RESEARCH DESIGNS AND STANDARDS ORGANISATION
HIGH SPEED OHE HIGH SPEED OHE OF OF
INDIAN RAILWAYSINDIAN RAILWAYS―ISSUESISSUES―CHALLENGESCHALLENGES―OPTIONSOPTIONS
Presented by – Presented by – J. N. LALJ. N. LALSENIOR EXECUTIVE DIRECTOR SENIOR EXECUTIVE DIRECTOR (TRACTION INSTALLATION)(TRACTION INSTALLATION)
RESEARCH DESIGNS AND STANDARDS ORGANISATION
INTRODUCTIONINTRODUCTION
RESEARCH DESIGNS AND STANDARDS ORGANISATION
ENERGY EFFICIENT
TRANSPORT FOR MASS MOVEMENT
RAILWAY SYSTEM
TRANSPORT TYPE ENERGY CONSUMPTION (MEGAJOULE/TKM)
ROAD TRANSPORT 1.2 – 8.0RAIL 0.6
VEHICLE TYPE PERMITTED AXLE LOAD (TONNES/AXLE)
ROAD 8.0RAIL 25 - 30
RESEARCH DESIGNS AND STANDARDS ORGANISATION
PASSENGER TRAINS
EMITS 10 TIMES LESS GREEN HOUSE GASES THAN ROAD PASSENGER VEHICLE
FREIGHT RAIL VEHICLE
EMITS 27 TIMES LESS GREEN HOUSE GASES THAN ROAD VEHICLE
CONTINUED . . .
ENERGY EFFICIENCY OF
RAILWAY SYSTEM
RESEARCH DESIGNS AND STANDARDS ORGANISATION
ROAD VEHICLE
CAN OFFER 110 – 120 KMPH SPEED
HIGH SPEED TRAINS
OFFER MUCH FASTER SERVICE THAN ROAD VEHICLE
HIGH SPEED
RESEARCH DESIGNS AND STANDARDS ORGANISATION
ENERGY EFFICIENT
ELECTRIC TRACTION IN INDIA
SYSTEM VOLTAGE
SECTION INTRODUCED DURING
550 VOLTS DC CALCUTTA TRAMWAYS 1905
1500 VOLTS DC VICTORIA TERMINUS – KURLA HARBOUR LINE
03.02.1925
3000 VOLTS DC HOWRAH – SHEORAPHULI
14.12.1957
25 KV AC KENDPOSI – RAJKHARSAWAN
15.12.1959
2 X 25 KV AT BINA – KATNI 16.01.1995
OVERHEAD CONDUCTOR SYSTEM
AS COMMISSIONED DURING EARLY
ELECTRIFICATION ON 15.12.1959 CATENARY WIRE: 65 sq. mm
(MESSENGER WIRE)
CONTACT WIRE: 107 sq. mm
(CONTACT LINE)
RESEARCH DESIGNS AND STANDARDS ORGANISATION
RESEARCH DESIGNS AND STANDARDS ORGANISATION
PRESENT SCENARIO
PRESENT STATUS OF ELECTRIFICATION (UPTO 31.03.2012)
TOTAL ROUTE KILOMETRE : 67346TOTAL ELECTRIFIED ROUTE KILOMETRE : 22,224
(33%)
FREIGHT TRAFFIC : 64.3%PASSENGER SERVICES : 51%ELECTRIC ENERGY BILL PAID : 38%
TRAFFIC CARRIED BY ELECTRIC TRACTION (2011-12)
RESEARCH DESIGNS AND STANDARDS ORGANISATION
PERIOD TYPE OF WAGONS AXLE LOAD(TONNES)
SPEED(KMPH)
1950 4 WHEELER 16.25 651960 8 WHEELER
(VACCUM BREAK)20.32 75
1980 8 WHEELER BOXN, BCNA (AIR BREAK)
20.32 80/100
19961997
CONTAINER WAGON (BLCA/BLCB)
--- 100
2006 8 WHEELER (BCNHL)
22.9 65
2006 8 WHEELER (BOXNHL)
22.9 100
FUTURE DEVELOPMENT
8 WHEELER BOXNHL
25 110
IN FUTURE 32.5 110
DEVELOPMENT OF FREIGHT WAGONS
RESEARCH DESIGNS AND STANDARDS ORGANISATION
TAKING OFF PERIOD(FROM)
PERMISSIBLE CARRYING CAPACITY (TONNES)
NUMBEROF WAGONSIN A RAKE
STANDARD RAKE LOAD(PAY LOAD)(TONNES)
1975 CC 30 BOX ---
TRAIN LOAD INTRODUCED ON 01.01.198201.01.1982 - - 1500
01.05.1993 - - 300015.01.1997 CC+2 (60.8) 58 BOX N 352607.11.2004 CC+4 (62.8) 58 BOX N 364210.05.2005 CC+8 (66.8) 58 BOX N 387401.07.2007 67 58 BOX N 38862009 67 59 BOX N 3953
01.08.2011 68 59 BOX N 4012
INSTRUCTION FOR STANDARD RAKE LOAD (PAY LOAD) ISSUED BY RAILWAY BOARD
EVOLUTION OF PAY LOAD FOR BOXN
PERFORMANCE: FREIGHT TRAFFIC
11RESEARCH DESIGNS AND STANDARDS ORGANISATION
RESEARCH DESIGNS AND STANDARDS ORGANISATION
PERIOD MAXIMUM PERMISSIBLE
SPEED (KMPH)
COACH
1955 96 IRS COACH1965 105 ICF-ALL COIL1971 130 RAJDHANI
INTRODUCED1988 140 SHATABDI
INTRODUCED2001 160 LHB COACH
SPEED POTENTIAL OF
PASSENGER COACHES/TRAINS
PERFORMANCE: PASSENGER TRAFFIC
13RESEARCH DESIGNS AND STANDARDS ORGANISATION
DEVELOPMENT OF TRACK TECHNOLOGY
Axle Load
20.3
22.9
25
32.5
20
22
24
26
28
30
32
34
1950 2005 2006 Future
Ax
le L
oa
d (
ton
ne
s)
26000 rkm(41% of Total rkm)
4800 rkm (7.6% of Total rkm)
Axle Load Railway(DFC)
RESEARCH DESIGNS AND STANDARDS ORGANISATION
RESEARCH DESIGNS AND STANDARDS ORGANISATION
PERIOD RAIL SECTIONEARLIER 74 UTS
50R, 60R, 75R, 890R1961-62 IRS 52 Kg RAIL
SECTIONS DEVELOPED1975-76 UIC 60 Kg RAIL
SECTION WAS ADOPTED
2009 68 Kg RAIL SECTION2001 160
ADOPTION OF HIGHER RAIL SECTIONS
RESEARCH DESIGNS AND STANDARDS ORGANISATION
PERIOD RAIL SECTIONEARLIER 13 METRES RAIL2004-05 65 m/78 m LONG RAIL
COMMENCED2005-06 SUPPLY OF 130 m/ 260
m LONG RAIL COMMENCED
2009 68 Kg RAIL SECTION
ADOPTING LONGER LENGTH
RESEARCH DESIGNS AND STANDARDS ORGANISATION
PERIOD SPEED POTENTIAL
(KMPH)
HORSE POWER
ELECTRIC LOCOMOTIVE
TYPE1960 80 2870 WAM11967 31501970 120 3400 WAM41983 130
1053850 WAP1,
WAG51991 140
1005000 WAP4,
WAG71993 100 6120 WAG9, WAP7
DFCCIL 100 9000
FUTURE 100 12000
INTRODUCTION OF HIGHER HORSE POWER ELECTRIC LOCOMOTIVES
DEVELOPMENT OF ELECTRIC LOCOS
Electric Locomotive Horsepower
2900 3150 34004000
5000
6000
9000
12000
1000
3000
5000
7000
9000
11000
13000
1958 1967 1970 1983 1991 1993 DFC Future
Ho
rsep
ow
er
RESEARCH DESIGNS AND STANDARDS ORGANISATION
OVERHEAD CONDUCTOR SYSTEM
AS ON 01.02.2012
(EVEN AFTER 53 YEARS OF COMMISSIONING)
CATENARY WIRE: 65 sq. mm
(MESSENGER WIRE)
CONTACT WIRE: 107 sq. mm
(CONTACT LINE)
RESEARCH DESIGNS AND STANDARDS ORGANISATION
RESEARCH DESIGNS AND STANDARDS ORGANISATION
SECTION POWER DENSITY DURING INITIAL
COMMISSIONING (MVA/RKM)
PRESENT POWER
DENSITY(MVA/RKM)
HOWRAH-NEW DELHI 0.18 0.53/0.57*
NEW DELHI- IGATPURI- MUMBAI CST
0.24 0.48/0.56*
NEW DELHI- KOTA-MUMBAI CENTRAL
0.19 0.46/0.49*
HOWRAH-VISHAKHAPATNAM-CHENNAI
0.32 0.46/0.63*
MUMBAI CST- PUNE-CHENNAI SECTION UNDER ELECTRIFICATION.
HOWRAH-NAGPUR-MUMBAI CST 0.28 0.51/0.66*
NEW DELHI-NAGPUR-CHENNAI 0.29 0.46/0.56*
EVOLUTION OF TRACTION POWER DENSITY
* TRACTION POWER DENSITY OF THE SECTION WHILE TRACTION TRANSFORMERS ARE WORKING WITH OIL NATURAL AIR FORCED COOLING CONDITION.
RESEARCH DESIGNS AND STANDARDS ORGANISATION
SUMMARY OF POPULATION OF TRACTION SUB-STATIONSECTION Route
(Km)Traction Sub-Station (Nos.)
Initially Constructed
Existing Augmented
Additional Constructe
d
Total
Howrah-New Delhi
1447 21 26 18 39
New Delhi- Igatpuri- Mumbai CST
1544 27 22 9 36
Churchgate - Mumbai Central-New Delhi
1393 21 18 9 28
Howrah-Vishakhapatnam-Chennai
1662 31 15 4 35
Mumbai CST- Pune-Chennai
1283 Electrification of complete section is in progress
Howrah-Nagpur-Mumbai CST
1968 40 20 13 53
New Delhi-Nagpur-Chennai
2184 44 32 4 48
RESEARCH DESIGNS AND STANDARDS ORGANISATION
DEPENDING UPON THE TRACTION POWER REQUIREMENT, EITHER EXISTING TRACTION SUB-STATIONS HAS BEEN
AUGMENTED (FROM 10 MVA TO 21.6/30.24 MVA AND FURTHER TO 30/40 MVA)
OR ADDITIONAL TRACTION SUB-STATION HAS BEEN
ADDED
SPACING BETWEEN TWO TRACTION SUB-STATION HAS BEEN REDUCED FROM 70 KMS TO 20 KMS (APPROX.)
FURTHER REDUCTION OF TRACTION SUB-STATION SPACING WILL HAVE ADVERSE EFFECT ON THE PERFORMANCE OF ELECTRIC LOCOMOTIVE AND THEREBY ON TRAIN OPERATION.
SPACING BETWEEN SUBSTATIONS
RESEARCH DESIGNS AND STANDARDS ORGANISATION
HIGH SPEED OHE HIGH SPEED OHE OF OF
INDIAN RAILWAYSINDIAN RAILWAYS
――ISSUESISSUES
RESEARCH DESIGNS AND STANDARDS ORGANISATION
ACCOMODATION OF HIGHER SPEED ON EXISTING OVERHEAD INFRASTRUCTURES
MEETING POWER QUALITY NORMS WHILE INCREASING TRANSFORMATION CAPACITY OF TRACTION SUB-STATIONS
INCREASING FAILURE TOLERANCE OF TRACTION DISTRIBUTION SYSTEM
ACHIEVING HIGHER SYSTEM RELIABILITY
REDUCING LAND REQUIREMENT FOR HIGHER TRACTION POWER DELIVERY
HIGH SPEED OHE OF IRISSUESISSUES
RESEARCH DESIGNS AND STANDARDS ORGANISATION
HIGH SPEED OHE HIGH SPEED OHE OF OF
INDIAN RAILWAYSINDIAN RAILWAYS
――CHALLENGESCHALLENGES
RESEARCH DESIGNS AND STANDARDS ORGANISATION
1. FOR ONE/ TWO TRAINS
REPLACEMENT OF CONTACT WIRE 107 sq. mm 150 sq. mm
(WITH 1200 Kgf TENSION IN CATENARY & CONTACT WIRE)
CHANGE OF DROPPER SCHEDULE (WITH 50 mm PRE SAG)
MULTI ZONE PROTECTION SYSTEM 2. FOR REGULAR SERVICES
1. ADOPTION OF 2X25 kV AT SYSTEM
HIGH SPEED OHE OF IRCHALLENGES (160 KMPH)CHALLENGES (160 KMPH)
RESEARCH DESIGNS AND STANDARDS ORGANISATION
1. ADOPTION OF 2X25 kV AT SYSTEM
2. ADOPTION OF LIGHT BRACKET ASSEMBLIES
3. ADJUST THE CONTACT WIRE GRADIENT(FROM 3 mm TO 2 mm/meter – ABSOLUTE)(FROM 1.5 mm TO 1 mm/meter – RELATIVE)
4. MAINTAIN MINIMUM DROPPER LENGTH(500 mm)
VALIDATION OF OHE
BY EN-50317, EN-50318 & EN-50367
HIGH SPEED OHE OF IRCHALLENGES (200 KMPH)CHALLENGES (200 KMPH)
RESEARCH DESIGNS AND STANDARDS ORGANISATION
HIGH SPEED OHE HIGH SPEED OHE OF OF
INDIAN RAILWAYSINDIAN RAILWAYS
――OPTIONSOPTIONS
RESEARCH DESIGNS AND STANDARDS ORGANISATION
TO INCREASE THROUGHPUT
TO MEET THE PUBLIC NEED
TO COPE UP WITH INCREASED GDP OF THE COUNTRY
TO BOOST UP THE ECONOMY OF THE COUNTRY
FOR SURVIVAL OF IR IN THE TRANSPORT SECTOR
CONTINUE . . .
HIGH SPEED OHE OF IROPTIONS – CORPORATE IMPERATIVEOPTIONS – CORPORATE IMPERATIVE
RESEARCH DESIGNS AND STANDARDS ORGANISATION
HIGH SPEED OHE OF IROPTIONS – CORPORATE IMPERATIVEOPTIONS – CORPORATE IMPERATIVE
THE ETERNAL QUESTION
• “YAKSHA PRASHNA” (THE ETERNAL QUESTION):
– “WHAT IS THE ULTIMATE SURPRISE?”
• YUDHISHTIR ANSWERED:
– “THE MOST IMPORTANT AND VALUABLE FACTORS
ARE MOST HIDDEN AND FORGOTTEN”
• WHAT WE SEE?
– WE SEE AND APPRECIATE THE MODERN RAILWAYS BUT
NOT THE TECHNOLOGICAL EXCELLENCE.
– WE SEE SUCCESS STORY OF ELECTRIC TRACTION ON
IR BUT NOT THE NEED TO CONTINUALLY UPGRADE
THE TRACTION DISTRIBUTION SYSTEM.
RESEARCH DESIGNS AND STANDARDS ORGANISATION