6
<; OFDA Emergency Project Plan International Liberia Plan - Liberia "" ~. Plan REQUEST FOR QUOTATION Renovation of CCC Structures and the construction of a generator house & incinerator at Jenneh # 3, Bomi County 1. CONTEXT /JUSTIFICATION Plan is a non-religious, non-political, and non-governmental, child centered development organization. Plan strives to achieve lasting improvements in the quality of life of deprived children in developing countries through a process that unites people across cultures and adds meaning and value to their lives. Under the current emergency response, Plan Liberia with support from OFDA, is committed to support the renovations of existing structures and constructions of a generator/power house & an incinerator at the vicinity of the eee, located in Jenneh# 3, Bomi County. Renovationsof 1 Staff tent 3-tents for (confirm probable & suspectedcases),4-latrines, 1-mouge, 1-donning, 1-doffing, 1-laundry, 1-dressing room and the construction of 1 Incinerator, 1 Generator/power house: To change the present conditions of these structures/facilities and construct an incinerator for burning wasteful substances and a house for the newly purchased generator and storage facilitate for fuel/gas and lubricant that would be used to provide electricity for light and water supply at the eec. The eee is maintained to reduce and sustain low transmission of Ebola virus within communities. 2. OBJECTIVES AND EXPECTED RESULTS 2.1 Objectives To provide safe housing for the generator and storage facility for fuel! gas and lubricants. To provide a place for the burning of waste from the eee to avoid pollutions. To change the structures of the present facilities/structures to a durable and suitable one for comfort. Plan Liberia is seeking a local Community Base Organizations/ Service Providers as contractors, who have expertise in the renovations of 1 Staff tent, 3-tents for (confirm probable & suspectedcases),4-latrines, 1-mouge, 1-donning, 1-doffing, 1-laundry, 1-dressing room and the construction of 1 Incinerator, 1 Generator/power house and according to the drawings and specifications in Jenneh No.3, Bomi County. The drawings, blank BoQ and specifications will be provided by Plan Liberia. 2.2 Relevant submission Letter of intent

REQUESTFORQUOTATION - President of Liberiaemansion.gov.lr/doc/Incinerator.pdf · 2015-06-26 · I • Filled in priced BoQ in keeping with Plan's submitted template (this canbe obtained

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REQUESTFORQUOTATION - President of Liberiaemansion.gov.lr/doc/Incinerator.pdf · 2015-06-26 · I • Filled in priced BoQ in keeping with Plan's submitted template (this canbe obtained

<;OFDA Emergency Project Plan International Liberia

Plan - Liberia ""~.Plan

REQUEST FOR QUOTATIONRenovation of CCC Structures and the construction of a generator house &

incinerator at Jenneh # 3, Bomi County

1. CONTEXT / JUSTI FICATION

Plan is a non-religious, non-political, and non-governmental, child centered developmentorganization. Plan strives to achieve lasting improvements in the quality of life of deprivedchildren in developing countries through a process that unites people across cultures and addsmeaning and value to their lives.

Under the current emergency response, Plan Liberia with support from OFDA, is committed tosupport the renovations of existing structures and constructions of a generator/power house &an incinerator at the vicinity of the eee, located in Jenneh# 3, Bomi County.

Renovations of 1 Staff tent 3-tents for (confirm probable & suspected cases),4-latrines,1-mouge, 1-donning, 1-doffing, 1-laundry, 1-dressing room and the construction of 1Incinerator, 1 Generator/power house: To change the present conditions of thesestructures/facilities and construct an incinerator for burning wasteful substances and a housefor the newly purchased generator and storage facilitate for fuel/gas and lubricant that wouldbe used to provide electricity for light and water supply at the eec. The eee is maintained toreduce and sustain low transmission of Ebola virus within communities.

2. OBJECTIVES AND EXPECTED RESULTS

2.1 Objectives

• To provide safe housing for the generator and storage facility for fuel! gas and lubricants.• To provide a place for the burning of waste from the eee to avoid pollutions.• To change the structures of the present facilities/structures to a durable and suitable

one for comfort.

Plan Liberia is seeking a local Community Base Organizations/ Service Providers as contractors,who have expertise in the renovations of 1 Staff tent, 3-tents for (confirm probable &suspectedcases),4-latrines, 1-mouge, 1-donning, 1-doffing, 1-laundry, 1-dressing roomand the construction of 1 Incinerator, 1 Generator/power house and according to thedrawings and specifications in Jenneh No.3, Bomi County. The drawings, blank BoQ andspecifications will be provided by Plan Liberia.

2.2 Relevant submission

• Letter of intent

Page 2: REQUESTFORQUOTATION - President of Liberiaemansion.gov.lr/doc/Incinerator.pdf · 2015-06-26 · I • Filled in priced BoQ in keeping with Plan's submitted template (this canbe obtained

•I

• Filled in priced BoQ in keeping with Plan's submitted template (this can be obtainedfrom Plan office here or in Tubmanburg)

• Detailed work schedule for work covering two weeks period

• Implementation strategy• Profile of company and capacity statement in the area of construction• Photocopy of all legal documents

Project duration:Project location:

15 days from 6th to 20th July, 2015Jenneh#3. Bomi County

Criteria for Applicationo Must be registered with the Government of Liberiao Must present a recent taxes clearanceo Include previous photos of similar worko Must have implemented construction project(s} and acquiescence with Ministry of Public

Works standardso Must have an establish office within the countyo Must have good community rapport and known by stakeholderso Must have an experienced engineer expertise and good reporting skillso All documents are to be stamp with entity original stamp

Date for submission of application: June 30th 2015, at 4:30PM.

Address letter to:

Dr. Djo MatangwaProject ManagerPlan International

Note: to support your application and quality of your submission, visit Plan office in Monroviaor in Tubmanburg to acquire additional information on the project design and outcomes beforesubmission.

OFDA Proj~ct ManagerPlan International Liberia

Rehabilitation ofjenneh#3 Bomi County

C\

Page 3: REQUESTFORQUOTATION - President of Liberiaemansion.gov.lr/doc/Incinerator.pdf · 2015-06-26 · I • Filled in priced BoQ in keeping with Plan's submitted template (this canbe obtained

PLAN INTERNATIONAL LIBERIAPROJECT: CONSTRUCTION OF GENERATOR HOUSE

LOCATION: PLAN COMMUNITY CARE CENTER AROUND LIBERIA.

Bill No. 01: CIVIL WORKSUnit Rate CostDescription Quantity Unit

US$ US$S.No

d e fb caA PRELIMINARY WORKS

LSsy $

A.1A.2

- ---.Mobilization and camp set-up___ __ __Site clearance

123

$$

$

$Sub Total: Prelim nary Works.

B8.1

POWERHOUSE CONSTRUCTIONPOWERHOUSE

8.1.1

8.1.2

8.1.38.1.48.1.58.1.68.1.7

8.1.8

Excavation in foundation, in top soil not exceeding 3'-0" deep ~20 cy $C20 Reinforced concrete for powerhouse column (6"x6") from 5 00 $ $foundation to roof, 4 Nos. ._ __ _ _ _ __ __ _. __ cy _C20 Plain concrete for powerhouse floor _ _ __ 1.60 cy $ .J.C25 Reinforced concrete for powerhouse ramp_._ _ O~ cy $ ....!C20 Reinforced concrete for powerhouse footing__ __ 1.30 cy $ ~ _C20 Reinforced concrete for lintel above doors and tie beam 0.80 cy $ ....!C25 Reinforced concrete machine base, 1 machines ~~. _~ $ __ -__ $6" 810c~ masonry for powerhousew walls with 1:4 cement mortar (from 42.00 s $foundation to superstructure) y---------- --

$8.1.9 1/4" Diameter steel as roof binder to building 2.00 pcs,--,-- -- ------

8.1.11

8.1.10 Plastering/rendering of power house walll ratio 1:6 cement mortal mix 12.00

8.1.12

sy-- -~ -- - -

8ack filling and manual compaction with ordinary soils in 15cm thick 10.00 c $layer __ __ ._, .__ . _"-- _~~ndows with decorated brick(1 '-0" x 1'-0") Lay in cement mortar Mix 19.20 sy

$

$

$

$

$ $

$Sub Total: Power House Works.

8.2 CARPENTRY WORK( ROOF, DOORS and WINDOWS)8.2.1 Powerhouse shed roof 29.00 syb.2.2 CGI Sheet for the roof, 28 gauge8.2.3 _ Double ste~1 door_~ith }rame (T-0"x4'-0")8.2.4 2"x4" hard wood timber as rafter @ 4'-0" c/c8.2.5 2"x2" hard wood timber as purlin @ 3'-0" c/c8.2.6 2"x6" hard wood timber as wall plate8.2.7 Zinc nail for roofing sheet8.2.8 Assorted nails for timber work on roof ~

_.19.00 _..E1.00 no.8.00 pcs8.00 pcs2.00 pcs1.00 box10.00 .e.ack

$$$$$$$

$- -- ---$$$$$$

Sub Total: Carpentry Works. $

8.3 PAINTING WORK 55.00 sy8.3.1 Appiled two coats of white wash on exterior and interior walls 55.00 sy $

8.3.2 Apply two coats of royal blue enamel paint, on exterior walls belowsy $

windows level and front of building 5.00

8.3.3 Apply two coats of white enamel paint, on exterior walls at and abovesy $

windows and front of building 20.00Sub Total: Painting Works.

8.4 ELECTRICAL WORK0.1 Junction cup 1.00 pc $--~-~ ---0.2 Utility cup 1.00 pc $-- ---0.3 SiQgle switch 1.00 __ P£.........$----- -_._-_.0.6 Wire # 10 0.50 roll $-- - - ,- ._-- -0.7 220V receptacle 2.00 pc $---- - -- - - -0.8 Light bulb (65 Wat!s) __ 1.00 yc $--, - - --~

0.9 Double throw 1.00 _pc $-----,- "--- -- --

. )

$

$

$

$

$-,-

$$$---$$$--- -

~

Page 4: REQUESTFORQUOTATION - President of Liberiaemansion.gov.lr/doc/Incinerator.pdf · 2015-06-26 · I • Filled in priced BoQ in keeping with Plan's submitted template (this canbe obtained

0.11 ClamQ 1.002.00

pack $.ec $

$0.12 Electrical conduit $

~Indicate %

TOTAL MATERIAL COST $ -

Transportation cost $ -

Labor cost $ -

Profit and overhead cost $ -

SUB-TOTAL MATERIALS AND OTHER COST $ -

5% contingency cost $ -

TOTAL GENERATOR HOUSE $ -

Sub Total 0: Electrical Works $

~

Page 5: REQUESTFORQUOTATION - President of Liberiaemansion.gov.lr/doc/Incinerator.pdf · 2015-06-26 · I • Filled in priced BoQ in keeping with Plan's submitted template (this canbe obtained

PLAN INTERNATIONAL LIBERIAPROJECT: CONSTRUCTION OF GENERATOR HOUSE

LOCATION: PLAN COMMUNITY CARE CENTER AROUND LIBERIA.I

Bill No. 01: CIVIL WORKSCostUnit RateDescription Quantity Unit

US$ US$S.No

c d e fa bA PRELIMINARY WORKS ----- -------A.1 Mobilization and camp set-up 1 LS $ $A.2 Site clearance 23 sy $ $

Sub Total: Prelimnary Works. $

B POWERHOUSE CONSTRUCTION8.1 POWERHOUSE8.1.1 Excavation in foundation, in top soil not exceeding 3'-0" deep 18.20 cy $-------

8.1.2 C20 Reinforced concrete for powerhouse column (6"x6") from5.00 cy $ $

foundation to roof, 4 Nos. - ---8.1.3 C20 Plain concrete for powerhouse floor 1.60 cy $ $- - -- -8.1.4 C25 Reinforced con~rete !Q~powerh(~u~e [email protected]. 0.90 cy $ $- - --B.1.5 C20 Reinforced concrete for powerhouse footing_ _ __ --..!.30 __ cy $ $---8.1.6 C20 Reinforced concrete for lintel above doors and tie beam 0.80 cy $ $--- -- --- - - ----8.1.7 C25 Reinforced concrete machine base, 1 machines 0.40 cy $ $---- ----

8.1.8 6" 810ck masonry for powerhousew walls with 1:4 cement mortar (from 42 00 sy $ $foundation to superstructure) .

8.1.9 1/4" Diameter steel as roof binder to building 2.00 pcs $ $----------- --.-.-

8.1.10 Plastering/rendering of power house walll ratio 1:6 cement mortal mix 12.00 sy $

8.1.118ack filling and manual compaction with ordinary soils in 15cm thick

10.00 cy $ $layer --~- ---- -- ._--- -- -~ -- ~ --- - - -- -----

8.1.12 ~~ndows with decorated brick(1'-0" x 1'-0") Lay in cement mortar Mix 19.20 sy $ $

Sub Total: Power House Works. $

8.2 CARPENTRY WORK( ROOF, DOORS and WINDOWS)8.2.1 Powerhouse shed roof 29.00 sy _

___ 29.00 sy $ _!_1.Q.0 __ ~_J....___ $

8.00 pcs $ _$8.00 pcs $ $2.00 pes $ $1.00 box $ $10.00 Eack $ $

b.2.2B.2.3

CGI Sheet for the roof, 28 gauge _Double steel door with frame (T-0"x4'-0")

8.2.48.2.58.2.68.2.78.2.8

2"x4" hard wood timber as rafter @ 4'-0" c/c2"x2" hard wood timber as purlin @ 3'-0" c/c2"x6" hard wood timber as wall plateZinc nail for roofing sheetAssorted nails for timber work on roof ~

Sub Total: Carpentry Works. $

B.38.3.1

8.3.2

8.3.3

PAINTING WORKAppiled two coats of white wash on exterior and interior wallsApply two coats of royal blue enamel paint, on exterior walls belowwindows level and front of buildingApply two coats of white enamel paint, on exterior walls at and abovewindows and front of building

55.00 sy55.00 sy $

5.00sy $

20.00sy $

$

$

$

Sub Total: Painting Works. $8.4 ELECTRICAL WORK0.1 Junction cup 1.00 e..c $----- -- -- ._- ------ -0.2 Utility cup 1.00 -~- $_._-- - - -, - - - ---0.3 Single switch 1.00 ~ $--------- -- --0.6 Wire # 10 0.50 roll $--------- - - -----0.7 220V receptacle 2.00_~_ $- ---, ------ -0.8 Light bulb (65 Watts) 1.00 ~ $---- --- -'-- -- ---0.9 Double throw 1.00 'pc_ $-- -- - - - -

$--$$$-- -- --$---- -$-----.--$

r

Page 6: REQUESTFORQUOTATION - President of Liberiaemansion.gov.lr/doc/Incinerator.pdf · 2015-06-26 · I • Filled in priced BoQ in keeping with Plan's submitted template (this canbe obtained

·.

0.11 Clam0.12 Electrical conduit

1.002.00

ack $EC $

$$.•.

Indicate %TOTAL MATERIAL COST $ -

Transportation cost $ -Labor cost $ -

Profit and overhead cost $ -SUB-TOTAL MATERIALS AND OTHER COST $ -

5% contingency cost $ -

TOTAL GENERATOR HOUSE $ -

Sub Total D: Electrical Works $

-