RFP.: NHBRC 1106/2013 Page 1
REQUEST FOR PROPOSAL
INVITATION TO SUBMIT A PROPOSAL FOR THE
APPOINTMENT OF A SERVICE PROVIDER FOR THE
PROVISION OF DATA CLEANSING SERVICES
RFP.: NHBRC 1106/2013
CLOSING DATE: 10 February 2014
CLOSING TIME: 11H00 am
NAME OF COMPANY:
___________________________________________________
RFP.: NHBRC 1106/2013 Page 2
TABLE OF CONTENTS PAGE NO.
TERMS AND CONDITIONS TO BE TAKEN INTO ACCOUNT BY SERVICE PROVIDERS ........................... 3
1. About NHBRC ........................................................................................................................................ 5
2. Risk Management by the NHBRC ......................................................................................................... 5
3. Business overview ................................................................................................................................. 6
PART B –TECHINICAL INFORMATION TO BE SUBMITTED BY SERVICE PROVIDERS ............................ 8
PART C –EVALUATION PROCESS ............................................................................................................... 15
1. Availability of the RFP Document ........................................................................................................ 36
2. Compulsory Briefing Session............................................................................................................... 36
3. RFP Closing Date ................................................................................................................................ 36
4. Enquiries should be directed to: .......................................................................................................... 37
5. Number of bid envelopes/files to be deposited:................................................................................... 37
PART E –ADDENDUMS TO THE RFP ........................................................................................................... 38
PART A– NHBRC BACKGROUND ................................................................................................................... 5
PART D – RFP SUBMISSION INSTRUCTIONS............................................................................................. 36
RFP.: NHBRC 1106/2013 Page 3
TERMS AND CONDITIONS TO BE TAKEN INTO ACCOUNT BY SERVICE PROVIDERS
This Request for Proposal (RFP) has been compiled by the NHBRC and it is made available to the
Bidders on the following basis.
Bidders submitting a Bid in response to this RFP are deemed to do so, on the basis that they
acknowledge and accept the terms and conditions set out below:
1. The NHBRC reserves the right to amend, modify, withdraw this RFP or any of the procedures or
requirements set out herein at any time without prior notice and without liability to compensate or
reimburse any person. If the NHBRC amends this RFP, the amendment will be sent to each Bidder
in writing or publicized as the case maybe. No oral amendments by any person will be considered or
acknowledged.
2. The premises of the bidder should be open at all reasonable hours for inspection by representatives
of the NHBRC. This is done in order to confirm any information provided by a Bidder in the RFP Bid.
3. This RFP is not intended to form the basis of a decision to enter into any transaction involving the
NHBRC, and does not constitute an offer or recommendation to enter into such transaction, or an
intention to enter into any legal relationship with any person.
4. A Bid submitted in response to this RFP will constitute a binding offer which will remain binding and
irrevocable for a period of six months from the date of submission to the NHBRC. The offer
constituted by the Bid will be deemed not to have been accepted and no agreement will be deemed
to be reached with any Bidder, unless and until a definitive Agreement and other related transaction
documents are concluded between the NHBRC and the Preferred Bidder.
5. Neither the NHBRC nor any of their respective directors, officers, employees, agents,
representatives or advisors will assume any obligation for any costs or expenses incurred by any
party in or associated with preparing or submitting a Bid in response to the RFP. All costs associated
with the preparation and submission of the Bid is the responsibility of the Service Provider. The costs
shall not be chargeable to the NHBRC by successful or unsuccessful Bidder.
6. No entity may be involved, whether directly or indirectly, in more than one Bid in response to this
RFP. A failure to comply with this requirement may, within the sole discretion of the NHBRC, result
in disqualification of the relevant entity.
7. Any material change in the control and/or composition of any Bidder or any core member of a Bidder
after submission of a Bid, shall require the prior written approval of the NHBRC, and any failure to
seek such approval from the NHBRC shall result in the NHBRC being entitled, in its sole discretion,
to exclude the relevant Bidder from any further participation in the bid process. The NHBRC shall be
the sole arbiter as to what constitutes a “material change in the control and/or composition of any
Bidder”, and as to what constitutes a “core member of a Bidder” for purposes of such approval. Any
request for such approval shall be made to the NHBRC in writing and shall provide sufficient reasons
and information to allow the NHBRC to make an informed decision. The NHBRC reserves the right
to accept or reject any such request for approval at its sole discretion.
RFP.: NHBRC 1106/2013 Page 4
8. The NHBRC and its advisors may rely on a Bid as being accurate and comprehensive in relation to
the proposals provided therein by the Bidders.
9. All bids information submitted to NHBRC will become the property of the NBHRC and will as such
not be returned to the bidder. The NHBRC will make all reasonable efforts to maintain proposals in
confidence. Proprietary information should be identified as such in each proposal.
10. RFP shall be considered irregular if they show any omissions, alteration of form, additions, or
conditions not called for, or irregularities of any kind. However, the NHBRC reserves the right to
waive any irregularities and to make award in the best interest of the company.
11. The NHBRC reserves the right to appoint one or more service providers.
12. RFP‟s shall be rejected, among other reasons, for any of the following:
RFP‟s received after the closing date and time as specified.
Collusion among bidders and upon detecting that the B-BBEEE status level of contribution
has been claimed or obtained in a fraudulent manner.
Incomplete work that in the judgment of the company shall prevent or hinder the prompt
completion of additional work, if awarded.
All Bids must be formulated and submitted in accordance with the requirements of this RFP.
RFP.: NHBRC 1106/2013 Page 5
PART A– NHBRC BACKGROUND
1. About NHBRC
1.1. Mandate of the NHBRC in terms of the Housing Consumers Protection Measures Act.
1.2. The National Home Builders Registration Council (NHBRC) has a mandate through the Housing
Consumer Protection Measures Act (Act No. 95 of 1998) providing warranty protection against defects
in new homes. The Act state that the objects of the Council are, inter alia:
3(b) “to regulate the home building industry”;
3(d) “to establish and promote ethical and technical standards in the home building
industry”; and
3(e) “to improve structural quality in the interests of housing consumers and the home
building industry”;
The Council is furthermore empowered by the Act:
5(5)(a) “to engage in undertakings to promote improved structural quality of homes
constructed in the Republic;
5(5)(b) ”to engage in undertakings to improve ethical and technical standards in the home
building industry;
5(5)(c) “to keep a record of competent persons”; and
5(h) “to generally do all things necessary or expedient to achieve its objects and the
objectives of this Act.”
2. Risk Management by the NHBRC
The NHBRC's primary mandate is to manage the risk of structural defects in the home building
industry and in so doing, protect the consumer. A prime activity of the NHBRC is to manage its risk
exposure in terms of the warranty scheme, in order to ensure that it is not unduly exposed to claims.
The current risk management tools being used by the Council include the Registration of Home
Builders, enrolment and inspection of homes, the Home Building Manual which incorporates design
and construction rules and the appointment of competent persons by the Home Builder to perform
certain tasks.
RFP.: NHBRC 1106/2013 Page 6
3. Business overview
The National Home Builders Registration Council is a statutory body with the responsibility to provide
warranty cover (protection) and regulatory services to the home-building industry. This is done in
terms of the Housing Consumers Protection Measures Act (No 95 of 1998). It is the NHBRC‟s
mandate to provide protection to housing consumers against defined defects and to regulate the home
building industry. Our mandate determines our scope of business as well as the principles and area of
business in which we operate. As a consequence our business is focused on specific business models
in defined geographical areas with specific business objectives for all South African Housing
Consumers.
The NHBRC is a medium sized organization with a staff complement of 420 employees. The NHBRC‟s
head office is located in Bryanston, Gauteng with 9 regional offices of varying size, and 12 satellite
offices.
RFP.: NHBRC 1106/2013 Page 7
NHBRC Office locations and number of user connection points
No. OFFICE
1 Head Office (Bryanston)
2 DR site (at Pretoria regional office)
3 KwaZulu Natal(Durban) – Regional
4 Western Cape (Cape Town) – Regional
5 Eastern Cape (Port Elizabeth) – Regional
6 North West (Rustenburg) – Regional
7 Limpopo (Pietersburg) – Regional
8 Mpumalanga (Nelspruit) – Regional
9 Gauteng (Woodmead) – Regional
10 Pretoria (Pretoria) – Regional
11 Free State (Bloemfontein) – Regional
12 Shelly Beach
13 New Castle
14 East London
15 George
16 Northern Cape (Kimberly)
17 Klerksdorp
18 Tzaneen
19 BelaBela
20 Witbank
21 Bethlehem
22 Mafikeng
23 Eric Molobi (Shoshanguve)
RFP.: NHBRC 1106/2013 Page 8
PART B – TERMS OF REFERENCE
INTRODUCTION
The National Home Builders Registration Council seeks to appoint a service provider for the
provision of Data Cleansing services.
BACKGROUND
The National Home Builders Registration Council herein referred to as NHBRC is a statutory body
established in terms of the Housing Consumer Protection Measures Act (HCPMA) 1998 (Act 95 of
1998). It is mandated to provide protection to housing consumer against defined defects and regulate
the home building industry.
The government granted the National Home Builder Registration Council exclusive rights to offer
housing consumers a five year standard home warranty against major structural defects throughout
the Republic of South Africa.
The NHBRC is in the business of registering homebuilders on its database and enroll new homes in
order to provide protection against structural defects in term of housing consumer protection measures
Act, 1998 (Act No: 95 of 1998)(the Act).
OBJECTIVE
The NHBRC has embarked on an initiative to implement SAP as its core business system.
The NHBRC is currently using a number of databases:-
IMS (reference only)
JD Edwards (reference only)
Oracle eBusiness Suite (current)
Siebel (CRM) (current)
Mobile (current)
These databases mentioned above (Current) must be cleansed/transformed ready.
Phase I of the Data Cleansing project require the extract of data from different sources
systems into a staging area in like-for-like format. Consultants with specific source system
specific knowledge were used to specify which tables contain the relevant data. These tables
were copied to the staging area. Not all tables in source systems were copied – only those
RFP.: NHBRC 1106/2013 Page 9
containing relevant data. The staging area database is built on Oracle Database 11g and
maps directly to source systems Siebel, Oracle EBS and Mobile, with JDE and IMS Data
having been transformed from MS SQL format to Oracle Database format. The staging area
database serves as the input for reporting and transformation processes (combining data
residing in different sources and providing users with a unified single view of this data).
Further to the above the following implementation process was followed:
1. Phase 1-Data Sizing
1.1 Process undertaken:
Copy the five databases into an extract database on a like for like basis. This allows the
interrogation the six databases.
Conduct workshops with business to establish issues.
Interrogate the extract database to establish the state of the data and remedies for each issue.
Estimate the effort to implement each remedy in order to cleanse the data.
1.2 Deliverables in terms of outcomes and outputs on completion to date:
Workshops held to identify issues and remedies.
Created a data consolidation Staging Database running on Oracle Database Version 11gR2.
Mapped the source systems databases to staging area database on a like-for-like basis and
populated the data from source systems to staging area database
Converted all databases to Oracle database in the like-for-like extract database.
Documented the Oracle database.
Shortly issue a report outlining the issues and their remedies.
1.3 Tools used in implementation of Phase 1
TOAD from Quest Software
APEX from Oracle
1.4 Resources supplied
IMS consultant
JD Edwards consultant
Seibel consultant
Oracle developer
Oracle database administrator
1.5 Note
The database containing the data from the individual databases is called the Extract Database.
The database containing the cleansed data is called the Staging database. SAP will use this
database to migrate the cleansed data.
RFP.: NHBRC 1106/2013 Page 10
1.6 Sources Systems
Oracle EBS (Current)
JDE (reference only)
Siebel CRM (Current)
Microsoft Excel Spreadsheets (Current)
IMS (reference only)
Quickfacts (Current)
Mobile (Current)
1.6.1 The key findings relating to the data cleansing requirements and scoping for different business units
were discussed with business process owners and data champions within the business unit and were
structured as follows:
Source Systems:- defined the different systems where the source systems data was identified
and extracted for reporting and analysis purposes.
Data Source:- defined the different sources within the source system data where the data was
extracted for purposes of analysis as per the requirements defined by the data Champions.
Issues and Remedies:- outlined a table wherein issues identified and associated remedies
were discussed and a total count of the respective records per issue are outlined.
Cleanse, transform and validate:- this includes updating data so it meets specific patterns,
transforming the data according to and validating the data for SAP readiness. This will require
the identification of missing or non standard data. The staging data base must be refreshed on
a regular basis and a dashboard maintained as to the progress of cleansed data.
SCOPE OF SERVICES
1.1 The Approach to data migration constitutes four phases as follows:
1. Define Legacy data environment (complete)
2. Manual and Automated Cleansing
3. Map and test the staging data base to SAP
4. Upload data to SAP via the SAP partner.
1.2 Proposal
The tender requires a response to Phase 2, 3 and 4.
1.3 Phase 2 – Manual and Automated Cleansing
1.3.1 Objective
Implement each remedy by either:
- Correcting the data element in the current-source system (manually).
- Correcting the data element in the staging database (via script).
Verify the integrity of the staging database.
RFP.: NHBRC 1106/2013 Page 11
Regularly refresh the staging database with live data from Oracle, Siebel and Mobile.
1.3.2 Activities
Understand the structure of the extract database and the business activities it supports.
Develop any additional links in the extract database according to business requirements.
Interface with business personnel to understand their requirements.
Assist the business as they evaluate and determine the accuracy and suitability of all data to be
transported and create query scripts that are required to view, correct, transport the data to the
staging database.
Project Management
1.4 Phase 3 - Map and test the staging database to SAP
1.4.1 Objective
Map the staging database to SAP data elements. This implies that the staging database is SAP
ready. Work with SAP personnel to ensure the staging database is SAP is fully tested.
1.4.2 Activities
Assist SAP personnel in understanding the data elements in the staging database.
Align the staging data base with the SAP templates.
1.5 Phase 4 (in conjunction with SAP implementation partner)
1.5.1 Objective
Run the transports from the staging database to SAP.
1.5.2 Activities
The SAP team will develop, test, run and have approved the processes to update the SAP
databases.
An Oracle resource is required to assist in this transporting.
1.5.3 Note
The current SAP partner will respond to their part of this requirement.
1.6 Approximate volumes
1.6.1 The approximate volumes are attached as per Annexure A.
RFP.: NHBRC 1106/2013 Page 12
Annexure A
RFP.: NHBRC 1106/2013 Page 13
1.6.2 Response to the Requirements
In responding to the above requirements you will be required to provide the following as part of
your proposal response.
A clearly defined approach and methodology of undertaking the data cleansing and
transforming project.
Detailed scope of work
Defined project phases with critical milestones and deliverables associated with each phase of
the project
Provide a high-level project plan, including a schedule of activities.
Provide a resource plan and describe how each of your resources is going to fit-in into the data
cleansing project
Provide a mobilization plan and outline how long it will take to fully deploy your project team
onsite, learning curve, lead times, on boarding, etc.
Outline what resources would be required from the NHBRC by your company.
If you plan to propose tools to undertake the data cleansing process, define how your tool is
going to assist the NHBRC in undertaking the cleansing process. Focus your attention on the
different remedial process it is likely to cover given your understanding of the above
requirements.
Outline your company‟s data cleansing experience and provide at-least two examples and
references where your company ran similar projects.
Note Phase 4 is expected to be completed by 31 December 2014.
1.7 Skills and Technical Resources
The successful service provider will require the following skills sets to successfully deliver the Data
Cleansing and Consolidation project.
Data Architect
IMS Technical skill.
JD Edwards Technical Resource with Functional experience.
Siebel Technical/Functional Resource.
Oracle Technical Resource.
Oracle Applications DBA.
Oracle Mobile - good understanding of mobile applications.
Subject Matter expect in field of Data Cleansing and Management.
Project Manager
RFP.: NHBRC 1106/2013 Page 14
Item Resource Years’ Experience
(Minimum)
IMS Technical skill 5
JD Edwards Technical Resource with Functional experience 5
Siebel Technical/Functional Resource 5
Oracle Technical Resource 5
Oracle Applications DBA 5
Oracle Mobile - good understanding of mobile applications. 5
Subject Matter expect in field of Data Cleansing and Management. 5
RFP.: NHBRC 1106/2013 Page 15
PART C –EVALUATION PROCESS
In accordance with the NHBRC Supply Chain Management Policy, the tender evaluation process
shall be carried out in two stages namely:
Stage 1 : Compliance check of Mandatory Documents
Stage 2 : Functionality in terms of the set technical evaluation criteria
Stage 3 : Preference and Pricing
1. Stage 1 : Compliance check of Mandatory Documents
The bidder documents will be assessed at this stage of the process to establish compliance
with the standard conditions of the tender as described under Terms and Conditions and
under the heading „1.1 Mandatory Requirements‟ below.
The bidder must indicate compliance with the mandatory requirements by ticking under
“Comply” or “Not Comply”.
Document proof of specific mandatory requirements must be attached to the relevant form
failure which will result in the disqualification of the bid from the process.
RFP.: NHBRC 1106/2013 Page 16
1.1. MANDATORY REQUIREMENTS
1.1.1.1 Mandatory Comply Not Comply
The service provider must populate Form 1 : Project Timeline
Summary and attach to the space allocated below.
Comments:
1.1.1.2 Mandatory Comply Not Comply
The service provider must provide a proposal and must attach it
to Form 2 : Proposal
Comments:
1.1.1.3 Mandatory Comply Not Comply
The service provider must provide a Curriculum Vitae and attach
it to Form 3 : Curriculum Vitae
Comments:
1.1.1.4 Mandatory Comply Not Comply
The service provider must provide a proof of qualification and
accreditation to Form 4 : Relevant Qualifications
Comments:
1.1.1.5 Mandatory Comply Not Comply
Each bidder is required to ensure that both Form 5 and Form 6
are populated by two previous clients.
Comments:
1.1.1.6 Mandatory Comply Not Comply
The bidders must populate Form 7 : Weekly Implementation Timeline Breakdown
RFP.: NHBRC 1106/2013 Page 17
Comments:
1.1.1.7 Mandatory Comply Not Comply
The bidders must populate Form 8 : Project Team Composition
Comments:
1.1.1.8 Mandatory Comply Not Comply
The bidders must populate Form 9 : Resource Composition
Comments:
1.1.1.9 Mandatory Comply Not Comply
The bidders must provide Form 10 : Software License
Comments:
1.1.1.10 Mandatory Comply Not Comply
The bidders must provide Form 11 : Pricing Schedule
Comments:
RFP.: NHBRC 1106/2013 Page 18
2. Stage 2 : Functionality
Functionality of the bids will be evaluated according to the predetermined evaluation criteria
set out on Table 1: Evaluation Criteria below.
During this phase bidders will be evaluated for functionality based on achieving a minimum
qualifying score of 60 percent as set out on Table 1: Evaluation Criteria below, those bidders who
fail to meet the minimum qualifying score (both threshold and sub thresholds) for functionality
will be disqualified from the process.
Bidders will not rate themselves, but need to ensure that all information is supplied as
required. The Bid Evaluation Committee (BEC) will evaluate functionality and score all the
bids that have met all the requirements as set out on „Stage 1 Compliance check of
Mandatory Documents‟ in this document.
The panel members will individually evaluate the compliant bids received for functionality
against the following criteria as set out on Table 1: Evaluation Criteria below:
The service provider must provide a proposal (attach to Form 2) with the following headings:
Evaluation Criteria Weight Sub Threshold
a) Project Management 20 12
b) Methodology 20 12
c) Key Personnel 20 12
d) Resources 15 9
e) Related Experience 15 9
f) Reference Questionnaires 10 6
Total Score 100
Minimum Qualifying Score (Threshold) 60 Table 1: Evaluation Criteria
a) Project Management
The service provider must have at least one Project Manager with a Project Management
Qualification and with the relevant experience. Project management accreditation would be
an advantage. The Project manager will be responsible for maintaining oversight over the
project and provide consolidated summary of reports.
The service provider must illustrate the expected project timeline in summary and the weekly
implementation timeline.
RFP.: NHBRC 1106/2013 Page 19
The service provider must provide information under heading ‘a) Project Management
under the following sub criteria headings and the service provider must attach Curriculum
Vitae to Form 3 and the relevant proof of qualifications to Form 4 and populate Form 8.
Sub – Criteria Weight
Qualifications 5
Experience (Data Cleansing experience an advantage) 15
Each panel member will rate this sub criterion on the score sheet using the following scale:
Value Description
5 – Excellent Meets and exceeds NHBRC functionality requirements
4 – Very Good Above average compliance to requirements
3 – Good Satisfactory and should be adequate for stated element
2 – Average Below average compliance to requirements
1 – Poor Unacceptable, does not meet criteria
b) Methodology
The demonstration of the bidders methods and approach from a systematic and theoretical
stand point in analyzing and executing the requirement.
The service provider must provide information under heading ‘b) Methodology’ under the
following sub criteria headings and the service provider must populate Form 1, Form 7.
Sub – Criteria Weight
Method and approach in establishing a baseline prior to execution 6
Method and approach in identifying and mitigating against risk 3
Method and approach in maintaining oversight 2
Method and approach in maintaining quality control 3
Method and approach in maintaining and consolidating reports 2
Project timelines summary (Populate Form 1) 2
Project timeline weekly breakdown (Populate Form 7) 2
3. Each panel member will rate this sub criterion on the score sheet using the following scale:
Value Description
5 – Excellent Meets and exceeds NHBRC functionality requirements
4 – Very Good Above average compliance to requirements
3 – Good Satisfactory and should be adequate for stated element
2 – Average Below average compliance to requirements
1 – Poor Unacceptable, does not meet criteria
RFP.: NHBRC 1106/2013 Page 20
c) Key Personnel (Points)
The service provider should provide a project team responsible for the execution of the
project with adequate skills, qualifications and experience in delivery of similar projects or
functions.
The service provider must provide information under heading ‘c) Key Personnel’ under the
following sub criteria headings and the service provider must attach Curriculum Vitae to
Form 3 and the relevant proof of qualifications to Form 4 and populate Form 8
Sub – Criteria Weight
Qualifications 2
Skills 2
Experience 10
Mobilization plan for resources (Deployment plan as per the form 6
4. Each panel member will rate this sub criterion on the score sheet using the following scale:
Value Description
5 – Excellent Meets and exceeds NHBRC functionality requirements
4 – Very Good Above average compliance to requirements
3 – Good Satisfactory and should be adequate for stated element
2 – Average Below average compliance to requirements
1 – Poor Unacceptable, does not meet criteria
d) Resources
A demonstration of the bidders capability to meet requirements in terms of the specified
infrastructure requirements to be utilized in execution of the project.
The service provider must provide information under heading ‘d) Resources’ under the
following sub headings, and populate Form 9 and must provide Form 10.
Sub – Criteria Weight
Tool for SQL 5
Database management tool 5
Reporting tool 5
Each panel member will rate this sub criterion on the score sheet using the following scale:
Value Description
5 – Excellent Meets and exceeds NHBRC functionality requirements
4 – Very Good Above average compliance to requirements
3 – Good Satisfactory and should be adequate for stated element
2 – Average Below average compliance to requirements
1 – Poor Unacceptable, does not meet criteria
RFP.: NHBRC 1106/2013 Page 21
e) Related experience
The service provider must illustrate two data cleansing projects under taken in satisfying
requirements of similar nature and relevant projects, and conditions in relation to the required
service in the scope of work. Service providers must have a proven track record of at least
three years minimum experience in IT and at least two years minimum experience in data
cleansing.
The service provider must provide information under heading ‘e) Related experience’ under
the following sub headings and under to Form 2 : Proposal
.Sub – Criteria Weight
Description and Nature of works 2
No of years providing IT service solutions 4
No of years providing Data Cleansing service solutions 7
Value of work 2
3. Each panel member will rate this sub criterion on the score sheet using the following scale.
Value Description
5 – Very Relevant Experience is very relevant to the current scope of work.
4 – Relevant Experience is relevant to the current scope of work.
3 – Moderate Experience is moderately relevant to the scope of work.
2 – Slightly Experience is slightly relevant to the scope of work.
1 – Irrelevant Experience in other unrelated fields to the scope of work.
f) Reference questionnaire (10 Points)
Each bidder is required to ensure that both Form 5 and Form 6 are populated by two
previous clients for the projects mentioned in sub section ‘d) Related experience’ and must
have the relevant clients company stamp displayed on it.
The points for the panel members as well as for the reference questionnaire will be added and
expressed as a fraction of the best possible score for each particular criterion as set out in ‘Table 1:
Evaluation Criteria’.
3. Stage 3 : Price and Preference
a) The bidders must populate Form 11 : Pricing Schedule and submit in a separate envelope.
b) Only bids that achieve minimum qualifying score for ‘Stage 3 : Functionality’ in this bid will evaluated
further.
c) The qualifying bids will be evaluated in accordance with the 90/10 preference point systems as
prescribed in the PPPFA regulations 5 and 6.
d) The lowest acceptable bid will score 90 points for price. Bidders that quoted higher prices will score
lower points for price on a pro-rata basis.
e) The formulae that will be utilized in calculating points scores for prices is as follows:
RFP.: NHBRC 1106/2013 Page 22
90/10 Preference point system (for acquisition of services, works or goods with a Rand value
above R1million) (all applicable taxes included)
(
)
Where:
Ps = Points scored for comparative price of bid or offer under consideration
Pt = Comparative price of bid or offer under consideration
Pmin = Comparative price of lowest acceptable bid or offer.
f) The points scored will be rounded off to the nearest two decimal places.
g) Then points will be awarded to a bidder for attaining the B-BBEE status level of contribution in
accordance with the table below:
BBBEE Level 90/10
Level 1 10
Level 2 9
Level 3 8
Level 4 5
Level 5 4
Level 6 3
Level 7 2
Level 8 1
Non-Compliant Contributor
0
h) Then the points scored for price will be added to the points scored for B-BBEE status level of
contribution to obtain the bidders total points scored out of 100.
RFP.: NHBRC 1106/2013 Page 23
Form 1 : Project Timeline Summary
RFP.: NHBRC 1106/2013 Page 24
Form 2: Proposal
RFP.: NHBRC 1106/2013 Page 25
Form 3 : Curriculum Vitae.
RFP.: NHBRC 1106/2013 Page 26
Form 4 : Relevant Qualifications
RFP.: NHBRC 1106/2013 Page 27
Form 5 : NHBRC Reference Questionnaire
Client Company Name:
Contact Person:
Designation of Contact Person:
Contact Number:
E-mail Address:
Nature of Contract:
Kindly furbish your company stamp in the space provided below or the reference will not
be considered:
The National Homebuilders Registration Counsel herein referred to as NHBRC is a
statutory body established in terms of the Housing Consumer Protection Measures Act
1998 (Act 95 of 1998). It is mandated to provide protection to housing consumer against
defined defects and regulate the home building industry.
The NHBRC invited suitably qualified Service Providers to submit proposals for the
provision of a Data Cleansing Services.
The NHBRC would like to do a reference check in line with the technical evaluation
requirements of the tender and request your assistance in helping us in making rating the
different focal areas as prescribed below.
There are 5 questions that are set up survey style and should take approximately 10 min
of your time. Kindly select one option as these points will be added and expressed as a
fraction of the best possible score for a particular criterion.
This information will be treated as confidential. NHBRC thanks you for taking time to
respond to this questionnaire.
RFP.: NHBRC 1106/2013 Page 28
On a scale of 1 to 5 how do you rate this company (bidder) on the following areas?
1. Professionalism
1. Below Average
2. Average
3. Good
4. Very Good
Comments:
2. Responsiveness
1. Below Average
2. Average
3. Good
4. Very Good
Comments:
3. Flexibility
1. Below Average
2. Average
3. Good
4. Very Good
Comments:
4. Overall satisfaction
1. Below Average
2. Average
3. Good
4. Very Good
Comments:
5. How likely are you to employ services of the same company in future?
1. Unlikely
2. Possible
3. Likely
4. Highly Likely
Comments:
RFP.: NHBRC 1106/2013 Page 29
Form 6 : NHBRC Reference Questionnaire
Client Company Name:
Contact Person:
Designation of Contact Person:
Contact Number:
E-mail Address:
Nature of Contract:
Kindly furbish your company stamp in the space provided below or the response will not
be considered:
The National Homebuilders Registration Counsel herein referred to as NHBRC is a
statutory body established in terms of the Housing Consumer Protection Measures Act
1998 (Act 95 of 1998). It is mandated to provide protection to housing consumer against
defined defects and regulate the home building industry.
The NHBRC invited suitably qualified Service Providers to submit proposals for the
provision of Data Cleansing Services.
The NHBRC would like to do a reference check in line with the technical evaluation
requirements of the tender and request your assistance in helping us in making rating the
different focal areas as prescribed below.
There are 5 questions that are set up survey style and should take approximately 10 min
of your time. Kindly select one option as these points will be added and expressed as a
fraction of the best possible score for a particular criterion.
This information will be treated as confidential. NHBRC thanks you for taking time to respond to this questionnaire.
RFP.: NHBRC 1106/2013 Page 30
On a scale of 1 to 5 how do you rate this company (bidder) on the following areas?
1. Professionalism
1. Below Average
2. Average
3. Good
4. Very Good
Comments:
2. Responsiveness
1. Below Average
2. Average
3. Good
4. Very Good
Comments:
3. Flexibility
1. Below Average
2. Average
3. Good
4. Very Good
Comments:
4. Overall satisfaction
1. Below Average
2. Average
3. Good
4. Very Good
Comments:
5. How likely are you to employ services of the same company in future?
1. Unlikely
2. Possible
3. Likely
4. Highly Likely
Comments:
RFP.: NHBRC 1106/2013 Page 31
Form 7 : Weekly Implementation Timeline Breakdown
RFP.: NHBRC 1106/2013 Page 32
Form 8 : Project Team Composition
RFP.: NHBRC 1106/2013 Page 33
Form 9 : Resource Composition
RFP.: NHBRC 1106/2013 Page 34
Form 10 : Resource Licensing
RFP.: NHBRC 1106/2013 Page 35
Form 11 : Pricing Schedule
RFP.: NHBRC 1106/2013 Page 36
PART D – RFP SUBMISSION INSTRUCTIONS
1. Availability of the RFP Document
Bid documents will be available from the following platforms at the NHBRC on 24
January 2014:
Website www.nhbrc.org.za
Email Address [email protected]
2. Compulsory Briefing Session
2.1 A Compulsory Briefing Meeting will be held at NHBRC Head Office, on the 30 January 2014 at 11h00
at the follow address:
Province Physical Address & Contact Number
Head Office, Gauteng 10 Muswell Road South
Phase 4 Silver Stream Business Park
Bryanston, Johannesburg
Tel: 011 317 0000
Table 2 Compulsory Briefing Session Schedule
2.2 Bidders who have not attended the compulsory briefing session will be disqualified.
3. RFP Closing Date
3.1 All Bid documents must be deposited into the Bid box situated at the NHBRC Head
Office, on or before 10 February 2014, at 11H00 at the following address:
Province Physical Address & Contact Number
Head Office, Gauteng 10 Muswell Road South
Phase 4 Silver Stream Business Park
Bryanston, Johannesburg
Tel: 011 317 0000
No late proposals will be accepted
3.2. Bid documents should be marked for Attention: Supply Chain Manager, and
deposited into the Bid boxes at the NHBRC Head Office, 10 Muswell Road South,
RFP.: NHBRC 1106/2013 Page 37
Phase 4 Silver Stream Business Park, Bryanston. No emailed or faxed Bids will be
accepted. The Bid document should be supplied in a sealed envelope and clearly
marked with the Bid number and the full name of the service provider.
4. Enquiries should be directed to:
Ms.Thobile Mgidi - Tel. (011) 317 0240,email: [email protected]
Mr. Mncedi Mabona – Tel. (011) 317 0174, email: [email protected]
5. Number of bid envelopes/files to be deposited:
Submission of bid envelopes/files MUST include ONE (1) Original Copy of the
submission and FOUR (4) copies of the submission. A total of FIVE (5)
envelopes/files per bidder.
RFP.: NHBRC 1106/2013 Page 38
PART E –ADDENDUMS TO THE RFP
The following documents as listed will be made available with the distribution of the RFP.
DOCUMENTS TO BE SUBMITTED
No. Please note; the items marked with an (X) are mandatory requirements
and failure to meet the requirements will result in your bid being
disqualified.
Yes/No
1. X Original and valid B-BBEE Status Level or certified copy
2. X SBD1 (Invitation to bid) (Make sure it is signed and thoroughly
completed)
3. X SBD2 (Tax Clearance Certificate) Certificate must be original and
valid
4. X SBD 3.1 or SBD 3.2 (Pricing schedule) If not filed please refer to
Annexure or Addendum in your submission where price is mentioned
5. X SBD 3.3 (Pricing schedule) If not filed please refer to Annexure or
Addendum in your submission where price is mentioned
6. X SBD 4 (Declaration of interest) (Make sure it is signed) and thoroughly
completed)
7. X SBD 6.1 (Preference claim form) Must be signed regardless if points
are claimed or not. (Make sure it is signed and thoroughly completed)
8. X SBD 6.3 (Promotion of small business) (Make sure it is signed and
thoroughly completed )
9. X SBD 8 (Declaration of Bidder‟s past supply chain management
practices) (Make sure it is signed and thoroughly completed)
10. X SBD 9 (Certificate of independent bid determination – Make sure it is
signed and thoroughly completed )
11. General Conditions of the contract (GCC)
12. X Other documents as mentioned in the bid terms of reference.