Request for Statement of Interest (SOI)
2013 Structure Inspections
The Kane County Division of Transportation is in need of professional services from a qualified
engineering firm to provide engineering services as detailed in the attached preliminary scope of work.
A Statement of Interest shall be submitted VIA EMAIL no later than 4:00 P.M. on November 6, 2012,
and should be addressed to Michael Zakosek, P.E., Senior Project Manager, at
Statements of Interest received will be used by County engineering staff to develop a short-list of three
(3) firms. The County will then submit a Request for Proposal (RFP) and schedule interviews with the
short-listed firms.
For more information regarding the SOI, such as content and format of these items, please reference the
QBS document found at http://www.co.kane.il.us/dot/consultant/selectionProcess.pdf . Also, the SOI
shall be submitted in PDF format viewable with the latest version of Adobe reader.
Short-listed firms will be posted at http://www.co.kane.il.us/dot/consultant.aspx. Click on the link
labeled “Consultant Selection Summary Table,” and click the project name.
If the respondent plans to utilize a sub-consultant for any portion of this work please note this on the
submitted Statement of Interest.
This project may be recommended for renewal on an annual basis for up to three years.
Any questions on the project may be emailed to the Project Manager.
A Statement of Interest (SOI) received after the above noted deadline will not be considered.
Michael Zakosek, P.E.
Senior Project Manager
Kane County Division of Transportation
41W011 Burlington Road
St. Charles, Illinois 60175
Exhibit “A”
SCOPE OF SERVICES 2013 STRUCTURE SAFETY INSPECTIONS
A. History The Surface Transportation Assistance Act of 1978 required that all public bridges over 20 feet in length be inspected and inventoried in accordance with the National Bridge Inspection Standards by December 31, 1980. In October 1988, NBIS was modified to require special inspections of fracture critical details and underwater features of bridges. Since then, changes have been made to address increased focus on scour inspections, timely reporting, inspector qualification, and other issues. Qualified personnel must typically inspect bridges every two years and have their findings submitted to IDOT for inclusion in the state and national databases. B. Qualifications The Consultant shall provided personnel qualified to perform the bridge inspections. An IDOT approved Team Leader shall supervise, in the field, all inspection activities. The Consultant shall also supply an IDOT approved staff member to act as Program Manager for all inspections. The Consultant shall also provide a structural engineer registered in the State of Illinois to review any bridges that are determined to be structurally deficient on an as needed basis. The Consultant shall provide staff trained in the use of Cartegraph BRIDGEview software to maintain the existing County structure database. The Consultant shall provide the specific qualifications for all members on the inspection team, and for all related work.
C. Scope of Work The Consultant shall inspect all structures detailed below, in accordance with the National Bridge Inspection Standards and the Illinois Department of Transportation Structure Information and Procedure Manual. In addition, an inspection will be conducted for the new Keslinger Road over LaFox Tributary to Mill Creek bridge. This bridge will also be evaluated for overweight loads, using the County four standard vehicle configurations.
The Consultant shall submit the following to the County for each major structure inspected:
1) IDOT Bridge Inspection Report, BBS-BIR 2) Bridge Inspection Report Narrative
The Bridge Inspection Report Narrative shall be in a format similar to the attached.
In addition, the consultant will provide a detailed cost estimate for each structure that includes the costs of all repairs mentioned in the report’s recommendations. The Consultant shall also provide a plan of access for inspection of the bridges. It is anticipated that specialized equipment such as snooper trucks or rigging may be required to allow the inspector to closely examine the bridge elements. Generally, the inspector must be within arm’s reach to adequately inspect a bridge element. Safety of the inspector is of extreme importance to the County and is the responsibility of the Consultant. The Consultant is solely responsible for the safety practices and methods used to perform any and all inspections. The consultant shall coordinate all inspections over railroads with the appropriate railroad. Any costs for licenses and permits shall be included in this work. The consultant will provide on-call design services, review services, and inspection services to be billed against the on-call item in the contract. The consultant will assist in any other needs as defined by the county to comply with the requirements of NBIS. D. Schedule The notice to proceed will be issued on approximately January 31, 2013. The project schedule shall be as follows. Structure Inspections May 10, 2013 Submittal of BBS BIR forms to IDOT and KDOT June 28, 2013 Narratives and cost estimates submitted August 2, 2013 Comments returned by KDOT
August 30, 2013 Final versions of all materials submitted to County, Cartegraph data updated
m:\dotserverd\users\implementation\consultant selection\2012 qbs\2013 structure inspections\scope\exhbit a scope2013.doc
JurisdictionStructure Number Roadway Carried Feature Crossed
Big Rock 045-3045 W. County Line Road Big Rock CreekBig Rock 045-3059 Lasher Road Welch CreekBig Rock 045-3067 Scott Road Big Rock CreekBig Rock 045-3090 W. County Line Road W. Branch Big Rock CreekBig Rock 045-3106 Price Road Big Rock CreekBig Rock 045-3111 Scott Road Malgren DrainBig Rock 045-5005 Dugan Road Welch CreekBlackberry 045-3056 Smith Road Blackberry CreekBlackberry 045-3057 Seavey Road Blackberry CreekBlackberry 045-3061 Scott Road Blackberry CreekBlackberry 045-3068 Brundidge Road Mill CreekBlackberry 045-3092 Finley Road Blackberry CreekBlackberry 045-3117 Seavey Road Blackberry CreekBlackberry 045-3129 Kenmar Drive StreamBlackberry 045-3320 Seavey Road Lake Run CreekBurlington 045-3120 Barron Road Virgil Drainage Ditch No. 3Burlington 045-3319 Middleton Road Virgil Drainage Ditch No. 3Campton 045-5003 Denker Road Ferson CreekCounty 045-0040 French Road Burlington CreekCounty 045-3000 County Line Road Union Ditch No. 3County 045-3002 Peplow Road Virgil Ditch No. 3County 045-3006 Bliss Road Blackberry CreekCounty 045-3009 Jericho Road Big Rock CreekCounty 045-3010 Jericho Road Blackberry CreekCounty 045-3025 Fletcher Drive Tyler CreekCounty 045-3036 Walker Road Burlington CreekCounty 045-3041 Ramm Road Virgil Ditch No. 3County 045-3047 Bowes Road Fitchie CreekCounty 045-3053 Keslinger Road Branch of Mill CreekCounty 045-3107 Dauberman Road Welch CreekCounty 045-3139 Dauberman Road Welch CreekCounty 045-3145 Keslinger Road Mill CreekCounty 045-3146 Scott Road Welch CreekCounty 045-3154 Keslinger Road Blackberry CreekCounty 045-5530 Keslinger Road LaFox Trib to Mill CreekCounty 045-5538 Jericho Road Rob Roy CreekCounty 045-5001 Meredith Road Virgil Ditch No. 1County 045-5542 Peplow Road Union Drainage DitchCounty 045-5518 Burlington Road Union Ditch No. 2Elgin 045-3124 Coombs Road IC&E RR
Elgin 045-3130 Raymond Road Poplar CreekGeneva 045-3123 Skyline Drive Trib. Of Mill CreekGeneva 045-5006 McKee Street Trib. Of Mill CreekHampshire 045-3049 Lenschow Road Burlington CreekKaneville 045-3118 Owens Road Big Rock CreekKaneville 045-3126 Ehlers Road Young's CreekKaneville 045-5012 Harter Road E. Branch Big Rock CreekPlato 045-3132 Muirhead Road Canadian National RRPlato 045-3142 Tower Road Canadian National RRPlato 045-3321 Nesler Road Fitchie CreekSugar Grove 045-3062 Densmore Road Blackberry CreekSugar Grove 045-3071 Ke-De-Ka Road Blackberry CreekSugar Grove 045-3073 Hankes Road Lake Run CreekVirgil 045-3038 Winters Road Virgil Drainage Ditch No. 3Virgil 045-3039 McNulty Road Virgil Drainage Ditch No. 1Virgil 045-3040 Welter Road Virgil Drainage Ditch No. 2Virgil 045-3114 Francis Road Virgil Drainage Ditch No. 1
Bridge Inspection Report for SN 045-3097; March 26, 2012
1
Bridge Inspection Report
STRUCTURE NO. 045-3097
Fabyan Parkway over the Fox River
For
Kane County Division of Transportation
INSPECTION TYPE: NBI DATE: March 26, 2012
Hampton, Lenzini and Renwick, Inc. Civil Engineers, Structural Engineers & Land Surveyors
Springfield, IL 217-546-3400
Bridge Inspection Report for SN 045-3097; March 26, 2012
2
I. ADMINISTRATIVE DATA. Region / District: 1 / 1 County: Kane Feature Carried: Fabyan Parkway / CH 8 / FAP 363 Feature Crossed: Fox River Weather: 47° F; Cloudy
II. ROADWAY/STRUCTURE DATA. ADT (current): 27,600 (2010 – IDOT Master Structure Report) ADTT (current): 1,656 – 6% (2010 – IDOT Master Structure Report) Inventory Rating HS: 20.0 (IDOT Master Structure Report) Operating Rating HS: 27.3 (IDOT Master Structure Report) Existing Clear Width: 55’-6” Face-to-Face of Parapets (Excluding 3’-0” Median) Width to Remain in Place: 55’-6” Improvement Width: 55’-6” CONSTRUCTION / RECONSTRUCTION / REPAIR HISTORY: Year Constructed: 1974 - Original construction (HS 20 Design Load). Year/s Reconstructed: 1980 - New bituminous wearing surface and expansion joints.
1991 - New concrete wearing surface, new expansion joints, concrete parapet and median repairs. 1998 - New expansion joints and concrete repairs. 2005 - New latex-modified concrete wearing surface, new modular expansion joints, parapet extensions, new lighting and miscellaneous concrete repairs.
STRUCTURE DESCRIPTION: Type: Unit 1 is a continuous, non-composite haunched welded plate
girder and Unit 2 is a continuous, non-composite welded plate girder
Span Arrangement: Unit 1 = 4 spans (175’-0”, 280’-0”, 280’-0”, 175’-0”), Unit 2 = 3 spans (130’-0”, 130’-0”, 130’-0”)
Length & Width: Length = 1,309’-4” Back-to-Back of Abutments; 62’-0” Out-to-Out of Deck; 58’-6” Face-to-Face of Parapet (including 3’-0” concrete median)
Skew: 0° Abutments: West – Open spill through abutment on spread footings;
East – Pile supported stub abutment Piers: Double hammerhead concrete piers supported on spread
footings keyed into rock
Bridge Inspection Report for SN 045-3097; March 26, 2012
3
INSPECTION HISTORY (NBIS RATINGS): Year: Deck: Super: Sub: 2002 6 7 7 2004 6 7 7 2006 8 7 7 2008 7 7 7 2010 6 6 7 2012 6 6 7
III. STRUCTURE CONDITION FINDINGS. APPROACH ROADWAY: The HMA approach roadway surface is in good condition with some transverse cracking present. (See Photo Nos. 1, 2, 6 & 7)The approach roadway consists of a four lane (two lanes each direction) hot mix asphalt surface with concrete curb and gutter and painted median. The east approach has a section of raised, mountable median. There are no bridge approach slabs at this structure. Signalized intersections of Fabyan Parkway with Illinois Route 31 and Illinois Route 25 are located beyond the west and east ends of the bridge, respectively. BRIDGE PARAPET / RAIL: There are concrete parapets and a raised concrete median on the structure.
The parapets are in good condition with minor cracking throughout and a few delaminated areas. (See Photo Nos. 12 & 13)
The concrete median is in fair condition with numerous areas of cracking, delaminations and a few spalls. (See Photo No. 16)
JOINTS: Modular expansion joints are present at both the east and west abutment and at Pier 4. The joints are in fair condition overall.
The joints were installed during a 2005 rehabilitation of the structure.
There is heavy open transverse cracking in the anchorage concrete along the west abutment joint. (See Photo No. 8)
There is 14’ long x 0.025” wide open transverse crack in the anchorage concrete in the westbound outside lane on the Span 4 side of Pier 4. The crack is approximately 6” – 8” off the rail. There is evidence that this crack is allowing water leakage to the girders and diaphragms below. A smaller crack is beginning to form on the Span 5 side of this joint at the same location. (See Photo Nos. 9, 10 & 21)
This cracking could simply be shrinkage cracks from the curing process. They could also be tension cracks from the restraint of the modular joint.
The expansion joint at the east abutment has holes in the rubber element. (See Photo No. 11)
DECK: The deck is in overall satisfactory condition. Top of Deck: There is a 6½” concrete deck with a 3” latex modified concrete overlay on the structure.
The latex modified concrete wearing surface is in good condition. (See Photo No. 14)
Widely spaced (6’ – 15’) tight longitudinal & transverse cracking is present throughout. (See Photo 15)
The first 40’ of the overlay at the northeast corner of the structure, between the parapet and outside lane marking, is delaminated and appears to be covered with asphalt.
Debris is collecting in the deck drainage scuppers.
Bridge Inspection Report for SN 045-3097; March 26, 2012
4
Underside of Deck: The underside of the deck is in satisfactory condition. (See Photo Nos. 17 – 20)
Transverse cracking with light leaching it typical throughout.
Delaminations and spalls with or without exposed reinforcement are present. This damage accounts for approximately 1% of the total deck area. (See Structure Sketches for specific locations and dimensions)
Deck drains do not extend below the low steel elevations and two deck drain pipes are broken (north side Span 2 & south side Span 3) allowing deck drainage to come in contact with the steel.
SUPERSTRUCTURE: All of the plate girders, cross braces, diaphragms and bearings are weathering steel. All of the steel, within 5’ of the expansion joints, was painted in 2005.
The girders are in overall satisfactory condition.
The major deficiencies with the girders are beneath the abutments and Pier 4 expansion joints. Most of the deficiencies at these locations are from the leaking expansion joints before the 2005 rehabilitation. However, there is some active corrosion occurring at the west abutment cross frames and along the north exterior girder in Span 4 due to continued leakage. The deficiencies include section loss, holes in the web and web crippling behind the bearing stiffeners at Pier 4 and heavy section loss with holes in a few cross frame members at the abutments & Pier 4. (See Photo Nos. 24 – 29)
Corrosion and exfoliation continues on the bottom flanges and web up to 15’ from the transverse joint at Pier 4.
The bottom flanges near the deck drains have slightly greater surface corrosion than the surrounding steel.
A few of the girder splices and diaphragm connections have loose or missing nuts and bolts. Many of these are due to insufficient clearance between the cross bracing connections and the girder splices.
Most of the exterior girder splice plates have pack rust forming between the top plate on the bottom flange and the web.
See the Structure Sketches for specific damage locations. BEARINGS:
The bearings are in good condition. (See Photo Nos. 30 & 31)
The rocker bearings at the abutments and Pier 4 have been painted.
A few of the anchor bolts on the bearings did not have nuts or nuts which were completely tightened.
The Pier 3 bearings sit off center on the cap. The eccentricity increases from the south (where the exterior bearing is nearly centered on the cap) to the north (where the exterior bearing bottom plate sits flush with the west edge of cap). The condition was also observed to a lesser extent at Pier 2. This extends back to the original construction. There is no sign of movement to the anchor bolts, so it is a placement issue.
SUBSTRUCTURE: Abutments: The abutments and wingwalls are in good condition. (See Photo Nos. 32 – 34)
Minor vertical hairline cracks are present in the backwalls.
There is a spall with leaching and exposed reinforcement at the north end of the west abutment back wall.
Bridge Inspection Report for SN 045-3097; March 26, 2012
5
There are cracks with leaching present at the abutment corners which extend into the wingwalls.
Piers: The piers are in good condition. (See Photo No. 36)
A minor concrete spall is present on the east side of Pier 4 near the bearing of girder 2.
There is a small crack at the bearing seat step on the north side fascia of Pier 4.
A small 1’ x 1’ delamination is present in the underside of the north cantilever of Pier 6.
Minor spalling is present near the water line of Pier 2.
There are minor abrasions on the inside face of both stems at the groundline of Pier 3.
There is a small 6” x 1’ spall with exposed reinforcement on the east face of the Pier 3 cantilever at the north end.
Some hairline diagonal cracking was noted in the cantilever caps. Cracks originate near the exterior girder and continue down toward the cap stem connection.
Rust staining is present due to runoff from the weathering steel. SLOPE / CHANNEL: Slope/Channel Protection: Concrete slopewalls are present at the abutments and are in fair condition. (See Photo No. 35)
Large transverse cracks are present on the concrete slopewalls.
The east abutment slopewall has settled approximately 2” in spots.
There is a 2” gap at the north corner of the east slopewall due to the settlement. Channel Adequacy: The stream channel throughout the structure is rocky with a limestone layer at the bottom of the channel. The channel is in very good condition. TRAFFIC SAFETY: The bridge is built on a tangent alignment with a curved roadway section on both approaches. There is a slight grade increase from west to east across the structure. Pavement markings are present and visible, but are beginning to fade. Guardrail: Steel plate beam guardrail with TBT Type 1 Special terminal end sections are present at all four corners of the structure. The guardrail is in good condition with no impact damage noted during the inspection. Signage / Posting: The bridge is not currently load posted. STRUCTURE RATING: The structure was analyzed for a proposed 217k / 11-axle overload permit vehicle in February 2012. No reductions in capacity were taken due to the deterioration present. It was determined that the structure was adequate to carry the designated overload vehicle. No load posting is required. UTILITIES / LIGHTING:
Electrical conduits are suspended from the bottom of deck in the north and south exterior bays.
There are light poles mounted on the concrete parapets along both sides of the structure.
The light pole bases and poles are in good condition, with no cracks noticed on the bases.
Bridge Inspection Report for SN 045-3097; March 26, 2012
6
An overhead, pole mounted utility, which runs along the bike path on the east side of the river, crosses the structure near Pier 4.
IV. CONCLUSIONS AND RECOMMENDATIONS. Conclusions: The structure is in satisfactory condition overall. The deck overlay is in good condition with only minor cracking noted. The original concrete deck has a number of delaminations and spalls on the underside, but the overall percentage is relatively low for the age of the structure. The overlay will help maintain the deck condition for the foreseeable future. There is transverse cracking noted at the expansion joints and evidence of continued water leakage, especially at the Pier 4 joint. The cracking in the concrete headers at the joints should be sealed to prevent additional damage. The steel girders are in satisfactory condition with the only significant damage noted located beneath/near the transverse expansion joints. This damage has been mitigated by cleaning and painting the steel, but minor active corrosion is developing. This is most prevalent near the Pier 4 expansion joint. The substructure units continue to remain in good condition with no significant deterioration present. Recommendations: Short Term:
Repair the leaking transverse joints.
Repair delaminated/spalled concrete along raised median.
Further investigate modular joint movement and cracking. Long Term:
Repair the damaged drain downspouts and extend all to 6” below low steel elevation.
ATTACHMENTS: Attachment A. Bridge Inspection Report Attachment B. IDOT Master Structure Report Attachment C. Structure Sketches Attachment D. Structure Photos Attachment E. Cost Estimate
BBS-BIR-1 (Rev.10/01)
Sheet 1 of 5
Bridge Inspection Report (MI)
Structure Number: 045-3097 Maintenance County: Kane County
90 - Insp. Date 90A - Insp. Team Leader/Qualification Temp. Township: Geneva
03 / 26 / 2012 Chandler Schramm / PE Municipality: Batavia
Fac Carried: Fabyan Parkway, FAU Route 1397
Feat Crossed: Fox River
Location: Between IL Rte 25 & 31
Mat/Type/# Span: 4 / 02 / 7
Bridge Inspection Year: 12 Team Sect. - Sub-Sect: ---
Appraisals Comments (All comments must be dated.)
Deck
58 - Deck Condition: 6 12 - Bottom of deck has widely spaced delams and spalls
Wearing Surface: 4 12 - Minor HL trans. & long. cracking in latex modified concrete WS
Parapets / Bridge Railings: 4 12 - Minor HL cracking & wetness
Curbs: -
Median: 3 12 - Widespaced cracks, delams & spalls
Sidewalks: -
Drain System: 3 12 - 2 broken drain pipes; pipes do not extend below low steel
Light Standards: 4
Expansion Joints: 3 Openings (In.): W Abut = 3 3/4", P4 = 4 1/8", E Abut = 3 3/4"
12 - E abut jt has hole in rubber element, trans crks in conc @ Pier 4 & W abut
Superstructure
59 - Superstructure Cond: 6
Bearing Devices: 4
Girders / Beams / Stringers: 3
Diaphragms / Braces: 3 12 - Some sect. loss & a few holes @ trans. Jts.
Trusses / Portals / Bracing: -
Rivets / Bolts: 4 12 - A few missing or loose bolts @ splices/diaphragm connections
Paint: 3 12 - Painted @ trans. exp. jts.; Some localized failure
Substructure
60 - Substructure Cond: 7
Stem / Columns / Piles: -
Caps: 4
Bearing Seats: 4
Backwalls: 3 12 - Vertical HL crks., Spall at N end of W abut
Wingwalls: 4 12 - Cracking at corner w/ backwall
Stem / Columns / Piles: 4
Caps: 4 12 - Minor spalls & HL cracking
Bearing Seats: 4
Crash Walls: -
Fender Systems: -
Paint: -
Ab
utm
en
tsP
iers
47
12 - Some sect. loss & a few holes @ trans. jts; Pack rust @ splices on ext.
girders
BBS-BIR-1 (Rev.10/01)
Sheet 2 of 5
Bridge Inspection Report
Structure Number: 045-3097
Bridge Inspection Year: 12
Appraisals Comments (All comments must be dated.)
Culvert
62 - Culvert Condition: N
Top Slab / Soffit:
Side Walls / Arch:
Bottom:
Headwalls:
Wingwalls:
Waterway and Channel
61 - Channel Condition: 8
Streambed: 4
Slope Walls & Rip-Rap: 4 12 - Trans. Cracking; Differential settlement of E. slopewall
Stream Banks: 4
Spur Dykes & Jetties: -
71 - Waterway Adequacy: 9
Approach Roadway
72 - Appr. Rdwy Alignment: 7
Riding Quality: 4
Structural Condition: 3 12 - Trans. cracks
Relief Joints: -
Navigable Waterways
111 -Pier Navig. Protect'n: N
Inspection Remarks
Year Item 90B - Inspection Remarks (237 characters maximum.)
Str. in satisfactory cond. Widely spa. tight long. & trans. cracks in overlay. Minor amount of
spalls on deck btm. Girders have some active corrosion @ deck jts. Substr. in good cond.
Insp. delayed to 3/26 due to insp. truck availability.
20
20
12
20
20
20
Bridge Inspection Report
Structure Number: 045·3097
Additional Inspection Data
-"3~6"Ac:·.!B:!n~· d~ec.R~a"il,!in!lL!A",d",e=u,,,a= __ .L::3:.J Rail Types: Concrete Parapets
Approach Guardrail Adequacy: 36B· Transitions: 131 36C • Guardrail : 3 360· Ends: 3
1 OBA • Wearin Surface T pe: F 108C· Deck Protection: J
1080· Total Deck Thickness 6.5" Concrete Deck w/3" Latex Modified Concrete Overlay = 9.5"
A - 588 Weatherin Steel ! Painted in 2005 at the ex ansion 'oints.
Color: Fascia - Inter. - Rai ling -
5SC • Utilities Attached : Electrical
Weight Limit Posting
70A2 • Single Unit Vehicles : T.I Combinations: 7082 ·3 or 4 Axle: I TI 70C2 - 5 or More Axle: 1 T· I
7002 • One Truck at a Time: 1
Time to Inspect (H:M): 1 16:00 1 Traffic Control: Iy Inspection Resource Needs Equipment
Boat- Y I Waders-- Y I Snooper-- Y Manllft-- Y
Ladder- Short N Medium Y Tall Y Other-
93C - Special Inspection Date: /
Signature Block Unit Supervisor
Signature Date , Initials · Date
(' ( '/7/:/",,/1/, (jf r< / /':;/1/12- '#/'!IJ--" o ~ .- E CD 0",'0 OJ OJ '" tt ..... ~ E
Additional Comments:
,
(Contlnue comments on page 4)
88S-8IR-1 (Rev.l0/01) Sheet 3 of 5
BBS-BIR-1 (Rev.10/01)
Sheet 4 of 5
Bridge Inspection Report
Structure Number: 045-3097
Additional Comments:
(Continue comments on additional pages as needed)
2012 - The HMA approach roadway surface is in good condition with some transverse cracking present. Steel plate beam guardrail and TBT Type 1 Special terminal end sections are present at all four corners of the structure and are in good condition with no impact damage noted. The concrete parapets are in good condition with minor cracking throughout and a few delaminated areas. There are modular expansion joints at the east and west abutment and at Pier 4. The joints are in fair condition overall. There is heavy open transverse cracking in the concrete header along the west abutment. There is a 14' long x 0.025" wide open transverse crack in the concrete header in the westbound outside lane on the Span 4 side of Pier 4. The crack is approximately 6" - 8" off the rail and there is evidence that the crack is allowing water leakage to the girders and diaphragms below. A smaller crack is beginning to form on the Span 5 side of this joint at the same location. The expansion joint at the east abutment has holes in the rubber element. There is a 6.5" concrete deck with 3" latex modified concrete wearing surface on the structure. The wearing surface is in good condition with widely spaced tight longitudinal and transverse cracking present throughout. The first 40' of the overlay at the NE corner of the structure, between the parapet and the outside lane marking, is delaminated and appears to be covered with asphalt. The raised concrete median on the bridge has numerous areas of cracking, delamination and a few spalls. There is transverse cracking with light leaching typical throughout the underside of deck. Delaminations and spalls with or without exposed reinforcment are present, but do not account for a large percentage of deck area overall. There are two broken deck drain pipes and the deck drains do not extend below the low steel elevation. All of the plate girders, cross braces, diaphragms, and bearings are A-588 weathering steel. The steel within 5' of the transverse expansion joints has been painted. The girders are in satisfactory condition overall with the major deficiencies occurring at the ends near the expansion joints in the deck. Water leakage through the joints in the past has caused section loss, holes in the web, & web crippling. Corrosion and exfoliation continues on the bottom flanges and web up to 15' from the joint at Pier 4. The bottom flanges near the deck drains have slightly greater surface corrosion than the surrounding steel. Most of the exterior girder splice plates have pack rust forning between the top plate on the bottom flange and teh web. A few of the girder splices and diaphragm connections have loose or missing nuts and bolts due to insufficient clearance between the cross bracing connections and girder splices. The bearings are in good condition. A few of the anchor bolts did not have nuts or the nuts were not completely tightened. The abutments and wingwalls are in good condition. There are minor vertical hairline cracks in the abutment backwalls. There is a spall with leaching and exposed reinforcement at the north end of the west abutment. There are cracks with leaching present at the abutment corners which extend in to the wingwalls. The piers are in good condition as well. Some minor spalls are present and some hairline diagonal cracking was noted in the cap cantilevers. Rust staining due to runoff from the weathering steel is present. The concrete slopewalls at the abutments are in fair condition with large transverse cracks present. The east abutment slopewall has settled approximately 2" in locations and there is a 2" gap at the north corner. There are light poles attached to the concrete parapets along both sides of the structure. The light poles and bases are in good condition with no defects noted.
Illinois Department of TransportationStructures Information Management System
Master Structure Report (S-107)
Date: 4/5/2012
Structure Number: 045-3097 District: 1
Page 1
Inventory DataFacility Carried: FABYAN PARKWAY
Feature Crossed: FOX RIVER
Bridge Remarks:
Bridge Status: 1
Status Remarks:
Maint County: 045
Maint Responsibility: 03
Service On/Under: 1 5
Bridge Name: FABYAN
Location: FABYAN PK W OF IL 25
StatusDate: 04/1988
KANE
OPEN - NO RESTRICT
COUNTY
/HIGHWAY WATERWAY
Reporting Agency: 3 COUNTY
Main Span Matl/Type: 4 STEEL CONTINUOUS 02 STRINGER/MULTI-BEAM/GIRDER/
Maint Township: 09 GENEVA
Nbr Of Main Spans: 7 Nbr Of Approach Spans: 0
***Approaches***
Near #1 Matl/Type:
Near #2 Matl/Type:
Far #1 Matl/Type:
Far #2 Matl/Type:
/
/
/
/
Median Width/Type: 3 Ft. 3/ Curb
Guardrail Type L/R: 0 None 0 None/
Toll Facility Indicator: 0 No Toll
Latitude: 41 51 53.00 Longitude: 88 18 44.00D M S D M S
Structure Length: 1309.3
AASHTO Bridge Length: 99.9
Length of Long Span: 280.0
Bridge Roadway Width: 55.5
Appr Roadway Width: 72.0
Deck Width: 62.0
Deck Structure Type: A CIP CON NRMLLY FORM Deck Structure Thickness: 6.5
Sufficiency Rating: 71.3
No
Replaced By: 000-0000
Replaces: 000-0000
Last Update Date: 01/18/2011
HBP Eligible:
Parallel Structure: None
Multi-Level Structure Nbr:
Skew Direction: None
00 D 00 M 00 SSkew Angle:
Structure Flared: No
NoHistorical Significance:
Border Bridge State:
Bdr State SN:
Bdr State % Responsibility: 0
Structural Steel Wt: 4,185,350
Rated By: N Rate Method:N/A
Inventory Rating: 20.0
Operating Rating: 27.3
(236)
(249)
Design Load: 02 HS20
Load Rating Date:
Sidewalk Width Right: 0.0
Sidewalk Width Left: 0.0
Sidewalks Under Structure: 0
Key Route On Data
None
Navigation Vert Clear: 0
Navigation Horiz Clear: 0
Navigation Control: 0 No
Culvert Fill Depth: 0.0
Number Culvert Cells: 0
Culvert Cell Width: 0.00
Culvert Cell Height: 0.00
Culvert Opening Area: 0.0
00 Ft 00 In
Crossing 1 Nbr:
RR Lateral Underclear: 00.0
RR Vertical Underclear:
Crossing 1 Nbr:
***Railroad Crossing Info***
Functional Class: 30
27600Curr AADT Yr/Count: 2010
Est Truck Percentage: 6
Number Of Lanes: 4
One Or Two Way: 2
Horizontal: 060.0 000.0
Min Vertical: 99 00
81 0363
Designated Truck Rte: NONE
Bypass Length: 5
Urban Area: 1051
Natl. Hwy System: On NHS
*** Marked Route On Data ***Designation
** CLEARANCES ** South/East North/West
Key Route Nbr: FEDERAL-AID PRIMARY
Two-Way
0363
Segment:Main RouteAppurtenances 00.000
OTHER PRINCIPAL ARTERIAL
Station: 001.450
Inventory County: 045
Township/Road Dist: 09
13635Future AADT Yr/Cnt: 2021
KANE
Special Systems: Yes
11Ft
In
00Ft
In
GENEVA
Linked: Y
Inventory Direction:Municipality: 0355
Max Rdwy Width: 000.0
10 Ft Vertical: 99 0011Ft
In
00Ft
In
BATAVIA
/
/
Mainline Other
Key Route Under Data
Curr AADT Yr/Count:
Est Truck Percentage:
Number Of Lanes:
One Or Two Way:
Designated Truck Rte:
Bypass Length:
Natl. Hwy System:
Segment:
Station:
Future AADT Yr/Cnt:
Special Systems:
Linked:
Inventory Direction:
/
/
South/East North/West
Ft
In
Ft
InFt
In
Ft
In
Lateral: Ft Ft
Kind Number
Route #1:
Route #2:
Route #3:
*** Marked Route Under Data ***Designation Kind Number
% %
Substructure Material: 55
FO: NSD: N
Illinois Department of TransportationStructures Information Management System
Master Structure Report (S-107)
Date: 4/5/2012
Structure Number: 045-3097 District: 1
Page 2
Data Related to Inspection Information***Inspection Intervals ***
Routine NBIS: 24
Fracture Critical: 0
Underwater: 60
Special: N
MOS
MOS
MOS
Bridge Posting Level:
5 No Posting RequiredOne Truck At A Time:
Single Unit Vehicles:
Combination Type 3S-1:
Combination Type 3S-2:
*** Maximum Allowable Posting Limits ***
Tons
Tons
Tons
Inspection/Appraisal Information
SATISFACTORY CONDITION - MINOR DETERIORATION
Inspection Date: 03/24/2010
Deck: 6
Structural Evaluation: 6
Deck Geometry: 5
Superstructure: 6
Underclearance-Vert/Lat.: N
Substructure: 7
Channel and Protection: 8
Waterway Adequacy: 9
Culvert: N
Approach Roadway Align: 7
SATISFACTORY CONDITION - MINOR DETERIORATION
GOOD CONDITION - SOME MINOR PROBLEMS
VERY GOOD CONDITION - NO PROBLEMS NOTED
NOT APPLICABLE
SUPERIOR TO PRESENT DESIRABLE CRITERIA
EQUAL TO PRESENT MINIMUM CRITERIA
BETTER THAN ADEQUATE TO BE LEFT IN PLACE
NOT APPLICABLE
BETTER THAN PRESENT MINIMUM CRITERIA
Pier Navig Protection: N N/A
Inspection Temperature: 50 Deg. F
One Truck At A Time:
Single Unit Vehicles:
Combination Type 3S-1:
Combination Type 3S-2:
** Actual Posted Limits **
Tons
Tons
Tons
Utilities Attached: 9 ELECTRIC
N/A
N/A
N
N
Deck Wearing Surf: C
Total Deck Thick: 09.5
Last Paint Date:
Insp by (Name):
LAT MOD CON OVERLAY
F NONE
J NONE
Inspection Remarks:
DECK OVERLAY IN GOOD COND. W/WIDELY SPACED LONG/TRANS TIGHT CRKS, UNDERSIDE OF DECK HAS MODERATE AMOUNT OF DELAMS AND SPALLS. GIRDERS SAT. OVERALL W/ SOME DA MAGE BENEATH TRANSVERSE DECK JOINTS, SUB. IN GOOD CONDITION
Deck Membrane:
Deck Protection:
Underwater Inspection/Appraisal Information11/22/2010
6N.TRIANAFILOU
VSPD
2Inspection Date:
Appraisal Rating:Inspected By:
Inspection Method:
Inspection Category:
SATISFACTORY - MODERATE DETERIORATION IN UNDERWATER UNITS
Visual Sonar Probe Diver
4 ft. water
Temperature: 50
Inspection Remarks: SATISFACTORY CONDITION - TWO AREAS OF CONCRETE SECTION LOSS ON THE CORNERS OF THE SOUTH SHAFT OF PIER 2 WITH UP TO 2 INCHES OF PENETRATION.
Scour Critical Information
02/14/1992
8 B
A RAHEEMAnalysis Date:
Rating: Evaluation Method:
Analysis By:
CALCULATED SCOUR ABOVE FOOTING Rational Analysis
Waterway InformationFlood Design Frequency: 0
Flood Design Q (CFS): 0
Flood Design Nat H W E: 0
Flood Des Open Prop: 0
Drainage Area: 0
Flood Base Q (CFS): 0
Flood Base Nat H W E: 0
YRS
SF
Acre
Fracture Critical Members:
Microfilm Data Recorded:
No
No
Miscellaneous
Meets Standards
Acceptable Acceptable Acceptable
Bridge Railing Appraisal: 3
Approach Guardrail: 333
Insp by (Name): M.D. CIMA 3
Inspected By:
Last Paint Type:
1974
CH 8
201B-MFT
82+15
00000000000000
3
Construction InformationYear: Original Reconstructed
Route:
Section Nbr:
Contract Nbr:
Fed Aid Pr #:
Built By:
Sta: Sta:
COUNTY AGENCY
Proposed Improvement
Bridge Cost:
Total Project Cost:
*** Costs in Dollars ***
Roadway Cost:
Cost Estimate Year:
Type of Work:
Done By:
Length:
Remarks:
N
GENERAL PLAN AND ELEVATION
T.
39
N.Structure No.
045-3097
LOCATION SKETCH
R. 8 E., 3rd. P.M.
1 2 3 4 5 6
24’
24’
~ Bridge Deck
Concrete Slopewall
Span 2
Electrical Conduits
6 Spaces @ |9’-9’’ = |58’-6’’
Deck Drains
Electrical Box
NSOUTH ELEVATION
Top of Water
Bike Path Bike Path
Electrical Box
Not to Scale
~ Bike Path
10’-
0’’
10’-
0’’
24’-0’’
24’-0’’
175’-0’’ ~ - ~ Brgs.
Span 1
280’-0’’ ~ - ~ Brgs.
Light Fixtures
280’-0’’ ~ - ~ Brgs.
Span 3
175’-0’’ ~ - ~ Brgs.
Span 4
Span 5
~ - ~ Brgs.
130’-0’’ 130’-0’’
Span 6
~ - ~ Brgs.
130’-0’’
Span 7
~ - ~ Brgs.
390’-0’’
Unit #2
10’-
0’’
10’-
0’’
Flo
w
~ Bike Path
1,309’-4’’ Bk - Bk Abuts.
910’-0’’
Unit #1
Not to Scale
PLAN
Lighting Conduit
1’-9’’
Deck Drains
Electrical Conduits
Plate girders
12’-0’’
Lane
3’-9’’
Shldr.
12’-0’’
Lane
3’-0’’
Median
Concrete Wearing Surface
3’’ Latex Modified
12’-0’’
Lane
6�’’ Thick
Concrete Deck
3’-9’’
Shldr.
58’-6’’ Bridge Roadway
62’-0’’ o. to o. Deck
Bonded Longitudinal Joints
1’-9’’
Lighting Conduit
TYPICAL DECK SECTION(Looking East)
12’-0’’
Lane
Cantilever
E. Face Pier Cap
6’’x1’ SP, RF
Stems @ Groundline
Inside Face Pier
Minor Abrasion on
w/ Diff. Settlement
Heavy Trans. Cracks
Concrete Slopewall
Repair (SF)Spall (SF) Delam. (SF)Area (SF)
Total Damage
0.6 0.6
Deck Damage Estimates (March 2012)
65,549
Area (SF)
Total Deck% Damage
w/ Repairs
% Damage
Bottom of Deck 97 303 - 400
Sheet 1 of 4
KANE COUNTY
STRUCTURE NO. 045-3097
PROJECT NUMBER: DATE:
FABYAN PARKWAY
OVER FOX RIVER
03/26/12
LEGEND
Crack
Spalls
Delamination
= Water Leakage
= Stalactites
= Shear Stirrup
= Spall
WL
ST
SS
SP
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
DRAWN: D.A.B.12.0004
Sheet 2 of 4
N
17’-3�’’ 2 Spa. @ 17’-6’’ 2 Spa. @ 17’-6’’ 2 Spa. @ 17’-6’’
Span 1 Span 2
143’-9’’
Span 1 Span 2
109’-6’’ 31’-1�’’ 112’-6’’
length along beam x width across beam.
Damage area dimensions are shown as
Note:
RF RF
1’x3’RF
RF
RFRF
1’x2’1’x2’
2’x2’
3’x3’
2’x5’
2’x8’ Loose Bolt
Missing Bolt
RF
RF on Splice ‘
Missing nutMissing nut on
bearing pin
1
2
3
4
5
6
7
Floor Drains (Typ.)
161’-4�’’ 214’-0’’
Floor drain
Layout
Light Std.
Layout
7 Spa. @ 17’-8’’ = 123’-8’’
= 35’-0’’ = 35’-0’’
5 Spa. @ 19’-0’’ = 95’-0’’ 20’-0’’ 5 Spa. @ 19’-0’’ = 95’-0’’
= 35’-0’’
93’-9’’ 68’-9’’ 68’-9’’ 67’-6’’
79’-7�’’
65’-6’’ 47’-0’’ 37’-6’’ 51’-10�’’
12’-6’’ 12’-6’’ 12’-6’’ 12’-6’’6 Spa. @ 25’-0’’ = 150’-0’’ 9 Spa. @ 25’-0’’ = 225’-0’’ 18’-9’’ 11’-3’’
Bk. of
W. Abut.
13’-9�’’
175’-0’’ ~. - ~. Brg. 280’-0’’ ~. - ~. Brg.
~ Light Std. #1
~ Brg. W. Abut. ~ Brg. Pier 1
~ Light Std. #2
~ Brg. Pier 2
~ Brg. W. Abut. ~ Brg. Pier 1
~ Field Splice 1 ~ Field Splice 2 ~ Field Splice 3
175’-0’’ ~. - ~. Brg. 280’-0’’ ~. - ~. Brg.
~ Field Splice 4 ~ Field Splice 5
~ Brg. Pier 2
UNIT 1-A BOTTOM OF DECK SURVEY
Transverse Jt.
Regular Underside
Transverse Cracks in Bay 1 & 2
30’’x3’’ Hole in Bot. Leg of Cross Frame
1’x2’
2’x3’
1’x2’ 1’x2’
the Angle of other Brgs.
Bearing @ BM 7 Rotated Outward Approx. Twice
1’x1’
1’x2’
1’x2’2’x2’
1’x2’
1’x1’
1’x2’
1’x3’
1’x1’
1’x1’
2’x2’
1’x1’
1’x1’
2’x1’
2’x4’1’x1’
6 spaces
@ 9’-
9’’ = 58’-
6’’
16’’x1’’ Hole in Bot. Leg of Cross Frame (Active Corrosion Top Cross Brace)
1’x2’
2’x3’
1’x1’
1 Loose Bolt
1’x1’
Top of Pipe Drain Extension Broken
1 Loose Bolt
1’x2’1’x1’1’x1’ 1’x1’ RF
3’x3’1’x1’
1’x1’
1’x1’
1’x2’
1’x2’
1’x2’ 1’x2’
RF
1’x1’1’x2’
TOP OF DECK
UNDERSIDE OF DECK
1’x3’
& web on exterior girders
Pack Rust typ @ top ‘ btm. flange 2 Loose Bolts on Splice ‘
Sheet 1 of 4
KANE COUNTY
STRUCTURE NO. 045-3097
PROJECT NUMBER: DATE:
FABYAN PARKWAY
OVER FOX RIVER
03/26/12
LEGEND
Crack
Spalls
Delamination
= Water Leakage
= Stalactites
= Shear Stirrup
= Spall
WL
ST
SS
SP
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
DRAWN: D.A.B.12.0004
Sheet 3 of 4
N
length along beam x width across beam.
Damage area dimensions are shown as
Note:
17’-3�’’2 Spa. @ 17’-6’’2 Spa. @ 17’-6’’2 Spa. @ 17’-6’’
Span 4Span 3
143’-9’’ 107’-9’’
Span 4Span 3
112’-6’’ 31’-1�’’ 109’-6’’
Floor Drains (Typ.)
~ Light Std. #3 ~ Light Std. #4
143’-9�’’98’-8�’’ 214’-0’’
7 Spa. @ 17’-8’’ = 123’-8’’
= 35’-0’’= 35’-0’’
5 Spa. @ 19’-0’’ = 95’-0’’20’-0’’5 Spa. @ 19’-0’’ = 95’-0’’
= 35’-0’’
67’-6’’
51’-10�’’ 37’-6’’ 47’-0’’ 65’-6’’
18’-9’’11’-3’’ 9 Spa. @ 25’-0’’ = 225’-0’’ 12’-6’’ 12’-6’’ 12’-6’’ 12’-6’’ 6 Spa. @ 25’-0’’ = 150’-0’’
Floor drain
Layout
Light Std.
Layout
280’-0’’ ~. - ~. Brg.
~ Brg. Pier 3
68’-9’’ 68’-9’’
175’-0’’ ~. - ~. Brg.
~ Brg. Pier 4
1
2
3
4
5
6
7
280’-0’’ ~. - ~. Brg.
~ Brg. Pier 2
~ Field Splice 6 ~ Field Splice 7 ~ Field Splice 8 ~ Field Splice 9
~ Brg. Pier 3
~ Field Splice 10
175’-0’’ ~. - ~. Brg.
~ Brg. Pier 4
3 loose bolts
Corrosion from drain
6’x3’
RS
Loose
~ Brg. Pier 2
Missing Bearing Anchor Bolt
diaphram
nut on
10’ Regular Transverse
Cracks Underside
1’x2’
1’x2’
1’x1’
UNIT 1-B BOTTOM OF DECK SURVEY
1’x2’ 1’x2’
1’x1’
Webs @ Bot.
Holes in Gir.
Gir. Web @ Bot.
6’’x2’’ Hole in
1’x1’1’x1’
6’x6’’
7�’’x1’’ Hole
1�’’} Hole
6-8’’ Off Joint Rail
14’’ L
CO (0.025’’)
trans. stiffener w/ excessive corrosion on bottom flange
Local Point Failure on top of bottom flange to just past 1st
Diaphragm Members
Active Corrosion on
1’x1’
1’x2’
1’x1’1’x1’1’x1’
1’x1’1’x1’
1’x1’
1’x1’
1’x1’
1’x2’
1’x3’
1 Loose Bolt
Extension Broken
Top of Pipe Drain
1’x2’ 2’x3’
2 Missing Bolts
1’x2’
1 Loose Bolt
Lat. Bracing
Missing Bolt
1’x8’
TOP OF DECK
UNDERSIDE OF DECK
1’x1’
Sheet 1 of 4
KANE COUNTY
STRUCTURE NO. 045-3097
PROJECT NUMBER: DATE:
FABYAN PARKWAY
OVER FOX RIVER
03/26/12
LEGEND
Crack
Spalls
Delamination
= Water Leakage
= Stalactites
= Shear Stirrup
= Spall
WL
ST
SS
SP
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
DRAWN: D.A.B.12.0004
Sheet 4 of 4
N
length along beam x width across beam.
Damage area dimensions are shown as
Note:
Floor drain
Layout
Light Std.
Layout
17’-3�’’ 2 Spa. @ 19’-0’’ 2 Spa. @ 19’-0’’ 17’-3�’’
Span 5 Span 6 Span 7
196’-2’’109’-6’’
31’-10’’ 83’-7�’’
Span 5 Span 6 Span 7
Cross Frame Spacing
~ Light Std. # ~ Light Std. #8
5 Spa. @ 19’-0’’ = 95’-0’’ 19’-0’’ 19’-0’’
= 38’-0’’ = 38’-0’’
16’-0’’ 19’-0’’ 19’-0’’ 5 Spa. @ 19’-0’’ = 95’-0’’
101’-10’’ 28’-2’’ 28’-2’’ 28’-2’’ 28’-2’’73’-8’’ 101’-10’’
18 Spa. @ 21’-8’’ = 390’-0’’
36’-9�’’ 160’-2�’’
Floor Drains (Typ.)
Bk. of
E. Abut.
~ Brg. Pier 4 ~ Brg. Pier 5 ~ Brg. Pier 6
130’-0’’ ~. - ~. Brg. 130’-0’’ ~. - ~. Brg. 130’-0’’ ~. - ~. Brg.
39’-0’’99’-8’’ 91’-0’’ 47’-8’’
~ Brg. Pier 4 ~ Brg. Pier 5 ~ Brg. Pier 6 ~ Brg. E. Abut.
~ Brg. E. Abut.
130’-0’’ ~. - ~. Brg. 130’-0’’ ~. - ~. Brg. 130’-0’’ ~. - ~. Brg.
~ Field Splice 12 ~ Field Splice 14~ Field Splice 13 ~ Field Splice 11
1
2
3
4
5
6
7
Loose bolts 2’x2’
2’x3’
2’x2’
RF
RF
2’x4’
Loose bolts on
cross brace
Moderate pack rusting
UNIT 2 BOTTOM OF DECK SURVEY
RS
2’x5’
1’x2’
1’x3’ 1’x2’
RF
1’x2’
1’x1’ 1’x1’2’x4’ 2’x2’
At drain
Small spall at
1’h x 5’w
NE corner pier
1’x2’
1’x2’
1’x2’
1’x4’
1’x4’
1’x4’
1’x2’
1’x8’
2’x5’
1’x5’ 2’x2’
2’x5’
2’x5’
2’x6’
1’x1.5’ 1’x1.5’
Drain Downspout with 14’’ Crk.
2’x1’
1’x8’ 2’x2’
1’x3’ RF
2’x2’
Webs @ Bot.
10’’x2’’ Hole in Gir.
Webs @ Top
2’’} Hole in Gir.
Web @ Btm.
Pin Hole in
1’x1’
1’x4’
1’x2’
1’x2’
1’x8’
1’x2’
1’x3’
1’x4’
1’x1’
1’x2’
TOP OF DECK
UNDERSIDE OF DECK
Sheet 1 of 4
KANE COUNTY
STRUCTURE NO. 045-3097
PROJECT NUMBER: DATE:
FABYAN PARKWAY
OVER FOX RIVER
03/26/12
LEGEND
Crack
Spalls
Delamination
= Water Leakage
= Stalactites
= Shear Stirrup
= Spall
WL
ST
SS
SP
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
DRAWN: D.A.B.12.0004
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 1
Photo No. 1 Looking East Across Bridge
Photo No. 2 Looking West Across Bridge
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 2
Photo No. 3 South Elevation of Structure (Typical)
Photo No. 4 Looking North Upstream from Bridge Deck
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 3
Photo No. 5 Looking South Downstream from Bridge Deck
Photo No. 6 East Approach Roadway Surface Condition Behind East Abutment
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 4
Photo No. 7 West Approach Roadway Surface Condition Behind West Abutment
Photo No. 8 Looking North at Modular Expansion Joint at West Abutment
Typical Transverse Cracking in Concrete Block
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 5
Photo No. 9 Looking North at Modular Expansion Joint at Pier 4
Photo No. 10 Looking North at Open Crack in Concrete Header at Pier 4 Expansion Joint
Westbound Outside Lane Crack 14’ Length, 0.025” Width
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 6
Photo No. 11 Looking North at Modular Expansion Joint at East Abutment
Photo No. 12 Typical Parapet (North Side Shown)
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 7
Photo No. 13 Typical Cracking in Parapet Face
Photo No. 14 Looking Northwest at Typical Top of Deck Overlay Condition
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 8
Photo No. 15 Typical Longitudinal & Transverse Cracking in Deck Overlay
Photo No. 16 Typical Spalls & Delaminations Along Median (Shown Looking West in Span 4)
6’ – 15’ Avg. Spacing
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 9
Photo No. 17 Typical Condition of Underside of Deck (Span 2 Shown)
Photo No. 18 Typical Condition of Underside of Deck (Span 6 Shown)
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 10
Photo No. 19 Broken Drain Pipe (Span 3, South Side)
Photo No. 20 Broken Drain Pipe (Span 2, North Side)
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 11
Photo No. 21 Bottom of Pier 4 Modular Expansion Joint at North End
Photo No. 22 Looking Southeast at Typical Steel Condition (Span 2)
Active Corrosion from Water Leakage on Diaphragm
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 12
Photo No. 23 Typical Pack Rust Along Inside Face of Web at Splice Location
Photo No. 24 Hole in Span 5 South Exterior Girder Web at Pier 4
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 13
Photo No. 25 Hole in Web of 2nd Girder from North in Span 5 at Pier 4
Photo No. 26 Pin Hole in Web of North Exterior Girder in Span 5 at Pier 4
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 14
Photo No. 27 Hole in North Exterior Girder Web in Span 4 at Pier 4
Photo No. 28 Section Loss in Cross Frame in North Exterior Bay at West Abutment
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 15
Photo No. 29 Section Loss in Cross Frame in South Exterior Bay at West Abutment
Photo No. 30 Typical Fixed Bearing Condition (Pier 2 Shown))
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 16
Photo No. 31 Typical Expansion Bearing Condition (Pier 1 Shown)
Photo No. 32 Typical Abutment Cap and Backwall Condition (East Abutment Shown)
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 17
Photo No. 33 Typical Wingwall Condition (Southwest Wingwall Shown)
Photo No. 34 Spall on West Abutment Backwall at North End
Bridge Inspection Report for SN 045-3097; March 26, 2012
Attachment D - Page 18
Photo No. 35 Cracking and Differential Settlement of East Abutment Slopewall
Photo No. 36 Typical Pier Elevation (West Face of Pier 2 Shown)
KANE COUNTY DIVISION OF STRUCTURE 045-3097
TRANSPORTATION FABYAN PARKWAY / CH 8 OVER
FOX RIVER
ESTIMATE OF COST - MAINTENANCE
1309' bk.-bk. abutment; 58.5' roadway; 62' o.-o. deck
ITEM UNIT
NO. ITEMS UNIT QUANTITY PRICE TOTAL
1. Epoxy Crack Sealer Foot 200.00 20.00 4,000.00
2. Modular Expansion Joint Repairs L. Sum 1.00 10,000.00 10,000.00
3. Drain Extensions & Repairs Each 20.00 450.00 9,000.00
4. Structural Repair of Concrete (≤ 5") Sq. Ft. 100.00 125.00 12,500.00
5. Traffic Control and Protection (Staged) L. Sum 1.00 15,000.00 15,000.00
6. Mobilization L. Sum 1.00 10,000.00 10,000.00
SUBTOTAL 60,500.00
15% CONTINGENCY 9,075.00
TOTAL ESTIMATE OF COST 69,575.00
Made by: CCS Date: 4/12/2012
Checked by: SWM Date: 8/7/2012
KANE COUNTY DIVISION OF STRUCTURE 045-3097
TRANSPORTATION FABYAN PARKWAY / CH 8 OVER
FOX RIVER
ESTIMATE OF COST - DECK REPLACEMENT
1309' bk.-bk. abutment; 58.5' roadway; 62' o.-o. deck
ITEM UNIT
NO. ITEMS UNIT QUANTITY PRICE TOTAL
1. Remove Existing Deck L. Sum 1.00 350,000.00 350,000.00
2. Concrete Superstructure Cu. Yd. 2,730.00 1,000.00 2,730,000.00
3. Concrete Structures Cu. Yd. 115.00 950.00 109,250.00
4. Protective Coat Sq. Yd. 10,250.00 2.00 20,500.00
5. Reinforcement, Epoxy Coated Pound 450,000.00 1.25 562,500.00
6. Bridge Deck Grooving Sq. Yd. 7,835.00 10.00 78,350.00
7. Steel Shear Studs Each 30,000.00 3.00 90,000.00
8. Structural Steel (Repairs) Pound 10,000.00 7.00 70,000.00
9. Clean & Paint Metal Structures L. Sum 1.00 80,000.00 80,000.00
10. Drainage System L. Sum 1.00 30,000.00 30,000.00
11. Modular Expansion Joints Foot 189.00 750.00 141,750.00
12. Structural Repair of Concrete (≤ 5") Sq. Ft. 150.00 125.00 18,750.00
13. Bridge Seat Sealer Sq. Ft. 1,900.00 3.50 6,650.00
14. Steel Plate Beam Guardrail, Type A Foot 400.00 30.00 12,000.00
15. Traffic Barrier Terminal, Type 6 Each 4.00 3,000.00 12,000.00
16. Traffic Barrier Terminal, Type 1 Sp Tang Each 4.00 3,500.00 14,000.00
17. Hot Mix Asphalt Surface Course Ton 300.00 85.00 25,500.00
18. Hot Mix Asphalt Surface Removal Sq. Yd. 700.00 25.00 17,500.00
19. Pavement Removal Sq. Yd. 415.00 10.00 4,150.00
20. Lighting L. Sum 1.00 60,000.00 60,000.00
21. Name Plate Each 1.00 600.00 600.00
22. Epoxy Crack Sealer Foot 500.00 8.00 4,000.00
23. Concrete Curb and Gutter Foot 200 20.00 4,000.00
24. Guardrail Removal Foot 150 10.00 1,500.00
25. Traffic Control and Protection (Staged) L. Sum 1.00 70,000.00 70,000.00
26. Mobilization L. Sum 1.00 50,000.00 50,000.00
SUBTOTAL 4,563,000.00
10% CONTINGENCY 456,300.00
5,019,300.00
INFLATION Years 15 1.80
Inflation Rate 0.04
TOTAL ESTIMATE OF COST 9,039,475.74
Made by: CCS Date: 4/12/2012
Checked by: SWM Date: 8/07/2012