APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 1 of 49
REQUEST FOR PROPOSALS
(RFP)
For
Request for proposal for Manpower
on
BI & Analytics activities GoAP Departments
ITE&C department
Chief Minister’s Office
Government of Andhra Pradesh
Hyderabad
May 2016
Prepared by
A.P Technology Services Ltd.,
4th
floor, B-Block, BRKR Bhavan, Tankbund Road
Hyderabad – 500 063.
Proprietary & Confidential
No part of this document can be reproduced in any form or by any means, disclosed or
distributed to any person without the prior consent of APTS except to the extent required
for submitting bid and no more.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 2 of 49
Table of Contents
1. Invitation for Competitive Bidding ................................................................................................ 4 2. Pre Qualification Criteria ............................................................................................................... 5 3. Scope of Work ................................................................................................................................ 6
3.1.5. Key Characteristics of Proposed BI based Solution ............................................................. 7 3.1.6. BI Analytics Dashboard Design ............................................. Error! Bookmark not defined. 3.1.7. Strategic planning features: .................................................................................................. 8 3.1.8. Technical details (Environment) ............................................ Error! Bookmark not defined. 3.1.9. Deployment Model ................................................................. Error! Bookmark not defined. 3.1.11 Web Services Security .......................................................... Error! Bookmark not defined. 3.1.12 Authorization ......................................................................... Error! Bookmark not defined. 3.1.13 Data Integrity and Data Confidentiality .............................................................................. 8 3.1.14 Integrity of Transactions and Communications ................... Error! Bookmark not defined. 3.1.15 Non-Repudiation ................................................................... Error! Bookmark not defined. 3.1.16 Audit Trails ........................................................................... Error! Bookmark not defined. 3.1.17 Application Controls ............................................................. Error! Bookmark not defined. 3.1.18 Data Integrity & Database Controls: ..................................... Error! Bookmark not defined. 3.2.1 Role of respective Department ............................................................................................. 8
4. Statement of important limits/ values related to bid ..................................................................... 10 5. Instructions to Bidders.................................................................................................................. 13
5.1.1 Introduction ...................................................................................................................... 13 5.1.2 General Eligibility ............................................................................................................ 13 5.1.3 Cost of Bidding .................................................................................................................. 13 5.1.4 Site visit ............................................................................................................................. 13 5.1.5. Clarification on bidding document ..................................................................................... 13 5.1.6. Address for clarification ..................................................................................................... 14 5.1.7. Amendment of bidding document ...................................................................................... 14
6. Bidding procedure ........................................................................................................................ 14 6.6.1. Language of Bids ............................................................................................................... 15 6.6.2 Documents Comprising the Bid ......................................................................................... 15 6.6.3 Bid Prices ............................................................................................................................ 16 6.6.4 Preliminary Project Plan...................................................................................................... 16 6.6.5 Bid Security ......................................................................................................................... 16 6.6.6 Bid Validity ......................................................................................................................... 16 6.6.7 Bid Submission, Format and Signing .................................................................................. 16 6.7.Submission of Bids ................................................................................................................ 17 Opening of Bids ........................................................................................................................... 18
7. General Conditions of Contract (GCC) ........................................................................................ 23 7.1.1. Definitions .......................................................................................................................... 23 7.1.2. Confidentiality .................................................................................................................... 25 7.1.3. Intellectual property rights ................................................................................................. 25 7.1.4. Use of documents and Information .................................................................................... 25 7.1.5. Indemnification .................................................................................................................. 25 7.2.1. Bid Security (EMD) ........................................................................................................... 26 7.2.2. Implementation cum Performance Security ....................................................................... 26 7.2.3. Payment .............................................................................................................................. 26 7.2.4. Prices .................................................................................................................................. 27 7.2.5. Taxes and Duties ................................................................................................................ 27 7.2.6. Delay in the SSP Performance ........................................................................................... 27 7.2.7. Liquidated Damages ........................................................................................................... 27 7.2.8. Application of LD .............................................................................................................. 27 7.2.9. Termination for Default...................................................................................................... 28
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 3 of 49
7.2.10. Termination for Insolvency .......................................................................................... 28 7.2.11. Force Majeure............................................................................................................... 28 7.2.12. Resolution of disputes .................................................................................................. 28 7.2.13. Governing Language .................................................................................................... 29 7.2.14. Applicable law .............................................................................................................. 29 7.2.15. No interest for performance Guarantee ........................................................................ 29 7.2.16. Notices .......................................................................................................................... 29 7.3.1. Inspections and Acceptance Test ....................................................................................... 29 7.3.2. Acceptance test method and final acceptance of the solution ............................................ 29 7.3.3. SSP’s Obligations ............................................................................................................... 30
8. Special Conditions of the Contract (SCC).................................................................................... 31 9.1.1. Contract Agreement ........................................................................................................... 31 9.1.2. Key Personnel for Client .................................................................................................... 31 9.1.3. Key Personnel for SSP ....................................................................................................... 31 9.1.4. Project development site .................................................................................................... 31 9.1.5. Change management & maintenance ................................................................................. 31 9.1.6. Project Reports ................................................................................................................... 32 9.1.7. Inspection and Acceptance: ................................................................................................ 32 9.1.8. Payments ............................................................................................................................ 32 9.1.9. Contract Price & Payments ................................................................................................ 32 9.1.10. Penalty for development, delivery & installation ......................................................... 32 9.1.11. Penalty for Operational & change management ........................................................... 32 9.1.12. Payment Authority ....................................................................................................... 33 9.1.13. Insurance to men, machine and material ...................................................................... 33 9.1.14. Subcontract ................................................................................................................... 33 9.1.15. Infrastructure arrangement by SSP ............................................................................... 33
9. Table of Sample Forms and Procedures ....................................................................................... 34 10. Annexure – A ............................................................................................................................... 38
Bid Table of Contents and Checklists ........................................................................................... 38 11. Annexure – B ............................................................................................................................... 39
Bid Security (EMD) Form .............................................................................................................. 39 12. Annexure –C -Stage – I Bidding (Pre Qualification) formats ...................................................... 40
Form – P#1 General Information of the SSP .............................................................................. 40 Form – P#2 - BI Software Development experience ................................................................... 41 Form – P#3 - Overall Turnover of the Firm ................................................................................ 41
13. Stage–II Bidding (Technical Solution offered by the Bidder) ..................................................... 42 Form – T#1 Past Experiences of Organization in BI based Dashboard Creation & Maintenance
Error! Bookmark not defined. Form – T#2 - Understanding of the project & Solution ................ Error! Bookmark not defined. Form – T#3 BI & Analytics Engine for Data analysis & report generation .. Error! Bookmark not defined. Form – T#4 - Innovation Proposed ................................................ Error! Bookmark not defined. Form – T#5: Project Management Framework and Work Plan ....... Error! Bookmark not defined. II. Work Schedule ....................................................................... Error! Bookmark not defined. Form – T#6: Data Management & Migration Plan, Knowledge Transfer PlanError! Bookmark not defined. Form – T#7 - Details of key staff committed for the assignment ............................................... 43 Form T#8 - Curriculum Vitae (CV) Of Key Staff Proposed ........................................................ 44
14. Stage – III Bidding (Commercial) formats ................................................................................... 45 Form C#1 - Commercial Proposal Submission Form ................................................................. 46 Form-C#2 - Commercial Form ...................................................................................................... 47
15. End of the bid document .............................................................................................................. 48
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 4 of 49
1. Invitation for Competitive Bidding
1.1 APTS invites Request for proposal for Manpower on BI & Analytics activities GoAP
Departments
1.2 Time schedule of various tender related events:
RFP Ref. No APTS/CS/BI-MAN-POWER/RFP/2016
Bid calling date 16.06.2016
Bid Closing date and time 25.06.2016 at 3.00 PM at APTS
Bid Opening date/time 25.06.2016 at 3.30 PM at APTS
Bid Document Fee Rs. 5,000/-
APTS Contact person [email protected]
ITE&C dept representative Mr Vinay, PMU – scope of the work
1.3 For further details regarding detailed Tender Notification please visit our web site
www.apts.gov.in
1.4 Those bidders, who are interested to participate in the tender, shall purchase the tender
document by paying the Bid document fee in favour of Managing Director, APTS.
Managing Director
A.P Technology Services Ltd.,
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 5 of 49
2. Pre Qualification Criteria
Solution providers desirous of bidding for the project shall meet the following pre-qualification
criteria.
2.1 Legal Entity: all the Company shall be registered under Companies Act, 1956 and should
have been in the business at least for three years as on bid calling date.
2.2 The bidder should be in the business of software development for enterprises at least for
three years as on bid calling date.
2.3 The average turnover of the firm must exceed Rs. 1000.00 Lakhs in the financial years of
2013-14, 2014-15 and 2015-2016 in India. The bidder should submit certificates from a
Charted Accountant for all the above stated financial year or extracts of the balance sheet to
support the claim.
2.4 The number of man power available in the company is should be more than 200 technical
professionals as on 31.3.2016. Bidder shall submit a self-certification to support the claim.
2.5 The bidder shall not have been black listed by any State Government, Central Government
or any other Public Sector undertaking or a Corporation or any other Autonomous
Organization of Central or State Government. Self-Certificate declaring that the bidder is not
black listed by any Central/ State Govt. Department to be enclosed.
Note:
1. Relevant documents in support of the above Pre-Qualification Criteria should be furnished
in the Pre-Qualification bid.
2. If Local office is not available in Vijayawada, the bidder will create a point of contact to be based in
Vijayawada, within 15 days of award notification 3. Proposals of bidders who do not conform to above pre-qualification criteria will be treated
as non–responsive at the pre-qualification stage and shall be summarily rejected.
4. Tenders will be accepted only from those who have obtained bid document from APTS and
a support receipt of purchase of document should be enclosed in the envelope.
5. All bid based correspondence should be with APTS contact person in writing only.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 6 of 49
3. Scope of Work
3.1 Scope of the Project
3.1.1. Introduction
CORE (CM Office Real-time Executive) Dashboard is an integrated dashboard an
initiative of Information Technology, Electronics & Communication Department,
Government of Andhra Pradesh in the year 2014, is a visual display of category-wise
key performance indicators of various departments Schemes/ Programs in near real time,
consolidated and arranged in a single frame so that the individual department’s
performance can be monitored effectively by Hon’ble Chief Minister at a glance.
Currently 33 State Government Departments are integrated in the CORE Dashboard
contributing 150 data sets of various key statistics of concerned departments are
published in the CORE Dashboard. The departments’ share the data from their
transactional systems through a variety of modes (eg: Web Service, Web links, Interface,
Spreadsheets, etc.) on real time, a daily / weekly / monthly basis (depending on the type
of service / data) as per the agreed frequency with the CORE Dashboard which are
displayed as reports for the respective scheme / department.
3.1.2. Objective
3.1.3 The overall scope consisting of the following activities:
1. To provide manpower to work in identified departments and also at CMO, Vijayawada
on behalf of ITE&C department.
1.1. Program Manager - 1
1.2. Data Visualization Engineer - 2 1.3. Business/ Data Analyst - 30 1.4. Data scientist - 15 1.5. Web designer cum portal development - 1
2. The team shall understand the data being collected in CORE application from the
existing service provider.
3. Collating, joining data Across multiple departments and draw inferences that can lead to
actionable activities of various departments
4. Assist the head of the department on the Business Process re-engineering, Data Collection, Data
Validation, Data Visualization, Data Analysis & Interpretation 5. Operations & Maintenance of the application for periods specified in the RFP
6. Host generated reports in a portal accessible to important stakeholder. Modify the BI
application / reports as per the day to day need.
7. To interact with all stake holders to analyze data flowing into current CORE dashboard
and submit a detailed work plan
8. Collate, join, compile, prepare / generate models for prescriptive and predictive reports
based on the BI models generate suggestive reports / recommendations
9. Collate, join and analyse important departments data from the department dashboard
views
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 7 of 49
10. Integrating Querying & Geo-clustering capability Acceptance of the System. Generate
reports are required Acceptance by CMO, certified by ITE&C dept
3.1.4 Deployment of Manpower
1. Program Manager (PM) shall be placed at CM Office, Vijayawada and coordinate with entire
team. PM is single point of contact between the CMO & the deployed team.
2. Every department will be allotted with 1 Business/ Data Analyst who will work for the
department.
3. Data Scientist will be deployed to each sector (like Welfare, Education, Health, etc) who will
work on the departmental data.
4. Data Visualization Engineer shall be placed at CM Office, Vijayawada
5. Web designer cum portal development shall be placed at CM Office, Vijayawada
3.1.4.1 Current Status of CORE Project:
URL: www.core.ap.gov.in
The CORE dashboard project was aimed at development of a comprehensive web based
interactive dashboard. It is to roll out key performance indicators of all 33 departments
Schemes/ Programs of Government of Andhra Pradesh requirements in the form of Statistics &
Reports and tabulation and Analytics platform which will help them to take policy decisions and
make government works to be more effective. The system was built for the visualization for the
users of departments / organizations as well as the Government of Andhra Pradesh.
3.1.5. Key Activities of the Resources
The proposed resources shall perform the following activities
Complete the activities assigned by CMO in coordination with the Program Manager
Assist the CORE Dashboard team for enabling data driven decision making through a
existing common dashboards / services that provide holistic understanding district and
department functionality
Assisting the departments in the processing re-engineering of departmental activities.
Should guide the CORE Dashboard team in identifying & displaying the department’s
key performance indicators that can be monitored at least as a measure, its value, its
target, visual indication of the status, relevant scales and ratios, progress over time and
geographic mapping where applicable.
Aggregation of data & data elements from numerous internal and approved external
sources to provide contextualized understanding of key issues
3.1.5.1. Connecting to Data
Identify the data source for the respective department.
Connecting to multiple data sources such as MSSQL, MYSQL, Any Web Services, Web
Links and Excel spreadsheets, etc
Functional ability to connect various source level data (beneficiary, mandal, sensor, PHC,
etc) across multiple databases and transaction types
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 8 of 49
Connecting with other (approved) (public) data sets such as map libraries, census and socio-
economic data to augment and contextualize data
Triangulation of data from multiple sources for data validation, verification and enrichment
Tool to enable user defined/managed data such as definition of KPIs, goals/targets, privacy
settings, alerts, permissions
3.1.7. Strategic planning features:
Visualization for monitoring the various KPIs across the departments with presentation
of variations.
visualization techniques and framework to empower users/ decision makers to appreciate
the reports quickly and take educated decisions
Support decision making for allocation or re-allocation of resource to achieve the goals
A GIS / map based view to compare between districts / mandals for various indicators
Provision to create Custom queries to represent the data on a state /district / Mandal map
Provision to have a Timeline view to see progress after every month / year
Addition of public data from external data sources to add context to data displayed on
CORE dashboard and aid planning decisions
3.1.13 Data Integrity and Data Confidentiality
Data integrity techniques shall be deployed to ensure that information has not been
altered, or modified during transmission without detection. Data confidentiality
features to be applied to ensures that the data is only accessible by the intended
parties.
3.2 Roles and Responsibilities
3.2.1 Role of respective Department 1. Certify the monthly attendance
2. Exact the work from the resource as defined
3. Provide necessary access to the departmental database for analysis
4. Responsible to create web services to share data, as proposed by the technical resource
5. Share information around key KPIs and decision points at multiple levels
3.2.2 Roles and Responsibilities of ITE&C Department
1. Appoint a dedicated project Coordinator / Manager of the rank JD to coordinate the team
2. Ensure that the required work is extracted from the team
3. Create the required IT infrastructure & connectivity to the technical resources for discharge
the day to day activities
4. Approval of budget and releasing the funds
5. Facilitate existing service provider to share documentation of web services, database access
and other requirements that are required by technical resources to carry out the assignment
6. Releasing the funds as per the recommendations of the contracting authority
7. Mobilization of the team and take up the work
8. Submission of the monthly reports to APTS for releasing of payments as per milestones
9. Assistance for Data migration for the data (if need) of departments
3.2.3 Roles and Responsibilities of APTS
1. RFP issuance, bid management and contract management
2. Receiving and evaluation of the bids
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 9 of 49
3. Finalization of the service provider
4. Sign the contract, contract management on behalf of ITE&C dept. bidder
5. Releasing the Payment to bidder as per recommendations of ITE&C dept.
6. Entering into a contract with the department
3.2.4 Roles and Responsibilities of Bidder
a. Understanding the Scope of Work & requirements of the Dept, through the Scope
documents shared by the APTS/ITE&C dept.
b. Submission of valid bids along with supporting documents as per RFP.
c. Submission of PBG, on receipt of the Award notification.
d. Submit valid contact address, contact person, phone/ mobile number, e-mail ID etc.
to the APTS & Department for easy communication.
e. Entering into Contract Agreement with the APTS
f. Deploy the teams as per the contract
g. Interacting with the concerned department officials for collecting the data / data
models for preparation predictive & prescriptive reports as per the scope,
deliverables and milestones etc.,
h. Submission of deliverables.
i. Attend the reviews of the ITE&C Dept
j. submit invoices
k. handover to ITE&C dept on completion of the contract
3.3 Project Timelines & Payment Terms
The following are the key time lines for the technical resources:
1. Deployment of Manpower, - Within 3 days from the date of contract signing (T0).
2. Kickoff meeting at CM Office - 4 days from the date of signing of contract (T0).
3. Allotment to different departments - 4 days from the date of signing of contract (T0).
4. Reporting to the allotted department - 5 days from the date of signing of contract (T0).
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 10 of 49
4. Statement of important limits/ values related to bid
Sl. No Item Description
1. EMD
Rs.1,00,000/- (Rupees one Lakhs only)
Note: DD should be enclosed along with PQ Bid. The
EMD shall be in favour of “Managing Director, APTS” and
shall be submitted in physically in a cover before the
scheduled time of opening of the bids online.
2. Bid Validity
Period 90 days from date of opening of bid
3. EMD validity
Period 90 days beyond bid validity period
4. Contract Period 12 months from the date of signing of contract.
5. Acceptance
criteria As defined by the RFP.
6.
Period for
furnishing
Performance
Security
Within 5 days from the date of receipt of Notification of
Award (LoI)
7. Performance
Security Value
10% of the Project Value (L1 quote incl. of all taxes)
The EMD of successful bidder will be returned back on
Submission of PBG.
8.
Performance
security validity
period
90 days beyond contract period
9. Payment terms Monthly invoice certified by ITE&C Department
10. Penalty As per Tender Document
11. Delivery &
Commissioning As per Tender Document
12 Period for signing
contract
Within 10 days from date of receipt of Notification of
Award (LoI)
13 Eligibility Criteria As per RFP
1
4
Bid submission Separate Sealed covers of Technical along with EMD
& Commercial Bids should be placed in the main
sealed envelope super-scribed
” and should be addressed to Managing Director, AP
Technology Services Ltd, 4th Floor, B-Block, BRKR
Bhavan, Hyderabad – 500 063.
Service Level Agreement (SLA) The successful bidder has to comply with all Service Level Agreements (SLAs) defined below to
ensure adherence to project timelines, quality and availability of services. Non compliance with
the SLA attracts penalty.
Note: Penalties shall not be levied on the successful bidder in the event of force majeure affecting the
SLA which is beyond the control of the successful bidder
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 11 of 49
The following is the table providing the indicative SLA for the project:
S.
No Measurement Target Penalty
1.
Change of consultant:
The package consultant shall not
change the consultants during
the contract period.
If any change is proposed shall
be taken up with prior approval
of APTS / ITE&C Dept. with
equal skills and experience
No resource
changes are
acceptable
For every change of resource without prior
approval will be levied with a penalty of Rs.
10,000/-.
If the resource replaced is not equal to the
original resource a penalty of 1% of the
resource of cost per week will be levied until
an approved and equivalent resource is placed.
2.
Change of Consultant as per the
department request.
In the event the CMO/
respective department/ ITE&C/
APTS finds that the technical
resource is not up to the mark.
Then APTS will request for
replacement through a notice.
Un
productive
technical
resource
Within 7 days from the date of notice the
bidder shall replace the resource with equal to
the original resource.
No payment will be released for the resource
from the period the date of resource is
replayed with a new resource
For delay in replacement will attract the
penalty as stated above
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 12 of 49
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 13 of 49
5. Instructions to Bidders
General
5.1.1 Introduction
Name of the Client A.: ITE&C department on behalf of Chief
Minister Office, Government of Andhra
Pradesh. Hyderabad.
Name of the Consultant
for the Client : Andhra Pradesh Technology Services
Ltd, B- Block, 4th
floor, BRKR Bhavan,
Tank bund Road, Hyderabad.
Description of the System
for which bids are invited : Development, Implementation,
Management of Application Software(s)
with Bug fixing, Enhancement,
Modification, Change Management,
Documentation and Provision of other
Services
5.1.2 General Eligibility
5.1.2.1 This invitation for bids is open to all Indian firms who fulfil prequalification
criteria.
5.1.2.2 Bidders marked / considered by APTS to be ineligible to participate for non-
satisfactory past performance, corrupt, fraudulent or any other unethical business
practices shall not be eligible.
5.1.2.3 Breach of general or specific instructions for bidding, general and special conditions
of contract with APTS or any of its user organizations may make a firm ineligible to
participate in bidding process
5.1.3 Cost of Bidding
The bidder shall bear all the cost associated with the preparation and submission of bid
including prototype presentation. The client/consultant will in no case be responsible or
liable for those costs.
5.1.4 Site visit
The bidder shall bear all the cost associated with the preparation and submission of
bid including prototype presentation. The client/consultant will in no case be
responsible or liable for those costs.
5.1.5. Clarification on bidding document
5.1.5.1 A prospective vendor requiring any clarification of the bidding documents may
notify APTS contact person. Written copies of the APTS response (including an
explanation of the query but without identifying the source of inquiry) will be sent to
all prospective bidders that have received the bidding documents
5.1.5.2 The concerned contact person will respond to any request for clarification of bidding
documents, which it receives no later than bid clarification date mentioned in the
notice prior to deadline for submission of bids prescribed in the tender notice. No
clarification from any bidder shall be entertained after the close of date and time for
seeking clarification mentioned in tender call notice. It is further clarified that APTS
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 14 of 49
shall not entertain any correspondence regarding delay or non receipt of
clarification.
5.1.6. Address for clarification The Managing Director,
AP Technology Services Ltd,
4th
Floor, B Block, BRKR Bhavan,
Tank bund Road, Hyderabad- 500 063.
Mail: [email protected]
5.1.7. Amendment of bidding document 5.1.8.1 At any time prior to the deadline for submission of bids, APTS, for any reason,
whether at its own initiative or in response to a clarification requested by a
prospective bidder, may modify the bidding documents by amendment.
5.1.8.2 All prospective bidders those have received the bidding documents will be notified
of the amendment, and such modification will be binding on all bidders.
5.1.8.3.In order to allow prospective bidders reasonable time in which to take the
amendment into account in preparing their bids, the APTS, at its discretion, may
extend the deadline for the submission of bids.
6. Bidding procedure
6.1 Three Stage Bidding Procedure
The bidding will be in three stages and at the end of every stage short listed bidders
will be informed to have fair and healthy competition. The following is the
comprehensive procedure for selection of bidders at each and every stage.
6.2 Stage-I - Bidding Procedure
The bidder shall furnish the information in the required formats specified in
Annexure-C [Stage-I Bidding (Pre-Qualification)]. In case the bidder fails to provide
necessary information or fails to fill any columns, bid will be liable to be treated, as
non-responsive. Information furnished after opening of the stage-I bids will not be
considered for evaluation purpose. Stage-I bidding formats consists the following
information.
6.3 Pre-Qualification Bid shall include:
It shall include the following information about the firm:
1.Name of the company/ organization registered with ROC, Quality Certifications
obtained by the Company in Form P#1
2. Software Development projects in BI projects Form P#2
3.Certificate proving that they have not black listed by any Central/ State Govt.
Department/corporation (Own format)
4.Other information, if any required in the bid document (own format)
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 15 of 49
6.4 Stage-II Bidding Procedure
The qualified bidders in the Stage-I shall give a presentation to the Committee on the
solution offered and Technological related issues. At this stage the bidder is
expected to explain their bid, detailing approach etc., outline of the solution
proposed.
the following documentation shall be included in the Technical Bid. The details to
be provided in the formats specified:
1. Past experiences of Organization in dash board creation and maintenance
Past experiences with Dashboard Projects involving Dynamic Map
Based Geo-Querying and clustering as per Format T#1
2. Understanding of the Project & solution (Technology Model, etc) as per
Format T#2
3. BI Engine for Data Validity and BI reports as per Format T#3
4. Innovation Proposed as per Format T#4
5. Project Management Framework and Work Plan as per Format T#5
6. Data Management & Migration Plan, Knowledge Transfer Plan as per
Format T#6
7. Details of Key Staff committed for the assignment as per Format T#7
8. The CV of the key staff proposed for the project in Format T#8
6. 5 Stage-III Bidding Procedure
The commercial proposal of the short-listed bidders in Stage-II will only be opened.
Note: Any bidder who offer discounts/ benefits suo moto after opening of
commercial bid(s) will be automatically disqualified from the current bidding
process without any prior notification and also may be disqualified for future
bidding processes in APTS.
6.6 Preparation of Bids
6.6.1. Language of Bids
The language for all of the correspondence and documents related to the bid must be
in English.
6.6.2 Documents Comprising the Bid
Stage 1: (Pre-Qualification)
a. Forms as per Annexure-C [Stage-I Bidding (Pre-Qualification)] along with
documentary evidence.
b. Audited balance sheet(s) & Proof of Work/ purchase orders and completion
certificates.
c. Self Certificate stating that not blacklisted
d. Bid security.
Stage 2: (Technical Proposals) Annexure- C [Stage-II bidding formats]
a. Note on understanding of the project and related issues.
b. Approach for executing and completion of the Project.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 16 of 49
c. Key staff
d. CV of Key staff
Stage 3: (Commercial Proposals) a. Commercial / Financial bid enclosed in Annexure- C [Stage-III bidding
formats]
6.6.3 Bid Prices
The bidder shall express their bid price for the information system using the price
schedule form provided in the bidding documents.
6.6.4 Preliminary Project Plan
A Preliminary Project Plan describing, among the other things, the methods by
which the Bidder will carry out its overall management and coordination
responsibilities if awarded the contract, and the human and other resources the
Bidder proposes to use. The plan should include a detailed Contract Implementation
Schedule in bar chart form, showing the estimated duration, sequence and
interrelationship of all the key activities needed to complete the contract .The
Preliminary Project Plan must also address any other topics specified in the Bid Data
Sheet.
6.6.5 Bid Security
The Bid Security shall, be in the form of a Demand Draft or BG from a Scheduled
bank located in India and at least having one branch in Hyderabad in the form given
in bid document.
Any bid not accompanied by an acceptable bid security shall be rejected and treated
as non-responsive. The bids with bid security not valid for period specified period
will be rejected.
The bid securities of unsuccessful Bidders will be returned as promptly as possible,
but not later than thirty (30) days after the expiration of the period of bid validity. The bid security of the successful bidder will be returned when the bidder has signed the
Agreement and furnished the required performance security.
6.6.6 Bid Validity The bid validity period shall as indicated in the bid document. A bid having validity
for shorter period shall be treated as non-responsive and rejected.
6.6.7 Bid Submission, Format and Signing The bidder has to submit 2 copies/ documents (sealed separately) subscribing on the
right hand side top corner as “Original” and “Duplicate”. Each copy of the bidding
document will consists of pre-qualification, technical and commercial that is sealed
individually. The 2 copies of the bidding documents consisting of 2 copies of all in
the following form:
Original Bid document must be sealed separately as one bundle and contain:
i. Pre-Qualification details Super Scribing on the right hand side top of the
cover as “Pre-qualification Original”.
ii. Technical Proposal details Super Scribing on the right hand side top of the
cover as “Technical Bid Original”.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 17 of 49
iii. Commercial Proposal (Sealed Separately) details Super Scribing on the right
hand side top of the cover as “Commercial Bid Original”
6.7.Submission of Bids Address for submission of bids
The Managing Director,
AP Technology Services Ltd,
4th
Floor, B Block, BRKR Bhavan, Tank bund Road,
Hyderabad- 500 063.
6.7.1 Deadline for submission of Bids
The Consultant at the address specified in the Bid Document not later than the date
and time indicated in bid document must receive bids.
The Client/ Consultant may, at its discretion, extend this deadline for submission of
bids by amending the Bidding Documents, in which case all rights and obligations
of the Client/ Consultant and Bidders will thereafter be subject to the deadline as
extended.
6.7.2 Late Bids
Any bid received by the Consultant after the bid submission deadline prescribed in the Bid
Data Sheet will be rejected and returned unopened to the bidder.
6.7.3 Withdrawal of the Bids
The Bidder may withdraw their bids after submission, one day prior to the deadline
date prescribed for bid submission date and time.
No bid can be withdrawn after expiry of time allowed for withdrawal of bid till bid
validity period. Withdrawal of bid during this prohibited period will result in
forfeiture of bid security (EMD).
6.8 Bid Opening and Evaluation
Opening of Bid by the Consultant/ Client
Date and Time : As indicated in bid document
Place for bid opening : APTS office,
4th
Floor, BRKR Bhavan,
Tank Bund Road, Hyderabad
“In the event of the specified date of bid opening being declared a holiday for the
Client or Consultant, the bids shall be opened at the appointed time and location on
the next working day.”
6.8.0 General Guidelines for bid opening
Bids will be in three parts (pre-qualification, technical and financial/ commercial)
and there will be three bid-opening events. APTS officers at each such event will
generally follow following guidelines. However APTS may deviate from these in
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 18 of 49
specific circumstances if it feels that such deviations are unavoidable, or will
improve speed of processing and consequent project execution.
Opening of Bids
Bids will be opened in the presence of bidder’s representatives, who choose to
attend. The bidder representatives who are present shall sign a register evidencing
their attendance.
The bidders names, bid modifications or withdrawals, discounts, and the presence or
absence of requisite bid security and such other details as the APTS officer at his/her
discretion, may consider appropriate, will be announced at the opening. No bid shall
be rejected at bid opening, except for late bids, which shall be returned unopened.
Bids that are not opened and read out at bid opening shall not be considered further
for evaluation, irrespective of the circumstances. Withdrawn bids will be returned
unopened to the bidders.
6.8.1 Clarification of bids
During evaluation of the bids, APTS may, at its discretion, ask the bidder for
clarification of its bid.
6.8.2 Preliminary examination of the bids
Preliminary scrutiny will be made to determine whether they are complete, whether
any computational errors have been made, whether required sureties have been
furnished, whether the documents have been properly signed, and whether the bids
are generally in order.
Arithmetical errors will be rectified on the following basis. If there is a discrepancy
between the unit price and the total price that is obtained by multiplying the unit
price and quantity, the unit price shall prevail and the total price shall be corrected.
If the vendor does not accept the correction of the errors, its bid will be rejected and
its bid security may be forfeited. If there is a discrepancy between words and
figures, the amount in words will prevail.
APTS may waive any minor informality; nonconformity or irregularity in a bid that
does not constitute a material deviation, provided such waiver does not prejudice or
affect the relative ranking of any bidder.
Prior to the detailed evaluation, APTS will determine the substantial responsiveness
of each bid to the bidding documents. For purposes of these clauses, a substantially
responsive bid is one, which conforms to all the terms and conditions of the bidding
documents without material deviations.
If a bid is not substantially responsive, it will be rejected by APTS and may not
subsequently be made responsive by the bidder by correction of the nonconformity.
6.9 Evaluation of Pre-Qualification bids
Pre-qualification bid documentation will be evaluated in two sub-steps.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 19 of 49
Firstly, the documentation furnished by the bidder will be examined prima facie to
see if the technical skill base and financial capacity and other vendor attributes
claimed therein are consistent with the needs of this project.
In the second step, APTS may ask bidder(s) for additional information, or visit to
bidder’s site and/ or arrange discussions with their professional, technical faculties
to verify claims made in bid documentation.
6.10 Evaluation of Technical bids
Technical bid documentation shall be evaluated in two sub-steps.
Firstly, the documentation furnished by the vendor will be examined prima facie to
see if the offer made, technical skill base and financial capacity and other vendor
attributes claimed therein are consistent with the needs of this project.
In the second step, APTS may ask vendor(s) for additional information, visit to
vendors site and/ or arrange discussions with their professional, technical faculties to
verify claims made in bid documentation. APTS may also ask the bidder to give
presentation on the understanding of the project scope, technical and financial
strengths, proposed development methodology, manpower and infrastructure
deployment etc.
6.10.1 Evaluation of Pre-Qualification and Technical Bids
1. The bidder’s pre-qualification (stage-I) will be evaluated as per the scope of the
work and requirements of the bid document.
2. Only Pre qualified bidders will be considered for stage-II bidding.
3. There is weightage for the scores obtained in Stage-II bidding for the purpose of
qualifying the bidders for Stage-II bidding process.
4. The scores obtained in Stage-II bidding will be used for the purpose of identifying
the successful bidder in Stage-III bidding process.
6.11 Evaluation of Technical bids
The CV’s submitted by the bidder shall meet the qualification criteria
6.12 Qualifications required for the proposed Team
Designated
Role / Title
Job Responsibility Profile Eligibility Details
Program
Manager Ensure Data Integration from various
departments
Single point of contact between the CMO
& the deployed team.
Interface with GoAP to understand the
different department KPIs that should be
displayed on dashboard
Ensure timely project delivery as per RFP
B. Tech/BE with MBA from
reputed institution
10 years of experience in
managing project teams for BI &
Analytics
Data
Visualization
Engineer
Convert visual design recommended by the
data and design team to live dashboard
Write clean, well-engineered code that
comply with accepted standards, and test
web applications and Cloud based
B. Tech / BE / MCA
5 years of experience having
worked on visual & map based
dashboards
Experience in the BI engine
proposed
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 20 of 49
Application developments
Build quality applications and portals with
structure of modern enterprise Web
applications: the user interface, application
server, and database. Business
Analyst
Data Analyst /
Data scientist
Build Data Quality Logic Checks
Understand data and structure indicators and
best way to represent data for analysis
Design indices, ranking and matrices for
measuring progress
Layering relevant public data sources with
CORE dashboard data to provide context for
analysis
model building
Masters in Statistics/
Mathematics/ or equivalent
degree in Economics/ Data
Science/ B Tech
Minimum 7 years experience in
Data Science and Analysis
Minimum 2 year experience in
working with a software firm to
design predictive / prescriptive
Analyses / Model building for
representing analysis
Experience in the BI engine
proposed
6.13 Technical Presentations
The technical evaluation of the bid will be based on the bidder’s response to the requirements as
mentioned in the RFP, which will include the Technical Specifications mentioned in RFP. The
parameters for technical evaluation would include the following criteria (indicative only).
The bidder with less than 80 score in technical evaluation will be treated as non-responsive.
Each bidder has to present the technical bids to the evaluation committee for examination.
The score will be computed for Score of 100.
6.13. 1 Commercial Bid Evaluation
The commercial evaluation would be based on the cost of the services provided by the
bidder in his commercial bid. The Lowest quoted for excluding taxes is the successful
bidder.
Final choice of firm for the project shall be made on the basis of conformity to pre
qualification, appropriateness of the financial offer from point of view of cost effectiveness
over the entire period for the services and capability of the firm to execute and service the
project.
GoAP reserves the right to reject all/ any part of the tender without assigning any reason
whatsoever and decision of APTS/ CT department/ GoAP in this regard, shall be final and
binding.
Although GoAP states views as to how its Requirements must be satisfied in this RFP,
respondents are invited to propose alternatives in addition if they believe the Requirements
can be better satisfied. Such alternatives must be clearly and separately itemized and costed.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 21 of 49
6.14 Overall Evaluation
APTS/ GoAP will evaluate and compare the bids determined to be substantially responsive.
It is APTS’s intent to select the proposal that is most advantageous to GoAP and each
proposal will be evaluated using the criteria defined. The technical evaluation of Bids will
be carried out using a score system.
APTS/ GoAP reserves the right to reject any or all proposal and to waive informalities and
minor irregularities in proposals received if deemed in the best interest of GoAP to do so.
6.15 Evaluation Process
The Bidders shall submit the Commercial Proposal for the entire work. GoAP will perform
a detailed evaluation of the Technical Bids of the Bidders who have qualified in the Pre-
qualification stage in order to determine whether they are substantially responsive to the
requirements set forth in the Request for Proposals. In order to reach such a determination,
GoAP will examine the information supplied by the Bidders, and shall evaluate the same as
per the evaluation criteria specified in this RFP.
Based on the technical evaluation, the commercial Bids of only the technically acceptable
bidders shall be opened by GoAP. The commercial evaluation will take into account the
information supplied by the Bidders in the Commercial Proposal, and shall evaluate the
same as per the evaluation criteria specified in this RFP.
6.16 Evaluation Committee
Tenders shall be evaluated by APTS/ITE&C Department.
The Tender Committee may choose to conduct contract negotiation or discussion with
successful bidder. However there will be no commercial negotiations post tender opening.
The decision of the Tender Committee in the evaluation of the Technical and Commercial
bids shall be final. No correspondence will be entertained outside the process of
negotiation/ discussion with the Committee.
6.17 Clarifications of Bids and Review of Bidder’s Proposed Deviations
To assist in the examination, evaluation and comparison of Bids GoAP may, at its
discretion, ask the Bidder for a clarification of its Bid. The request for clarification and the
response shall be in writing and no change in the price or substance of the Bid shall be
sought, offered or permitted.
6.18 Contacting of GoAP
Any attempt by a Bidder to influence GoAP in its bid evaluation, bid comparison or
contract award decisions may result in the rejection of the Bidder’s Bid.
6.19 Content and form of response
This section contains the table of contents for the bid response. In order to facilitate
evaluation and comparison of bid responses, bidders shall submit their response in this
format. Failure to do so may result in the bid being eliminated at the examination stage as
no responsive. Should the bidder have additional information to submit that cannot be
encompassed by the current table of contents, additional sections may be added at the end.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 22 of 49
6.20 Award criteria
Final choice of Bidder, to execute this project shall be made on the basis of to the
following:
Availability of Technical Man power
Appropriateness of financial offer from the point of view of cost-effectiveness,
Total cost over contact period
Sustainability of solution
6.21 Notification of award & signing of Contract
Prior to expiration of the period of Bid validity, APTS will notify the successful Bidder in
writing, that its Bid has been accepted. At the same time as the APTS notifies the successful
Bidder that its Bid has been accepted, the APTS will send the Bidder the Contract Form.
Within the specified days of receipt of the Contract Form, the successful Bidder shall sign
and date the Contract and return it to the APTS. Upon the successful Bidder's furnishing of
Implementation Guarantee and signing of Contractual documents, APTS will promptly
notify each unsuccessful Bidder and will discharge its Bid security.
6.22 Corrupt fraudulent practices
Defines, for the purpose of this provision, the terms set forth below as follows:
“Corrupt practice” means the offering, giving, receiving or soliciting of anything of value to
influence the action of a public official in the process of Contract execution and “fraudulent
practice” means a misrepresentation of facts in order to influence a procurement process or
the execution of a Contract the detriment of the Borrower, and includes collusive practice
among Bidders (prior to or after Bid submission) designed to establish Bid prices at
artificial non competitive levels and to deprive the Borrower of the benefits of free and open
competition.
APTS will reject a proposal for award if it determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in competing for, or in executing,
Contract(s).
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 23 of 49
7. General Conditions of Contract (GCC)
Contract and Interpretation
7.1.1. Definitions
In this Contract, the following terms shall be interpreted as indicated below and the
solution provider must bind all the definitions and prepare financial quotations.
Applicable Law means the Contract shall be interpreted in accordance with the
laws of the Client’s country, unless otherwise specified in Special Conditions of
Contract (SCC).
Bidder means any firm offering the solution(s), service(s) and/or materials required
in the tender call. The word vendor when used in the pre award period shall be
synonymous with bidder and when used after award of the contract shall mean the
successful bidder with whom User signs the contract for rendering of goods and
services.
Client means the AP Government Office and its organizations, units or functional
units whether partially or fully owned or controlled by it.
Composite bid means a bid in which the technical and financial parts are combined
into one but their evaluation is sequential.
SSP Software Solution Provider means the firm or joint venture providing the
solution under this contract as named in RFP/Technical specifications/scope of
work.
Consultancy Service Provider’s Bid means the SSP’s bid which shall form part of
the Contract.
Contract means the agreement entered into between the Client and the Software
Solution Provider (SSP), as recorded in the Contract Form signed by the parties
including all attachments and appendices thereto and all documents incorporated by
reference therein.
Contract Price means the price payable to the SSP under the Contract for the full
and proper performance of all its contractual obligations.
Cost of the Solution (CS) means the costs involved for the works and services
mentioned in the scope of work and also include any amendments made there on
before award of the contract.
SSP’s representative means the duly authorized representative of the SSP,
approved by the Clients and responsible for the SSP’s performance under the
contract.
Day means calendar day.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 24 of 49
Effective Date means the date following contract signing that the contract enters
into full force as and upon fulfillment of any and all additional conditions specified
in the SCC.
Financial bid means that part of the offer that provides price schedule, total project
costs etc.
Firm means a company, authority, co-operative or any other organization
incorporated under appropriate statute as is applicable in the country of
incorporation.
GCC means these General Conditions of Contract.
Goods when used singly shall mean the hardware, firmware component of the
goods and services.
Goods and services mean the solution(s), service(s), materials or a combination of
them in the context of the tender call and specifications.
Incidental services means those services ancillary to the supply of the goods and
services, such as transportation and insurance, and any other incidental services,
such as installation, commissioning, provision of technical assistance, training and
other such obligations of the vendor covered under the contract.
Implementation cum Performance security means on receipt of notification of
award from the User, the successful bidder shall furnish the security in accordance
with the conditions of contract, in the Implementation cum performance security
form provided in the bidding documents or in another form acceptable to the User.
Pre-qualification and Technical bid means that part of the offer that provides
information to facilitate assessment, by APTS, professional, technical and financial
standing of the bidder, conformity to specifications etc.
Project Plan means the document to be developed by the SSP and approved by the
Clients, based on the requirements of the Contract and the preliminary project plan
included in the SSP’s bid. Should the Project Plan conflict with the Contract in any
way; the relevant provisions of the Contract shall prevail in each and every instance.
Project sites means the place or places named in the schedule or requirements for
delivery of goods and services.
Specification means the functional and technical specifications or statement of
work, as the case may be.
Tender call or invitation for bids, means the detailed notification seeking a set of
solution(s), service(s), materials or any combination of them.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 25 of 49
Confidentiality and intellectual Property rights
7.1.2. Confidentiality
The SSP must maintain absolute confidentiality of the documents/ maps/ tools
collected in any form including electronic media and any other data/information
provided to him for the execution of the work. The bidder should not use the Project
data for any purpose other than the scope of work specified in the document and
added/ amended before signing the contract. The SSP must remove/ destroy the
entire data from his custody after completion of the warranty period. If at any stage
it is found that the bidder is using the data provided by the client any time during the
contract execution or after completion of the contract for any other purposes,
stringent legal action will be initiated as per applicable law of land and the contract
will be terminated without assigning any reasons.
7.1.3. Intellectual property rights
The parties agree that the final output dashboard or visualization, by whatever name it may
be called, that will be generated during the course of rendition of service will belong to
GoAP. The parties acknowledge and agree that all work products and all intellectual
property rights relating to the software platform including, but not limited to reports,
curricula, specifications, outlines, drafts, software, map based infrastructure, shape files,
source code and any other materials in any medium, which are prepared and/or developed
by Service Provider are the sole and exclusive property of the Service Provider provided it
is licensed to GoAP for the purpose of CORE dashboard.
7.1.4. Use of documents and Information
1. The vendor shall not, without prior written consent from client/APTS,
disclose/share/use the bid document, contract, or any provision thereof, or any
specification, plan, drawing, pattern, sample or information furnished by or on
behalf of the client/APTS in connection therewith, to any person other than a person
employed by the vendor in the performance of the contract. Disclosure to any such
employed person shall be made in confidence and shall extend only so far as may be
necessary for purposes of such performance.
2. The Vendor shall not, without prior written consent of client/APTS, make use of any
document or information made available for the project, except for purposes of
performing the Contract.
3. All project related document (including this bid document) issued by client/APTS,
other than the contract itself, shall remain the property of the client/APTS and shall
be returned (in all copies) to the client/APTS on completion of the Vendor’s
performance under the contract.
7.1.5. Indemnification The SSP shall, at its own expense, defend and indemnify the Client against all third-
party claims of infringement of intellectual property rights, including patent,
trademark, copyright, trade secret or industrial design rights arising from use of the
products or any part thereof in the Client’s country.
The SSP shall expeditiously extinguish any such claims and shall have full rights to
defend itself there from. If the Client is required to pay compensation to a third
party resulting from such infringement, the SSP shall be fully responsible there of,
including all expenses and court and legal fees.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 26 of 49
The Client will give notice to the SSP of any such claim without delay and shall
provide reasonable assistance to the SSP in disposing of the claim.
The Client shall indemnify and defend the SSP against all third-party claims of
infringement of Intellectual Property Rights, including patent, trademark, copyright,
trade secret or industrial design rights arising from the use of any information of
Software provided to the SSP by the Client under the contract.
7.2 Bid Security, Payments, Guarantees and Liabilities
7.2.1. Bid Security (EMD)
1. Bid Security must be drawn in favor of “The Managing Director, A.P. Technology
Services Ltd, Hyderabad” that can be in form of a Bank Guarantee (BG) or Demand
Draft (DD) payable at Hyderabad (India).
2. The bidder shall furnish, as part of its bid, a bid security for the amount specified in
the tender call notice. Format of EMD is enclosed in Annexure–B.
3. The bid security is required by APTS to:
a. Assure bidder’s continued interest till award of contract and
b. Conduct in accordance with bid conditions during the bid evaluation
process.
4. The BG or DD shall be in Indian rupees and shall be from bank scheduled in India
and having at least one branch office in Hyderabad.
5. Unsuccessful bidder’s bid security will be discharged or returned as promptly as
possible but not later than thirty (30) days after the expiration of the period of bid
validity prescribed by APTS.
6. The successful bidder’s bid security will be discharged upon the bidder signing the
contract, and furnishing the performance security.
7. The bid security may be forfeited:
a. If a bidder withdraws its bid during the period of bid validity or
b. In the case of a successful bidder, if the bidder fails:
i. To Sign the contract in time or
ii. To furnish performance security.
7.2.2. Implementation cum Performance Security
On receipt of the notification of Contract award, the successful Bidder shall furnish
to the Client the implementation cum Performance Security for the amount specified
in SCC with in time limit fixed, in the form of BG/ DD payable at Hyderabad. The
other requirements of BG/ DD will be same as that for EMD.
The proceeds of the security shall be payable to the Client as compensation for any
loss resulting from the SSP’s failure to complete any one or all obligations under the
Contract.
The implementation security will be discharged by the Client and returned to the
SSP not later than thirty (30) days after completion of three months from the date of
submission of deliverables and its final acceptance.
7.2.3. Payment
The method and conditions of payment to be made to the solution provider under
this contract shall be specified in SCC.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 27 of 49
The solution provider request(s) for payment shall be made to the Client in writing,
accompanied by an invoice describing, as appropriate, the deliverables defined are
delivered and accepted, and by documents submitted and upon fulfillment of other
obligations stipulated in the Contract. IT if any will be deducted at source as per IT
act.
7.2.4. Prices
Prices charged for deliverables and Services performed under the Contract shall not
be increased from the prices quoted by them in its bid. The prices shall include all
taxes, duties, license fees, and other such levies as required in the format given.
7.2.5. Taxes and Duties
The SSP shall be entirely responsible for all taxes, duties, license fees, and other
such levies.
7.2.6. Delay in the SSP Performance
The SSP has to start as per the direction of the client at the designated locations and
Services shall be made in accordance with the time schedule prescribed by the
Client in the Schedule of Requirements.
If at any time during performance of the Contract, the SSP should encounter
conditions impeding timely delivery or installation of the Systems or performance of
the Services, the SSP shall promptly notify the Client in writing of the fact of the
delay, likely duration and its cause(s). As soon as practicable after receipt of the
SSP notice, the Client shall evaluate the situation and may at its discretion extend
the time for performance, with or without liquidated damages, and revised
implementation plan will be prepared by both parties.
Except as provided under GCC Clause, if SSP fails in the performance of its
delivery or installation obligations shall render the liable to the imposition of
liquidated damages pursuant to GCC Clause, unless an extension of time is agreed
upon by client without the application of liquidated damages.
7.2.7. Liquidated Damages
If the SSP fails to deliver goods/ Services or install any or all of the systems or if
any of the goods/ services fail to gain Acceptance within the period(s) specified in
the Contract, the Client shall, without prejudice to its other remedies under the
Contract, deduct from the performance security, as liquidated damages, a sum
equivalent to the percentage of the Contract price specified in SCC. Once the
maximum is reached, the Client may consider termination of the Contract.
If delivered or installed goods and/or Services cannot be put to use without the
undelivered goods/Services, the damages will be calculated using the total price of
the goods/services that cannot be put to use.
7.2.8. Application of LD
Liquidated damages shall be assessed as per the mile stones as per schedule,
submission of deliverables and its acceptance”.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 28 of 49
7.2.9. Termination for Default
The Client, without prejudice to any other remedy for breach of Contract, may
terminate this Contract in whole or in part by giving 30 days advance notice; if the
SSP fails to deliver any or all of goods/services or to install any or all of the Systems
within the period(s) specified in the Contract, or within any extension thereof
granted by the Client or if he fails to perform any other significant obligations(s)
under this contract.
In the event the Client terminates the Contract in whole or in part, the Client may
procure, upon such terms and in such manner as it seems appropriate, goods/services
similar to those undelivered, and the SSP shall be liable to the Client for any excess
costs for those similar goods or Services. However, the SSP shall continue
performance of the contract to the extent not terminated.
7.2.10. Termination for Insolvency
The Client may at any time terminate the Contract by giving written notice to the
SSP if he becomes bankrupt or otherwise insolvent. In this event, termination will
be without compensation to the SSP, provided that such termination will not
prejudice or affect any right of action or remedy that has accrued or will accrue
thereafter to the Client.
7.2.11. Force Majeure The SSP shall not be to liable for forfeiture of its performance security, liquidated
damages, or termination for default if and to the extent that its delay in performance
or other failure to perform its obligations under the Contract is the result of an event
of Force Majeure.
For purposes of this Clause, “Force Majeure” means an event beyond the control of
the and not involving SSP’s fault or negligence and not foreseeable. Such events
may include, but are not restricted to, acts of the Client in its sovereign capacity,
wars or revolutions, fires, floods, epidemics, quarantine restrictions, and freight
embargoes.
If a Force Majeure situation arises, the SSP shall promptly notify the Client in
writing of such condition and the cause thereof. Unless otherwise directed by the
Client in writing, the SSP shall continue to perform its obligations under the
Contract as far as is reasonably practical, and shall seek all reasonable alternative
means for performance not prevented by the Force Majeure event.
If an event of Force Majeure continues for a period of one hundred and eighty (180)
days or more, the parties may, by mutual agreement, terminate the Contract without
either party incurring any further liabilities towards the other with respect to the
Contract, other than to effect payment for goods/services already delivered or
performed.
7.2.12. Resolution of disputes The Client and the Vendor shall make every effort to resolve amicably by direct
informal negotiation any disagreement or dispute arising between them under or in
connection with the contract.
If, after thirty (30) days from the commencement of such informal negotiations, the
Client and the Vendor have been unable to resolve amicably a contract dispute,
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 29 of 49
either party may require that the dispute be referred for resolution to the formal
mechanisms specified here in. These mechanisms may include, but are not restricted
to, conciliation mediated by a third party.
The dispute resolution mechanism shall be as follows:
In case of a dispute or difference arising between the Client and the Vendor relating
to any matter arising out of or connected with this agreement, such disputes or
difference shall be settled in accordance with the Arbitration and Conciliation Act,
of India, 1996.
7.2.13. Governing Language The contract shall be written in English. All correspondence and other documents
pertaining to the contract, which are exchanged by the parties, shall be written in
same languages.
7.2.14. Applicable law The contract shall be interpreted in accordance with appropriate Indian laws.
7.2.15. No interest for performance Guarantee No interest shall be paid on the earnest money, security deposit and the amount
retained against performance guarantee.
7.2.16. Notices Any notice given by one party to the other pursuant to this contract shall be sent to
the other party in writing or by telex, email, cable or facsimile and confirmed in
writing to the other party’s last known address.
A notice shall be effective when delivered or tendered to other party whichever is
earlier.
7.3 Contract Execution
7.3.1. Inspections and Acceptance Test Inspection: The Client or its representatives shall have the right to inspect re-
engineering, design, development, installation and commissioning works or any
other work that would carried as part of contract execution for its quality to confirm
their Contract specifications at point of development/delivery and/or at the final
place(s) of delivery. The SSP shall arrange necessary systems, people and
equipment for such inspections.
Should any inspected or tested or delivered goods/services fail to conform to the
Contract specifications or to pass the Acceptance tests as defined jointly in the
Project Plan, the Client may reject the delivered goods/services, and the SSP shall
either replace the rejected delivered goods/services or make alterations as necessary
to meet the specifications free of cost to the Client.
7.3.2. Acceptance test method and final acceptance of the solution
Acceptance of the deliverables shall be made at the department site specified in the
Schedule of Requirements at the Client’s discretion.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 30 of 49
The SSP shall develop and deliver the reports to CMO and CMO will accept them
Acceptance testing for the final deliverables shall commence within 30 days from
the date of completion of the project as per scope defined.
Nothing in shall in any way release the SSP from any warranty or other obligations
under this Contract or limit the Client’s ability to seek other remedies as specified in
the Contract.
7.3.3. SSP’s Obligations The SSP will abide by the job safety, insurance, customs and immigration measures
prevalent and laws in force in the Client’s country, and will indemnify the Client
from all demands or responsibilities arising from accidents or loss of life. The SSP
will pay all indemnities arising from such incidents and will not hold the Client
responsible or obliged.
The SSP is responsible for, and obligated to conduct all contracted activities with
due care and diligence, in accordance with the Contract and using state of the art
methods and economic principles, and exercising all reasonable means to achieve
the performance specified in the Contract.
The SSP is obliged to work closely with the Client’s Project Manager and staff, act
within its own authority, and abide by directives issued by the Client that are
consistent with the terms of the Contract. SSP is responsible for managing the
activities of its personnel, and will hold itself responsible for any misdemeanors.
The SSP shall appoint an experienced Representative to manage its performance of
the Contract within 15 days from Contract signature. The Representative shall be
authorized to accept orders and notices on behalf of the SSP, and to generate notices
and commit the SSP to specific courses of action within the scope of the Contract.
The Representatives may be replaced only with the prior written consent of the
Client.
The SSP shall develop the final Project Plan based on Contract requirements, to be
submitted to the Client for review and approval within the number of days specified
in SCC from the Effective date of the Contract, with all reasonable and necessary
input from the Client.
The SSP shall complete Delivery, Installation and Acceptance of the Systems in
accordance with Contract requirements (as may be further elaborated in SCC and
the Project Plan).
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 31 of 49
8. Special Conditions of the Contract (SCC)
The following Special Conditions of Contract (SCC) shall supplement to the
General Conditions of Contract (GCC). Whenever there is a conflict, the provisions
of the SCC shall prevail over those in the General Conditions of Contract.
Subject Matter of Contract
9.1.1. Contract Agreement The successful bidder should enter into agreement with the client.
9.1.2. Key Personnel for Client Co-ordinator from the Client.
Co-ordinator(s) from the Consultant.
9.1.3. Key Personnel for SSP List of Key personnel identified and listed by the SSP in the bid document.
[SSP shall provide the List]
“Contract signing”
The SSP has to enter into agreement with the Client/Consultant for which he has
quoted and awarded within the stipulated time as mentioned in the bid document.
“Effective Date”
Means the date on which the contract signed for execution
“Local office”
The bidder should undertake to provide a project office in the State where the
services are to be provided
“GO live”
Means the date on which all modules as per the contract are made operational and
accepted by the client.
“Project Coordinator”
Means the Project Manager or any other officer appointed by SSP on its behalf for
overall co-ordination, supervision and project management;
“Project site”
Where applicable, means the place(s) where services are to be made available to
user(s);
9.1.4. Project development site The development team shall be stationed at the SSP site. However, the department
will arrange for the office space for the Program/ Project Manager in the client
office.
9.1.5. Change management & maintenance The Change management & maintenance team will be stationed at the office of the
CT department. The department will arrange for the office space and systems. a. The department will maintain attendance register at the office.
b. The Change management & maintenance team shall report on all
working days of government.
c. The office hrs are 10.00 AM to 6.00 PM
d. The Change management & maintenance shall stay beyond office hours if
needed, No overtime will be paid for the extra hours.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 32 of 49
9.1.6. Project Reports The SSP shall on a regular basis but not less than once in a month for the first eight
months and monthly thereafter provide progress reports giving information on
implementation of the Project as per the Project Plan, any delays, etc.
9.1.7. Inspection and Acceptance: The client will be entitled at any time, to inspect the site or sites at which the Project
is being carried on to check on the implementation of the Project. SSP shall provide
all information and assistance required by client in this regard.
The Client will commence the Acceptance Testing within two weeks of intimation
of commissioning of the module. The client will issue an Acceptance Certificate to
the SSP within two weeks of conducting the acceptance test, signifying its
acceptance of the Project, provided any defects, deviations’ identified during
acceptance tests are rectified. However such acceptance shall not relieve BSP of
liability for any defects or problems subsequently arising in the Project.
The date on which client notifies SSP of completion of module will be deemed to be
the date on which module is operational.
The SSP may at its option, appoint one or more engineers for the duration of this
contract, to regularly provide an independent assessment report of the progress of
execution of the Project as well as the operation of the network and the provision of
Service as well as to conduct acceptance tests.
9.1.8. Payments
9.1.9. Contract Price & Payments Prices are fixed and no adjustment will be made to the contract price. The payment
will be done on submission of invoices supported by uptime certification form the
authorized officer of the client department for the uptime and performance.
9.1.10. Penalty for development, delivery & installation
If the bidder fails to achieve the milestones as per the milestones mentioned in the
scope of the work, then for every day of the delay in delivery of the deliverables
then, the client at his discretion will levy a penalty of Rs.1,000/- per day or part
thereof.
9.1.11. Penalty for Operational & change management If the bidder fails to achieve the agreed time lines for every change request, then for
every day of the delay in delivery of the deliverables then, the client at his discretion
will levy a penalty of Rs.1,000/- per day or part thereof.
If any report generation is taking beyond 3 minutes, till the report is fine tuned in a
week days from the date of written communication. If successful bidder fails to
achieve the report generation time, then for every day, the client at his discretion
will levy a penalty of Rs.1,000/- per day or part thereof.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 33 of 49
9.1.12. Payment Authority APTS is the payment authority based on the recommendations of ITE&C dept. The
client/ consultant will make the payment as per payment terms and conditions.
9.1.13. Insurance to men, machine and material The SSP has to insure against all risks on his men, machine and material and
provide the evidence before commencing the work to the client.
9.1.14. Subcontract Subcontract is not allowed in any form. During the program, if found that SSP has
given subcontract, the contract will be cancelled and implementation cum
performance security will be forfeited besides black listing the bidder to participate
in any future tender of APTS/ Client/ GoAP.
9.1.15. Infrastructure arrangement by SSP The SSP shall make his own arrangements for infrastructure which includes power,
water and transportation of personnel deployed by him, security at the site in
addition to the men, machine and material.
9.1.16. As per GO Ms no.12 dated: 08.06.2015, Clause 6, Simplification of
Documentation for Bidding: The preparation of the support documents by the bidders for bid submission and evaluating
the same by purchaser is a time consuming process. To simplify the procedure the following
methods are to be followed:
a. Bidders shall submit their bids with self-declarations in respect of the pre-qualification
criteria prescribed in the tender document.
b. The procuring agency shall evaluate the bids based on the self-declaration and select the
successful bidder.
c. The successful bidder shall submit the documents to prove their pre-qualification, as
specified in the RFP, within 5 working days from the date of declaration of successful
bidder.
d. APTS will receive support documentations, verify the compliance with the requirements of
the RFP and if they are in order, issue the award notification.
e. Failure to submit all support documents by the successful bidder within specified time or
non-compliance with the self-declaration or non-fulfilment of the pre-qualification criteria
specified on the RFP, upon their verification, shall entail forfeiting the EMD and
Blacklisting of such bidder for a period of two years. In such cases, the procuring agency
may proceed further with the next-ranked bid.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 34 of 49
9. Table of Sample Forms and Procedures
Bid Form
Date: [ insert: date of bid ]
To:
The Managing Director ,
APTS, 4th
floor, BRKR Bhavan
Tank bund road
Hyderabad
Dear Sir,
1. Having examined the Bidding Documents, the receipt of which is hereby acknowledged,
we, the undersigned, offer to develop and implement the solution, submit deliverables
under the above-named Contract in full conformity with the said Bidding Documents
for the sum of: ………………………………….. (herein after called “the Total Bid
Price”) or such other sums as may be determined in accordance with the terms and
conditions of the Contract. The above amounts are in accordance with the Price
Schedules attached herewith and are made part of this bid.
2. We undertake, if our bid is accepted, to commence work as per the schedule and to
achieve the Acceptance within the respective times stated in the Bidding Documents.
3. Construction of the Contract
We declare that we have studied Bid document and are making this proposal with a
stipulation that you shall award us Contracts for CORE dash board Application Re-
engineering to Service Oriented Architecture as per specifications and deliver all
deliverables and other services specified in the Contract Documents.
4. We have read the provisions of bid and confirm that these are acceptable to us.
5. We further declare that bid is unconditional.
6. We undertake, if our bid is accepted, to commence the work as per the schedule
immediately upon your Notification of Award to us, and to achieve Completion within
the time stated in the Bidding Documents.
7. If our bid is accepted, we undertake to provide an Implementation cum Performance
Security in the form and amounts, and within the times specified in the Bidding
Documents.
8. We undertake that, in competing for (and, if the award is made to us, in executing) the
above contract, we will strictly observe the laws against fraud and corruption in force in
India namely “Prevention of Corruption Act”.
9. We, hereby, declare that only the persons or firms interested in this proposal as
principals are named here and that no other persons or firms other than those mentioned
herein have any interest in this proposal or in the Contract to be entered into, if the
award is made on us, that this proposal is made without any connection with any other
person, firm or party likewise submitting a proposal is in all respects for and in good
faith, without collusion or fraud.
10. We agree to abide by this bid, consists of this letter, the Price Schedules, the Bid
Security, the duly notarized written power of attorney, and Attachments 1 through
[ specify: the number of attachments ] to this Bid Form, for a period of bid validity
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 35 of 49
from the date fixed for submission of bids as stipulated in the Bidding Documents, and
it shall remain binding upon us and may be accepted by you at any time before the
expiration of that period.
11. Until the formal final Contract is prepared and executed between us, this bid, together
with your written acceptance of the bid and your notification of award, shall constitute a
binding contract between us.
Dated this [ insert: number ] day of [ insert: month ], [ insert: year ] Signed:
In the capacity of [ insert: title of position ]
Duly authorized to sign this bid for and on behalf of [ insert: name of Bidder ]
Attachments:
As per the technical specifications
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 36 of 49
Form of Contract Agreement
This contract agreement is made on the [insert: number] day of [insert: month], [insert:
year].
Between
(1) [ insert: Name of Client ], (hereinafter called “the Client”), and
(2) [ insert: name of ], (hereinafter called “the SSP ”).
Whereas the Client desires to engage the SSP to Re-Engineer, develop and implement the " ---------
------------ as per the scope and deliver all the deliverables and have agreed to such engagement upon
and subject to the terms and conditions appearing below in this Contract Agreement.
NOW IT IS HEREBY AGREED as follows:
Article 1 - Contract Documents
1.1 Contract Documents
The following documents shall constitute the Contract between the Client and the
SSP, and each shall be read and construed as an integral part of the Contract:
This Contract Agreement and the Appendices attached to the Contract Agreement
(a) Notification of Award
(b) The Bid and Price Schedules submitted by the SSP
(c) Special Conditions of Contract
(d) General Conditions of Contract
(e) Bid document with modification if any
(f) Add here – any other documents)
1.2 Order of Precedence
In the event of any ambiguity or conflict between the Contract Documents listed
above, the order of precedence shall be the order in which the Contract Documents
are listed in Article 1.1 (Contract Documents) above.
1.3 Definitions (Reference GCC Clause 1)
Capitalized words and phrases used in this Contract Agreement shall have the same
meanings as are ascribed to them in the General Conditions of Contract.
Article 2 - Contract Price and Terms of Payment
2.1 Contract Price
The Client hereby agrees to pay to the SSP as amount of Rs.xxxx/- per / Quarter
the Contract Price in consideration of the performance by the SSP of its obligations
under the Contract.
Article 3 - Effective Date for Determining Time for Operational Acceptance
3.1 Effective Date
The date of signing of the contract
(a) This Contract Agreement has been duly executed for and on behalf of the
Client and the SSP;
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 37 of 49
(b) The SSP has submitted to the Client the Implementation cum performance
security.
Article 4 – Jurisdiction
4.1. Any legal proceedings arising out of the agreement shall be subject to the
appropriate court in Hyderabad.
Article 5 - Appendixes
5.1. The Appendixes listed in the attached List of Appendixes shall be deemed to form
an integral part of this Contract Agreement.
5.2. Reference in the Contract to any Appendix shall mean the Appendixes attached to this
Contract Agreement, and the Contract shall be read and construed accordingly.
IN WITNESS WHERE OF the Client and the SSP have caused this Agreement to be duly
executed by their duly authorized representatives the day and year first above written.
For and on behalf of the Client (Purchaser)
Signed: _________________
in the capacity of [ insert: title or other appropriate designation ]
in the presence of ___________________
For and on behalf of the SSP
Signed: ___________________
in the capacity of [ insert: title or other appropriate designation ]
in the presence of
SSP ’s Representative (Appendix 1)
Name: [ insert: name, or state: “to be nominated within fourteen (14) days of the
Effective Date” ]
Title: [ insert: title, or state: “to be specified within fourteen (14) days of the Effective
Date” ]
Revised Price Schedules [if any] (Appendix 3)
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 38 of 49
10. Annexure – A
Bid Table of Contents and Checklists
Bidders may expand and modify (if appropriate) and complete the following table. The
purpose of the table is to provide the Bidder with a summary checklist of items that
must be included in the bid to be considered for contract award, it also provides
A summary reference scheme to ease and speed the Client’s bid evaluation process
Item Present
(Yes/No)
Bid Form
EMD
Man Power details
Past experience details
Application Development standards &
Certifications
Price Schedules
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 39 of 49
11. Annexure – B
Bid Security (EMD) Form
APTS. File. No: …………………………….....
Project Name: ……………………………….
(To be issued by a bank scheduled in India as having at least one branch in Hyderabad)
Whereas...................................... (here in after called “the Bidder”) has submitted its bid
dated ......(Date). For the execution of ........................ (here in after called “the Bid”)
KNOW ALL MEN by these presents that WE ................... of ........................ having our
registered office at........................ (here in after called the “Bank”) are bound unto the
Andhra Pradesh Technology Service Ltd. (hereinafter called “The APTS”) in the sum of
................ for which payment well and truly to be made to the said APTS itself, its
successors and assignees by these presents.
The conditions of this obligation are:
1. If the bidder withdraws its bid during the period of bid validity or
2. If the bidder, having been notified of the acceptance of its bid by the APTS during the
period of bid validity:
i. fails or refuses to execute the contract form if required; or
ii. fails or refuses to furnish the performance security, in accordance with the bid
requirement;
We undertake to pay the APTS up to the above amount upon receipt of its first written
demand, without the APTS having to substantiate its demand, provided that in its demand
the APTS will note that the amount claimed by it is due to it, owing to the occurrence of
one or both of the two conditions, specifying the occurred condition or conditions.
This guarantee of Rs. will remain in force up to and including 45 days after the period of the
bid validity, and any demand in respect thereof should reach the Bank not later than the
above date.
Place: Signature of the Bank Official
Date : with Seal
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 40 of 49
12. Annexure –C -Stage – I Bidding (Pre Qualification) formats
Name of the SSP:
Name of the Project:
Form – P#1 General Information of the SSP
1. Name of the Company/ Firm :
2.
Date of Incorporation (Registration
Number & Registering Authority),
PAN No. :
3. Legal Status of the Company in India &
Nature of Business in India :
Public Ltd Company/ Private/
Partnership firm
4. Address of the Registered Office in
India :
5. Date of Commencement of Business :
6. Name & e-mail id, phone number, fax
of the Contact Person :
Phone:
Fax:
Email:
7. Web-Site :
10. Awards :
11. EMD details :
Amount:
DD No. & Date
Name of the Bank:
Valid up to :
12. Proof of purchase of bid document : APTS Receipt No:
Date of purchase:
Place: Bidder’s Signature
Date : and Seal.
Name of the SSP:
Name of the Project:
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 41 of 49
Form – P#2 - BI Software Development experience
S.No
Name of the Client
with address and
Phone No
Project Duration Value of
Project in Rs.
Brief Project
description Start Date Completion
Date
1.
2.
3.
Place: Bidder’s Signature
Date : and Seal.
Note: Provide sufficient evidence such as agreements, work completion certificates along
client satisfaction letter to support information provided in the above table.
Name of the SSP:
Name of the Project:
Form – P#3 - Overall Turnover of the Firm
(All values in Rs. Lakhs)
S.No
Financial Year
Turnover of the firm in Profit after
Tax Net Worth
of
Company Total Turnover
of the firm
Software/
Application
Development Total
(1) (2) (3) (4) (5)
1 FY.2013-14
2 FY.2014-15
FY.2015-16
Place: Bidder’s Signature
Date : and Seal.
Note:
1. Please attach audited Balance Sheets and IT return statements to confirming the
figures mentioned in columns (2) or CA certificate
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 42 of 49
13. Stage–II Bidding (Technical Solution offered by the Bidder)
(This format must be kept in a separate sealed cover)
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 43 of 49
Name of the SSP:
Name of the Project:
Form – T#1 - Details of key staff committed for the assignment
SNo Name Designation Qualifications
Length of
total
experience
BI Projects
implemented &
Years of BI
experence
1
2
3
4
5
6
7
.....
Place: Bidder’s Signature
Date : and Seal.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 44 of 49
Form T2 - Curriculum Vitae (CV) Of Key Staff Proposed
1. Name of Staff [Insert full name]:
2. Name of Firm [Insert name of firm proposing the staff]:
3. Date of Birth: 4. Nationality:
4. Education [Indicate college/university and other specialized education of staff member, giving
names of institutions, degrees obtained, and dates of obtainment]:
5. Total No. of years of experience in Data Intelligence, Dashboard Design & Development
Domain:
7. Awards or Recognition
9. Details of Involvement and specific role in at least 3 major dashboard design and
development Projects in the format:
Below:
Name of assignment or project:
Year:
Location:
Employer:
Main project features:
Positions held:
Activities performed:
Specific Contribution to Project: ______________________
Screenshots/ Links to work produced:
10. Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly
describes me, my qualifications, and my experience. I understand that any wilful
misstatement described herein may lead to my disqualification or dismissal, if engaged.
Date:
[Signature of staff member or authorized representative of the staff] Day/Month/Year
Full name of authorized representative:
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 45 of 49
14. Stage – III Bidding (Commercial) formats
(This format must be kept in a separate sealed cover)
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 46 of 49
Form C#1 - Commercial Proposal Submission Form [Location, Date]
To: [Name and address of Employer]
Dear Sirs:
We, the undersigned, offer to provide the for [Insert title of Assignment] in accordance with your Request
for Proposal dated [Insert Date], and our Technical Proposal. Our attached Financial Proposal is for the
sum of [Insert amount(s) in words and figures].
This amount is inclusive of the Domestic taxes such as --------- (Indicate the amounts against each). We
hereby confirm that the financial proposal is unconditional and we acknowledge that any condition
attached to financial proposal shall result in reject of our financial proposal.
Our Financial Proposal shall be binding upon us subject to the modifications resulting from Contract
negotiations, up to expiration of the validity period of the Proposal.
We understand you are not bound to accept any Proposal you receive.
We remain,
Yours sincerely,
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 47 of 49
Name of the Bidder:
Name of the Project:
Form-C#2 - Commercial Form
S.No Payment terms Number
of
resources
*
Duration
#
Man
Month
cost
Amount Taxes Total
(1) (2) (3) (4) (5) (6) (7) (8)
Team Cost
1 Program Manager 1 12
2 Data Visualization
Engineer 2 12
3 Business/ Data
Analyst 30 12
4 Data Scientist 15 12
5 Portal design and
developer 1 12
Estimated number of resources as mentioned in column 3 above are indicative only. IT&C
Department reserves the right to engage suitable number of resources in each category accordingly to
their requirements. The reimbursements/ payments towards providing the resources based on the
actual number of resources actually engaged by ITE&C department.
Period of engagement as indicated in column 4 is indicative only. ITE&C department deserve the
right to extend/ foreclosed the same depending on the requirements. In the event of foreclosed, no
completion what so ever shall be payable below period of actual engagement of the resources.
Place: Bidder’s Signature
Date: with Seal
Note: 1. AP ITE&C Department reserves it right to alter the scope (increase quantity / remove certain
items).
2. All other tasks pertinent to the contract even though may not have been mentioned in the bid
document are assumed to have been included in the work.
3. Deduction of taxes at source will be made as per applicable laws from the payments to be made
to the vendor.
4. Bids will be evaluated excluding Taxes.
5. Contract can be extended on mutual agreeable terms & conditions for 3 months are multiples of
3 months
6. Government reserves the right to move the application from Cloud to AP SDC
Place : Bidder’s signature
Date : and seal.
APTS Confidential and Proprietary RFP - Selection of Service Provider for BI service provider for GoAP
APTS: One Stop-Shop Solution Provider for e-Governance Page 48 of 49
15. End of the bid document