REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW FEBRUARY 2018

REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

REQUIREMENTS MANAGEMENTSOFTWARE: AN OVERVIEW

FEBRUARY 2018

Page 2: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

• Introduction to Fenix Australasia

• Background

• Overview of Software functionality

• Demonstration

• Application of the software

• Commercial arrangements

• Questions

OVERVIEW OF PRESENTATION

Page 3: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

INTRODUCTION

Fenix Australasia was established in 2018 and forms part of Fenix Rail Systems.

We aim to help the Australasian rail industry prepare for the future through adoption of technology and innovation.

Our team has a track record for providing trusted advice and rail systems engineering services to the rail industry across Australasia.

Backed by our parent company, Fenix Rail Systems, we are respected for our work in delivering information, signalling and communications technology solutions.

Page 4: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

OUR LEADERSHIP TEAM

Craig Purcell, Group CEO

Mark Quintana, Regional Director

Brian McNaughton, Technical Director

Eddie Murphy, Project Director (Worldwide)

Page 5: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

RAIL SYSTEMS REQUIREMENTS MANAGEMENT SOFTWARE

Page 6: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

BACKGROUND

MGB Systems were approached by Hitachi Rail to assist them in the development and Management of a Customised Requirements Management (RM) Database for the Rail Systems Requirements for the Ho Chi Minh Urban Railway Project (Line 1).

Hitachi determined they needed a customised database suited to their project, rather than a commercial ‘off the shelf’ product such as IBM DOORS.

They felt that a customised system would allow for a flexible and cost effective approach to the RM process.

The result was a bespoke software product developed for that project and for other applications.

Page 7: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

HO CHI MINH URBAN RAILWAY (LINE 1) PROJECT

Signalling Communications Overhead Traction Power System

Trackwork Rolling Stock

T h e P r o j e c t

Power Systems Facilities SCADA Platform Screen Doors

Fare Collection Systems

Depot Equipment and Systems

Design of a Customised RM Database to manage the System Requirements for 10 sub-systems including:1

Page 8: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

THE PROJECT BRIEF

T h e P r o j e c t Initial Database Development Workshop with Hitachi to identify the functional requirements of the database.

Development and Initial Population of the Database with System Requirements taken from project specifications and other documents supplied by Hitachi (System Requirements Specification – SRS)

Assignment of System Requirements to Sub-Systems (Sub-System Requirements Specifications - SSRS)

Act as the Requirements Manager for the system during the initial stage (Technical Design - TD) of the project

Verify compliance with requirements during TD stage of the project. MGB reviewed/verified nominated compliance evidence for TD stage for all sub-systems

Train Hitachi staff in Vietnam in Requirements Management principles and in the use of the Requirements Management Database

2

3

4

5

6

7

Page 9: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

REQUIREMENTS MANAGEMENT PROCESS

The RM Database was specifically designed to support the V&V process detailed in Hitachi’s Project Verification and Validation Plan.

The objective of the V&V plan was to provide traceability from System Requirements identified from project specifications, plans, etc., to compliance evidence compiled from verification activities undertaken at nominated stages of the project.

Page 10: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

RM SOFTWARE FUNCTIONALITY

The following slides describe the current database functionality and

the associated V&V process.

Software functionality can be modified to suit an alternative process specified by the client.

Page 11: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

HOW TO USE THE SOFTWARE

STAGE 1Requirements identification

STAGE 2Configuration

STAGE 3Verification &

Validation

Reports

Page 12: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

HOW TO USE THE SOFTWARE

Agree project requirements source documents.

• Identify requirements.

• Define sub systems.

• Define project stages where compliance with requirements is to be tested.

Example Source documents:

• System Assurance Plans

• System Specifications

• User Specifications

• Hazard Logs

• Operation and Maintenance Requirements

• Any other source where system requirements are identified

Example Project Stages:

• Technical Design, Preliminary Design, CCB Gate1, etc.

• Construction and Installation Design, Detailed Design, CCB Gate 2 etc.

• Testing and Commissioning, SAT, FAT, SIT etc.

STAGE 1Requirements identification

STAGE 2Configuration

STAGE 3Verification &

Validation

Reports

Page 13: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

HOW TO USE THE SOFTWARE

• Customise database.

• Populate requirements.

• Assign requirements to sub systems.

• Define verification and validation activities.

• Nominate type of V&V activity required at each stage

STAGE 1Requirements identification

STAGE 2Configuration

STAGE 3Verification &

Validation

Reports

System & Sub System Requirements Specifications

Page 14: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

HOW TO USE THE SOFTWARE

• Compliance evidence nominated.

• Review compliance evidence (V&V activity).

• Record compliance status and review comments

Typical activities:

• Nominate evidence

• Review evidence

• Add comments recording outcome of review

• Update V&V status

STAGE 1Requirements identification

STAGE 2Configuration

STAGE 3Verification &

Validation

Reports

Page 15: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

HOW TO USE THE SOFTWARE

STAGE 1Requirements identification

STAGE 2Configuration

STAGE 3Verification &

Validation

Reports

Report Type Summary

SRS Report A complete (or filtered) list of Requirements listed in the database

SSRS Reports Sub-System Reports showing requirements assigned to a particular sub-system. Includes details of V&V activities & status

Gap Report Filters the requirements to only display those that  have not reached the ultimate status – Verified or Validated

Deleted and Superseded Reports

Retained in the database but not normally displayed in SRS or SSRS reports

Custom reports Other Reports designed during configuration stage

Page 16: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

OTHER FUNCTIONALITY & INFORMATION

Web based application.

Can be hosted on Client or off-site web servers.

O.S.: Windows Server 2008 or later.

Internet Information Services 7 or later.

Microsoft .Net framework 4.5 or later.

Database: MS SQL Server 2008 or later

Configurable User Rights.

Delete and Supersede Requirements.

Software optimised for Microsoft web browser. Can be used with other browsers.

Page 17: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

SOFTWARE DEMONSTRATION

Page 18: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

REFEREE

“It demonstrates traceability from a statement within a document/ test procedure/test report

to a technical requirement.”

“They find the system easy to use especially the people who have used DOORS before; it is

simple to use and compliant system.”

“Our Internal ISA is happy we now have a process and databases. It is easy to use

and fully traceable system”

B a r r y B a l d r e y , H i t a c h i

Page 19: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

APPLICATION OF SOFTWARE

Requirements Management of internal projects – Internal project team reporting to Project Manager.

Requirements Management of external contractors – Internal project team performing verification and validation of contractor evidence of compliance against requirements.

Contractor Management – Contractors can prepare data for inclusion in the database in a pre-defined spreadsheet format.

Page 20: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

COMMERCIAL ARRANGEMENTS

One off, perpetual license fee across PTA.

Fee for service for:

Bespoke development

Specific PTA wide or project configuration.

Annual maintenance fee

Schedule of rates for support

Page 21: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

QUESTIONS

Page 22: REQUIREMENTS MANAGEMENT SOFTWARE: AN OVERVIEW• Overview of Software functionality ... OVERVIEW OF PRESENTATION. INTRODUCTION Fenix Australasia was established in 2018 and forms part

THANK YOU