Requirements for Establishment of Site Data for a Permanent

Mars SettlementDamon Ellender, Mars Homestead

Project Programming Team

Page 2: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

Outline

• The Mars Homestead Project

• Site Criteria and Selection

• Potential Settlement Sites

• Site Information Required

Page 3: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

Mars Homestead Project

Bulk Gas Plant

Greenhouses

DRM Habs

Private RoomsManufacturing

Reactors

Interior

Mining

Plan View

To Arrive, Survive, and Thrive TM

Page 4: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

Site Criteria

• Located within 500-1000 kms of the Meridiani Expedition landing site

• Located near substantial subsurface aquifer• Located within range of additional sites of scientific

interest• Located at low altitudes of -3 to -4 km below datum• Minimal obstructions to local terrain• Located near substantial mineral resources• Located near the equator• Located in hill or cliffline• Located with reasonable range of spacecraft landing

zone

Page 5: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

MHP Site #1MHP Site #2

MHP Site #3

Opportunity Site

Potential Settlement Sites

Page 6: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

Copyright European Space Agency 2005 ©

Site #1 Ares Valles (17.34°W, 4.09°N)

Page 7: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

Site #2 Arabia Terra (356.90°W, 2.14°N):

Page 8: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

Site #3 Schiaparelli Crater (347.37°W, 2.90°S)

Page 9: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

Site Information Required

• Resource Identification, Sampling, and Recovery– Location of Water Resources– Detailed Mapping and Seismography Collection – Confirmation of Atmospheric Composition– Confirmation of Regolith Composition and Water Content

• Confirmation of Construction Methods– “Cut and Fill” Process

• Other Experimentation– Water Well Drilling and Proving– Automated Greenhouse– Brick and Concrete Manufacture– Metal and Glass Extraction and Refining Methods

Page 10: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

Location of Water Resources

• Subsurface Aquifers

• Regolith Water Recovery Methods

• Surface Concentrations

Page 11: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

Detailed Mapping and Seismography

• Aquifer Location• Required for Drilling

Test Wells• Geological and Civil

Engineering Assessment

• Location of Additional Mineral Resources

Page 12: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

Confirmation of Atmospheric Composition

• Composition

• Physical Properties

• Separation Techniques

• Fuel Manufacture

Page 13: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

Confirmation of Regolith Composition

• Mechanical Properties

• Physical Properties

• Chemical Composition

• Water Content

Page 14: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

Confirmation of Construction Methods

• “Cut and Fill” Methodology

• Slope Stability

• Fragmentation and Removal Methods

• Materials Testing in Mars Ambient Conditions

Page 15: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

Water Well Drilling and Proving

• Detailed Drilling Siesmology

• Operational Testing of Drill Platform

• Proving Water Flow Rates

• Recovered Water • Composition Testing

Page 16: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

Automated Greenhouse Setup

• Supply of seeds, soils, and nutrients.

• Testbed for future

• Setup and Commissioning

Page 17: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

Other Experimentation

• Brick Manufacture

• Concrete Manufacture

• Metal Extraction and Refining

• Glassmaking Methods

Page 18: Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

[email protected]

You could live here! Help us make it happen.