox
PurnaOLICK
1.1101100.1.
1411011311W11.91
perrik
nt
JP
001
0311,17
03.11.17
03.11.17
03.11.T/
03.11.T/
nomJS
FOR TENDER
--6g2012/000289 ANNAN.
NB98005-ECC-DG-0528
05
(FT
Li LEGEND FOR REFERENCE
EXISTING PROPERTY BOUNDARY CONSTRUCTION WORK ZONE WORKS SUBJECT TO FURTHER COUNCIL AND STAKEHOLDER CONSULTATION
— — ARCHAEOLOGICAL DEPOSIT ZONE
-4— - —I— CONTROL LINE PAVEMENT AND KERBS
PAVEMENT TYPE 1 - MAIN CARRIAGEWAY
PAVEMENT TYPE 2- ROUNDABOUT
PAVEMENT TYPE 3 - WIDENING
PAVEMENT TYPE 4 - LOCAL ROAD
PAVEMENT TYPE 5 - REHABILITATION
PAVEMENT TYPE 6 - LEVEL CORRECTION
PAVEMENT TYPE 7 - MILL AND RE-SHEET
PAVEMENT TYPE 8 - BRIDGE DECK
PAVEMENT TYPE 9 - ROUNDABOUT APRON
PAVEMENT TYPE 10 - SHARED ZONE
PAVEMENT TYPE 11 - RAISED MEDIAN
PAVEMENT TYPE 12- DRIVEWAY
PAVEMENT TYPE 13 - SHARED PATH
PAVEMENT TYPE 14- FOOTPATH
PAVEMENT TYPE IS-PAVED MEDIAN
PAVEMENT TYPE 16- PAVED PATH
EXISTING PAVEMENT TO BE REMOVED
PAVEMENT TYPE LABEL (REFER NB98005-ECC-DG-0531 TO 0532)
INTERFACE DETAIL (REFER NB98005-ECC-DG-0541 TO 0543)
EDGE DETAIL START/END (REFER NB98005-ECC-DG-0551 TO 0557)
KERB/GUTTER TAG (REFER NB98005-ECC-DG-0581)
KERB/GUTTER STRING START/END (REFER N698005-ECC-DG-0581)
NOTES 1. FOR GENERAL NOTES REFER NB98005-ECC-DG-0503. 2. FOR PAVEMENT TYPE 10 INTERFACE DETAILS REFER
NB98005-ECC-DG-561 TO 562.
;
(Kxxx)
LOT 1 DP60716
LOTS No.5
DP745036
KEY PLAN
OFS011.111,...102.0,1 DOCIMATIMOini Own. nonimonmulmununcro.1711f11
VOLUME
05
IFT
03.11.11 0100 1)
:0" 5 130 15 1 12509, .11.0 ORIGINAL
NOT USED
Cf.11.1.41.1
1100111576:r4c1dr"101,11050 AUST0/1111
72 (001.21 3100 Fax PA 9025 25110 Wee wo,020.010
fl
ViO.FCT
HAWKESBURY CITYCOUNCIL AREA MR182 - BRIDGE STREET, WINDSOR
WINDSOR BRIDGE REPLACEMENT PAVEMENT & KERBS
PROFILES SHEET 1
DS2012/000289
NB98005-ECC-DG-0531
VAN.
FOR TENDER
bawng may low been wang War. nuy nong1.10 cepod 1.1M00
OOP 1.511.1CMCK
1910EC1IIMMAA91
03 1117
0111,17
0111.17
0111.11 WOO FOR TIMER ISSUED GOR TENDER
Mom I 100nm 210.0
6"1"1=1
600/0,x.,0 PRP u000enes, ,021CDMIlt
HEWED FOR GREATER SYDNEY PROJECT OFFICE SYDNEY OUTER
Nsw Roads & Maritime orsomrser Services
Transport -46
\\,.•
PAVEMENT TYPE 5 REHABILITATION
PAVEMENT TYPE 10 SHARED ZONE
PAVEMENT TYPE MAIN CARRIAGEWAY
PAVEMENT TYPE 6 LEVEL CORRECTION
50mm AC14 (A15E)
130mm AC20 (AR450)
7mm LOW CUTTER SEAL
240mm HEAVILY BOUND MATERIAL
7mm PRIMERSEAL
300mm SELECTED MATERIAL (CBR a 33%)
300mm LOWER UPPER ZONE (CBR a 8%)
SUBGRADE (CBR a 2%)
50mm MIN. AC14 (A15E)
EXISTING PAVEMENT (REFER NOTE 4)
PAVEMENT TYPE 2 ROUNDABOUT
PAVEMENT TYPE 7 MILL AND RE-SHEET
A A
qweitql 404040:40 kittiTtitte -10.44041,1 lOketkiTtie-obiteasaam!
PAVEMENT TYPE 3 WIDENING
50mm AC14 (A15E)
130mm AC20 (AR450)
7mm LOW CUTTER SEAL
200mm DGB20 (CAT. A)
300mm SELECTED MATERIAL (CBR a 33%)
SUBGRADE (CBR a 2%)
tilketkoitts kotipt • es OA ON - • - • 010100;
tetletketi-440%404ft-le V.s •
PAVEMENT TYPE 4 LOCAL ROAD
PAVEMENT TYPE 9 ROUNDABOUT APRON
50mm AC14 (AR450)
7mm LOW CUTTER SEAL
270mm DGB20 (CAT. C)
300mm SELECTED MATERIAL (CBR a 33%)
SUBGRADE (CBR a 2%)
230mm N35 CONCRETE WITH 5L82 FABRIC (80mm COVER)
7mm LOW CUTTER SEAL
240mm HEAVILY BOUND MATERIAL
7mm PRIMERSEAL
300mm SELECTED MATERIAL (CBR 33%)
300mm LOWER UPPER ZONE (CBR 8%)
SUBGRADE (CBR a 2%)
50mm AC14 (A15E)
130mm AC20 (AR450) (REFER NOTE 2)
EXISTING PAVEMENT (REFER NOTE 3)
\
NOTES 1. FOR GENERAL NOTES REFER NB98005-ECC-DG-0503. 2. PLACE ASPHALT REINFORCEMENT GRID BETWEEN AC20
LAYERS AT INTERSECTION OF BRIDGE STREET AND GEORGE STREET. EXTENT TO BE DETERMINED BY THE PRINCIPAL FOLLOWING DEMOLITION OF EXISTING RAISED MEDIANS AND ROUNDABOUT.
3. MILL EXISTING PAVEMENT TO THE DEPTH NECESSARY TO ENABLE PLACEMENT OF AC14 AND AC20 TO MATCH DESIGN LEVELS.
4. MILL EXISTING PAVEMENT TO THE DEPTH NECESSARY TO ENABLE PLACEMENT OF AC14 TO MATCH DESIGN LEVELS,
5. FOR EXPOSED AGGREGATE FINISH DETAILS REFER
NB98005-ECC-DG-0561.
50mm AC14 (A35P)
130mm AC20 (A35P)
7mm LOW CUTTER SEAL
240mm HEAVILY BOUND MATERIAL
7mm PRIMERSEAL
300mm SELECTED MATERIAL (CBR a 33%)
300mm LOWER UPPER ZONE (CBR 8%)
SUBGRADE (CBR a 2%)
EXPOSED AGGREGATE FINISH (REFER NOTE 5)
230mm N35 CONCRETE
7mm SPRAYED SEAL
150mm HEAVILY BOUND MATERIAL
7mm PRIMERSEAL
300mm SELECTED MATERIAL (CBR z 33%)
SUBGRADE (CBR a 2%)
45mm AC14 (A15E) 25mm AC7 (AR450)
I
SPRAYED BITUMINOUS WATERPROOFING MEMBRANE
PRIME
BRIDGE DECK EXISTING PAVEMENT (REFER NOTE 4)
.50mm ACM (A15E)
PAVEMENT TYPE 8 BRIDGE DECK
-,,
150mm N25 CONCRETE WITH 5L82 FABRIC (75mm COVER)
150mm DGB20 (CAT. D)
100mm N20 CONCRETE
100mm DGB20 (CAT. D)
100mm N25 CONCRETE WITH S182 FABRIC (50mm COVER)
100mm DGB20 (CAT. D)
150mm N32 CONCRETE WITH 5L82 FABRIC (75mm COVER)
150mm DGB20 (CAT. D)
PAVEMENT TYPE 11 RAISED MEDIAN
Irelr
erk
• • •
PAVEMENT TYPE 14 FOOTPATH
PAVEMENT TYPE 12 DRIVEWAY
PAVEMENT TYPE 13 SHARED PATH
PAVEMENT TYPE 15 PAVED MEDIAN
PAVEMENT TYPE 16 PAVED PATH
01.116610FWMPRFPAPinfn
JACOBS in Pa./ .11,55511
PAN 5,boy 511.1.1122 ARO MATRA.
TM (071.71 2100 Fax (OD.. 2500 0.0 w•55 mats oRRA (FT NB98005-ECC-DG-0532
NOTES 1. FOR GENERAL NOTES REFER NB98005-ECC-DG-0503.
DATE DAIDIA.INNWICATAISDE
DRATS112201 03.11.17
DRVT.14 OEM 0111.17 iII. I MAR 2110wn
plume: CW 1:511.11 LUAU 12
Sn NIP TR DES011.00 1015 0111.2 AT A3
PICKCIIIANADDII TR CO 11.17
COPIDDIAR TirOA mu./ 55 I FLISrt DARN AHD
se
Transp
s
ort Roads & Mme
rvice
PREPARED 7.
GREATER SYDNEY PROJECT OFFICE SYDNEY OUTER
HAWKESBURY CITY COUNCIL AREA MR182 - BRIDGE STREET, WINDSOR
WINDSOR BRIDGE REPLACEMENT PAVEMENT 8 KERBS
PROFILES SHEET 2
VANS
FOR TENDER
--6g2012/000289 DIAD1141.
0111.17 01012
ISSUED FOR 1211DER MED FOR TOIDER NOT USED DESCRIPTON
fl
1,04ECT
0 S 110 (is 120 115 nwn OM MORI.. DR. DrnmA Pay new Own 5,2201 wrog War and may le PcornMe1e 0.00
Act.
05
2
76mm BRICKS WITH JOINT FILLING MATERIAL
30mm BEDDING MATERIAL
145mm MIN. 625 CONCRETE WITH 5L82 FABRIC (PLACED CENTRALLY)
76mm BRICKS WITH JOINT FILLING MATERIAL
30mm BEDDING MATERIAL
100mm N25 CONCRETE WITH SL82 FABRIC (50mm COVER)
Zet
NSW GOVERNMENT
MAIN ROAD No 182
Transport Roads & Maritime Services
CITY OF HAWKESBURY
BRIDGE OVER HAWKESBURY RIVER AT WINDSOR
BEARING REPLACEMENT MAXIMUM CALCULATED JACKING LOAD, 16S0kN SLS I200T JACK) DESIGN JACKING LOAD IS BASED ON SM1600 TRAFFIC LOAD LOCATED WITHIN CENTRAL 2 TRAFFIC LANES. A DYNAMIC LOAD ALLOWANCE OF 0.1 AND AN ULTIMATE LIMIT STATE FACTOR OF 1.8 HAVE BEEN CONSIDERED IN DESIGN. AN ULTIMATE LOAD FACTOR OF 1.2 HAS BEEN APPLIED TO PERMANENT AND SUPERIMPOSED DEAD LOADS. DESIGN TRAFFIC SPEED RESTRICTED TO 40km/6. HLP400 LOADING SHALL NOIRE PERMITTED ON THE BRIDGE DURING BEARING REPLACEMENT. ALL JACKS AT EACH ABUTMENT AND PIER SHALL BE HYDRAULICALLY LINKED AND HAVE A CONTROL MECHANISM TO ENSURE THAT THE SAME VERTICAL DISPLACEMENTS OCCUR AT EACH JACKING POINT AT ALL TIMES DURING JACKING UP OPERATIONS. STEEL PLATES SHALL BE PLACED BETWEEN CONCRETE BEARING SURFACE AND HYDRAULIC JACK. MAXIMUM ALLOWABLE CONTACT PRESSURE BETWEEN CONCRETE SURFACE AND STEEL PLATE SHALL BE 18MPa. MAXIMUM ALLOWABLE LIFT SHALL BE 10mm
LOCALITY PLAN NOT TO SCALE
THE BRIDGE SITE IS APPROXIMATELY 56km BY ROAD FROM SYDNEY.
1 01.09.17 ISSUED FOR TENDER A.S. JS, J.S. 0 13.04.17 ISSUED FOR TENDER AS. J.S. IS.
Rev. Dote 0....1,... 5/ C. Appd
NEW BRIDGE -2016 BRIDGE No. 11386 DESIGN FILE : 5M4408 DESIGN STANDARD : AS 5100 - BRIDGE DESIGN TRAFFIC LOADING: SM1600 -3 DESIGN LANES HLP400 LOCATED WITHIN THE CENTRAL 15.6m OF ROADWAY NUMBER OF HEAVY VEHICLES PER LANE FER DAY: 708 ROUTE FACTOR :0.5
DESIGN TRAFFIC SPEED: 50 km PER HOUR TRAFFIC BARRIER PERFORMANCE LEVEL: REGULAR EARTHQUAKE LOADING: BRIDGE CLASSIFICATION - TYPE IN IMPORTANCE FACTOR: 125 ACCELERATION COEFFICENT : 0.06 SITE FACTOR 1.0 nFcinN CATEGORY : BEDO2 STRUCTURAL RESPONSE FACTOR :2
VVIND LOADING: WIND TERRAN CATEGORY: 2 AVERAGE RECURRENCE INTERVAL ULS .49 a* AVERAGE FtECURRENCE INTERVAL SLS = 37mt NET PRESSURE COEFFICIENTS IN ACCORDANCE WITH 02 OF AS 11702
VESSEL IMPACT LOAD GOT VESSEL TRAVELLING AT 21 Ws (4 KNOTS)
FLOOD DATA: 100 YEAR FLOW VELOCITY 3.0 mis 2000 YEAR FLOW VELOCRY 25 mfs 100 YEAR FLOOD LEVEL : ML 17.77 2000 YEAR FLOOD LEVEL: ML 23.19 DESIGN DEBRIS DEPTH: 1.5m DESIGN SCOUR Rio IRS
CONSTRUCTION LOADING: OONSTRUCTION LIVE LOAD: 2kPa
ACCEPTED
RINCRAIARIOGE ENGKEP
DATE
FOR TENDER
JACOBS
WINDSOR DOCUMENT CONTROL NoN098005-DG-BR-0001
REGN. No. OF PLANS
0S2012/000155
BRIDGE NUMBER 11386
ISSUE STATUS TENDER
SHEET No. 1 No. OF 142 SHEETS ISSUE 1
101. PRESTRESSING - TRANSVERSE TENDONS - SHEET B 102. RETAINING WALL ARRANGEMENT-SHEET A 103. RETAINING WALL ARRANGEMENT - SHEET B 104. SHARED PATH BARRIER-ARRANGEMENT 105. RETAINING WALL SECTIONS - SHEET A 106. RETAINING WALL SECTIONS - SHEET B 107. RETAINING WALL REINFORCEMENT - SHEET A 108. RETAINING WALL REINFORCEMENT- SHEET B 109. RETAINING WALL REINFORCEMENT - SHEET C 110. RETAINING WALL REINFORCEMENT - SHEET D 111. RETAINING WALL REINFORCEMENT - SHEET E 112. RETAINING WALL REINFORCEMENT- SHEET F 113. FOOTWAY ARRANGEMENT AND DETAILS 114. DECK EXPANSION JOINTS - SHEET A 115. DECK EXPANSION JOINTS - SHEET B 116. DECK EXPANSION JOINTS-SHEET C 117. APPROACH SLAB - SHEET A 118. APPROACH SLAB-SHEET B 119. DECK LONGITUDINAL DRAINAGE - SHEET A 120. DECK LONGITUDINAL DRAINAGE - SHEET B 121. PRECAST BARRIER LAYOUT 122. PRECAST BARRIER DETAILS - SHEET A 123. PRECAST BARRIER DETAILS - SHEET B 124. PRECAST BARRIER DETAILS - SHEET C 125. PRECAST BARRIER DETAILS - SHEET D 126. PRECAST BARRIER DETAILS - SHEET E 127. PRECAST BARRIER DETAILS - SHEET F 128. PRECAST BARRIER DETAILS - SHEET G 129. PRECAST BARRIER DETAILS - SHEET H 130. PRECAST BARRIER DETAILS - SHEET I 131. PRECAST BARRIER DETAILS - SHEET J 132. TRAFFIC BARRIER RAILING LAYOUT 133. TRAFFIC BARRIER RAILING PANELS-SHEET A 134. TRAFFIC BARRIER RAILING PANELS - SHEET B 135. TRAFFIC BARRIER RAILING DETAILS 136. PEDESTRIAN RAILING PANEL TYPES 137. PEDESTRIAN RAILING DETAILS - SHEET A 138. PEDESTRIAN RAILING DETAILS - SHEET B 139. BAR SHAPES DIAGRAM - SHEET A 140. BAR SHAPES DIAGRAM - SHEET B 141. BRIDGE ABUTMENT CLADDING - SHEET A 142. BRIDGE ABUTMENT CLADDING - SHEET B
FOR TENDER
JACOBS
ISSUE 1
01.09.17 ISSUED FOR TENDER AS. IS. J.S. 0 13.04.17 ISSUED FOR TENDER AS. IS. IS.
Rey. Dale Deurption By CIO Ape,
DS2012/000155
BRIDGE NUMBER 11386
ISSUE STATUS TENDER
SHEET No. 2 No. OF 142 SHEETS
SCHEDULE OF DRAWINGS
1. COVER SHEET 51. DECK SEGMENT A - REINFORCEMENT SHEET C 2. SCHEDULE OF DRAVVINGS 52. DECK SEGMENT A - REINFORCEMENT SHEET D 3. GENERAL ARRANGEMENT - SHEET A 53. DECK SEGMENT B - REINFORCEMENT SHEET A 4. GENERAL ARRANGEMENT - SHEET B 54. DECK SEGMENT B - REINFORCEMENT SHEET B 5. GENERAL ARRANGEMENT - SHEET C 55. DECK SEGMENT B - REINFORCEMENT SHEET C 6. LAUNCHING SEQUENCE - SHEET A 56. DECK SEGMENT C - REINFORCEMENT SHEET A 7. LAUNCHING SEQUENCE - SHEET B 57. DECK SEGMENT C - REINFORCEMENT SHEET B 8. FOUNDATION LAYOUT 58. DECK SEGMENT D - REINFORCEMENT SHEET A 9. CAST-IN-PLACE PILE DETAILS 59. DECK SEGMENT D - REINFORCEMENT SHEET B 10. ABUTMENT A CONCRETE - SHEET A 60. DECK SEGMENT D - REINFORCEMENT SHEET C 11. ABUTMENT A CONCRETE - SHEET B 61. DECK SEGMENT E - REINFORCEMENT SHEET A 12. ABUTMENT A CONCRETE - SHEET C 62. DECK SEGMENT E - REINFORCEMENT SHEET B 13. ABUTMENT A REINFORCEMENT - SHEET A 63. DECK SEGMENT F - REINFORCEMENT SHEET A 14. ABUTMENT A REINFORCEMENT-SHEET B 64. DECK SEGMENT F - REINFORCEMENT SHEET B 15. ABUTMENT A REINFORCEMENT - SHEET C 65. DECK SEGMENT F - REINFORCEMENT SHEET C 16. ABUTMENT A REINFORCEMENT - SHEET D 66. DECK SEGMENT G - REINFORCEMENT SHEET A 17. ABUTMENT B CONCRETE - SHEET A 67. DECK SEGMENT G - REINFORCEMENT SHEET B 18. ABUTMENT B CONCRETE - SHEET B 68. DECK SEGMENT G - REINFORCEMENT SHEET C 19. ABUTMENT B CONCRETE - SHEET C 69. DECK SEGMENT H - REINFORCEMENT SHEET A 20. ABUTMENT B REINFORCEMENT - SHEET A 70. DECK SEGMENT H - REINFORCEMENT SHEET B 21. ABUTMENT B REINFORCEMENT - SHEET B 71. DECK SEGMENT H - REINFORCEMENT SHEET C 22. ABUTMENT B REINFORCEMENT - SHEET C 72. DECK SEGMENT I - REINFORCEMENT SHEET A 23. ABUTMENT B REINFORCEMENT - SHEET D 73. DECK SEGMENT I - REINFORCEMENT SHEET B 24. PRECAST PILE CAP CONCRETE 74. DECK SGEMENT I - REINFORCEMENT SHEET C 25. PRECAST PILECAP REINFORCEMENT - SHEET A 75. DECK SEGMENT J - REINFORCEMENT SHEET A 26. PRECAST PILECAP REINFORCEMENT - SHEET B 76. DECK SEGMENT J - REINFORCEMENT SHEET B 27. PIERS 1 TO 4 CONCRETE 77. DECK SEGMENT J - REINFORCEMENT SHEET C 28. PILE CAP REINFORCEMENT 78. DECK SEGMENT J - REINFORCEMENT SHEET D 29. PIERS 1 TO 4 REINFORCEMENT 79. DECK SEGMENT J - REINFORCEMENT SHEET E 30. BEARINGS - SHEET A 80. DECK SEGMENT J - REINFORCEMENT SHEET F 31. BEARINGS - SHEET B 81. DECK PRESTRESSING -.NOTES 32. BEARINGS - SHEET C- 82. DECK PRESTRESSING - LAYOUT - SHEET A 33. BEARINGS - SHEET D 83. DECK PRESTRESSING - LAYOUT - SHEET B 34. BEARINGS - SHEET E 84. DECK PRESTRESSING - DETAILS 35. BEARINGS - SHEET F 85. DECK PRESTRESSING - SECTIONS - SHEET A 36. BEARINGS - SHEET G 86. DECK PRESTRESSING - SECTIONS - SHEET B 37. DECK CONCRETE - SHEET A 87. DECK PRESTRESSING - SECTIONS - SHEET C 38. DECK CONCRETE - SHEET B 88. PRESTRESSING REINFORCEMENT - SHEET A 39. DECK CONCRETE - SHEET C 89. PRESTRESSING REINFORCEMENT - SHEET B 40. DECK CONCRETE - SHEET D 90. PRESTRESSING REINFORCEMENT - SHEET C 41. DECK CONCRETE - SHEET E 91. PRESTRESSING REINFORCEMENT - SHEET D 42. DECK CONCRETE - SHEET F 92. PRESTRESSING REINFORCEMENT - SHEET E 43. DECK CONCRETE - SHEET G 93. PRESTRESSING REINFORCEMENT - SHEET F 44. DECK CONCRETE - SHEET H 94. PRESTRESSING REINFORCEMENT - SHEET G 45. DECK CONCRETE - SHEET I 95. PRESTRESSING REINFORCEMENT - SHEET H 46. DECK CONCRETE - SHEET J 96. PRESTRESSING REINFORCEMENT - SHEET I 47. DECK CONCRETE - SHEET K 97. PRESTRESSING REINFORCEMENT - SHEET J 48. DECK CONCRETE - SHEET L 98. PRESTRESSING REINFORCEMENT - SHEET K 49. DECK SEGMENT A - REINFORCEMENT SHEET A 99. PRESTRESSING-TENDON PROFILES 50. DECK SEGMENT A - REINFORCEMENT SHEET B 100. PRESTRESSING - TRANSVERSE TENDONS - SHEET A
IMNDSOR DOCUMENT CONTROL No N898005-DO-BR-00:0
REGN. No. OF PLANS
_
31320 31320 31320 31320 31320 500
SPAN 1 SPAN 2 SPAN 3 SPARS SPAN 5 •
END OF 6 OF PIER 1— 6 OF PIER 2— r CALCULATED 11N 2000
YEAR ARI RL 23.19 1305)— q. OF PIER 3 i. OF PIER 4— END OF
SUPERSTRUCTURE SUPERSTRUCTURE ABUTMENT A CALCULATEO 11N 100 ABUTMENT B [YEAR ARI RL 1737 RIM
LIGHTING COLUMNS — CALCULATED 1 INS YEAR — EXISTING
El ARI RL 11.03 DECK RL 7.15 - FALL 1.296% __ - El
... _ -
MHWS RL 0.7
FROM
WINDSOR
TYPE F BARRIER
TRANSITION
CAST-IN-PLACE RC
RETAINING WALL
000 OVERALL LENGTH OF DECK ON CONTROL LINE MCB0 = 157600 TO
WILBERFORCE 500 END OF DECK
ABUTMENT A
END OF APPROACH SLAB
innr ----- rri
u LI LI o
Th 1
UUUULJUU ULJUUUU U
LOW CLEARANCE SIGNAGE TORE FIXED TO THE BRIDGE PARAPETS OVER THE TERRACE. REFER TO DS2012/000289 VOLUME 6 FOR DETAILS OF THE SIGNAGE. THE FIXING DETAILS TO THE PARAPETS TO BE CONFIRMED WITH THE CONTRACTOR PRIOR TO INSTALLATION.
DATUM RL -20.000
DESIGN SURFACE LEVEL ON CONTROL LINE MCBO, RL
EXISTING SURFACE LEVEL ON CONTROL LINE MCBO. RL
STATION ON CONTROL LINE MCE10
END OF DECK ABUTMENT B
END OF
APPROACH SLAB
TYPE F BARRIER TRANSITION
SITE PLAN
FROM
WINDSOR _
EW BRIDGE
ABUTMENT STN 370.820, ,
TO
WILBERFORCE
EXISTING BRIDGE
CONTRACT LEVEL RL -8.100
MINIMUM CLEARANCE ABOVE ROWS APPROXIMATE EXISTING
SURFACE LEVEL
CONTRACT LEVEL RL -15.100
CONTRACT LEVEL RL -15.700
CONTRACT LEVEL RL -15.400
u CONTRACT LEVEL RL -15.400
• -EXISTING BRIDGE (NUMBER 000415)
ITO BE DEMOLISHED)
+ +BH7
-*/ B 8
BH6 /
? SCOUR PROTECTION SHOWN ABOVE
WATER LINE ONLY. (REFER TO DRAWING VOLUME 09 SCOUR PROTECTION.
REGISTRATION No OF PLANS
DS2012/000289)
STN 307.680
RL 10.778
OW.RHO2
NAME PLATE
SHARED PATH
BEARING 336° 57'1S.4
APPROACH SLAB
STN 245.040 STN 276.360 RL 11.590 RL 11.184
SCOUR PROTECTION SHOWN ABOVE
WATER LINE ONLY. (REFER TO DRAWING
VOLUME 09 SCOUR PROTECTION, REGISTRATION No OF PLANS
D52012/000289)
FOR INFORMATION ON EXISTING AND
PROPOSED UTILITIES AND SERVICES REFER TO DRAWING VOLUME
04-UTILITIES, PLAN REGISTRATION No. D52012/000289
LEGEND BOREHOLE INVESTIGATION LOCATION (SKMOCToBER 20121
* DCP INVESTIGATION LOCATION /am 2013)
4- BOREHOLE INVESTIGATION LOCATION (LOCATIONS APPRoXIMATE,RMS2C08)
-4,- BOREHOLE INVESTIGATION LOCATION (SKM 2012 /20131
4- CPT INVESTIGATION (sNM 2012)
DRAINAGE PIT 14.01
NAME PLATE
PRINCIPAL BRIDGE ENGINEER
H11
STN 339.000 RL 10.372
ELEVATION
FOR TENDER
GENERAL NOTES SCALE 200 OR AS SHOWN DIMENSIONS ARE IN MILLIMETRES. STATIONS AND REDUCED LEVELS ARE IN METRES. REDUCED LEVELS ARE TO AUSTRALIAN HEIGHT DATUM. El DENOTES EXPANSION JOINT
R DENOTES RESTRAINED BEARING.
TBC DENOTES TO BE CONFIRMED. FOR UTILITIES SEE SHEET No. 6
FOR HORIZONTAL AND VERTICAL ALIGNMENT DIAGRAMS SEE SHEET No 5
THE BOREHOLES AND CPT INVESTIGATION ARE SHOWN FOR INFORMATION ONLY
2 03.11.17 ISSUED FOR TENDER A.S. J.S. J.S.
1 01.09.17 ISSUED FOR TENDER AS. J.S. J.S.
0 13.04.17 ISSUED FOR TENDER A.S. .1.0. J.S. Rev. Bele Desyryyfion By CEO oogo
MA N ROAD No 182 CITY OF HA1NKESBURY
BRIDGE OVER HAWKESBURY RIVER AT VVINDSOR
GENERAL ARRANGEMENT - SHEET A
JACOBS
NB980050G-BR
Nsw I Transport RIXIdS a Wahl&
ROMS AM MARONE SERVICES STONEY REGION OFFICE MiROTBE Si. PARBABIBITA
RPM 02 8519 2069 FABSIBLE 02 BUB 2818
PREPARED
DESIGN _
DRAWING LC.
CHECKED
I.T..___.
REGISTRATION No. OF PLANS
DS2012/000155 BRIDGE NUMBER 11386
APPROVED DESIGN.PECORDS ISSUE STATUS: TENDER
SHEET No. 3 I ISSUE 2 0.r.a.
SECTION SECTION
SOUTHERN APPROACH EMBANKMENT RETAINING WALL
ABUTMENT A
DOWNSTREAM
PRECAST REGULAR PERFORMANCE LEVEL
BARRIER AND RAILING
ELASTOMERIC
BEARINGS ITYP.1
FACE BRICKWORK. SEE SHEET No 141
OPENING IN DIAPHRAGM
FOR RECYCLED WATER MAIN FIXING DETAILS REFER TO VOLUME 04
UTILITIES. PLAN REGISTRATION No 052012/000289
0900 CAST IN PLACE RC PILES,
LANE LANE
T— •
LANE
CONTROL LINE MCBO
520 280 3000 532_ 11000
3750 3650 SHARED PATH 3800
UPSTREAM 5332
FCALCULATED 11N 100
YEAR ARI RL 17.77
r
75 THICK ASPHALT AND WATERPROOF
MEMBRANE. TYPICAL
COLLAPSIBLE PEDESTRIAN
BALUSTRADE
PRECAST RC BARRIER E T-GIRDEIR
I ...1_514 1.5%
r CALCULATED 11N 5 YEAR ARI RL 11.03
ET GIRDER
OPENING IN DIAPHRAGM. - FOR POTABLE WATER MAIN FIXING
DETAILS REFER TO VOLUME 04 UTILITIES. PLAN REGISTRATION No
D52012/000289
[FINISHED SURFACE LEVEL
I I
50 MASS CONCRETE
FOR TENDER
GENERAL NOTES SCALE " 0010 OR AS SHOWN. FOR GENERAL NOTES SEE SHEET No 3.
1 01.09.17 ISSUED FOR TENDER A.S. IS. J.S.
0 13.04.17 ISSUED FOR TENDER A.S. J.S. IS. Dale Oenripton By GM /Vid
MAIN ROAD No 182 CITY OF HAWKESGURY
BRIDGE OVER HAWKESBURY RIVER AT VVINDSOR
GENERAL ARRANGEMENT - SHEET B
JACOBS N098005-DG-BR
NSW 1 -4=114- 'ti n *me
ROADS MD MIME SERVICES
SYDNEY REGION OFfICE 27 ARGYLE ST. MUUMUU
PHONE 02 88d9 2069
FACSIMILE 0166191818
PREPARED
DESIGN KN._
DRAWING --)S2--
CHECKED
A.M. _
REGISTRATION No. OF PLANS
DS2012/000155 —1.:1----- BRIDGE NUMBER j11300
APPROVED 1:10000 OA RECORDS ISSUE STATUS, TENDER
SHEET No. 4 I ISSUE 1 on
280 520 VARIES
2 DOWNSTREAM
I I
1 .
1,
SECTION
ABUTMENT B
0900 CAST IN PLACE RC PILES.
10960 INCLUDING CASING/
I I
SO MASS CONCRETE
VARIES VARIES LANE I LANE
75 THICK ASPHALT
AND WATERPROOF MEMBRANE. TYPICAL
VARIES LANE
OPENING IN DIAPHRAGM FOR RECYCLED
WATER MAIN FIXING DETAILS REFER TO
VOLUME 04 UTILITIES.PLAN REGISTRATION No 052012/000289
ET-GIRDER 1.6%
UPSTREAM
CONIROL LINE
T-GIRDEq
MCI30
FOR POTABLE WATER MAIN FIXING
DETAILS REFER TO VOLUME 04 UTILITIES. PLAN REGISTRATION No
052012/000289
LI
ELASTOMERIC
BEARINGS 1TYP.1
FACE BRICKWORK SEE SHEET No 141
I CALCULATED 1 INS YEAR ARI RL 11.03
ACCEPTED
PAIKIPAL BRIDGE ENGINEER
DATE
PRECAST REGULAR PERFORMANCE LEVEL
BARRIER AND RAILING
FINISHED
SURFACE LEVEL [Fit 5.400
PRECAST CONCRETE PARAPET
TO MATCH BRIDGE PARAPET
FACE BRICKWORK.
SEE SHEET No 141
FINISHED
SURFACE LEVEL
SUBWRFACE DRAINAGE
520
R6240.000
CONTROL LINE MCB0
i
;100.000
BEARING07
336 is
. w f
HCEN2
HCEN1
HORIZONTAL ALIGNMENT DIAGRAM NOT TO SCALE
HORIZONTAL ALIGNMENT DATA FOR CONTROL MCBO
H (COLUMN
CONTROL LINE NCH
( COLUMN
SECTION
141/
r (PIER
250
VIEW IX
IF STN 190.667 RL 12.294
IF STN 391.941 RL 9.686
1
LENGTH OF VC 00 .2.7
1.520%
VERTICAL ALIGNMENT DIAGRAM NOT TO SCALE
FOR TENDER
GENERAL NOTES sca E
2 OR AS SHOWN.
FOR GENERAL NOTES SEE SHEET No 3.
1 01.09.17 ISSUED FOR TENDER A.S. 1.S. J.S. 0 13.04.17 ISSUED FOR TENDER AS. ES. J.S.
16r Ale Ns,. 14 C111 we
MA N ROAD No 182 CITY OF HAWKESBURY
BRIDGE OVER HAWKESBURY RIVER AT VVINDSOR
GENERAL ARRANGEMENT- SHEET C
JACOBS NE198005-OS.BR
NSW 1
Transport
RMdi a 14.018rn•
ROAM MO WARNE SERVICES SMIEV REGION OM. 27 ARGYLE Si. PARIUMATTA
PHONE 0.49 2099 fACSIMLE 02 0192111
DESIGN
PREPARED
KN.
CHECKED
A.M.
REGISTRATION No. OF PLANS
DS2012/000155 DRAWING _IL IT. BRIDGE NUMBER I 11386
./PPOVED 0001000000c0700 ISSUE STATUS: TENDER
SHEET No. 5 IISSUE 1 ...,..,.,
UPSTREAM 050 UPVC CONDUIT
15332
280 53
LIGHTING COLUMN. REFER VOLUME 4 UTILITITES. PLAN REGISTRATION No DS2012/000289
3750 LANE
1
— CALCULATED 1 IN 100 YEAR ARI RL 17.77
DOWNSTREAM
/— REGULAR PERFORMANCE / LEVEL STEEL TRAFFIC
BARRIER RAILING
LIGHTING COLUMN. REFER VOLUME 4 UTILITITES. PLAN REGISTRATION No 0S2012/000 289
PIER 3800 LANE
3450 LANE
2512..L
C 1
PILE
ACCEPTED
REMOVABLE/ COLLAPSIBLE PEDESTRIAN BALUSTRADE
SEE NOTES
SEE NOTE 4
SEE NOTE 5
(BEARING
NOTE 1: 4-0125 ELECTRICAL CONDUITS
NOTE 2: 3-0100 CONDUITS FOR TELSTRA
NOTE 3: 4-0100 ITS CONDUITS FOR RHS
NOTE 4: 080 SEWER MAIN IN 0160 SLEEVE
NOTE V. 050 COMMUNICATIONS CONDUIT FOR FIBRE OPTIC CABLE
(UPSTREAM COLUMN
75 THICK ASPHALT AND WATERPROOF MEMBRANE. TYPICAL-
03370D RECYCLED WATERMAIN. REFER VOLUME 4 UTILITIES PLAN REGISTRATION No 052012/000289
2 o 0419 O.D. POTABLE WATERMAINS. REFER VOLUME 4 UTILITIES PLAN REGISTRATION No DS2012/000289
ELASTOMERIC BEARINGS ITSP.)
Ht. PILE
SECTION
r CALCULATED 1 INS YEAR ARI RL 1103
0300 LONGITUDINAL DRAINAGE PIPE
1850 DEEP INCREMENTALLY LAUNCHED DOUBLE T-EIRDERS
(BEARING
050 UPVC CONDUIT
(DOWNSTREAM COLUMN
POINT LOCATION FASTING NORTHING
HCEN1 CENTRE OF CIRCLE 298227.362 6279748.226
HTP1 STN 145.309 298042.038 6279595.731
HTP2 STN 214.020 297971.383 6279741.202
HCEN2 CENTRE OF CIRCLE 298037.974 6279835.779
HTP3 STN 368.724 297945.955 6279796.633
HTP4 STN 395.219 297938.915 6279822.095
CONTROL LINE MCB0
RL 1.200
HWS RL 0.716
MLWS RL -0.123
01500 PERMANENTLY CASED CAST-1N-PLACE RC PILES 101562 INCLUDING CASING)
H—rt_ PILE t PILE
LAUNCHING NOSE EBERSBACHER JACK LOCATION
RODS
SEGMENT A SEGMENT B SEGMENT C SEGMENT D SEGMENT E
30170 31320 31320 31320 30170 16000
BEARINGS ABUTMENT A B. PIER 1 (PIER 2 (PIER 3 (PIER 4 (BEARINGS ABUTMENT B
SEGMENT C SEGMENT B SEGMENT F SEGMENT 0 I SEGMENT E
LAUNCHING SEQUENCE
I. POUR CASTING BED AND SURVEY TO ENSURE DESIGN LEVELS MATCH DRAWINGS.
2. POSITION LAUNCHING NOSE ON CASTING BED AND ABUTMENT B.
3. INSTALL EBERSPACHER JACKS AND ALL TEMPORARY WORKS.
4. a. CAST SEGMENT A. MATCH CAST AGAINST LAUNCHING NOSE
b. STRESS LONGITUDINAL TENDONS IN SEGMENT A IN THE SEQUENCE PROVIDED ON SHEET No. 81 AND GROUT TENDONS.
c. CONNECT LAUNCHING NOSE.ANO STRESS HIGH STRENGH STRESS BARS.
d. LAUNCH SEGMENT A.
e. INSTALL BRAKING SADDLE AND TEMPORARY GUIDES AT ABUTMENT.
S. a. CAST SEGMENT B.
b. STRESS LONGITUDINAL TENDONS IN SEGMENT DIN THE SEQUENCE PROVIDED ON SHEET No. 81 AND GROUT TENDONS.
c. CAST DIAPHRAGM AT END OF SEGMENT A (DIAPHRAGM TONE CAST AT OR PRIORI TO REACHING ABUTMENT DI
d. LAUNCH SEGMENT B.
e. INSTALL TEMPORARY GUIDES AT THE INSIDE OF EACH PIER COLUMN FOR LAUNCHING.
I. CONTRACTOR TO SURVEY THE BRIDGE DECK SOFFIT AT THE PIERS AFTER EVERYILAUNCH AND ENSURE SETTLEMENT / DEFLECTIONS ARE WITHIN t 5mm AT THE ABUTMENT AND WITHIN 0 10mm AT THE PIERS.
g. REPEAT STEPS 32, b & d FOR SEGMENTS CO. E, F SO.
6. a. CAST SEGMENT H.
b. STRESS LONGITUDINAL TENDONS IN SEGMENT KIN THE SEQUENCE PROVIDED ON SHEET No. 81 AND GROUT TENDONS.
c. LAUNCH SEGMENT H.
d. STRESS TRANSVERSE TENDONS IN SEGMENT KIN SEQUENCE PROVIDED ON SHEET.
8. REPEAT STEPS 5a, b, c & d FOR SEGMENTS I & J.
N. LAUNCH BRIDGE TO FINAL POSITION AND REMOVE LAUNCHING NOSE AND SURVEY BRIDGE LEVELS..
10.CAST DIAPHRAGM AT END OF SEGMENT J.
11. STRESS AND GROUT CONTINUITY TENDONS IN SEQUENCE PROVIDED ON SHEET No. RI,
COMPRESSIVE STRENGTH OF CONCRETE IN SEGMENT J SHALL BE AT LEAST 45 MPa. PRIOR TO STRESSING.
12.CAST END FACE AT ABUTMENT BAND POCKETS AT ABUTMENT A.
13.REMOVE EBERSPACHER JACKS AND SEAT SUPERSTRUCTURE ON PERMANENT BEARINGS AT ABUTMENT B. MAKE GOOD REBATES IN ABUTMENT.
CONSTRUCT ABUTMENT A AND BEND WALLS. COMPRESSIVE STRENGTH OF GROUT IN TENDONS SHALL BE AT LEAST 32 MPa. PRIOR TO JACKING,
14.RAISE SUPERSTRUCTURE AT EACH SUPPORT TO COMPLETE INSTALLATION OF PERMANENT BEARINGS. SUPERSTRUCTURE SHALL BE RAISED BY AN EQUAL AMOUNT (3mm MAXIMUM) UNDER EACH GIRDER AT ONE SUPPORT (PIER OR ABUTMENT) AT THE SAME TIME. COMPRESSIVE STRENGTH OF CONCRETE IN DIAPHRAGM SHALL BE AT LEAST 30 MPa. PRIOR TO JACKING.
15.REMOVE BEARING SLIDE PADS. FIX AND GROUT PERMANENT BEARING TOP PLATES.
16.1AUNCHING NOSE AND SIDE GUIDES ARE TONE DESIGNED BY THE CONTRACTOR, TAKING INTO ACCOUNT FLOOD LOAD AND DEBRIS LOAD DURING A FLOOD EVENT.
ASSUMED LAUNCH NOSE PROPERTIES
LOCATION WEB
THICKNESS Imm)
TOP AND BOTTOM FLANGE
THICKNESSES loom)
OVERALL BEAM DEPTH
Imm)
BOTTOM FLANGE
WIDTH (mm)
TOP FLANGE WIDTH Imml
CROSS SECTIONAL
AREA Imm')
MOMENT OF INERTIA )F•104mml
0.0m 20 40 1850 750 900 101400 6.3007
1.0m 20 40 1850 750 900 101400 6.3007
2.0m 20 40 1850 500 500 75400 4.2003
3.0m 20 40 1850 500 500 75400 4.2003
4.0m 20 40 1850 500 500 75400 4.2003
5.0m 20 40 1850 500 500 75400 4.2003
6.8ro 20 40 1850 500 500 75400 4.2003
7.0m 20 40 1850 500 500 75400 4.2003
8.0m 20 40 1850 500 500 75400 4.2003
9.0m 20 40 1850 500 BOO 75400 4.2003
10.0m 20 40 1850 500 500 75400 4.2003
11.0m 20 40 1850 500 500 75400 4.2003
12.0m 20 40 1850 500 500 75400 4.2003
13.0m 20 40 1850 500 500 75400 4.2003
14.0m 20 40 1850 500 500 75400 4.2003
15.0m 20 40 1850 500 500 75400 4.2003
16.0m 20 40 1850 500 500 75400 4.2003
17.0m 20 40 1850 500 500 75400 4.2003
18.0m 20 40 1850 500 500 75400 4.2003
19.0m 20 40 1850 500 500 75400 . 4.2003
20.0m 20 40 1850 500 500 75400 4.2003
21.0rn 20 40 1850 SOO 500 75400 4.2003
22.0m 20 40 1850 500 500 75400 4.2003
23.0m 20 40 1850 500 500 75400 4.2003
NOTE: M min IS TENSION IN THE BOTTOM FLANGE M max IS TENSION IN THE TOP FLANGE THE ACTIONS PROVIDED ARE UNFACTORED ACTIONS FOR THE TOTAL LAUNCHING NOSE
LAUNCH DIRECTION
AUNCHING NOSE
LAUNCHING NOSE ACTIONS LOCATION CHAINAGE (ml 11 mi. II,Nm1 M max NNW V max Ka
AT INTERFACE WITH SEGMENT 0.000 -18000 2315 2605 1.900 -13900 2090 1810
3.800 -10500 1676 1915
5.700 -7755 1317 1335 7.700 -5465 1009 1050
9.600 -3650 750 930 11.500 -2410 532 590
13.500 -1506 357 420
15:300 -960 254 815 17.300 -621 144 508
19.200 -325 67 299
21.100 -115 21 165 AT START OF LAUNCHING NOSE 23.000 o o o
SEQUENCE NOTES PRECAST BARRIERS SHALL NOT BE PLACED ON SEGMENTS A ORB DURING LAUNCHING. PRECAST BARRIERS MAY ONLY REPLACED IN THEIR POSITIONS ON SEGMENTS C TO J DURING LAUNCHING..
2. WATERMAIN PIPES CAN BE ATTACHED TO THE DECK IN THEIR FINAL POSITIONS PRIOR/ DURING THE LAUNCHING PROCESS. -
3. THE CONCRETE STRENGTH OF A SEGMENT AT TRANSFER TO BE A MINIMUM OF 30MPa PRIOR TO THE STRESSING OF THE LAUNCHING TENDONS. THE MINIMUM CONCRETE STRENGTH OF THE SEGMENT IMMEDIATELY ADJACENT TO THE CASTING BED (SEGMENT BEHIND ABUTMENT B) SHALL BE 45MPa PRIOR TO LAUNCHING.
4. AFTER LAUNCHING IS COMPLETE AND CONTINUITY TENDONS ARE STRESSED AND GROUTED, THE PRECAST BARRIER IS TO BE ADJUSTED FOR LINE AND LEVEL. THE STITCH POUR WILL THEN RECAST. IN THE EVENT OF FLOODING PRIOR TO CASTING OF STITCH POUR, THE BARRIER REINFORCEMENT IN THE STITCH POUR SHALL BE STRAPPED TO THE DECK KERB STARTER BARS.
FOR TENDER
23000
CASTING BED (REFER RELEVANT CONSTRUCTION
DRG'S BY OTHERS) 16626
TEMPORARY SIDE GUIDE INTERMEDIATE SYSTEM TO BE SUPPORT INSTALLED BY
CONTRACTOR
SEGMENT C SEGMENT A SEG ENID
LAUNCHING NOSE SEGMENT A SEGMENT B
1.1
AUNCHING NOSE
SEGMENT A LAUNCHING NOSE
GENERAL NOTES SCALE
0 OR OR AS SHOWN
1 01.09.17 ISSUED FOR TENDER A.S. J.S. J.S. 0 13.04.17 ISSUED FOR TENDER A.S. J.S. J.S.
Rev. Dele DiscsOon Hy C. WO
MA N ROAD No 182 CITY OF HAVVKESBURY
BRIDGE OVER HAWKESBURY RIVER AT VVINDSOR
LAUNCHING SEQUENCE - SHEET A
JACOBS
NB98005-00-13R
11111 I
NSW I Transport
Services Rands a Madill'.
ROOS AND MUNE SEMCES STONEY REGION OFFICE V ARGYLE ST. PAPRAMALTA
NSW2121 PHONE 02 AM 0069 FACSIMILE 02 81,19 2818
PREPARED
Ill.
DRAWING .1E-
CHECKED
A .M,____
IT, _
REGISTRATION No. OF PLANS
0S2012/000155 BRIDGE NUMBER 1 11306
APPROVED DESIGN OA RECORDS ISSUE STATUS: TENDER
SHEET No. 6 IISSUE 1 00000m
SEGMENT A
LAUNCHING NOSE SEGMENT A SEGMENT B SEGMENT C SEGMENT D
U
LAUNCHING NOSE SEGMENT A SEGMENT B SEG ENT C SEGMENT 0 SEGMENT E SEGMENT F SEGMENT G
LAUNCHING NOSE SEGMENT A I SEGMENT 8 SEGMENT C SEGMENT 0 SEGMENT E SEGMENT F SEGMENT G SEGMENT H
30170 31320 31320 I 31320 30170
(PIER 4 (BEARINGS ABUTMENT El (PIER 1 (PIER 2 (PIER 3 BEARINGS ABUTMENT A
16000 CASTING BED
1- U
LAUNCH DIRECTION
LAUNCHING NOSE SEGMENT A SEGMENT B SEGMENT C SEGMENT F SEGMENT G SEGMENT H SEGMENT I SEGMENTS SEGMENT
...L.
LAUNCHING NOSE _ SEGMENT A SEGMENT 8 SEGMENT C SEGMENT SEGMENT
SEGMENTS SEGMENT E SEGMENT I
PULLING FRAME-1
SEG ENT I SEGMENT D[ i T
LAUNCHING NOSE _ SEGME TA SEGMENT 8 SEGM NT C SEGMENT E SEGMENT D SEGMENT F SEGMENT G SEGMENT H SEGMENT I
IL. P
FPULLING FRAME
SEGMENT
PULLING FRAME SEGMENT B
SEGMENTS SEGMENT H SEGMENT I SEGMENT 1 SEGMENT E SEGMENTS SEGMENT E SEGMENT F
FOR TENDER
GENERAL NOTES
SCALE °.1_.J OR AS SHOWN
FOR CONSTRUCTION SEQUENCE NOTES REFER SHEET NA 6
1 01.09.17 ISSUED FOR TENDER A.S. J.S. J.S.
0 1104.17 ISSUED FOR TENDER A.S. J.S. IS. oo., Cod /cob
MAN ROAD No 182 CITY OF HAWKESBURY
BRIDGE OVER HAWKESBURY RIVER AT WINDSOR
LAUNCHING SEQUENCE - SHEET B
JACOBS 6898005.0G-BR
ROADS AM 11130111.1E SMILES SM. REGION COTICE
,,: Si. PASIRWATIA PAPRANATTO
PHONE V MOMS FACSIMILE 021111.td
m PREPARED
DESIGN PI.
CHECKED
AR.
REGISTRATION No. OF PLANS
DS2012/000155 DRAWING ...5.11_ IT, _ BRIDGE NUMBER I 11386
APPROVED DESIGN CMPECOOOS
--- ..------
ISSUE STATUS: TENDER
SHEET No. 7 I iSSUE 1
CO
010 9
MO
0 LOT A No.10
DP381403 .1771-07(
(Km()
KABD 03 04
02 _
REFER NOTE 2
LOT 2 No.20
DP420926 LOTS
No.1/52 OP 5/27020
too*
CALI. CAVINCAT MIRE DRAW. FOCRAM1313.3POW
03.11.17
03.11.17 CARR114133301
OW 03.11.17 ARA TR 0111.13
30.11.13 DOAN RECK 0101113 TR 313
MAAR MAWR 0111.13
RAO.
1330ED FOR TOWER ISSUED FCCI TOWER NOT USED
DERwrivi
JACOBS AUSTROLA
IS (CO NU 21E0 OR (02) 2300 MO RAW jece. cw,
SCALE SRN • • • • • • • 1 AT A3
COCRWAW WM WAWA% IOW, MVO Alin
Transport
Nsw servicesRoads & Maritime Maritime
FOP GREATER SYDNEY PROJECT OFFICE SYDNEY OUTER
0 110 115 120 125ffn 011/0 CAW RA 111cAwRnAy Noe beeR prwand uleg celew swetr$1310 WAN
fl
--6g2012/000289
FOR TENDER
ORARAC 1••
NB98005-ECC-DG-0521
05
(FT 2
VOA
REMOVE EXISTING PEDESTRIAN RAMP AND PROVIDE SEPARATE PEDESTRIAN RAMPS IN ACCORDANCE WITH RMS STANDARD DRAWING R0300-11. ALSO REFER VOLUME 04.3 TRAFFIC SIGNALLING - MANAGEMENT
NO
PAVEMENT TYPE 1 - MAIN CARRIAGEWAY
PAVEMENT TYPE 2 - ROUNDABOUT
PAVEMENT TYPE 3 - WIDENING
PAVEMENT TYPE 4 - LOCAL ROAD
PAVEMENT TYPES - REHABILITATION
PAVEMENT TYPE 6- LEVEL CORRECTION
PAVEMENT TYPE 7 - MILL AND RE-SHEET
PAVEMENT TYPE 8 - BRIDGE DECK
PAVEMENT TYPE 6- ROUNDABOUT APRON
PAVEMENT TYPE 10- SHARED ZONE
PAVEMENT TYPE 11 - RAISED MEDIAN
PAVEMENT TYPE 12- DRIVEWAY
PAVEMENT TYPE 13- SHARED PATH
PAVEMENT TYPE 14- FOOTPATH
PAVEMENT TYPE 16- PAVED MEDIAN
PAVEMENT TYPE 16- PAVED PATH
EXISTING PAVEMENT TO BE REMOVED
PAVEMENT TYPE LABEL (REFER NB98005-ECC-DG-0531 TO 0532)
INTERFACE DETAIL (REFER N898005-ECC-DG-0541 TO 0543)
EDGE DETAIL START/END (REFER NB98005-ECC-DG-0551 TO 0557)
KERB/GUTTER TAG (REFER NB98005-ECC-DG-0581)
KERB/GUTTER STRING START/END (REFER NB98005-ECC-DG-0581)
LOT I No.68
cn 0P555685
NOTES 1. FOR GENERAL NOTES REFER NB98005-ECC-DG-0503. 2. REMOVE AND HEAVY PATCH ALL AREAS OF CRACKED,
REVELLED OR OXIDISED ASPHALT PRIOR TO CONSTRUCTION OF PAVEMENT TYPES BAND 7. EXTENTS TO BE DETERMINED BY THE PRINCIPAL DURING CONSTRUCTION.
TIE INTO EXISTING . FOOTPATH AT '
NEAREST JOINT 85
CEP CIF BRIDGE STREET
04
7=3
, I D, ., w . iii, A . o
, 73
TIE INTO EXISTING FOOTPATH AT
LOT 2 LOT S NEAREST JOINT DP840300 DP840300 I 12102/4415
rzw
LIMI T _
woRiss OF PPNE-4E-
ci
011 ott
oz
Tar
TIIFF
-PAVEMEN-T-WORKS
CUP
THOMPSON SQUARE
LOT 7007 DP1029964
NO
TO FREEMANS REACH
N. 0 0 0
09
NO
LEGEND FOR REFERENCE
EXISTING PROPERTY BOUNDARY CONSTRUCTION WORK ZONE WORKS SUBJECT TO FURTHER COUNCIL AND STAKEHOLDER CONSULTATION
•••• ••••• •••••• ARCHAEOLOGICAL DEPOSIT ZONE - CONTROL LINE
PAVEMENT AND KERBS
0 09
TIE INTO EXISTING FOOTPATH AT
NEAREST JOINT
EL
LOT 1 No.14
DP136637
HAWKESBURY CITY COUNCIL AREA MR182 - BRIDGE STREET, WINDSOR
WINDSOR BRIDGE REPLACEMENT PAVEMENT & KERBS
PLAN SHEET 1
LOT 19 No.21
DP1109316
[Er
FROM SYDNEY
TIE INTO EXISTING MEDIAN AT NEAREST JOINT
03
CC 0
I
Appendix 5
Estimate Approval & Acceptance Form
NSW GOVERNMENT
Transport Estimate Approval Roads & Maritime Services Infrastructure projects
I have undertaken a peer review of the project estimate, including the project scope definition, risk register, project cost and schedule reports, in accordance with the RMS Estimating Manual and ProjectPack Estimating pocojwe-
Preparation of project estimate
Signed: Date: 13/04/2ol Name: Lic:3.'t Sink Project Manager
Date: 26 . • Name: I " A"'""• SignedPosition: „1, tio„...)-
1 col
Signed: Name:
Position: 4pc
Note that Delegation 5520 requires separate customer division app announced (P90) project budgets and changes.
Project description Windsor Bridge Replacement over Hawkesbury Road from Macquarie Street to Wilberforce Road
Equip Project No: P.0011444 INSW project tier Tier 3
Customer Division: Sydney Project Office: Greater Sydney PO
Funding source State Funded Delivery method Construct
Scope description Construction of New Bridge over Hawkesbury River and Demolition of the Existing Bridge
Estimate status: Post-Tender Date: 12/04/2018
P50 Cost Estimate (current $)
$124 million ($ March 2018) P50 Cost Estimate (outturn $)
$130 million (Construction period June-2018 to August-2021)
P90 Cost Estimate (current $) $131million ($ March 2018)
P90 Cost Estimate (outturn $)
$137 million (Construction period June-2018 to August-2021)
Name: 0"-a- -1"1 r,et-e•-\/ Signed:Senior Project Manager (Delivery)
I recommend that the estimate amounts are approved.
Date: /6.o 4_15
Estimate review Director of the-reepeyrraibic delivery Office and je.. Ar_
Tier 1&2: Director, Project Services, TPS
Recommendation
Tier 3&4: Director, Project Support, TPS
Tier 5&6: Engineering Estimating Manager
I recommend concurrence with the project estimate vales.
Name: t'KUCe fA6(-414+1-- SignePosition:Di/Y(,DL PPQ)gur SuProgi"
Date:
I concur with the project estimate values in accordance h RMS Delegation 5510. Estimate concurrence
Tier 1&2 — Level 2 Tier 3&4 — Level 3 Tier 5&6 — Level 4
Name:
Position: 41Nceck,f'
Signed:
approve the project estimate values in accordance wit MS Delegation 5510.
Date: '5-16
For use with procedure ILC-Ml-TP0-601 ProjectPack form: ILC-MI-TP0-601-F01 Issue 2.0 April 2018 Document name. ILC-MI-TP0-601-F01Estimate approval form - final v2.1 docx
Delegation 5510
Tier 1&2 — ED Technical nd Project Services Tier 3&4 — Director Projec4 Services Tier 5&6 — N/A
Estimate Approval
Delegation 5510
JO( ç7ç I of project objectives, scope, allocated (P50)
Date:
I have reviewed the estimate based on the estimate concurrence report and I recommend the estimate values.