ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS PART A: PRE-CONSTRUCTION SERVICES (Design-Assist) and PART B: CONSTRUCTION SERVICES (Construction Management at Risk) Replacement of Cowboy Stadium Pressbox McNeese State University Lake Charles, Louisiana Project No. 19-627-21-01, F.19002370 & 01-107-05B-13, F.01004240(Supplement) September 13, 2021 ITEM NO. 1: EXHIBIT 7 – PROGRAM This Addendum No. 1 includes Exhibit 7 – Program (see attached).
END OF ADDENDUM
MCNEESE STATE UNIVERSITYSKYRANCH PROGRAMMING
SPACE DIAGRAMS
SEPTEMBER 3, 2021
McNeese State University New SkyRanch - Proposed Program September 3, 2021 Prepared by Gould Evans
Space Name Area Qty Total SF Remarks/Description FF&E / Finish Requirements
> Occupy current footprint, with main broadcast camera at 50-yard line.
> All spaces facing field to be able to open windows as much as possible on
gameday (except officials replay).
> Existing film deck can satisfy other camera needs, but consider additional open
camera platforms at N/S ends which can be used for track filming as well.
> In-house PA for press area (similar to existing)
Counters, chairs, elec/data/phone hookups, typ.
> Finishes in boxes: Carpet, acoustic ceiling
10 x 6 60 1 60 2 toilets, 2 sinks? Code requires 1 each. Minimum Fixture count: 100 seats/2 = 50. 50/75 = 1 WC
50/200 = 1 lavatory. 1 drinking fountain
10 x 6 60 1 60 2 toilets, 2 sinks? Code requires 1 each. Minimum Fixture count: 100 seats/2 = 50. 50/75 = 1 WC
50/200 = 1 lavatory. 1 drinking fountain
30 x 15 450 1 450 25 seats - minimize mullions for views - tiered seating. Work counters with power/data/phone at each seat
36 x 15 540 1 540 > Sound, PA, Scoreboard Operations, Video Board Operations, Marketing. 10
seats @ 24" to 26".
> Scoreboard/PA operations needs large platform in 2nd tier at press/coach level
to get them out of the brick outbuilding at the base of the scoreboard
> Verify if separate rooms are desired for each function.
> Clock operation separate from scoreboard?
15 x 12 180 1 180 8 seats Direct hard comm's line to field not needed.
15 x 10 150 1 150 4 seats 4 seats
15 x 12 180 1 180 8 seats Direct hard comm's line to field not needed.
15 x 10 150 1 150 4 seats 4 seats
15 x 10 150 1 150 4 seats 4 seats
TV Broadcast Booth 15 x 15 225 1 225 TV linkup by plugging into parked truck at base of press box (south of entry) TV linkup by plugging into parked truck at base of press box (south of
entry)
15 x 8 120 1 120
15 x 12 180 1 180 Open flex box for scouts, visiting AD, etc.
Not required but good to have.
15 x 12 180 1 180 Operable window for camera. Operable window for camera.
15 x 10 150 1 150 Dining/kitchen space for all attendees of this level (primarily serves Press Row). Counter/cabinets, full-size fridge, sink, dishwasher, icemaker
20 x 10 200 1 200 > Provide enough storage to remove all tables/chairs in Skyclub to create open
space as needed for events for events (this space can be located on any level)
> Adjacent to an elevator.
10 x 9 90 1 90 Stop at this level not used on gameday.
10 x 9 90 1 90 Does not need to be an enclosed space
12 x 9 108 1 108 Primary elevator for access to this level. Durable cleanable finishes.
12 x 10 120 1 120 Does not need to be an enclosed space
10 x 6 60 2 120 Space for elevator controls.
25 x 10 250 1 250
10 x 6 60 1 60
8 x 6 48 1 48 a. Hardline internet and regular phone line ports in each radio booth; multiple
ports in TV and press areas.
b. In-house PA for press area (as is current)
c. TVs with Suddenlink cable in all booths; multiple in press area; one if there's a
dining area
6 x 6 36 1 36 Mop sink, custodial equipment storage
10 x 20 200 2 400 Allow access to descend stairs from this level to ease load on elevators. Exterior plaform will most likely be needed to connect to stairs; platform
can also be used for additional camera locaitons.
4,297
Janitor
Stairs
Level 4 Total Interior
Elevator Control Rooms
Mechanical
Electrical
SkyClub Elevator Lobby
A/V
Storage for SkyRanch
SkyClub Elevator
Service Elevator
Service Elevator Lobby
Security
Flex Box
TV Camera Room
Kitchenette
Visiting Coach
Visiting Radio
Officials Replay
Press Row
Operations / Control Booth
Home Coach
Home Radio
Operations Level (Level 4)
Men's Restoom
Women's Restroom
Room Size
50
RR
120 SF
RR
120 SF
CURRENT PRESS BOX OUTLINE
PRESS ROW
450 SF
OPERATIONS /
CONTROL BOOTH
540 SF
HOME
COACH
180 SF
VISITING
COACH
180 SF
HOME
RADIO
150 SF
VISITING
RADIO
150 SF
REPLAY
150 SF
TV CAMERA
225 SF
TV BROADCAST
225 SF
SECURITY
120 SF
FLEX
SUITE
180 SF
170' - 0"
SKYCLUB
ELEVATOR
90 SF
SERVICE
ELEVATOR
ELEV
LOBBY
81 SF
SERVICE
ELEVATOR
LOBBY
KITCHENETTE
150 SF
AV
60 SFMECH
250 SF
ELEC
60 SF
STORAGE
200 SF
STAIR 1
JAN
60 SF
ELEV
CTRL
60 SF
ELEV
CTRL
60 SF
CORRIDOR
EXIT /
CAMERA
PLATFORM
(EXTERIOR) STAIR 2
EXIT / CAMERA
PLATFORM
(EXTERIOR)
PROPOSED LEVEL 3 OUTLINE BELOW
N
W. STADIUM DRIVE
LEVEL 4 INTERIOR SPACE: 5125 SF
Level 4 - Program A
McNeese State University SkyRanch08/27/21
50
RR
120 SF
RR
120 SF
CURRENT PRESS BOX OUTLINE
PRESS ROW
450 SF
OPERATIONS /
CONTROL BOOTH
540 SF
HOME
COACH
180 SF
VISITING
COACH
180 SF
HOME
RADIO
150 SF
VISITING
RADIO
150 SF
REPLAY
150 SF
TV CAMERA
225 SF
TV BROADCAST
225 SF
SECURITY
120 SF
FLEX
SUITE
180 SF
170' - 0"
ELEV
LOBBY
81 SF
SERVICE
ELEVATOR
LOBBY
KITCHENETTE
150 SFAV
60 SF
MECH
250 SFELEC
60 SF
STORAGE
200 SFJAN
60 SF
ELEV
CTRL
60 SF
ELEV
CTRL
60 SF
CORRIDOR EXIT / CAMERA
PLATFORM
(EXTERIOR)
EX
IT /
CA
ME
RA
PLA
TF
OR
M
(EX
TE
RIO
R)
PROPOSED LEVEL 3 OUTLINE BELOW
SKYCLUB
ELEVATOR
90 SF
STAIR 2
200 SF
STAIR 1
200 SF
SERVICE
ELEVATOR
108 SF
W. STADIUM DRIVE
N
LEVEL 4 INTERIOR SPACE: 5200 SF
Level 4 - Program B
McNeese State University SkyRanch08/27/21
McNeese State University New SkyRanch - Proposed Program September 3, 2021 Prepared by Gould Evans
Space Name Area Qty Total SF Remarks/Description FF&E / Finish Requirements
> Open views on both sides (will be used for events during the rest of the non-
football year - flexible for all types of events); view to track/baseball.
> 236 total fixed seats (24" to 26" wide each).
> Finishes: Cleanable/Mop-able floor desired in the main suite space;
carpet in smaller suites and acoustic materials in non-carpeted areas.
> PA in suite area able to switch between game PA, radio, music, TVs.
> Plug and play for outside events.
100 x 27 2,700 1 2,700 > Multipurpose, open area similar to Doland End-Zone room, access to 100
exterior seats (24" to 26"). Bar(s), distributed food stations.
> Tickets for this level will include food/beverage.
> Rentable space for campus and outside events.
> Suite holders pass through SkyClub to get to Suites and access SkyClub food &
beverage unless paying for in-suite service.
>This space should be central to the suite level; on 50-yard line.
> May extend over W. Stadium Drive as needed.
> Ability to open windows when weather permits.
> Plug-and-play PA system inside.
> Ability to have presentations on video or projection.
> Automatic shades to allow for daytime presentations; leave down when
not in use.
> Mobile carts for food service, locate and provide electrical. Carving
station.
> Built-in back bar with refrigeration, sinks, etc (beer taps not required).
Front bar to be mobile / removable.
> Tables/chairs/barstools/high-boys.
> TVs
> Drink rail along glass.
15 x 12 180 10 1,800 >10 suites; acces to 10 exterior seats per suite, 24" to 26" width seats.
>Suites are located on either side of the SkyClub. Access to Suites is by walking
through SkyClub to corridor for suites.
>Clear glass to field, solid wall at rear.
>Privacy and exclusivity are selling points.
>Food access from main sky club or purchase special service delivery to suite.
>Ability to open windows when weather permits.
>Suite at each end may be bigger since corridor will not be needed.
> Counter with base and upper cabinets and sink; lockable full-size fridge.
> Space for ice.
> Liquor locker in each suite.
> TV
> Drink rail along glass.
42 x 12 504 1 504 36 fixed exterior seats.
Suite located closest to Skyclub. Food access from main sky club or purchase
special service.
Counter/cabinets/fridge?
Ability to open windows when weather permits.
> Counter with base and upper cabinets and sink; lockable full-size fridge.
> Space for ice.
> Liquor locker.
10 x 9 90 1 90 Finishes consistent with SkyClub
10 x 10 100 1 100 > Arrive at prominent location in or near SkyClub. Direct ticket-holders into
SkyClub; discourage crowding after getting off elevator. Open to SkyClub as
much as possible.
> Fire/smoke separated lobby not required per IBC 3006.2.1, if level 4 floor is less
than 75' above grade.
Finishes consistent with SkyClub
12 x 9 108 1 108 Gameday: Credentialed service access to suite level. Back of house access. Durable cleanable finishes.
12 x 12 144 1 144 Fire/smoke separated lobby not required per IBC 3006.2.1, if level 4 floor is less
than 75' above grade.
Durable cleanable finishes.
30 x 12 360 1 360 > Food service staging area & storage.
> Adjacent to service elevator lobby.
> Food brought in on warming carts from off-site kitchen via service elevator.
> Durable cleanable finishes.
> Counter, ice machine, 2-door refrigerator, 3-comp sink, hand sink, open
space with electrical outlets for warming carts.
> 4'x4' walk-in cooler
12 x 10 120 2 240 > One at each side preferably.
> Provide more fixtures than code minimum to eliminate waiting.
> Airport-style (no doors) not required. Consider privacy of entry especially for non-
football events.
Minimum Fixture count: 236 seats/2 = 118. 118/75 = 2 WCs
118/200 = 1 lavatory. 1 drinking fountain
12 x 12 144 2 288 > One at each side preferably.
> Provide more than code minimum to eliminate waiting.
> Airport-style (no doors) not required. Consider privacy of entry especially for non-
football events.
Minimum Fixture count: 236 seats/2 = 118. 118/40 = 3 WCs
118/200 = 1 lavatory. 1 drinking fountain
Men's Restoom
Women's Restroom
Service Elevator
Service Elevator Lobby
Food Service Staging
Suites*
President's Suite*
SkyClub Elevator
SkyClub Elevator Lobby
Suite Level (Level 3)
SkyClub*
Room Size
10 x 8 80 1 80 Mop sink, custodial equipment storage
10 x 9 90 1 90
10 x 6 60 1 60
8 x 6 48 1 48
20 x 10 200 2 400 Allow ticket-holders to descend stairs after game to ease load on elevators. Can be open-air.
Limited in location by 20'-0" maximum dead end corridor code
requirement.
*Suite area tabulation does not include exterior seating
7,012
100 x 6 600 1 600 > 2 rows of seats at 24" to 26" width each, fixed seats with backs and arms.
> Alternate: 3 rows of seats (75' x 9')
> Skyclub: 100 fixed seats
> Could extend out from current footprint toward field or be in current footprint of
interior tiered seating; exterior seating should be covered from sun and wind.
> Speakers above seating. Review acoustics w/ existing stadium PA at
scoreboard.
> Fans above seating for airflow / comfort.
> No exterior TVs.
15 x 6 90 10 900 Suites: 10 fixed seats each. 2 rows of seats at 24" to 26" width each, fixed seats
with backs and arms.
Same notes as SkyClub
42 x 6 252 1 252 President's Suite: 36 seats. 2 rows of seats at 24" to 26" width each, fixed seats
with backs and arms.
Same notes as SkyClub
Exterior Seating - Skyclub
Exterior Seating - Suites
Exterior Seating - President's Suite
A/V
Stairs
Level 3 Total Interior
Level 3 Exterior Space
Janitor
Mechanical
Electrical
50
SKYCLUB
ELEVATOR
90 SF
STAIR 2
200 SF
STAIR 1
200 SF
SERVICE
ELEVATOR
108 SF
SKYCLUB
2700 SF
SKYCLUB SEATING
100 SEATS / 600 SF
PRESIDENT'S SUITE
504 SF
PRESIDENT'S SUITE SEATING
36 SEATS / 252 SF
CORRIDOR
SUITE SEATING
40 SEATS / 360 SF
SUITE SEATING
60 SEATS / 540 SF
CORRIDOR
FOOD SERVICE
STAGING
390 SF
RR
120 SF
RR
120 SF
RR
120 SF
RR
120 SF
JAN / STOR
180 SF
AV
60 SF
MECH
90 SF
ELEC
60 SF
ELEV
LOBBY
90 SF
SERVICE
ELEVATOR
LOBBY
120 SF
SUITE
180 SF
SUITE
180 SF
SUITE
180 SF
SUITE
260 SF
SUITE
235 SF
SUITE
180 SF
SUITE
180 SF
SUITE
180 SF
SUITE
180 SF
SUITE
180 SF
292' - 0"
CURRENT PRESS BOX OUTLINE
W. STADIUM DRIVE
LEVEL 4 INTERIOR SPACE: 8200 SF
N
Level 3 - Program A
McNeese State University SkyRanch08/27/21
50
CURRENT PRESS BOX OUTLINE
SKYCLUB
ELEVATOR
90 SF
STAIR 2
200 SF
STAIR 1
200 SF
SERVICE
ELEVATOR
108 SF
SKYCLUB
2700 SF
SKYCLUB SEATING
100 SEATS / 600 SF
PRESIDENT'S SUITE
504 SF
PRESIDENT'S SUITE SEATING
36 SEATS / 252 SF
CORRIDOR
SUITE SEATING
40 SEATS / 360 SF
SUITE SEATING
60 SEATS / 540 SF
CORRIDOR
FOOD SERVICE
STAGING
390 SF
RR
120 SF
RR
120 SF
RR
120 SF
RR
120 SF
JAN / STOR
180 SF
AV
60 SF
MECH
90 SF
ELEC
60 SF
ELEV
LOBBY
90 SF
SERVICE
ELEVATOR
LOBBY
120 SF
SUITE
180 SF
SUITE
180 SF
SUITE
180 SF
SUITE
260 SF
SUITE
235 SF
SUITE
180 SF
SUITE
180 SF
SUITE
180 SF
SUITE
180 SF
SUITE
180 SF
267' - 0"
W. STADIUM DRIVE
LEVEL 4 INTERIOR SPACE: 8130 SF
N
Level 3 - Program B
McNeese State University SkyRanch08/27/21
McNeese State University New SkyRanch - Proposed Program September 3, 2021 Prepared by Gould Evans
Space Name Area Qty Total SF Remarks/Description FF&E / Finish Requirements
10 x 10 100 1 100 Access to this level, but no planned gameday access to this level.
10 x 20 200 1 200 Used for ticket-holder access to upper seating bowl.
10 x 20 200 2 400 Access to stairs at this level not required. Egress via stadium bowl as is done
currently.
Can be open-air.
700
- 800 > Maintain use as film deck: Coaches Film, TV, In-House Replay, Officials Replay.
> Enhance experience of ticket-holders using elevator for access to upper seating
bowl.
> Study feasibility of expanding deck north and south for stadium bowl amenity or
rentable space.
> Consider platform along face of suite space similar to U. of GA.
Replace existing drink rails.
Chairs.
12 x 10 120 2 240 Exterior landings for both elevators. Protect elevator from weather.Elevator Landings
Stairs
Level 2 Total Interior
Level 2 Exterior Space
Existing Exterior Film Deck
Existing Film Deck (Level 2)
Sky Club Elevator
Service Elevator
Room Size
50
CURRENT PRESS BOX OUTLINE ABOVE
SKYCLUB
ELEVATOR
SERVICE
ELEVATOR
ACCESS
BRIDGE
215 SF
ACCESS BRIDGE
215 SF
STAIR 1
(NOT USED THIS LEVEL)
STAIR 2
(NOT USED THIS LEVEL)
FILM DECK / UPPER BOWL ACCESS
800 SF
PROPOSED LEVEL 3 OUTLINE ABOVE
N
W. STADIUM DRIVE
Level 2 - Program A
McNeese State University SkyRanch08/27/21
50
CURRENT PRESS BOX OUTLINE ABOVE
ACCESS
BRIDGE
215 SF
AC
CE
SS B
RID
GE
14
5 S
F
FILM DECK / UPPER BOWL ACCESS
800 SF
PROPOSED LEVEL 3 OUTLINE ABOVE
SKYCLUB
ELEVATOR
90 SF
STAIR 2
(NOT USED THIS LEVEL)
STAIR 1
(NOT USED THIS LEVEL)
SERVICE
ELEVATOR
108 SF
N
W. STADIUM DRIVE
Level 2 - Program B
McNeese State University SkyRanch08/27/21
McNeese State University New SkyRanch - Proposed Program September 3, 2021 Prepared by Gould Evans
Space Name Area Qty Total SF Remarks/Description FF&E / Finish Requirements
20 x 20 400 1 400 > Allow only those with tickets to Skyranch to access elevator.
> Space for Skyranch ticket holders to wait for elevator.
> Provide built-in display cases to house existing memorabilia in
Skyranch lobby?
> Large scale graphics to welcome suite ticket-holders.
15 x 15 225 2 450 > Larger on Level 1 than other levels.
> Ticketed access for upper concrete bowl ticket holders.
10 x 10 100 1 100 > Near service elevator lobby.
> Able to service ground level main seating bowl concourse to replenish beverage
concessions.
Walk-in refrigerator unit w/ wire shelving
10 x 9 90 1 90 > Suite access only on gameday, but provide ability to stop at all four levels.
> 2-hour rated separation from other interior spaces per NFPA 101 8.6.5.
Finishes consistent with SkyClub
12 x 9 108 1 108 > Gameday: Upper concrete bowl ticket-holder access via film deck, credentialed
service access to suite level, credentialed access to press / coaches level. Stops
at all four levels.
> 2-hour rated separation from other interior spaces per NFPA 101 8.6.5.
Durbale cleanable finishes.
10 x 20 200 2 400 > Similar each Level 1-4.
> Run stairs all the way down; allow ticket-holders to descend stairs after game to
ease load on elevators.
> Keyed access from ground level.
Can be open-air.
10 x 9 90 2 180 Verify requirements with Fire Department Fire Alarm Control Panel
Spinkler Riser
Does not need a "Fire Command Center" if building is not considered High-
Rise. (High-rise only if top floor is more than 75' above the street)
12 x 9 108 1 108 Replace existing data hub
1,836
25 x 18 450 1 450 > Welcoming entrance at ground level.
> Provide access through base of Skyranch to ground level concourse and
restrooms, between existing restrooms?
> Allow only those with Skyranch tickets to Skyranch to access elevator.
Large scale graphics to welcome ticket-holders.
24 x 56 3,280 1 3,280 Existing mechanical yard serving both the existing Skyranch and Doland
Fieldhouse and other parts of campus.
Maintain as much of existing as feasible.
Need to temporarily relocate services while under construction.
Equipment serving new Skyranch can be located here or in upper levels if cost
efficient.
Screen mechanical yard visually from pedstrians.
Replace existing fencing and gates as needed for new construction.
Graphics on screen material over fence.
x 1 - > Ticketing at north end of street once past main ramp to stadium. Create
precinct of ticketed area at base of press box with gate at north end of driveway;
driveway becomes pedestrian-only during football season, except as needed for
emergency and service vehicles.
> Enhance Pre-game environment.
> Open to all ticket holders; Skyranch / film deck ticket holders are
verified at respective elevator lobby?
> Space for TV broadcast and delivery trucks at south end of Skyranch.
Room Size
West Stadium Drive
Data Room
Stairs
Mechanical Yard
Main Lobby
Ground Level (Level 1)
Service Elevator
Fire Protection Room
SkyClub Elevator Lobby
Walk-in Refrigerator
Service Elevator Lobby
SkyClub Elevator
Level 1 Total Interior
Ground Level Exterior Space
50
CURRENT PRESS BOX OUTLINE ABOVE
EXISTING MECHANICAL YARD
STADIUM
BOWL ACCESS
SKYCLUB
ELEVATOR
LOBBY
400 SF
SERVICE
ELEVATOR
LOBBY
225 SF
WALK-IN
FRIDGE
100 SF
EDGE OF CONCRETE BOWL ABOVE
FIRE
PROTEC-
TION
90 SF
DATA
108 SF
SKYCLUB
ELEVATOR
90 SF
SERVICE
ELEVATOR
108 SFSTAIR 1STAIR 2
PROPOSED LEVEL 3 OUTLINE ABOVE
WEST STADIUM DRIVE
N
LEVEL 4 INTERIOR SPACE: 1120 SF
BACK OF HOUSE / SUPPORT SPACES
SUITE AND OPS SPACES
EXTERIOR SPACES
EXISTING
CHILLER EXISTING
PUMPS
EXISTING PUMPS
EXISTING FIRE
PROTECTION
EXISTING
CHILLER
EXISTING
TRANSFORMER
PAD
EXISTING FOOTINGS
EXISTING PRESS BOX
COLUMN BASES
EX
IST
. G
EN
ER
AT
OR
Level 1 - Program - A
McNeese State University SkyRanch08/26/21
50
CURRENT PRESS BOX OUTLINE ABOVE
EXISTING MECHANICAL YARD
STADIUM
BOWL ACCESS
SKYCLUB ELEVATOR LOBBY
400 SF
EDGE OF CONCRETE BOWL ABOVE
DATA
108 SF
PROPOSED LEVEL 3 OUTLINE ABOVE
SKYCLUB
ELEVATOR
90 SF
STAIR 2
200 SF
STAIR 1
200 SF
WEST STADIUM DRIVE
N
LEVEL 4 INTERIOR SPACE: 1120 SF
SERVICE
ELEVATOR
LOBBY
225 SF
WALK-IN
FRIDGE
100 SF
FIRE
PROTEC-
TION
90 SF
SERVICE
ELEVATOR
108 SF
BACK OF HOUSE / SUPPORT SPACES
SUITE AND OPS SPACES
EXTERIOR SPACES
EXISTING
CHILLER EXISTING
PUMPS
EXISTING PUMPS
EXISTING FIRE
PROTECTION
EXISTING
CHILLER
EXISTING
TRANSFORMER
PAD
EXISTING FOOTINGS
EXISTING PRESS BOX
COLUMN BASES
EX
IST
. G
EN
ER
AT
OR
Level 1 - Program - B
McNeese State University SkyRanchSept 3, 2021
McNeese State University New SkyRanch - Proposed Program September 3, 2021 Prepared by Gould Evans
Space Name Total SF Remarks/Description FF&E / Finish Requirements
11,309 NET AREA TOTAL
10% 1,131 Gross Factor (circulation, mechanical/electrical/plumbing, chases)
GROSS INTERIOR SPACE TOTAL
> Illuminated signage on west/east sides of Skyranch.
> Naming rights and logo graphics on west façade.
> LED color-changing lights on west façade.
> Naming opportunity signage facing stadium for press box and film deck.
> No access needed other than maintenance.
> Should be cohesive with Doland FieldHouse Roof
> Will need to meet ESPN requirements.
> Install by Fall 2022 season ($250,000 ticket revenue swing between day and
night games).
> Freestanding poles where possible; attach to Skyranch structure if necessary
but integrate in design if so.
12,440
Exterior Signage
Stadium Lighting
Roof
Other