Project No. D105 An Industry Presentation Rawdon J.H. Seager Gaffney, Cline & Associates www.gaffney-cline.com SPE Petroleum Resources Management System (PRMS) Sponsored by SPE/WPC/AAPG/SPEE Approved March 2007

Reserves Definitions

Embed Size (px)

Citation preview

Page 1: Reserves Definitions

Project No. D105

An Industry Presentation

Rawdon J.H. SeagerGaffney, Cline & Associates

www.gaffney-cline.com

SPE Petroleum Resources Management System (PRMS)

Sponsored by SPE/WPC/AAPG/SPEEApproved March 2007

Page 2: Reserves Definitions

Project No. D105

Technical and Management Advisers to the Petroleum Industry Internationally since 1962

Page 3: Reserves Definitions

D1053

Worldwide Multi-disciplined Presence

Representative Office

Page 4: Reserves Definitions

D1054

Field Engineering

GeologicalModeling

Reservoir Simulation& Characterization

Gas: LNG - GTL

Field, Pipeline, Plant

Unconventional / EOR

Reserves Audit & Certification

Page 5: Reserves Definitions

D1055

Expert Witness

National Oil Company Government Interface

Project Finance Training

Market Studies

Regulation – ContractStructure & Negotiation

Valuation, Mergers &

Acquisitions

Page 6: Reserves Definitions

D1056

Reserves

Reserves TrainingGCA provides a two-day reserves training course covering all aspects of reserve estimation and reporting

Technical basesUnderstanding of and compliance with definitions

Now includes detailed review of the new SPE/WPC/AAPG/SPEE Petroleum Resources Management System (PRMS) as well as regulatory requirements such as reporting to the US Securities and Exchange Commission (SEC)

“The course far exceeded my expectations, excellent instructors”S. P. Singh, Director – Occidental Reserves and Reservoir Engineering

Reserves ProcessGCA provides independent audit of companies internal reserves estimation, recording and reporting processes and proceduresPreparation and revision of reserve management guidelines to meet companies unique requirements

Page 7: Reserves Definitions

Project No. D105

An Industry Presentation

Rawdon J.H. SeagerGaffney, Cline & Associates

www.gaffney-cline.com

SPE Petroleum Resources Management System (PRMS)

Sponsored by SPE/WPC/AAPG/SPEEApproved March 2007

Page 8: Reserves Definitions

D1058

Disclaimer

Still being studied

Page 9: Reserves Definitions

D1059

Topics for Discussion

Review of key features of the new SPE PRMS

Discussion of the core definitions

Comparison with the 1997 SPE/WPC and 2000 SPE/WPC/AAPG documents

Brief comments on the revised “Standards” document and “auditing”

Page 10: Reserves Definitions

D10510

SPE PRMS Key Features - 1

Combines four documents into one consolidated and unified system1997 SPE/WPC Petroleum Reserves Definitions2000 SPE/WPC/AAPG Petroleum Resources Classification and Definitions2001 SPE/WPC/AAPG Guidelines for the Evaluation of Petroleum Reserves and Resources2005 SPE/WPC/AAPG Glossary of Terms

The fundamental terminology of Reserves, Contingent Resources (CR) and Prospective Resources (PR) has been maintained

Using the classification framework presented in 2000

Key distinctions have been made between Reserves and Contingent Resources where some ambiguity previously existed

Particularly between CR and Probable or Possible Reserves

Page 11: Reserves Definitions

D10511

SPE PRMS Key Features - 2

A “Project” has been identified as the primary element of the system“In order to assign recoverable resources of any class, a development plan needs to be defined consisting of one or more projects”Combines the “reservoir” and the “property” to derive entitlement to recoverable resourcesIs generally identified as the level at which investment decisions are made

Three distinct approaches are recognized for the categorization of volumesTwo deterministic and one probabilistic – discussed later

The “base case” scenario is predicated on a “forecast” of costs and pricesAlthough a “constant” case is still recognized as an alternative

Applies to both Conventional and Unconventional resources

There are several other issues for which a position has now been clarified

Page 12: Reserves Definitions

D10512

What are Reserves - 1?

Volumes expected to be sold from assets in which the entity has an entitlement by the application of development projects

Page 13: Reserves Definitions

D10513

What are Reserves - 2?

The summation of future production from a given date forward to the economic, contract or lease limit

0

20

40

60

80

100

120

1 3 5 7 9 11 13 15 17Time (years)

Production Rate (MB/D)

Economic LimitPrice and cost dependent

Contract Limit – extensions?

Page 14: Reserves Definitions

D10514

Resources Classification

Page 15: Reserves Definitions

D10515

Resources Classification

ReservesDiscovered, recoverable, commercial, remainingProved, Probable, Possible1P, 2P, 3P (now formalized)

Contingent ResourcesDiscovered, potentially recoverable, not yet commercial, remaining1C, 2C, 3C (new terms)

Equivalent to Low, Best and High Estimates

Prospective ResourcesUndiscovered, potentially recoverable, potentially commercial, remainingLow, Best and High Estimates

UnrecoverableDiscovered or undiscovered, not recoverable

Cla

ssifi

catio

n

Categorization

Page 16: Reserves Definitions

D10516

Project-Based Classification

The Reservoir assessment determines the petroleum initially in place, and fluid and rock properties that affect petroleum recoveryThe Project is applied to a specific reservoir volume to generate production and cash flow schedule

One project may develop many reservoirs or many projects may develop one reservoirThe Property incorporates contractual rights and obligations, and fiscal terms, defining the entitlement share of investments, production and revenue

One property may encompass many reservoirs or one reservoir may span many properties

RESERVOIR(in-place volumes)

PROJECT(production/cash flow)

PROPERTY(ownership/contract terms)

NetRecoverableResources

Entitlement

RESERVOIR(in-place volumes)

PROJECT(production/cash flow)

PROPERTY(ownership/contract terms)

NetRecoverableResources

Entitlement

Page 17: Reserves Definitions

D10517

Resources Classification

Discovery Status

Commerciality Status

Page 18: Reserves Definitions

D10518

Discovery Status

“A discovery is one petroleum accumulation, or several petroleum accumulations collectively, for which one or several exploratory wells have established through testing, sampling, and/or logging the existence of a significant quantity of potentially moveable hydrocarbons”

The PRMS intentionally does not require a flow test in order to establish a discoveryIn some instances it may nevertheless be considered that logging alone would not be considered sufficient to identify a discovery since some indication of fluid type and producibility will normally be required to comply with the following requirement:

“In this context, “significant” implies that there is evidence of a sufficient quantity of petroleum to justify estimating the in-place volume demonstrated by the well(s) and for evaluating the potential for economic recovery”

Page 19: Reserves Definitions

D10519

Determination of Commerciality

“Discovered recoverable volumes (Contingent Resources) may be considered commercially producible, and thus Reserves, if the entity claiming commerciality has demonstrated firm intention to proceed with development and such intention is based upon all of the following criteria:

Evidence to support a reasonable timetable for developmentA reasonable assessment of the future economics of such development projects meeting defined investment and operating criteriaA reasonable expectation that there will be a market for all or at least the expected sales quantities of production required to justify developmentEvidence that the necessary production and transportation facilities are available or can be made availableEvidence that legal, contractual, environmental and other social and economic concerns will allow for the actual implementation of the recovery project being evaluated”

With some minor differences, these criteria were typically applied to Proved reserves under prior guidelines

Page 20: Reserves Definitions

D10520

What Determines Commerciality?

“While each organization may define specific investment criteria, a project is generally considered to be “economic” if its “best estimate” case has a positive net present value under the organization’s standard discount rate, or if at least has a positive undiscounted cash flow”

It is generally understood that “commerciality” requires that the project provides a positive return on its investment to the organization at the discount rate used for its investment decision-making

There will of course be exceptions, when investments are made for strategic reasons

This is different from “economic” in the sense that even a positive undiscounted cash flow could be considered economic

Page 21: Reserves Definitions

D10521

Project Maturity Linked to Decision Gates(can be quantified if desired)

Chance of discovery

Chance of commerciality

But apply chance to economic outcome, not to volumes

Page 22: Reserves Definitions

D10522

Reserves Defined

RESERVES are those quantities of petroleum anticipated to be commercially recoverable by application of development projects to known accumulations from a given date forward under defined conditions

Reserves must satisfy four criteria:discoveredrecoverablecommercialremaining (as of the evaluation date) based on the development project(s) applied

Page 23: Reserves Definitions

D10523

Reserves

Categorized in accordance with the level of certainty associated with the estimates

Classified based on project maturityProject must be sufficiently defined to establish commercial viabilityReasonable timeframe for development (5 years suggested)

Characterized by development and production status

Producing/Non-ProducingDeveloped/Undeveloped

Cla

ssifi

catio

n

Categorization

Page 24: Reserves Definitions

D10524

Reserves - Producibility

High confidence in the commercial producibility supported by actual production or formation tests

In certain cases, Reserves may be assigned on the basis of well logs and/or core analysis that indicate that the subject reservoir is hydrocarbon-bearing and is analogous to reservoirs in the same area that are producing or have demonstrated the ability to produce on formation tests

Several of these criteria were applied to Proved Reserves only before

Page 25: Reserves Definitions

D10525

Project Maturity - Reserves

On Production The development project is currently producing and selling petroleum to market

Approved for Development All necessary approvals have been obtained, capital funds have been committed, and implementation of the development project is under way

Justified for Development Implementation of the development project is justified on the basis of reasonable forecast commercial conditions at the time of reporting, and there are reasonable expectations that all necessary approvals/contracts will be obtained

Page 26: Reserves Definitions

D10526

Project Maturity – Contingent Resources

Development PendingA discovered accumulation where project activities are ongoing to justify commercial development in the foreseeable future

Development Unclarified or on Hold A discovered accumulation where project activities are on hold and/or where justification as a commercial development may be subject to significant delay

Development Not Viable A discovered accumulation for which there are no current plans to develop or to acquire additional data at the time due to limited production potential

Page 27: Reserves Definitions

D10527

Project Maturity – Prospective Resources

Prospect A project associated with a potential accumulation that is sufficiently well defined to represent a viable drilling target

Lead A project associated with a potential accumulation that is currently poorly defined and requires more data acquisition and/or evaluation in order to be classified as a prospect

PlayA project associated with a prospective trend of potential prospects, but which requires more data acquisition and/or evaluation in order to define specific leads or prospects

Page 28: Reserves Definitions

D10528

Developed and Undeveloped Reserves

“Developed Reserves are expected quantities to be recovered from existing wells and facilities”“Undeveloped Reserves are quantities expected to be recovered through future investments”

Thus these subdivisions are applied to all Reserves categories, not just Proved

Regarding the distinction between DNP and UD, the PRMS says:“Undeveloped Reserves [are] ... where a relatively large expenditure (e.g. when compared to the cost of drilling a new well) is required to (a) recompletean existing well or (b) install production or transportation facilities for primary or improved recovery projects

This is useful, but there is no quantitative guidance given

Page 29: Reserves Definitions

D10529

Project Maturity – Economic Status

“All projects classified as Reserves must be economic under defined conditions”Contingent Resources are divided into Marginal and Sub-Marginal quantities

MarginalTechnically feasible and economic, but not committed due to some other contingency

Sub-MarginalTechnically feasible, but not economic and/or other contingencies exist

These are additional status descriptors to the sub-classes in the Classification FrameworkThe PRMS indicates that these different sets of groups can be used together, but it is not yet clear how this will work in practice

Page 30: Reserves Definitions

D10530

Resources Volume Categorization

The PRMS recognizes three distinct approaches to volume categorization

Deterministic incremental (“risk-based”)Proved, Probable, PossibleThere are no “incremental” categories for CR or PR, so by inference this is expected to be applied to Reserves only

Deterministic scenario (“cumulative”) 1P, 2P, 3P1C, 2C, 3CLow, Best, High Estimates

ProbabilisticP90, P50, P10

Probabilistic method may be applied to any volume, it is most often applied to volumetric calculations in the early phases of an exploitation and development project

Although not mentioned, it is also typically applicable for Prospective Resources

Page 31: Reserves Definitions

D10531

SPE Illustration of Uncertainty

Page 32: Reserves Definitions

D10532

Proved Reserves Comparison

Very similar definitions, with the key difference being the use of “defined” economic conditions

Still requires “reasonable certainty”

Proved Reserves are those quantities of petroleum, which by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be commercially recoverable, from a given date forward, from known reservoirs and under defined economic conditions, operating methods, and government regulations

If deterministic methods are used, the term reasonable certainty is intended to express a high degree of confidence that the quantities will be recoveredIf probabilistic methods are used, there should be at least a 90% probability that the quantities actually recovered will equal or exceed the estimate

Proved reserves are those quantities of petroleum which, by analysis of geological and engineering data, can be estimated with reasonable certainty to be commercially recoverable, from a given date forward, from known reservoirs and under current economic conditions, operating methods, and government regulations

If deterministic methods are used, the term reasonable certainty is intended to express a high degree of confidence that the quantities will be recoveredIf probabilistic methods are used, there should be at least a 90% probability that the quantities actually recovered will equal or exceed the estimate

CommentsSPE PRMS 2007SPE/WPC 1997

Page 33: Reserves Definitions

D10533

Proved Reserves ComparisonSEC and SPE

Both definitions require “reasonable certainty”

Proved Reserves are those quantities of petroleum, which by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be commerciallyrecoverable, from a given date forward, from known reservoirs and under defined economic conditions, operating methods, and government regulations

If deterministic methods are used, the term reasonable certainty is intended to express a high degree of confidence that the quantities will be recoveredIf probabilistic methods are used, there should be at least a 90% probability that the quantities actually recovered will equal or exceed the estimate

Proved oil and gas reserves are the estimated quantities of crude oil, natural gas, and natural gas liquids which geological and engineering data demonstrate with reasonable certainty to be recoverable in future years from known reservoirs under existing economic and operating conditions, i.e., prices and costs as of the date the estimate is made

Prices include consideration of changes in existing prices provided by contractual arrangements, but not on escalations based upon future conditions

CommentsSPE PRMS 2007SEC 1978

Page 34: Reserves Definitions

D10534

Reasonable Certainty – SEC Guidance

“The determination of reasonable certainty is generated by supporting geological and engineering data

There must be data available which indicate that assumptions such as decline rates, recovery factors, reservoir limits, recovery mechanisms and volumetric estimates, gas-oil ratios or liquid yield are valid

If the area in question is new to exploration and there is little supporting data for decline rates, recovery factors, reservoir drive mechanisms etc., a conservative approach is appropriate until there is enough supporting data to justify the use of more liberal parameters for the estimation of proved reserves

The concept of reasonable certainty implies that, as more technical data becomes available, a positive, or upward, revision is much more likely than a negative, or downward, revision”

Page 35: Reserves Definitions

D10535

Probable Reserves Comparison

Removed mathematical inconsistency in the definitions of Probable and 2P

Probable Reserves are those additional Reserves which analysis of geoscience and engineering data indicate are less likely to be recovered than Proved Reserves but more certain to be recovered than Possible Reserves. It is equally likely that actual remaining quantities recovered will be greater than or less thanthe sum of the estimated Proved plus Probable Reserves (2P)

In this context, when probabilistic methods are used, there should be at least a 50% probability that the actual quantities recovered will equal or exceed the 2P estimate

Probable reserves are those unproved reserves which analysis of geological and engineering data suggests are more likely than not to be recoverable

In this context, when probabilistic methods are used, there should be at least a 50% probability that the quantities actually recovered will equal or exceed the sum of estimated proved plus probable reserves

CommentsSPE PRMS 2007SPE/WPC 1997

Page 36: Reserves Definitions

D10536

Probable Reserves

Probable Reserves may be assigned to areas of a reservoir adjacent to Proved where data control or interpretations of available data are less certain

The interpreted reservoir continuity may not meet the reasonable certainty criteria

Probable estimates also include incremental recoveries associated with project recovery efficiencies beyond that assumed for Proved

Page 37: Reserves Definitions

D10537

Possible Reserves Comparison

Essentially identical definitionsPossible Reserves are those additional reserves which analysis of geoscience and engineering data indicate are less likely to be recoverable than Probable Reserves

The total quantities ultimately recovered from the project have a low probability to exceed the sum of Proved plus Probable plus Possible (3P), which is equivalent to the high estimate scenarioWhen probabilistic methods are used, there should be at least a 10% probability that the actual quantities recovered will equal or exceed the 3P estimate

Possible reserves are those unproved reserves which analysis of geological and engineering data suggests are less likely to be recoverable than probable reserves

In this context, when probabilistic methods are used, there should be at least a 10% probability that the quantities actually recovered will equal or exceed the sum of estimated proved plus probable plus possible reserves

CommentsSPE PRMS 2007SPE/WPC 1997

Page 38: Reserves Definitions

D10538

Possible Reserves

Possible Reserves may be assigned to areas of a reservoir adjacent to Probable where data control and interpretations of available data are progressively less certain

Frequently, this may be in areas where geoscience and engineering data are unable to clearly define the area and vertical reservoir limits of commercial production from the reservoir by a defined project

Possible estimates also include incremental quantities associated with project recovery efficiencies beyond that assumed for Probable

Page 39: Reserves Definitions

D10539

Contingent Resources Comparison

Essentially identical definitionsContingent Resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations, but the applied project(s) are not yet considered mature enough for commercial development due to one or more contingencies

Contingent Resources are those quantities of petroleum which are estimated, on a given date, to be potentially recoverable from known accumulations, but which are not currently considered to be commercially recoverable

CommentsSPE PRMS 2007SPE/WPC/AAPG 2000

Page 40: Reserves Definitions

D10540

Contingent Resources

CONTINGENT RESOURCES may include, for example, projects for which there are currently no viable markets, or where commercial recovery is dependent on technology under development, or where evaluation of the accumulation is insufficient to clearly assess commerciality

Contingent Resources are further categorized in accordance with the level of certainty associated with the estimates and may be sub-classified based on project maturity and/or characterized by their economic status

Page 41: Reserves Definitions

D10541

Prospective Resources Comparison

Essentially identical definitionsProspective Resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from undiscovered accumulations by application of future development projects

Prospective Resources are those quantities of petroleum which are estimated, on a given date, to be potentially recoverable from undiscovered accumulations

CommentsSPE PRMS 2007SPE/WPC/AAPG 2000

Page 42: Reserves Definitions

D10542

Prospective Resources

PROSPECTIVE RESOURCES have both an associated chance of discovery and a chance of development

Prospective Resources are further subdivided in accordance with the level of certainty associated with recoverable estimates assuming their discovery and development and may be sub-classified based on project maturity

Page 43: Reserves Definitions

D10543

Unrecoverable

UNRECOVERABLE is that portion of Discovered or Undiscovered Petroleum Initially-in-Place quantities which is estimated, as of a given date, not to be recoverable by future development projects

A portion of these quantities may become recoverable in the future as commercial circumstances change or technological developments occur; the remaining portion may never be recovered due to physical/chemical constraints represented by subsurface interaction of fluids and reservoir rocks

Page 44: Reserves Definitions

D10544

Additional Comments on Reserves

ReservesTo qualify for allocation of volumes as Reserves, a project must be shown to have passed the relevant commerciality confidenceFor both primary and enhanced recovery projects, the requirements are now similar to those that were previously applied to Proved Reserves only

No ProvedIt is permissible to report Probable and/or Possible Reserves even if the low estimate fails to qualify as Proved Reserves (for instance, it does not pass the economic test)It is not necessary or appropriate to relegate all volumes to Contingent Resources in such cases

Page 45: Reserves Definitions

D10545

Unconventional Resources

Page 46: Reserves Definitions

D10546

Standards Pertaining to the Estimating and Auditing of Oil and Gas Reserve Information

Although the standards have no legal or other force, they represent a generally-accepted set of guidelines for the conduct of Reserves Estimation and Auditing

The original version was published in 1977 and last updated in 2001

The current 2007 edition:Includes modifications required to incorporate the latest PRMS

Although it remains concerned with Reserves only at presentClarifies the terms “auditors” and “auditing”, as well as “process review”Acknowledges the integration of geoscience with engineering in the preparation of reliable reserves information

Companies may require their internal or external Reserves Estimators and Auditors to comply with these standards

Page 47: Reserves Definitions

D10547

Conclusions

The PRMS is a major contribution to international oil and gas resources management and one that many companies will adopt

There is clear recognition of the different ways that reserves and resources can be estimated and these are all embraced within the system

Certain changes in procedures will probably be required to ensure that the differences with the prior definitions are recognized and incorporated into resource reporting

Nothing will change with respect to reporting Proved reserves to the SEC

Contingent Resources should become better understood and more acceptable as a valid resource category and not just “not reserves”

The revised “Standards” document should remain a valuable guidebook in the practical and ethical application of reserves estimation and auditing procedures

Page 48: Reserves Definitions

Project No. D105

An Industry Presentation

Rawdon J.H. SeagerGaffney, Cline & Associates

www.gaffney-cline.com

SPE Petroleum Resources Management System (PRMS)

Sponsored by SPE/WPC/AAPG/SPEEApproved March 2007

Page 49: Reserves Definitions

Project No. D105

Technical and Management Advisers to the Petroleum Industry Internationally since 1962