TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 55 1578 Lookout Place 0 6 29 1987 U.S. Nuclear Regulatory Camtssion ATTI: Documnt Control Desk ashington, D.C. 20555 Gentlemen: In the Matter of ) Docket Nos. 50-259 50-390 Tennessee Valley Authority ) 50-260 50-391 50-296 50-438 50-327 50-439 50-328 AUTHORIZATION OF ASNE BOILER AND PRESSURE VESSEL (B&PV) CODE CASES 1-341 and 1-356 FOR TiE RONWS FERRY, SEQUOYAN, MTTS BAR, AND BELLEFONTE NUCLEAR PLANTS TVA has t vieed the applications of the subject code cases and we plan to apply these code cases for the extension of certification period for Level III NOL eva.•ners from three to five years. Enclosed ts the required justification. e request your concurrence on the use of these code cases by February 15, 1988. If you have any questions, please telephone M. L. Hellum at 6151751-2695. Very truly yours. TENNESSEE VALLEY AUTHORITY R. Gdley Dir tor Nuclear Licensing and Regulatory Affairs Enclosure cc: See page 2 8801040516 871229 Po PDR ADOCK 05000259 Pp An fjdl Opportnty p An I ltlbl Opportlinity Employer

Requests authorization for use of ASME Boiler & Pressure Vessel … · 2012. 11. 30. · JUSTIFICATION BadMwMoud addenda The current rqutre approved reuirsemnts of ASNE BP W Code

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401

    55 1578 Lookout Place

    0 6 29 1987 U.S. Nuclear Regulatory Camtssion ATTI: Documnt Control Desk

    ashington, D.C. 20555

    Gentlemen:

    In the Matter of ) Docket Nos. 50-259 50-390 Tennessee Valley Authority ) 50-260 50-391

    50-296 50-438 50-327 50-439 50-328

    AUTHORIZATION OF ASNE BOILER AND PRESSURE VESSEL (B&PV) CODE CASES 1-341 and 1-356 FOR TiE RONWS FERRY, SEQUOYAN, MTTS BAR, AND BELLEFONTE NUCLEAR PLANTS

    TVA has t vieed the applications of the subject code cases and we plan to apply these code cases for the extension of certification period for Level III NOL eva.•ners from three to five years. Enclosed ts the required justification. e request your concurrence on the use of these code cases by February 15, 1988.

    If you have any questions, please telephone M. L. Hellum at 6151751-2695.

    Very truly yours.

    TENNESSEE VALLEY AUTHORITY

    R. Gdley Dir tor Nuclear Licensing and

    Regulatory Affairs

    Enclosure cc: See page 2

    8801040516 871229 Po PDR ADOCK 05000259 Pp

    An fjdl Opportnty p

    An I ltlbl Opportlinity Employer

  • -2

    IU.S. Nuclear Regulatory CO iission 0 829

    cc: Mr. K. P. Barr. Acting Assistant Director for Inspection Programs

    TVA Projects Division Office of Special Projects U.S. Muclear Regulatory Comission Region II 101 Narletta Street, M. Suite 2900 Atlanta, Georgia 30323

    Nr. G. G. Zech. Assistant ODirector for Projects

    TVA Projects Division Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East-Nest Highmay OE 322 Bethesda, Maryland 20814

    Beltefonte Resident Inspector Bellefonte Nuclear Plant P.O. Box 2000 Hollywood. Alabama 35752

    Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, P.O. Box 637 Athens, Alabama 35611

    Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379

    Natts Bar Resident Inspector Natts Bar Nuclear Plant P.O. Box 700 Spring City, Tennessee 37381

    I a

  • JUSTIFICATION

    BadMwMoud

    The current approved reuirsemnts of ASNE BWP Code Section XI edition and addenda rqutre Levl III MOE examiners recertification vey three years.

    Rationale

    Tme c Society of on Destructive Testing. Reco Practice No. SOT-TC-1A* August 1964 Edition (Reference paragraph 9.7.2) published policy Is for five-year recertification pertods. This certification period was also Incorporated Into ASN6 PV Code. Section XI. 1983 Edition, Minter 1983 Addenda.

    ASI KP Code Case I1-341 and M-356 states that the certification peritod for LEVEL III NOE examiners certification period may be extended to five years. Several of TVA's Level III examiners' certification requirmaents will expire In February 19883 and usage of these code cases would permit a two-year extension on their current certification. Also, the extension would be more economical for training purposes.