STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION __________________________________________________________
REQUEST FOR PROPOSALS I-15/I-215 Interchange Improvements (Devore)
FOR DESIGN AND CONSTRUCTION ON STATE HIGHWAY
On I-15 from 0.8 mile south of Glen Helen Parkway UC to 1.4 mile north of Kenwood Ave UC.
And
On I-215 from 1.2 mile south of Devore Road OC to the I-15 junction
DISTRICT 08, ROUTE I-15/I-215
__________________________________________________________
CONTRACT NO. 08-0K7104
08-SBD-I-15 PM 14.0/R16.4, I-215 PM 16.0/17.8
Project ID 08000003664
Federal Aid Project
Addendum No. 4 Issued June 21, 2012
June 21, 2012 2
Addendum No. 4 CONTRACT NO. 08-0K7104
The Department issues this Addendum No. 4 to inform Proposers of the following changes and corrections to the RFP. BOOK 2 PROJECT REQUIREMENTS
The Book 2, Project Requirements, is modified as indicated by the deletions and additions set forth below.
Section 2 Project Management
Section 2.5.2.2.1 “General” is modified as indicated below:
2.5.2.2.1 General
All Key Personnel will be required to be on-site 100% of the time during activities that involve their areas of responsibility. Key Personnel for the Project shall include the following:
Project Manager,
Quality Manager,
Design Quality Manager,
Construction Quality Manager,
Design Manager,
Construction Manager,
Design Lead Engineer – Roadway (Engineer of record),
Design Lead Engineer – Structure (Engineer of record),
Geotechnical Engineer,
Safety Manager,
Utility Coordinator,
Railroad Coordinator,
Project Scheduler,
Environmental Compliance Manager,
Traffic Manager,
Information Technology Manager..
Section 2.5.2.2.2 “Minimum Requirements of Key Personnel” is modified as indicated below:
2.5.2.2.2 Minimum Requirements of Key Personnel
The following provides a brief job description and minimum requirements of the Key Personnel assigned to the Project. Key Personnel will be evaluated, in part, based on the extent they meet and/or exceed such requirements.
The following provides a brief job description and minimum requirements of the Key Personnel assigned to the Project.
June 21, 2012 3
Addendum No. 4 CONTRACT NO. 08-0K7104
Project Manager
a) Shall be responsible for the overall design, construction, quality control, and Contract administration for the Project. This person shall have full responsibility for the prosecution of the Work, full decision-making and budgetary authority to act on behalf of the Design-Builder and bind the Design-Builder on all matters relating to the Project.
b) Reports directly to the Design-Builder’s Executive Management Committee
c) Responsible for overall design, construction, quality management, and contract administration
d) Act as agent and be a single point of contact in all matters on behalf of the Design-Builder
e) Has authority to bind the Design-Builder on all matters relating to the project
f) Has authority to stop work
g) Must be present (or his/her Approved designee will be present) at the Site at all times that Work is performed
h) Fifteen (15) years experience managing complex infrastructure projects
i) Ten (10) years experience managing the design and construction of major urban freeway projects
j) Five (5) years of project management experience in design-build on major urban freeway projects
k) Recent experience as Project Manager for design and construction of highway projects similar in scope and complexity
l) License as Professional Civil Engineer in California preferred, but not required
Quality Manager
a) Shall be responsible for developing and implementing the Quality Control/Quality Assurance program, responsible for overseeing the day-to-day quality aspect of design, construction and Project management activities including managing the Design-Builder’s workmanship inspections, overseeing Design-Builder’s production testing, and coordinating with the Department’s verification testing and inspection.
b) Shall work independently of the Design and Construction teams, shall not have any production-related responsibilities and report directly to Design-Builder’s Executive Management Committee
c) Design Quality Assurance Manager and Construction Quality Manager shall be different people.
d)c) Shall be assigned full-time to the Project and be on Site during regular business hours whenever any Work is being performed and be available to be on Site within two hours outside of regular business hours
e)d) Reviews contract documents for adherence to quality and testing requirements.
f)e) Shall have the authority to stop any and all Work that does not meet the Contract requirements.
g)f) Recent experience in quality management of design and construction of projects similar in scope and complexity
June 21, 2012 4
Addendum No. 4 CONTRACT NO. 08-0K7104
h)g) Shall have fifteen (15) years of recent experience managing complex infrastructure projects
i)h) Shall have five (5) years of major design-build construction management of major urban freeways,
j)i) Must be a registered Professional Engineer in the State of California
Design Quality Manager
a) Shall report directly to the Design-Builder’s Executive Management Committee,
b) Shall be a licensed Professional Engineer in the State of California now or by the time the first Notice to Proceed is issued,
c) Shall have responsibility for design quality management including overseeing the day-to-day quality aspects of design,
d) Shall be responsible for implementing design related quality planning and training, as well as providing continuous improvement of the Quality Management System,
e) Must demonstrate experience checking plans, calculations, drawings, and other design documents to ensure that they are independently checked,
f) The Design Quality Manager and Construction Quality Manager shall be different people.
g) Shall not be assigned any other duties or responsibilities on the Project,
h) Shall have five (5) years of experience as a design quality assurance manager on a project of similar scope and complexity.
Construction Quality Manager
a) Shall be responsible for overseeing the day-to-day quality aspect of construction including managing the Design-Builder’s workmanship inspections, overseeing Design-Builder’s production testing, and coordinating with the Department’s verification testing and inspection,
b) Shall ensure that all testers have current certifications for the tests they are performing, that all on and off-site field labs have current certifications and that materials incorporated into the work meet the requirements of the contract documents,
c) The Design Quality Manager and Construction Quality Manager shall be different people,
d) Shall report directly to the Design-Builder’s Executive Management Committee,
e) Shall be assigned full-time to the Project and be on Site during regular business hours whenever any construction activities are being performed,
f) Shall not have any production-related responsibilities,
g) Shall have the authority to stop any and all Work that does not meet the Contract requirements,
e) Shall have five (5) years experience as a Construction Quality Manager on a project of similar scope and complexity.
Design Manager
a) Shall be responsible for ensuring that the overall Project design is completed and design criteria requirements are met. The Design Manager must be available to the Department
June 21, 2012 5
Addendum No. 4 CONTRACT NO. 08-0K7104
within 24 hours whenever design activities are being performed, including design activities related to field design changes. The Design manager shall be responsible for design quality management.
b) Shall work under the direct supervision of the Design-Builder’s Project Manager
c) Shall have five (5) years of major design-build project management of major urban freeway systems.
d) Shall have ten (10) years of recent experience in managing the design of complex highway projects
e) Shall have at least five (5) years or preferred ten (10) years of recent experience managing the design of highway projects similar in scope and complexity.
f) Shall have fifteen (15) years of experience managing complex infrastructure projects.
g) Must be a registered Professional Civil Engineer in the State of California now or by the time the initial notice to proceed is issued
Construction Manager
a) Reports directly to the Project Manager
b) Responsible for ensuring that the project is constructed in accordance with the design and project requirements
c) Must be present at the site of work at all times construction is in progress
d) Has authority to stop work
e) License as Professional Civil Engineer in California preferred but not required
f) Fifteen (15) years of experience managing complex infrastructure projects
g) Ten years (10) experience managing the construction of major urban freeway systems
h) Five (5) years of major design-build construction management of major urban freeways
Design Lead Engineer – Roadway (Engineer of Record):
a) Reports directly to the Design Manager
b) Engineer of Record for the roadway design
c) Responsible for ensuring that the roadway design is completed and Caltrans design criteria are met
d) Responsible for following the Quality Control processes and activities
e) Must be present at all review and design coordination meetings
f) Minimum of ten (10) years of recent experience as Engineer of Record and in design of roadway on the California State Highway System
g) Minimum of ten (10) years of recent experience in the design of roadways in major urban freeway systems similar in scope and complexity
h) Must have a license as Professional Civil Engineer in California
Design Lead Engineer – Structures (Engineer of Record)
a) Reports directly to the Design Manager
June 21, 2012 6
Addendum No. 4 CONTRACT NO. 08-0K7104
b) Engineer of Record for the structure design
c) Responsible for following the Quality Control processes and activities
d) Responsible for ensuring that the structure design is completed and Caltrans design criteria are met
e) Must be present at all review and design coordination meetings
f) Ten (10) years experience as Engineer of Record in the design of long-span bridges structures similar in scope and complexity on the California State Highway System
g) Minimum of ten (10) years experience as Engineer of Record in the design of large complex bridge structures – segmental bridges and/or steel bridges on the California State Highway System
h) Minimum ten (10) years bridge design and seismic design experience on California State Highway System
i) Must have a license as Professional Civil Engineer in California
Geotechnical Engineer
a) Reports directly to the Design Manager
b) Responsible for geotechnical investigations and reports
c) Minimum fifteen (15) years ten (10) of which in California of recent experience in deep foundation design including large pipe piles, drilled shafts, monitoring drilled shaft construction, drilled shaft load testing criteria and analysis, spread footings, and settlement
d) Must have a license as Civil Engineer or Geotechnical Engineer in California
Safety Manager
a) Must not be under the direct supervision of construction personnel and will report directly to Design-Builder’s Project Manager
b) Shall be assigned to the Project full time and will be required to be on site for the duration of the Project
c) Shall have the authority to stop any and all Work when unsafe conditions are present
d) Shall have ten (10) years experience managing complex infrastructure projects.
e) Shall have five (5) years of construction safety management experience in implementing and managing safety programs and maintaining compliance with safety regulations during construction activities on major urban freeways.
f) Must be familiar with work zone safety regulations and must have at least five (5) years of recent experience working in roadway work zone safety and OSHA (Cal-OSHA) regulations
Utility Coordinator
a) Available during project design for utility design coordination. Required to be on-site during underground operations, utility relocations
b) Responsible for coordination of utility, and permitting requirements of the Design-Builder and for ensuring that utility, and permitting issues are resolved prior to start of construction work
June 21, 2012 7
Addendum No. 4 CONTRACT NO. 08-0K7104
c) Ten (10) years of experience with complex infrastructure projects
d) Five (5) years of management of utility function on major urban freeways
Railroad Coordinator
a) Responsible for coordination of railroad requirements of the Design-Builder and for ensuring that railroad issues are resolved prior to start of construction work
b) Ten years (10) of experience with complex infrastructure projects with direct management of railroad function
c) Five years (5) of management of railroad function on major urban freeways
Project Scheduler
a) Works directly for the Design-Builder
b) Fifteen (15) years experience in scheduling complex infrastructure projects
c) Five years (5) experience of schedule management on major urban freeways
Environmental Compliance Manager
a) Previous experience on more than one project, which required substantial coordination with Army Corps of Engineers, California State Regional Water Quality Control Board, California Department of Fish and Game (including preparation of permit applications), implementing measures addressing impacts to threatened and endangered species, implementing measures addressing impacts to waters, and implementing measures addressing cultural and paleontological resources (including on-site monitoring related to all of the above)
b) Experience on multiple projects requiring implementation of measures to address air quality, noise, and hazardous waste compliance requirements
c) Previous experience developing measures to satisfy Section 401, 404, and 1602 requirements as identified by corresponding Resource Agency, pertinent to issuance of same
Traffic Manager
a) Shall be assigned full time to implement, manage, and oversight the Traffic Management Plan for the Project, and serve at Design-Builder‘s point of contact for all TMP-related issues
b) Must be familiar with the California MUTCD and with Caltrans‘ standards
c) Five (5) years recent experience managing similar type of projects
d) Registered Professional Civil Engineer in the State of California now or by the time the notice to proceed is issued is preferred, but not required
Information Technology Manager
a) Reports directly to the Design-Builder Project Manager,
b) Responsible for installing and maintaining computer hardware, software and networks,
c) Acts as a single point of contact for Department Information Technology to coordinate the acquisition, deployment, maintenance and disposal of information technology equipment,
June 21, 2012 8
Addendum No. 4 CONTRACT NO. 08-0K7104
d) Responsible for the implementation and maintenance of the Document Control System,
e) Responsible for the security and management of project information.
Section 4 Environmental Compliance Replace Exhibit 4-A “Environmental Commitment Record” with the revised Exhibit 4-B attached to this addendum.
Section 6 Utilities Section 6.3.6.1 “Utility Work Which Shall Be Avoided” is modified as indicated below.
6.3.6.1 Utility Work Which Shall Be Avoided
The Design-Builder shall avoid Utility Work and protect in place the following utilities shown on the Utility Plan Sheets:
All Utilities shown on I-15 south of Devore OH (Br. No. 54-818),
The 14-inch Kinder Morgan pipeline within the project limits. Requirements for working near Kinder Morgan facilities are included in the RID. The Design-Builder shall contact Kinder Morgan for the most current requirements for working near a Kinder Morgan facility. It should be noted that protecting this utility in place may require a retaining wall near where the Utility follows the ‘CD’ Line,
All Utilities in Cajon Blvd north of 'CAJ' Station 79101+00, except for adjustments to manholes and utility boxes,
All Utilities in Kenwood Boulevard, expect for adjustments to manholes and utility boxes,
The Southern California Gas 36-inch line crossing I-15 near 'A4' Station 28+00, except to extend casings,
The Southern California Edison overhead line crossing I-15 near 'A4' Station 37+00,
All underground Utilities in existing Dement Street except the 4-inch fiber optic line owned by Verizon Business (left side of existing street) and any casing extensions.
Section 6.3.6.4 “San Bernardino Municipal Water Department” is added as indicated below.
6.3.6.4 San Bernardino Municipal Water Department
The relocation of the 16-inch water line owned by San Bernardino Municipal Water Department (SBMW) between 'CAJ' Stations 57+00 and 79+00 shall be designed and constructed by the Design-Builder. This Utility shall be relocated within the new Cajon Blvd within the limits specified. The Design-Builder will coordinate with SBMW to determine the SBMW's specific requirements for design and construction of the relocation. The Contract Price of the Project shall include all costs, excluding Betterments, associated with the relocation of the Utility within the limits specified. The Design-Builder shall provide the Department with a lump sum estimate for the costs associated with this relocation, excluding Betterments, within 90 days of NTP1.
Section 6.3.6.5 “Devore Water Company” is added as indicated below.
June 21, 2012 9
Addendum No. 4 CONTRACT NO. 08-0K7104
6.3.6.5 Devore Water Company
The relocation of Devore Water Company (DWC) Utilities shall be designed by the Design-Builder. The Design-Builder will coordinate with DWC to determine DWC’s specific requirements for design. A preliminary drawing of the required relocation is included in the RID. The Contract Price of the Project shall include all costs for the design of this relocation. The Design-Builder shall provide the Department with a lump sum estimate for the costs associated with the design of this relocation within 90 days of NTP1.
Replace Exhibit 6-B “Utility Tracking Report” with the revised Exhibit 6-B attached to this addendum.
Section 7 Right of Way Section 7.5.1 “Construction Easements” is modified as indicated below.
7.5.1 Easements
7.5.1.1 Construction Easements
The Design-Builder shall include in the Preliminary Master Design Submittal all Construction Easements necessary for construction of the Project. The Preliminary Master Design Submittal shall identify the Construction Easements sought and shall include drawings depicting proposed construction limits and cross-sections. Any additional Construction Easements identified after the Preliminary Master Design Submittal will be acquired at the Design-Builder cost, excluding Construction Easement required for utility relocation. Payment for additional Construction Easements shall be made by the Department and deducted from the Design-Builder’s monthly progress payment.
The Department will be responsible for the acquisition activities of all Construction Easements for the Project, including additional Construction Easements identified after the Preliminary Master Design Submittal.
Acquisition of Construction Easements could take up to 24 calendar months from the time the written notification is submitted by the Design-Builder. Schedule implications associated with the acquisition of Construction Easements shall be the responsibility of the Design-Builder.
Section 7.5.1.2 “Utility Easements” is added as shown below.
7.5.1.2 Utility Easements
The Design-Builder shall coordinate with the Department and utility owners to assist in identifying the location of utility replacement easements.
The Department will be responsible for the acquisition activities of all utility easements for the Project, including additional utility easements identified after the Preliminary Master Design Submittal. The Department and utility owner will identify the utility easements after conflict maps are received from the Design-Builder.
Acquisition of additional utility easements could take up to 22 calendar months from the time Department approved relocation plans are approved by the Design-Builder. Schedule implications associated with the acquisition of utility easements shall be the responsibility of the Design-Builder.
June 21, 2012 10
Addendum No. 4 CONTRACT NO. 08-0K7104
Utility easements shown on the R/W Work Map will be acquired by the date referenced in Book 2 Section 7 7.1.
Section 13 Structures Section 13.2.7 “Bridge Deck” is modified as indicated below:
13.2.7 Bridge Deck
Final bridge deck shall be cast-in-placed concrete. Precast concrete deck panels can only be used as stay-in-place forms for precast concrete girders.
Bridge decks that require treatment shall be cleaned and treated with high molecular weight methacrylate.
The Design-Builder will be required to check the live load capacity of existing bridges that require overlays. Overlays on existing bridge decks shall be polyester concrete. Asphalt concrete is not allowed for bridge deck overlays.
The closure pour width shall be constant throughout the length of the bridge. For the widened structures, the spacing between the existing girder and the first new girder shall be 50% or less of the spacing between the new adjacent girders on the widened portion.
Section 13.2.13 “Inspection and Maintenance Access” is modified as indicated below:
13.2.13 Inspection and Maintenance Access
The design shall allow all new and widened portions of the bridge superstructures, joints, and bearings to be accessible for long-term inspection and maintenance. Box structures, cast-in-place concrete, or concrete segmental box girders shall be designed with a minimum inside depth of 4’ to facilitate interior inspection.
Section 13.2.18 “Foundation Design” is modified as indicated below:
13.2.18 Foundation Design
The Design-Builder shall perform geotechnical investigations at the bridge site and produce Geotechnical Design Reports (GDRs) and Foundation Reports (FRs). Foundation type, capacity, estimated lengths, and bottom elevations shall be determined by the Design-Builder in accordance with the Geotechnical Report for the structure. Analysis shall include bearing capacities, factors of safety and an estimate of total and anticipated differential settlement for each structure. The final foundation design for each structure will be based on the approved Final Foundation Reports. The Preliminary Foundation Reports, Geotechnical Design Reports and Foundation Reports shall conform to Section 8, “Geotechnical”.
Bridge Abutments and bent/columns shall be supported on pile foundations. Each bridge/structure shall have the same type of pile foundations (Group piles, Type I, or Type II shaft) at all bents.
Column and Pile transverse reinforcement requirements shall comply with Exhibit 13-C “Transverse Reinforcement Requirements for Columns and Piles”
June 21, 2012 11
Addendum No. 4 CONTRACT NO. 08-0K7104
Add Exhibit 13-C “Transverse Reinforcement Requirements for Columns and Piles” attached to this addendum.
Section 16 Signing, Pavement Marking, Signalization and Lighting
Section 16.2.8 “Certification Requirements” is modified as indicated below:
16.2.8 Certification Requirements
Design-Builder shall have an Electrical Engineer or a registered Civil Engineer with a minimum of 5 years electrical design experience on the California State Highway System.
Section 17 Intelligent Transportation Systems
Section 17.2.6 “Certification Requirements” is modified as indicated below:
17.2.6 Certification Requirements
The Design-Builder shall have an Electrical Engineer or a registered Civil Engineer with a minimum of 5 years electrical design experience on the California State Highway System.
The Design-Builder shall coordinate with the METS lab to coordinate the inspection of Electrical equipment and all pole standards.
Section 23 Ramp Metering
Section 23.2.8 “Certification Requirements” is modified as indicated below:
23.2.8 Certification Requirements
The Design-Builder shall have an Electrical Engineer or a registered Civil Engineer with a minimum of 5 years electrical design experience on the California State Highway System.
The Design-Builder shall perform all laboratory testing at a Department certified and approved lab and an AMRL-accredited facility for material tests required by this section. All material testers are to be certified for the materials they are testing. The design builder shall also coordinate with Caltrans METS lab for inspection of Electrical equipment and all pole standards
REFERENCE INFORMATION DOCUMENTS (RID) See revised RID Index for a list of provided Reference Information Documents in the Data Room.
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-1
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
Co
mm
un
ity
Imp
acts
RE
L-1
In
co
njun
ctio
n w
ith
acqu
isiti
on
of
any
prop
erty
, w
heth
er f
or t
empo
rary
use
or
a pa
rtia
l or
fu
ll ac
quis
ition
fo
r pe
rman
ent
use,
all
requ
irem
ents
of
th
e U
nifo
rm
Rel
ocat
ion
Ass
ista
nce
and
Rea
l P
rope
rty
Acq
uisi
tion
Pol
icie
s A
ct o
f 19
70,
as
amen
ded
in
1987
, an
d T
he
Bus
ines
s an
d F
arm
R
eloc
atio
n P
rogr
am w
ill b
e fu
lly s
atis
fied.
2.3-
93
Dep
artm
ent
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l P
lann
ing
Dur
ing
Des
ign-
Bui
ld
Uti
liti
es a
nd
Em
erg
enc
y S
ervi
ces
UT
-1 P
rior
to t
he a
ppro
val o
f fin
al
plan
s,
the
impa
cts
of
all
utili
ty
relo
catio
ns
shal
l be
as
sess
ed
agai
nst
the
impa
cts
iden
tifie
d in
th
e pr
elim
inar
y pl
ans
and
asse
ssed
in
th
is
docu
men
t.
If su
ch im
pact
s ex
ceed
the
impa
cts
asse
ssed
in
this
doc
umen
t, th
en
the
Dep
artm
ent
will
co
nduc
t ad
ditio
nal
envi
ronm
enta
l re
view
s of
th
e re
vise
d pl
ans,
as
ne
cess
ary.
Dur
ing
prep
arat
ion
of
final
pl
ans,
th
e D
epar
tmen
t w
ill
coor
dina
te
requ
isite
ut
ility
re
loca
tion
effo
rts
prio
r to
2.4-
6
Des
ign
Bui
lder
Dis
tric
t D
esig
n /
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l P
lann
ing
Dur
ing
Des
ign-
Bui
ld
Des
ign
Bui
lder
sh
all
asse
ss
and
disc
lose
im
pact
s of
al
l ut
ility
re
loca
tion
to
the
Dep
artm
ent.
T
he
Dep
artm
ent
will
co
nduc
t ad
ditio
nal
envi
ronm
enta
l re
vie
ws
and
coor
dina
te
requ
isite
util
ity
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-2
I-1
5/I-2
15 In
terc
hang
e Im
prov
emen
ts P
roje
ct In
itial
Stu
dy/E
nviro
nmen
tal A
sses
smen
t
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
co
nstr
uctio
n.
relo
catio
n ef
fort
s as
ne
cess
ary.
Tra
ffic
an
d T
ran
spo
rtat
ion
/Bic
ycle
an
d P
edes
tria
n F
acili
ties
TR
-1 P
rior
to t
he c
omm
ence
men
t of
any
con
stru
ctio
n, t
he d
esig
n-b u
ilder
sh
all
prep
are
a T
raffi
c M
anag
emen
t P
lan
per
the
Dep
artm
ent’s
re
quire
men
ts,
incl
udin
g: a
com
mun
ity o
utre
ach
prog
ram
, m
edia
bu
lletin
s,
appr
opria
te
sign
ing,
ad
here
nce
to
dust
co
ntro
l re
stric
tions
, av
oida
nce
of
traf
fic
rest
rictio
ns
durin
g pe
ak
trav
el
per
iods
, co
nstr
uctio
n zo
ne
enha
nced
en
forc
emen
t (p
rovi
ded
by
the
C
alifo
rnia
H
ighw
ay
Pat
rol),
em
erge
ncy
resp
onse
, an
d co
ordi
natio
n of
w
ork
as
nece
ssar
y w
ith
any
othe
r ro
adw
ay p
roje
cts
in t
he v
icin
ity.
In
part
icul
ar,
the
TM
P
shal
l en
sure
th
at
emer
genc
y re
spon
ders
ha
ve
adeq
uate
ac
cess
du
ring
all
phas
es
of
cons
truc
tion,
an
d sh
all
prov
ide
for
emer
genc
y co
ntac
t po
ints
be
twee
n th
e co
nstr
uctio
n en
gine
er
and
all
emer
genc
y re
spon
ders
. T
he T
MP
sha
ll al
so
incl
ude
mea
sure
s to
pre
serv
e th
e
2.5-
85
Des
ign
Bui
lder
Res
iden
t E
ngin
eer
/ D
istr
ict
Tra
ffic
Man
agem
ent
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-3
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
vi
abili
ty o
f I-
15 a
s a
heav
y ha
ul
rout
e du
ring
cons
truc
tion
to t
he
degr
ee f
easi
ble,
and
will
ide
ntify
m
easu
res
to c
oord
inat
e w
ith t
he
heav
y ha
ul in
dust
ry.
TR
-2 T
he p
roje
ct w
ill n
ot u
tiliz
e K
enw
ood
Ave
nue
nort
h o
f th
e I-
15 n
orth
boun
d ra
mps
, or
Dev
ore
Roa
d no
rth
of
the
I-21
5
nort
hbou
nd
ram
ps
as
a de
tour
ro
ute
durin
g an
y pa
rt
of
the
cons
truc
tion
of
this
pr
ojec
t. A
dditi
onal
ly,
cons
truc
tion
haul
tr
ucks
will
be
rout
ed a
way
fro
m
cong
este
d st
reet
s an
d se
nsiti
ve
area
s.
2.5-
86
Des
ign
Bui
lder
Res
iden
t E
ngin
eer
/ D
istr
ict
Tra
ffic
Man
agem
ent
Dur
ing
Des
ign-
Bui
ld
TR
-3
The
de
sign
sh
all
inco
rpor
ate
spec
ific
new
sig
nage
di
rect
ing
mot
oris
ts
to
Ken
woo
d
Ave
nue
from
no
rthb
ound
I-
15
and
I-21
5.
2.5-
86
Des
ign
Bui
lder
Dis
tric
t D
esig
n /
Res
iden
t E
ngin
eer
/ D
istr
ict
Tra
ffic
Man
agem
ent
Dur
ing
Des
ign-
Bui
ld
TR
-4 I
f th
e pr
ojec
t re
quire
s th
e cl
osur
e of
th
e lo
cal
serv
ice
inte
rcha
nges
at
G
len
Hel
en
Par
kway
, D
evor
e R
oad,
or
K
enw
ood
Ave
nue
for
mor
e th
an
ten
days
, th
en
a ra
mp
clos
ure
stud
y m
ust
be c
ompl
eted
dur
ing
the
desi
gn- b
uild
ph
ase.
T
he
Dep
artm
ent
will
en
sure
im
plem
enta
tion
of a
ny m
easu
res
2.5-
86
Des
ign
Bui
lder
Res
iden
t E
ngin
eer
/ D
istr
ict
Tra
ffic
Man
agem
ent
/ D
istr
ict
Env
ironm
enta
l P
lann
ing
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-4
I-1
5/I-2
15 In
terc
hang
e Im
prov
emen
ts P
roje
ct In
itial
Stu
dy/E
nviro
nmen
tal A
sses
smen
t
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
re
sulti
ng fr
om s
uch
stud
ies.
Vis
ual
/Aes
thet
ics
V-1
Har
dsur
face
Pla
n: A
pla
n to
im
plem
ent
reta
inin
g an
d so
und
wal
ls,
med
ians
, an
d ot
her
aest
hetic
ha
rdsc
ape
will
be
in
corp
orat
ed i
nto
the
final
des
ign
of t
he p
roje
ct c
onsi
sten
t w
ith t
he
appl
icab
le
goal
s an
d po
licie
s ar
ticul
ated
in
the
San
Ber
nard
ino
Cou
nty
and
City
of
S
an
Ber
nard
ino
Gen
eral
P
lans
, as
w
ell
as t
hose
in
the
Gle
n H
elen
S
peci
fic P
lan,
incl
udin
g:
2.6-
62
Des
ign
Bui
lder
Dis
tric
t D
esig
n /
Res
iden
t E
ngin
eer
/ La
ndsc
ape
Arc
hite
ctur
e
Dur
ing
Des
ign-
Bui
ld
V-1
-a
Sou
nd a
nd r
etai
ning
wal
ls
will
be
heav
ily t
ext
ured
(su
ch a
s fr
actu
red
rib
or
split
- fac
e)
to
min
imiz
e vi
sual
im
pact
s of
mas
s.
Sur
face
s fa
cing
pu
blic
us
e w
ill
inco
rpor
ate
wal
l ca
p an
d pa
nel
deta
iling
to
sc
ale
elem
ents
to
ad
jace
nt
feat
ures
, an
d si
te-
spec
ific
aest
hetic
fea
ture
s (lo
cal
or
hist
oric
re
fere
nces
) to
m
inim
ize
com
mun
ity
impa
ct
by
enha
ncin
g th
e re
gion
al “
sens
e of
pl
ace.
” S
ound
and
ret
aini
ng w
alls
in
hi
stor
ic/c
ultu
ral
impa
ct
area
s w
ill
incl
ude
a ra
nge
of
m
inim
izat
ion
tech
niqu
es
not
limite
d to
: se
t ba
ck w
ith p
lant
ing
2.6-
62
Des
ign
Bui
lder
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ La
ndsc
ape
Arc
hite
ctur
e
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-5
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
at
roa
d ed
ge,
terr
acin
g, b
atte
red
(non
-ver
tical
) re
tain
ing
wal
ls,
and
colo
ring
to
dupl
icat
e ad
jace
nt
nativ
e so
il.
V-1
-b
Slo
pe
pavi
ng
will
in
clud
e te
xtur
al
elem
ents
w
ith
patt
ern
linki
ng
wal
l tr
eatm
ents
to
m
inim
ize
visu
al
impa
cts
of
disr
uptio
n of
vie
wsh
ed e
lem
ents
an
d lin
k pa
ved
elem
ents
in
to
exis
ting
feat
ures
.
2.6-
62
Des
ign
Bui
lder
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ La
ndsc
ape
Arc
hite
ctur
e
Dur
ing
Des
ign-
Bui
ld
V-1
-c
Gor
e pa
ving
w
ill
inco
rpor
ate
cont
rast
ing
pavi
ng
trea
tmen
t bo
th
as
a sa
fety
fe
atur
e an
d as
a
min
imiz
atio
n m
easu
re t
o re
duce
vis
ual
mas
s of
pro
pose
d pa
ving
are
as.
2.6-
62
Des
ign
Bui
lder
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ La
ndsc
ape
Arc
hite
ctur
e
Dur
ing
Des
ign-
Bui
ld
V-1
-d
Med
ian
barr
iers
, w
here
ap
prop
riate
and
app
rove
d by
the
D
epar
tmen
t ,
will
in
corp
orat
e an
em
boss
ed
patt
ern
or
“logo
” to
m
inim
ize
visu
al i
mpa
ct o
f m
ass
hard
surf
ace
resu
lting
fr
om
med
ian
infil
l an
d lo
ss o
f cu
rren
t te
xtur
al
varie
ty
of
natu
ral
eart
h m
edia
n.
The
em
boss
ed
patte
rn
will
not
be
cont
inuo
us a
nd w
ill b
e
appl
ied
to
bet w
een
20
%
and
25
% o
f th
e ne
w m
edia
n ba
rrie
rs
cons
truc
ted.
B
ackg
roun
d fo
r th
e pa
tter
ned
area
s w
ill b
e th
at o
f th
e
2.6-
62
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ La
ndsc
ape
Arc
hite
ctur
e
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-6
I-1
5/I-2
15 In
terc
hang
e Im
prov
emen
ts P
roje
ct In
itial
Stu
dy/E
nviro
nmen
tal A
sses
smen
t
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
75
%
to
80%
of
th
e re
mai
ning
m
edia
n ba
rrie
rs c
onst
ruct
ed.
V-2
H
ighw
ay
Pla
ntin
g:
All
mea
sure
s ne
cess
ary
to a
ddre
ss
the
pote
ntia
l vi
sual
/aes
thet
ic
impa
cts
resu
lting
fro
m t
he I
-15/
I-21
5 In
terc
hang
e Im
prov
emen
ts
proj
ect
will
be
fu
nded
an
d co
nstr
ucte
d as
pa
rt
of
the
road
way
co
nstr
uctio
n pr
ojec
t. R
eveg
etat
ion
mea
sure
s be
low
w
ill
add
ress
vi
sual
/aes
thet
ic
impa
cts
and
be im
plem
ente
d in
a
man
ner
that
is
co
nsis
tent
w
ith
cons
trai
nts
and
othe
r re
quire
men
ts
rela
ted
to
the
biol
ogic
al a
nd c
ultu
ral
reso
urce
s w
ithin
the
pro
ject
are
a. M
easu
res
will
be
pro
vide
d a
t th
e fo
llow
ing
lo
catio
ns:
2.6-
62
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ La
ndsc
ape
Arc
hite
ctur
e /
Dis
tric
t C
ultu
ral S
tudi
es
Dur
ing
Des
ign-
Bui
ld
V-2
-a
All
grad
ed
slop
es
will
be
re
vege
tate
d so
tha
t m
atur
e (n
on-
pion
eer)
sp
ecie
s co
ver
is
esta
blis
hed.
Pla
ntin
g w
ill b
e si
te-
spec
ific
and
vary
ac
cord
ing
to
slop
e as
pect
an
d el
evat
ion.
T
empo
rary
irr
igat
ion
as
nece
ssar
y to
est
ablis
h pl
antin
g is
co
nsid
ered
pa
rt
of
this
re
vege
tatio
n pl
antin
g.
Rev
eget
atio
n w
ill b
e re
quire
d fo
r al
l di
stur
bed
grou
nd
as
wel
l as
2.6-
63
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ La
ndsc
ape
Arc
hite
ctur
e /
Dis
tric
t C
ultu
ral S
tudi
es
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-7
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
gr
aded
slo
pes,
to
rest
ore
visu
al
unity
of
the
site
and
int
egrit
y of
th
e se
tting
.
V-2
-b A
t D
evor
e R
oad/
I-21
5 an
d at
K
enw
ood/
I-15
, pl
antin
g w
ill
supp
lem
ent
Har
dsur
face
P
lan
elem
ents
an
d pr
ovid
e ap
prop
riate
pl
antin
g at
co
mm
unity
en
trie
s.
Pla
ntin
g w
ill
min
imiz
e vi
sual
an
d co
mm
unity
im
pact
s of
the
incr
ease
d sc
ale
of
the
adja
cent
in
terc
hang
e,
and
prov
ide
buff
erin
g to
re
tain
th
e ex
istin
g ru
ral s
ettin
g. P
lant
ing
will
be
site
spe
cific
and
will
link
to
the
adja
cent
nat
ive
land
scap
e.
2.6-
63
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ La
ndsc
ape
Arc
hite
ctur
e /
Dis
tric
t B
iolo
gist
/
Dis
tric
t M
aint
enan
ce
Dur
ing
Des
ign-
Bui
ld
V-2
-c A
long
the
nor
thbo
und
truc
k cl
imbi
ng
lane
, pl
antin
g w
ill
min
imiz
e vi
sual
im
pact
s of
th
e fr
eew
ay
wid
enin
g th
at
wou
ld
occu
r un
der
the
proj
ect.
Pla
ntin
g w
ill
be
prov
ided
to
re
duce
ad
jace
nt
owne
rs’
aw
aren
ess
of
the
adja
cent
inte
rcha
nge.
2.6-
63
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ La
ndsc
ape
Arc
hite
ctur
e /
Dis
tric
t B
iolo
gist
/
Dis
tric
t M
aint
enan
ce
Dur
ing
Des
ign-
Bui
ld
V-2
-d
Are
as
adja
cent
to
br
idge
an
d w
all e
lem
ents
will
be
plan
ted
to m
inim
ize
the
incr
ease
d sc
ale
of
built
el
emen
ts.
Nat
ive
tree
m
assi
ng,
appr
opria
te
to
each
sp
ecifi
c lo
catio
n,
will
be
im
plem
ente
d ut
ilizi
ng
tem
pora
ry
2.6-
63
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ La
ndsc
ape
Arc
hite
ctur
e /
Dis
tric
t B
iolo
gist
/
Dis
tric
t M
aint
enan
ce
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-8
I-1
5/I-2
15 In
terc
hang
e Im
prov
emen
ts P
roje
ct In
itial
Stu
dy/E
nviro
nmen
tal A
sses
smen
t
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
irr
igat
ion,
to
min
imiz
e lo
cal
visu
al
impa
cts.
V-2
-e S
torm
wat
er e
lem
ents
(i.e
., sw
ales
, ba
sins
) w
ill b
e ad
dre
ssed
as
in
tegr
ated
el
emen
ts
of
the
reve
geta
tion
plan
ting.
A
s ap
prov
ed b
y th
e D
epar
tmen
t, rip
-ra
p an
d ot
her
cons
truc
ted
elem
ents
will
be
colo
red
to m
atch
na
tive
soil
to
min
imiz
e vi
sual
in
trus
ion.
Gra
ding
of
basi
ns w
ill
min
imiz
e th
eir
visu
al i
mpa
cts
by
bein
g de
sign
ed to
pre
sent
a “
not
man
- mad
e ap
pear
ance
,”
mim
icki
ng n
atur
al la
nd fo
rms.
2.6-
63
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ La
ndsc
ape
Arc
hite
ctur
e /
Dis
tric
t B
iolo
gist
/
Dis
tric
t S
torm
wat
er
/ D
istr
ict
Mai
nten
ance
Dur
ing
Des
ign-
Bui
ld
V-3
Li
ght
and
Gla
re:
Ligh
ting
fix
ture
s w
ill
be
sele
cted
to
m
inim
ize
glar
e on
ad
jace
nt
prop
ertie
s an
d in
to t
he n
ight
sky
. Li
ghtin
g w
ill
be
shie
lded
w
ith
non-
glar
e ho
ods
an
d fo
cuse
d w
ithin
th
e fr
eew
ay
right
-of-
way
. T
he li
ghtin
g pl
an w
ill b
e r
evie
we
d
and
appr
oved
by
the
Dep
artm
ent
and
the
Cou
nty
and
the
City
of
San
B
erna
rdin
o,
as
appl
icab
le,
prio
r to
co
nstr
uctio
n to
en
sure
co
mpl
ianc
e w
ith
thes
e cr
iteria
. In
crea
sed
glar
e fr
om
prop
osed
w
alls
, st
ruct
ures
and
pav
emen
ts
will
be
m
inim
ized
by
m
easu
res
2.6-
63
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ La
ndsc
ape
Arc
hite
ctur
e /
Dis
tric
t B
iolo
gist
/
Dis
tric
t M
aint
enan
ce
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-9
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
id
entif
ied
in V
-1 a
nd V
-2.
V-4
Gra
ding
: S
lope
s, p
artic
ular
ly
thos
e ab
uttin
g un
dist
urbe
d ar
eas,
w
ill
incl
ude
cont
our
grad
ing,
ea
sing
al
l ed
ges
and
slop
e ro
undi
ng (
Dep
art
men
t’s H
ighw
ay
Des
ign
Man
ual 3
04.4
and
109
.3),
an
d w
here
nec
essa
ry,
addi
tiona
l rig
ht-o
f-w
ay
to
achi
eve
it.
Con
tour
gr
adin
g
and
slop
e
roun
ding
w
ill
be
prov
ided
to
m
inim
ize
the
visu
al
impa
cts
of
disr
upte
d gr
aded
slo
pes
agai
nst
exis
ting
land
form
s an
d to
ad
dres
s im
pact
s to
uni
ty b
etw
een
na
tive
surr
ound
ings
and
gra
ded
area
s.
2.6-
64
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ La
ndsc
ape
Arc
hite
ctur
e /
Dis
tric
t B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
V-5
S
truc
ture
s:
Arc
hite
ctur
al/
aest
hetic
tre
atm
ent
of b
ridge
s w
ill
addr
ess
the
I-15
/I-21
5 In
terc
hang
e as
a
uniq
ue
and
vi
vid
visu
al a
sset
. S
truc
ture
s w
ill
incl
ude
shap
e an
d te
xtur
al
elem
ents
as
ap
prop
riate
to
lin
k th
em
to
adja
cent
H
ards
urfa
ce
Pla
n el
emen
ts.
Gird
ers
and
barr
iers
w
ill
inco
rpor
ate
sim
ilar
unify
ing
trea
tmen
ts.
Sup
port
fo
r lig
htin
g an
d si
gnag
e w
ill
inco
rpor
ate
linki
ng
elem
ents
of
th
e ba
se o
r th
e po
le i
tsel
f to
the
ov
eral
l st
ruct
ure.
T
hese
2.6-
64
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ S
truc
tura
l D
esig
n/
Land
scap
e A
rchi
tect
ure
/ D
istr
ict
Cul
tura
l Stu
dies
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-1
0
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
tr
eatm
ents
will
add
ress
the
vis
ual
impa
cts
of
the
prop
osed
st
ruct
ures
by
in
tegr
atin
g its
el
emen
ts
into
a
visu
ally
un
ified
st
ruct
ure
linke
d in
to s
urro
undi
ng
grou
nd t
reat
men
ts.
Cu
ltu
ral R
eso
urc
es
CR
-1
If
cultu
ral
mat
eria
ls
are
disc
over
ed
durin
g co
nstr
uctio
n,
all
eart
h-m
ovin
g ac
tivity
w
ithin
an
d ar
ound
th
e im
med
iate
di
scov
ery
area
w
ill
be
dive
rted
un
til a
qua
lifie
d ar
chae
olog
ist
can
asse
ss
the
natu
re
and
sign
ifica
nce
of t
he f
ind.
2.7-
5
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Cul
tura
l S
tudi
es
Dur
ing
Des
ign-
Bui
ld
CR
-2
If
hum
an
rem
ains
ar
e di
scov
ered
, S
tate
H
ealth
an
d S
afet
y C
ode
Sec
tion
7050
.5
stat
es
that
fu
rthe
r di
stur
banc
es
and
activ
ities
sha
ll ce
ase
in a
ny
area
or
near
by a
rea
susp
ecte
d to
ov
erlie
rem
ains
, an
d th
e C
ount
y C
oron
er
cont
acte
d.
Pur
suan
t to
P
ublic
Res
ourc
es C
ode
Sec
tion
5097
.98,
if
the
rem
ains
ar
e th
ough
t to
be
N
ativ
e A
mer
ican
, th
e co
rone
r w
ill n
otify
the
Nat
ive
Am
eric
an
Her
itage
C
omm
issi
on
(NA
HC
) w
ho w
ill t
hen
notif
y th
e M
ost
Like
ly
Des
cend
ent
(MLD
).
At
this
tim
e,
the
pers
on
who
2.7-
6
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Cul
tura
l S
tudi
es
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-11
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
di
scov
ered
th
e re
mai
ns
will
co
ntac
t th
e D
istr
ict
8, D
ivis
ion
of
Env
ironm
enta
l P
lann
ing,
G
abrie
lle D
uff,
DE
BC
: (9
09)
383-
6933
, an
d G
ary
Jone
s,
DN
AC
: (9
09)
383-
7505
, so
tha
t th
ey m
ay
wor
k w
ith
the
MLD
on
th
e re
spec
tful
trea
tmen
t an
d di
spos
ition
of
th
e re
mai
ns.
Fur
ther
pr
ovis
ions
of
P
RC
50
97.9
8 ar
e to
be
fo
llow
ed
as
appl
icab
le.
CR
-3
Arc
haeo
logi
cal
and
trib
al
mon
itors
sha
ll be
pre
sent
dur
ing
gr
ubbi
ng a
nd c
lear
ing
activ
ity i
n th
e ar
eas
surv
eyed
in
th
e S
uppl
emen
tal
HP
SR
. In
th
e ev
ent
that
ad
ditio
nal
cultu
ral
depo
sits
ar
e un
cove
red
durin
g
grub
bing
and
cle
arin
g op
erat
ions
, th
e ar
chae
olog
ical
mon
itor
shal
l be
em
pow
ered
to
halt
or d
iver
t w
ork
in
the
vici
nity
of
th
e fin
d un
til t
he a
rcha
eolo
gist
is
able
to
dete
rmin
e th
e na
ture
an
d th
e si
gnifi
canc
e of
the
dis
cove
ry.
2.7-
6
Des
ign
Bui
lder
Res
iden
t E
ngin
eer
/ D
istr
ict
Cul
tura
l S
tudi
es
Dur
ing
Des
ign-
Bui
ld
Hyd
rolo
gy
and
Flo
od
pla
in
FP
-1
Dur
ing
desi
gn-b
uild
, al
l ap
plic
able
coo
rdin
atio
n w
ith S
an
Ber
nard
ino
Cou
nty
De
part
men
t of
P
ublic
W
orks
F
lood
C
ontr
ol
2.8-
8
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict
Hyd
raul
ics
/ D
istr
ict D
esig
n
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-1
2
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
D
ivis
ion
shal
l oc
cur
incl
udin
g ob
tain
ing
an
encr
oach
men
t pe
rmit
as r
equi
red
prio
r to
wor
k w
ithin
the
ir rig
ht-o
f-w
ay.
FP
-2
Dur
ing
desi
gn-b
uild
, th
e ag
ency
sh
all
ensu
re
that
th
e pr
ojec
t en
gine
er p
repa
res
a F
inal
Lo
catio
n H
ydra
ulic
S
tudy
(L
HS
) ba
sed
on
an
upda
ted
hydr
aulic
m
odel
fo
r C
able
C
reek
. In
ad
ditio
n, a
det
aile
d su
rvey
of
the
exis
ting
cree
k w
ill b
e pe
rfor
med
to
de
term
ine
actu
al
as-b
uilt
cond
ition
s.
The
re
sults
of
th
e su
rvey
w
ill
be
inco
rpor
ated
in
to
an
upda
ted
hydr
aulic
mod
el f
or
both
ex
istin
g an
d pr
opos
ed
cond
ition
s.
2.8-
8
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict H
ydra
ulic
s
Dur
ing
Des
ign-
Bui
ld
The
ab
ove
m
easu
re
only
ap
plie
d to
A
ltern
ativ
es
2 an
d 5
beca
use
Alte
rnat
ive
3A
was
se
lect
ed
as
the
Pre
ferr
ed
Alte
rnat
ive,
th
is
mea
sure
is
no
lo
nger
ap
plic
able
to
th
e pr
ojec
t.
Wat
er Q
ual
ity
and
Sto
rm R
un
off
WQ
-1 C
ompl
y w
ith t
he p
rovi
sion
s of
th
e N
atio
nal
Pol
luta
nt
Dis
char
ge
Elim
inat
ion
Sys
tem
(N
PD
ES
) P
erm
it,
Sta
tew
ide
S
torm
Wat
er P
erm
it an
d W
aste
D
isch
arge
Req
uire
men
ts (
WD
Rs)
fo
r th
e D
epar
tmen
t’s O
rder
N
o.
99-0
6-D
WQ
, N
PD
ES
N
o.
CA
S00
0003
, an
d an
y su
bseq
uent
per
mit
as t
hey
rela
te
to
cons
truc
tion
activ
ities
fo
r th
e
2.9-
20
Des
ign
Bui
lder
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict S
torm
Wat
er
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-13
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
pr
ojec
t. T
his
will
in
clud
e su
bmis
sion
of
a N
otic
e of
Int
ent
(NO
I)
to
the
Sta
te
Wat
er
Res
ourc
es C
ontr
ol B
oard
at
leas
t 14
da
ys
prio
r to
th
e st
art
of
cons
truc
tion
whi
ch
incl
udes
pr
epar
atio
n an
d im
plem
enta
tion
of
a S
torm
W
ater
P
ollu
tion
Pre
vent
ion
Pla
n (S
WP
PP
),
and
subm
issi
on
of
a N
otic
e of
T
erm
inat
ion
(NO
T)
to
the
Sta
te
Wat
er R
esou
rces
Con
trol
Boa
rd
upon
com
plet
ion
of c
onst
ruct
ion
and
stab
iliza
tion
of th
e si
te.
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-1
4
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
W
Q-2
Com
ply
with
the
pro
visi
ons
of t
he G
ener
al W
aste
Dis
char
ge
Req
uire
men
ts f
or D
isch
arge
s to
S
urfa
ce
Wat
ers
that
P
ose
an
Insi
gnifi
cant
(D
e M
inim
us)
Thr
eat
to
Wat
er
Qua
lity,
O
rder
N
o.
R8-
2009
-000
3, N
atio
nal P
ollu
tant
D
isch
arge
E
limin
atio
n S
yste
m
(NP
DE
S)
No.
C
AG
9980
01,
as
they
re
late
to
di
scha
rge
of
unco
ntam
inat
ed n
on-s
torm
wat
er
dew
ater
ing
was
tes
disc
harg
es f
or
the
proj
ect.
Thi
s w
ill
incl
ude
subm
ittin
g to
th
e S
anta
A
na
Reg
iona
l W
ater
Q
ualit
y C
ontr
ol
Boa
rd a
Not
ice
of I
nten
t (N
OI)
at
leas
t 60
day
s pr
ior
to t
he s
tart
of
cons
truc
tion,
no
tific
atio
n of
di
scha
rge
at l
east
5 d
ays
prio
r to
an
y pl
anne
d di
scha
rges
, an
d m
onito
ring
repo
rts
by
the
30th
da
y of
eac
h m
onth
fol
low
ing
the
m
onito
ring
perio
d.
2.9-
20
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict S
torm
Wat
er
Dur
ing
Des
ign-
Bui
ld
WQ
-3 C
ompl
y w
ith t
he S
tate
wid
e
Sto
rm W
ater
M
anag
emen
t P
lan
(SW
MP
, M
ay
2003
, or
su
bseq
uent
is
suan
ce)
and
the
Nat
iona
l P
ollu
tant
D
isch
arge
E
limin
atio
n S
yste
m
(NP
DE
S)
Per
mit,
S
tate
wid
e S
torm
W
ater
P
erm
it an
d W
aste
D
isch
arge
R
equi
rem
ents
(W
DR
s)
for
the
Con
stru
ctio
n G
ener
al
Per
mit
(CG
P)
2009
000
9-D
WQ
, N
PD
ES
2.9-
20
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict S
torm
wat
er
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-15
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
N
o. C
A00
0002
, an
d th
e N
PD
ES
P
erm
it an
d W
aste
D
isch
arge
R
equi
rem
ents
fo
r th
e S
an
Ber
nard
ino
Cou
nty
Flo
od C
ontr
ol
Dis
tric
t, th
e C
ount
y of
S
an
Ber
nard
ino,
and
the
Inc
orpo
rate
d C
ities
of
San
Ber
nard
ino
Cou
nty
with
in
the
San
ta
Ana
R
egio
n,
Ord
er
No.
R
8-20
10-0
036
(N
PD
ES
N
o.
CA
S61
8036
),
and
any
subs
eque
nt
perm
it as
re
quire
d an
d as
th
ey
rela
te
to
oper
atio
n of
the
proj
ect.
WQ
-4
The
po
tent
ial
exis
ts
for
cont
amin
ated
gro
undw
ater
in
the
proj
ect
area
du
e to
pa
st
leak
s an
d sp
ills
in t
he v
icin
ity.
In t
he
une
xpec
ted
even
t th
at
dew
ater
ing
of
cont
amin
ated
gr
ound
wat
er o
ccur
s, c
ompl
ianc
e w
ith
the
Gen
eral
P
erm
it fo
r de
m
inim
us w
ater
dis
char
ges
or a
n
indi
vidu
al
perm
it fr
om
the
SA
RW
QC
B,
cons
iste
nt
with
N
PD
ES
re
quire
men
ts,
shal
l be
re
quire
d.
Onc
e th
e S
AR
WQ
CB
re
ceiv
es
and
revi
ew
s th
e N
OI,
th
e S
AR
WQ
CB
will
dec
ide
whi
ch
perm
it is
app
licab
le.
2.9-
21
Des
ign
Bui
lder
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict
Sto
rmw
ater
/
Dis
tric
t E
nviro
nmen
tal
Eng
inee
ring
Dur
ing
Des
ign-
Bui
ld
Geo
log
y/S
oils
/Sei
smic
/To
po
gra
ph
y
G-1
Dur
ing
the
desi
gn p
hase
of
the
proj
ect,
nu
mer
ous
expl
ora
tory
bo
rings
w
ill
be
2.10
-10
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g/
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-1
6
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
ex
cava
ted
thro
ugho
ut t
he p
roje
ct
area
to
in
vest
igat
e si
te-s
peci
fic
soils
an
d co
nditi
ons
and
to
colle
ct
sam
ples
of
su
bsur
face
so
ils
for
labo
rato
ry
test
ing.
T
he
loca
tions
an
d de
pth s
of
th
e bo
rings
w
ill
be
sele
cted
ba
sed
upon
th
e fin
al
desi
gn
sele
cted
. E
ither
a t
ruck
-mou
nted
dril
ling
rig
equi
pped
w
ith
hollo
w-s
tem
au
gers
or
a m
ud-r
otar
y dr
illin
g rig
sh
all
be
used
to
ex
cava
te
the
ex
plo
rato
ry
bore
hol
es.
Soi
l sa
mpl
es
reco
vere
d sh
all
be
test
ed t
o de
term
ine
soil
type
, so
il sh
ear
stre
ngth
, co
mpr
essi
bilit
y ch
arac
teris
tics,
San
d E
quiv
alen
t, R
- val
ue,
com
pact
ion
char
acte
ristic
s,
perm
eabi
lity
and
eros
ion,
and
cor
rosi
on p
oten
tial.
Geo
tech
nica
l D
esig
n
G-2
D
urin
g th
e de
sign
ph
ase,
se
ttlem
ent
mag
nitu
des
and
time
rate
s of
se
ttlem
ent
shal
l be
ve
rifie
d by
ex
plor
ator
y bo
rings
, la
bora
tory
so
il te
stin
g,
and
anal
ysis
.
2.10
-11
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g /
Str
uctu
ral
Des
ign/
G
eote
chni
cal D
esig
n
Dur
ing
Des
ign-
Bui
ld
G-3
In
or
der
to
min
imiz
e th
e po
tent
ial
for
surf
ace
soil
eros
ion,
se
lect
ive
grad
ing
and
adhe
ring
to
prov
isio
ns
for
site
dr
aina
ge,
slop
e pl
antin
g,
and
any
othe
r m
easu
res
requ
ired
by
the
2.10
-11
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g /
Geo
tech
nica
l D
esig
n/
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-17
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
D
epar
tmen
t w
ill b
e in
corp
orat
ed
into
the
des
ign.
D
istr
ict S
torm
wat
er
Pal
eon
tolo
gy
P-1
A q
ualif
ied
pale
onto
logi
st o
r hi
s/he
r re
pres
enta
tive
will
atte
nd
the
pre-
grad
e m
eetin
g.
At
this
m
eetin
g,
the
pale
onto
logi
st
will
ex
plai
n th
e lik
elih
ood
for
enco
unte
ring
pale
onto
logi
cal
reso
urce
s,
wha
t re
sour
ces
may
be
dis
cove
red,
and
the
met
hods
th
at w
ill b
e em
ploy
ed i
f an
ythi
ng
is d
isco
vere
d.
2.11
-3
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict P
aleo
ntol
ogy
Dur
ing
Des
ign-
Bui
ld
P-2
D
urin
g co
nstr
uctio
n ex
cava
tion,
a q
ualif
ied
vert
ebra
te
pale
onto
logi
c m
onito
r sh
all
initi
ally
be
pres
ent
on a
ful
l-tim
e ba
sis
whe
neve
r e
xcav
atio
n w
ill
occu
r w
ithin
th
e se
dim
ents
th
at
have
a h
igh
sens
itivi
ty r
atin
g an
d on
a
spot
- che
ck
basi
s in
se
dim
ents
th
at
have
a
low
se
nsiti
vity
rat
ing.
Mon
itorin
g m
ay
be r
educ
ed t
o a
part
-tim
e ba
sis
if no
re
sour
ces
are
bein
g di
scov
ered
in
se
dim
ents
w
ith
a hi
gh s
ensi
tivity
rat
ing
(mon
itorin
g re
duct
ions
and
whe
n th
ey o
ccur
w
ill
be
dete
rmin
ed
by
the
qu
alifi
ed
Prin
cipa
l P
aleo
ntol
ogis
t).
The
mon
itor
shal
l
2.11
-3
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict P
aleo
ntol
ogy
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-1
8
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
in
spec
t fr
esh
cuts
an
d/or
spo
ils
pile
s to
re
cove
r pa
leon
tolo
gica
l re
sour
ces.
The
mon
itor
shal
l be
em
pow
ered
to
tem
pora
rily
dive
rt
cons
truc
tion
equi
pmen
t aw
ay
from
the
im
med
iate
are
a of
the
di
scov
ery.
The
mon
itor
shal
l be
eq
uipp
ed t
o ra
pidl
y st
abili
ze a
nd
rem
ove
foss
ils
rapi
dly
to
avoi
d
prol
onge
d de
lays
to
cons
truc
tion
sche
dule
s.
If la
rge
mam
mal
fo
ssils
or
larg
e co
ncen
trat
ions
of
foss
ils
are
enco
unte
red,
th
e gr
adin
g co
ntra
ctor
sha
ll co
nsid
er
usin
g he
avy
equi
pmen
t on
site
to
assi
st
in
the
rem
oval
an
d co
llect
ion
of la
rge
mat
eria
ls.
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-19
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
P-3
Lo
caliz
ed
conc
entr
atio
ns
of
smal
l (or
mic
ro-)
ver
tebr
ates
may
be
fou
nd i
n al
l na
tive
sedi
men
ts.
The
refo
re,
it is
re
com
men
ded
that
th
ese
nativ
e se
dim
ents
oc
casi
onal
ly
be
spot
-scr
eene
d th
roug
h 1/
8-
to
1/20
-inch
m
esh
scre
ens
to
dete
rmin
e w
heth
er
mic
rofo
ssils
ar
e pr
esen
t.
If m
icro
foss
ils
are
enco
unte
red,
ad
ditio
nal
sedi
men
t sa
mpl
es (
up
to
3 cu
bic
yard
s,
or
6,00
0 po
unds
) sh
all
be
colle
cted
an
d pr
oces
sed
thro
ugh
1/20
-inch
m
esh,
and
som
etim
es 1
/30-
inch
m
esh
scre
ens,
to
re
cove
r ad
ditio
nal f
ossi
ls.
The
pro
cess
ing
of
larg
e bu
lk
sam
ples
is
be
st
acco
mpl
ishe
d at
a
desi
gnat
ed
loca
tion
with
in t
he p
roje
ct l
imits
th
at w
ill b
e ac
cess
ible
thr
ough
out
the
dura
tion
of c
onst
ruct
ion
but
will
al
so
be
aw
ay
from
an
y pr
opos
ed
cut
or
fill
area
s.
Pro
cess
ing
is u
sual
ly c
ompl
eted
co
ncur
rent
ly
with
co
nstr
uctio
n,
with
th
e in
tent
to
ha
ve
all
proc
essi
ng c
ompl
eted
bef
ore,
or
just
af
ter,
pr
ojec
t co
mpl
etio
n.
A
smal
l co
rner
of
a
stag
ing
or
equi
pmen
t pa
rkin
g ar
ea
is
an
idea
l lo
catio
n.
If w
ater
is
no
t av
aila
ble,
the
loc
atio
n sh
ould
be
acce
ssib
le
for
a w
ater
tr
uck
to
2.11
-3
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict P
aleo
ntol
ogy
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-2
0
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
oc
casi
onal
ly
fill
cont
aine
rs
with
w
ater
.
P-4
A
ny
reco
vere
d sp
ecim
ens
shal
l be
pre
pare
d to
the
poi
nt o
f id
entif
icat
ion
and
perm
anen
t pr
eser
vatio
n.
Thi
s in
clud
es
the
pick
ing
of
any
was
hed
mas
s sa
mpl
es
to
reco
ver
smal
l in
vert
ebra
te
and
vert
ebra
te
foss
ils,
the
rem
oval
of
su
rplu
s se
dim
ent
from
ar
ound
la
rger
sp
ecim
ens
to r
educ
e th
e vo
lum
e of
sto
rage
for
the
rep
osito
ry a
nd
the
stor
age
cost
, an
d th
e ad
ditio
n of
ap
prov
ed
chem
ical
ha
rden
ers/
stab
ilize
rs
to
frag
ile
spec
imen
s.
Thi
s is
be
st
acco
mpl
ishe
d at
a
desi
gnat
ed
labo
rato
ry,
usua
lly
off
site
, w
ith
acce
ss t
o fo
ssil
prep
arat
ion
tool
s,
mag
nify
ing
equi
pmen
t, st
orag
e bo
xes
and
vial
s,
and
chem
ical
ha
rden
ers.
Pro
cess
ing
of f
ossi
ls
thro
ugh
the
lab
is
best
ac
com
plis
hed
conc
urre
ntly
w
ith
cons
truc
tion,
es
peci
ally
if
num
erou
s fo
ssils
ar
e be
ing
colle
cted
.
2.11
-4
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict P
aleo
ntol
ogy
Dur
ing
Des
ign-
Bui
ld
P-5
Spe
cim
ens
shal
l be
iden
tifie
d to
th
e lo
wes
t ta
xono
mic
le
vel
poss
ible
an
d cu
rate
d in
to
an
inst
itutio
nal
repo
sito
ry
with
2.11
-4
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict P
aleo
ntol
ogy
D
urin
g D
esig
n-B
uild
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-21
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
re
trie
vabl
e st
orag
e.
The
re
posi
tory
in
stitu
tions
us
ually
ch
arge
a o
ne-t
ime
fee
base
d on
vo
lum
e,
so
rem
ovin
g su
rplu
s se
dim
ent
is
impo
rtan
t. T
he
repo
sito
ry
inst
itutio
n m
ay
be
a
loca
l m
useu
m o
r un
iver
sity
tha
t ha
s a
cura
tor
who
ca
n re
trie
ve
the
spec
imen
s on
re
ques
t. T
he
draf
t cu
ratio
n ag
reem
ent
betw
een
the
land
ow
ner
and
the
cu
ratio
n fa
cilit
y sh
ould
be
in
pl
ace
with
an
appr
oved
cur
atio
n
faci
lity
prio
r to
the
initi
atio
n of
any
pa
leon
tolo
gica
l m
onito
ring
or
miti
gatio
n ac
tiviti
es.
P-6
A r
epor
t of
fin
ding
s w
ill b
e
prep
ared
at
the
conc
lusi
on o
f th
e pr
ojec
t di
scus
sing
w
hat
was
fo
und
and
the
sign
ifica
nce
of t
he
finds
.
2.11
-4
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict P
aleo
ntol
ogy
Dur
ing
Des
ign-
Bui
ld
Haz
ard
ou
s W
aste
/Mat
eria
ls
HW
-1
Dew
ater
ing
is
not
antic
ipat
ed
durin
g th
e co
nstr
uctio
n of
th
e pr
ojec
t. H
owe
ver,
in t
he e
vent
de
wat
erin
g
may
be
re
quire
d,
a S
ite
Inve
stig
atio
n fo
r po
tent
ially
co
ntam
inat
ed
grou
ndw
ater
w
ill
be
requ
ired
durin
g th
e
2.12
-14
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict
Sto
rm W
ater
/
Dis
tric
t Bio
logi
st
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-2
2
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
pr
epar
atio
n of
fin
al p
lans
with
in
the
area
of t
he p
roje
ct R
OW
.
HW
-2
Add
ition
al
AD
L sa
mpl
ing
will
oc
cur
in
unpa
ved
loca
tions
ou
tsid
e th
e ex
istin
g S
tate
hi
ghw
ay
RO
W
durin
g th
e pr
epar
atio
n of
fin
al p
lans
, w
hen
th
e ad
jace
nt
prop
ertie
s w
ill
be
acqu
ired
as p
art
of t
he p
roje
ct.
The
ana
lytic
al r
esul
ts o
f th
e so
il sa
mpl
ing
will
de
term
ine
the
appr
opria
te
hand
ling
of
the
soil
and
disp
osal
of
surp
lus
mat
eria
ls.
Whe
n fe
asib
le,
soil
will
be
reus
ed
with
in
Dep
artm
ent
RO
W
in
acco
rdan
ce
with
C
alE
PA
D
TS
C
Var
ianc
e N
o.
V09
HQ
SC
D00
6 (e
ffec
tive
July
1,
20
09
thro
ugh
Ju
ly 1
, 20
14)
for
AD
L im
pact
ed
soil,
or
a su
bseq
uent
var
ianc
e. I
f it
is n
ot f
easi
ble
to r
euse
soi
ls,
then
th
e ex
cava
ted
haza
rdou
s so
ils w
ill r
equi
re o
ff-si
te d
ispo
sal
as
haza
rdou
s w
aste
at
a
perm
itted
fa
cilit
y.
Ref
er
to
Cal
tran
s S
peci
al
Sta
ndar
d P
rovi
sion
(S
SP
) X
E
19-9
00
for
addi
tiona
l in
form
atio
n re
gard
ing
the
disp
osal
of
so
ils
impa
cted
w
ith A
DL.
The
fo
llow
ing
addi
tiona
l m
easu
res
will
be
unde
rtak
en t
o
2.12
-14
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-23
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
m
inim
ize
the
pote
ntia
l fo
r ad
vers
e im
pact
s fr
om
aeria
lly
depo
site
d le
ad.
HW
-2-a
A
si
te-s
peci
fic
lead
co
mpl
ianc
e pl
an
shou
ld
be
deve
lope
d to
add
ress
hea
lth a
nd
safe
ty o
f con
stru
ctio
n w
orke
rs.
2-12
.14
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
HW
-2-b
In
cons
ider
atio
n of
tot
al
lead
con
cent
ratio
ns,
exis
ting
soil
with
in t
he s
tate
rig
ht-o
f-w
ay m
ay
be
man
aged
as
no
n-ha
zard
ous
and
may
be
re
used
on
site
w
ithou
t re
stric
tion
or r
elea
sed
as
surp
lus
to t
he d
esig
n-bu
ilder
for
di
spos
ition
as
no
n-ha
zard
ous
was
te.
2-12
.14
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
HW
-2-c
H
owe
ver,
it
shou
ld
be
stip
ulat
ed
that
th
e so
il is
co
ntam
inat
ed
with
le
ad
and
shou
ld
not
be
reus
ed
at
resi
dent
ial
or
othe
r se
nsiti
ve
rece
ptor
lo
catio
ns
(i.e.
sc
hool
s,
day
care
. et
c.).
2-12
.14
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
HW
-3
Prio
r to
th
e st
art
of
cons
truc
tion,
a
site
-spe
cific
H
ealth
an
d S
afet
y P
lan
will
be
pr
epar
ed,
cons
iste
nt
with
D
epar
tmen
t re
quire
men
ts,
to
addr
ess
cont
act,
hand
ling,
an
d di
spos
al
of
pote
ntia
lly
2.12
-15
D
esig
n Bu
ilder
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-2
4
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
co
ntam
inat
ed
grou
ndw
ater
an
d
soil.
The
Pla
n sh
all
incl
ude
the
follo
win
g:
HW
-3-a
Id
entif
icat
ion
of
key
pers
onne
l 2.
12-1
5
D
esig
n Bu
ilder
R
esid
ent
Eng
inee
r /
Dis
tric
t E
nviro
nmen
tal
Eng
inee
ring
Dur
ing
Des
ign-
Bui
ld
HW
-3-b
M
onito
ring
of
pote
ntia
l va
pors
re
sulti
ng
from
co
ntam
inat
ed
soil
or
grou
ndw
ater
, ut
ilizi
ng
a ph
oto-
ioni
zatio
n de
tect
or
2.12
-15
D
esig
n Bu
ilder
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
HW
-3-c
S
umm
ary
of
risk
asse
ssm
ent
for
wor
kers
, th
e co
mm
unity
, and
the
env
ironm
ent
2.12
-15
D
esig
n Bu
ilder
R
esid
ent
Eng
inee
r /
Dis
tric
t E
nviro
nmen
tal
Eng
inee
ring
Dur
ing
Des
ign-
Bui
ld
HW
-3-d
Air
Mon
itorin
g P
lan
2.12
-15
D
esig
n Bu
ilder
R
esid
ent
Eng
inee
r /
Dis
tric
t E
nviro
nmen
tal
Eng
inee
ring
Dur
ing
Des
ign-
Bui
ld
HW
-3-e
E
mer
genc
y R
espo
nse
Pla
n 2.
12-1
5
D
esig
n Bu
ilder
R
esid
ent
Eng
inee
r /
Dis
tric
t E
nviro
nmen
tal
Eng
inee
ring
Dur
ing
Des
ign-
Bui
ld
HW
-4 P
rior
to t
he c
ompl
etio
n of
E
nviro
nmen
tal
Doc
umen
t an
d P
roje
ct A
ppro
val
phas
e, b
ut a
fter
a bu
ild a
ltern
ativ
e is
sel
ecte
d, a
ce
rtifi
ed c
onsu
ltant
sha
ll co
nduc
t as
best
os s
urve
ys o
f an
y ro
adw
ay
stru
ctur
es
with
in
the
Sta
te
2.12
-15
Dep
artm
ent
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Prio
r to
PA
&E
D
Co
mp
lete
d.
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-25
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
hi
ghw
ay
RO
W
that
w
ill
be
reno
vate
d or
dem
olis
hed.
HW
-5 D
urin
g th
e pr
epar
atio
n of
fin
al
plan
s,
prio
r to
th
e st
art
of
any
dem
oliti
on o
r re
nova
tion
of a
st
ruct
ure,
a
cert
ified
co
nsul
tant
sh
all
cond
uct
asbe
stos
, le
ad-
base
d pa
int
(LB
P),
an
d po
lych
lorin
ated
bip
heny
ls (
PC
Bs)
su
rvey
s of
any
bui
ldin
g st
ruct
ures
th
at
will
be
re
nova
ted
or
dem
olis
hed.
2.12
-15
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
HW
-6 D
urin
g th
e pr
epar
atio
n of
fin
al
plan
s,
prio
r to
th
e st
art
of
any
dem
oliti
on
or
reno
vatio
n,
and/
or r
eloc
atio
n of
a s
truc
ture
, al
l ut
ility
po
le-m
ount
ed
tran
sfor
mer
s w
ithin
th
e pr
ojec
t ar
ea s
hall
be in
spec
ted
for
leak
s.
Leak
ing
tran
sfor
mer
s w
ill
be
cons
ider
ed
a po
tent
ial
PC
B
haza
rd
unle
ss
test
ed
and
shal
l be
han
dled
acc
ordi
ngly
.
2.12
-15
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
HW
-7 P
rior
to c
onst
ruct
ion,
any
ye
llow
tr
affic
st
ripin
g an
d pa
vem
ent-
mar
king
m
ater
ial
will
be
te
sted
an
d re
mov
ed
in
acco
rdan
ce
with
C
altr
ans
SS
P
14-0
01.
2.12
-15
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-2
6
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
HW
-8 S
oils
adj
acen
t to
the
BN
SF
ra
ilroa
d tr
acks
wer
e te
sted
and
it
was
de
term
ined
th
at
the
cont
amin
atio
n of
su
ch
soils
is
co
nsis
tent
w
ith
back
grou
nd
leve
ls.
How
ever
, an
y e
xces
s so
il fr
om
the
railr
oad
right
-of-
wa
y sh
ould
not
be
used
on
resi
dent
ial
or o
ther
sen
sitiv
e us
e (i.
e.;
day
care
) pr
oper
ties.
2.12
-15
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
HW
-9
Soi
l sa
mpl
ing
for
pest
icid
es o
n fo
rmer
agr
icul
tura
l pr
oper
ties
that
w
ill
be
acqu
ired
as p
art
of t
he p
roje
ct h
as b
een
cond
ucte
d w
here
so
il ha
s no
t be
en d
istu
rbed
(th
roug
h gr
adin
g,
etc.
). T
he a
naly
tical
res
ults
of
the
soil
sam
plin
g in
dica
te
that
th
e so
ils c
an b
e sa
fely
reu
sed
on t
he
proj
ect
site
. H
owev
er,
any
soil
cons
ider
ed f
or o
ff-si
te r
e-us
e or
di
spos
al
shou
ld
be
stoc
kpile
d,
sam
pled
an
d an
alyz
ed,
at
a m
inim
um,
for
TP
H
(car
bon
chai
n),
VO
Cs,
an
d m
etal
s to
as
sure
tha
t th
e so
il is
sui
tabl
e fo
r its
inte
nded
reu
se.
2.12
-16
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
HW
-10
Prio
r to
the
sta
rt o
f an
y de
mol
ition
or
re
nova
tion
of
a
stru
ctur
e,
notif
icat
ion
and
subm
ittal
of
fees
to
the
SC
AQ
MD
2.12
-16
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-27
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
at
le
ast
10
days
pr
ior
to
proc
eedi
ng
with
th
e de
mol
ition
w
ork
(ref
er
to
SC
AQ
MD
R
ule
1403
) sh
all
be
requ
ired.
N
otifi
catio
n w
ould
fa
ll un
der
Sec
tion
7-1.
01F
, A
ir P
ollu
tion
Con
trol
, an
d S
ectio
n 7-
1.04
, P
erm
its
and
Lice
nses
, of
th
e S
tand
ard
Spe
cific
atio
ns.
The
de
sign
-bui
lder
sha
ll ad
here
to
the
requ
irem
ents
of
S
CA
QM
D
Rul
e
1403
dur
ing
reno
vatio
n/
dem
oliti
on a
ctiv
ities
.
HW
-11
Unl
ess
docu
men
tatio
n fr
om t
he u
tility
com
pany
indi
cate
s th
at c
reos
ote
was
not
use
d, a
ll w
oode
n ut
ility
pol
es t
hat
are
to
be r
emov
ed o
r re
loca
ted
as p
art
of
the
proj
ect,
as
w
ell
as
soils
lo
cate
d at
the
base
of t
hese
util
ity
pole
s, w
ill b
e te
sted
for
cre
osot
e du
ring
the
prep
arat
ion
of
final
pl
ans
whe
n ac
cess
is a
vaila
ble.
If
creo
sote
is
de
tect
ed
with
in
sam
ples
ta
ken
from
ei
ther
th
e ut
ility
pol
es o
r so
ils b
enea
th t
he
utili
ty p
oles
, su
ch m
ater
ial
shal
l be
dis
pose
d of
at
the
appr
opria
te
clas
sifie
d w
aste
fac
ility
.
2.12
-16
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
HW
-12
If un
know
n w
aste
s or
su
spec
t m
ater
ials
are
dis
cove
red
durin
g co
nstr
uctio
n,
all
2.12
-16
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l D
urin
g D
esig
n-B
uild
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-2
8
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
ex
cava
tion
activ
ities
in
th
e im
med
iate
vic
inity
of
the
area
of
conc
ern
shal
l be
susp
ende
d. T
he
cont
ract
or
will
fo
llow
th
e
Dep
artm
ent
Unk
now
n H
azar
ds
Pro
cedu
res
outli
ned
in S
ectio
n 7-
1.06
of
th
e E
nviro
nmen
tal
Haz
ards
and
Saf
ety
Pro
cedu
res
of t
he D
epar
tmen
t's C
onst
ruct
ion
Man
ual.
1 T
he
Dep
artm
ent,
in
co
njun
ctio
n w
ith
othe
r ap
prop
riate
ag
enci
es,
shal
l de
velo
p a
plan
to
in
vest
igat
e su
spec
t m
ater
ials
and
det
erm
ine
wha
t co
rrec
tive
mea
sure
s, i
f an
y,
may
be
re
quire
d to
sa
fegu
ard
publ
ic
heal
th
and
the
envi
ronm
ent.
Eng
inee
ring
HW
-13
Prio
r to
re
nova
tion
or
dem
oliti
on
activ
ities
, a
licen
sed
asbe
stos
aba
tem
ent
firm
sha
ll be
co
ntra
cted
to
re
mov
e th
e id
entif
ied
AC
M
shim
an
d bo
lt m
astic
m
ater
ials
. T
he
iden
tifie
d re
ason
ably
av
aila
ble
cont
rol
mea
sure
s (R
AC
Ms)
w
ill
requ
ire
rem
oval
in
co
mpl
ianc
e w
ith
the
US
EP
A
NE
SH
AP
an
d th
e lo
cal
2.12
-16
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
1 ht
tp:/
/ww
w.d
ot.c
a.go
v/hq
/con
stru
c/m
anua
l200
1/ch
apte
r7/c
hp7_
1.pd
f
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-29
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
S
outh
C
oast
A
ir Q
ualit
y M
anag
emen
t D
istr
ict
(SC
AQ
MD
) R
ule
1403
.
HW
-14
The
asb
esto
s ab
atem
ent
cont
ract
or s
hall
com
ply
with
Rul
e
1403
and
pro
vide
at
leas
t a
10-
day
notif
icat
ion
prio
r to
asb
esto
s re
mov
al.
2.12
-17
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
HW
-15
Prio
r to
the
impo
rtat
ion
of
any
fill
mat
eria
l, th
e de
sign
-bu
ilder
sh
all
ensu
re
that
al
l im
port
ed
fill
is
sam
pled
an
d is
fr
ee o
f con
tam
inat
ion.
2.12
-17
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
HW
-16
It is
re
com
men
ded
that
ad
ditio
nal
inve
stig
atio
n be
co
nduc
ted
at t
he c
lose
d se
rvic
e st
atio
n si
te
loca
ted
on
Dev
ore
R
oad
nort
h of
I-2
15 t
o id
entif
y th
e an
omal
y us
ing
a ba
ckho
e.
If ne
cess
ary,
th
e st
ruct
ure
shou
ld
be
rem
oved
or
ab
ando
ned
in
plac
e in
ac
cord
ance
w
ith
regu
lato
ry
requ
irem
ents
. A
dditi
onal
sa
mpl
ing
and
labo
rato
ry
anal
ysis
m
ay
be
requ
ired
belo
w t
he s
truc
ture
if
it is
a
US
T
or
othe
r po
tent
ial
sour
ce
of
chem
ical
re
leas
e.
Giv
en
the
hist
ory
of
the
Site
, un
disc
over
ed
or
unkn
own
en
viro
nmen
tal
cond
ition
s m
ay b
e
2.12
-17
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-3
0
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
en
coun
tere
d du
ring
grad
ing
and
de
velo
pmen
t of
th
e pr
ojec
t.
If en
coun
tere
d,
addi
tiona
l in
vest
igat
ions
an
d re
mov
al
actio
ns m
ay b
e re
quire
d at
tha
t tim
e.
Alth
ough
no
ev
iden
ce
of
chem
ical
im
pact
w
as
iden
tifie
d du
ring
the
PS
I,
the
cont
ract
or
shou
ld
be
prep
ared
to
ha
ndle
so
ils
impa
cted
by
fo
rmer
si
te
oper
atio
ns,
shou
ld
they
be
en
coun
tere
d du
ring
cons
truc
tion.
A
ll ex
cava
tion
activ
ities
sh
ould
be
pe
rfor
med
by
a
grad
ing
co
ntra
ctor
po
sses
sing
an
ac
tive
vario
us lo
catio
ns S
outh
Coa
st A
ir Q
ualit
y M
anag
emen
t D
istr
ict
(SC
AQ
MD
) R
ule
1166
ex
cava
tion
perm
it.
Dur
ing
cons
truc
tion,
sta
ined
or
odor
ous
soil,
if
enco
unte
red,
m
ay
be
stoc
kpile
d fo
r ch
arac
teriz
atio
n on
a
port
ion
of
the
Dep
artm
ent’s
pr
oper
ty o
utsi
de t
he c
onst
ruct
ion
zone
. T
his
soil
shou
ld b
e pl
aced
in
side
be
rmed
, pl
astic
-line
d st
agin
g ar
eas
and
cove
red
with
pl
astic
whe
n no
t in
act
ive
use.
If
enco
unte
red,
im
pact
ed
soils
sh
ould
be
m
anag
ed
by
the
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-31
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
co
ntra
ctor
in
ac
cord
ance
w
ith
regu
latio
ns.
Air
Qu
alit
y
AQ
-1
Dur
ing
the
desi
gn-b
uild
ph
ase,
th
e fo
llow
ing
stan
dard
co
nditi
ons
shal
l be
impl
emen
ted:
2.13
-30
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
AQ
-1-a
P
rior
to
any
site
pr
epar
atio
n,
grad
ing
and/
or
cons
truc
tion
activ
ities
, th
e P
roje
ct
Eng
inee
r w
ill r
equi
re t
he d
esig
n-bu
ilder
to
deve
lop
a C
onst
ruct
ion
Em
issi
on
Min
imiz
atio
n P
lan
(CE
M
Pla
n).
Tha
t pl
an
will
sp
ecifi
cally
inco
rpor
ate
mea
sure
s fo
r co
ntro
lling
pa
rtic
ulat
e an
d ot
her
emis
sion
s du
ring
cons
truc
tion
from
th
e fo
llow
ing
so
urce
s:
• D
epar
tmen
t’s
Sta
ndar
d S
peci
ficat
ions
S
ectio
ns
14-9
an
d 18
(R
ule
App
licab
ility
and
D
ust
Con
trol
)
• D
epar
tmen
t’s
Sta
ndar
d S
peci
ficat
ions
Sec
tion
39-3
.06
(Asp
halt
Con
cret
e P
lant
E
mis
sion
s)
• D
epar
tmen
t’s
Sta
ndar
d S
peci
ficat
ions
S
ectio
n 13
(Sto
rmw
ater
m
easu
res
rela
ted
to d
ust c
ontr
ol)
2.13
-30
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-3
2
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
• S
CA
QM
D R
ule
403,
inc
ludi
ng
cont
rol
mea
sure
s fr
om T
able
s 1,
2, a
nd 3
in t
hat
rule
• A
RB
O
ff-R
oad
Fle
et
and
Por
tabl
e E
quip
men
t re
gula
tions
, an
d S
CA
QM
D
perm
ittin
g re
quire
men
ts,
as
appl
icab
le
unde
r S
tand
ard
Spe
cific
atio
ns 1
4-9
AQ
-1-b
D
urin
g al
l si
te
prep
arat
ion,
gr
adin
g,
clea
n-up
, an
d ot
her
activ
ities
du
ring
cons
truc
tion,
th
e R
esid
ent
Eng
inee
r w
ill r
equi
re t
he d
esig
n-bu
ilder
to
co
mpl
y w
ith
the
mea
sure
s in
the
CE
M P
lan.
2.13
-30
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
AQ
-1-c
T
he
Res
iden
t E
ngin
eer
will
co
nduc
t si
te
insp
ectio
ns
at
leas
t on
ce a
mon
th to
ens
ure
that
th
e de
sign
-bui
lder
is
co
mpl
ying
w
ith t
he p
rovi
sion
s of
the
CE
M
Pla
n.
2.13
-30
Dep
artm
ent
Dis
tric
t E
nviro
nmen
tal
Eng
inee
ring
D
urin
g D
esig
n-B
uild
AQ
-2
Du
ring
clea
ring,
gr
adin
g,
eart
h m
ovin
g,
or
exca
vatio
n
oper
atio
ns,
exce
ssiv
e fu
gitiv
e du
st e
mis
sion
s w
ill b
e co
ntro
lled
by r
egul
ar w
ater
ing
and/
or o
ther
du
st
prev
entiv
e m
easu
res
iden
tifie
d in
th
e S
CA
QM
D
Rul
e 40
3 B
AC
Ms,
as
liste
d in
Tab
le 2
-13
-H in
Sec
tion
2.13
.3 o
f C
hapt
er
2.13
-30
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-33
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
2
of
this
E
nviro
nmen
tal
Doc
umen
t. T
hese
co
ntro
l te
chni
ques
w
ill
be
indi
cate
d in
pr
ojec
t sp
ecifi
catio
ns.
Com
plia
nce
with
th
e R
ule
403
B
AC
Ms
will
be
subj
ect
to p
erio
dic
site
in
spec
tions
by
th
e D
epar
tmen
t.
Mea
sure
s w
ill
incl
ude:
AQ
-2-a
All
mat
eria
l ex
cava
ted
or
grad
ed
will
be
su
ffic
ient
ly
wat
ered
to
pr
even
t ex
cess
ive
amou
nts
of d
ust.
2.13
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
AQ
-2-b
W
ater
ing
will
oc
cur
at
leas
t th
ree
times
da
ily
with
co
mpl
ete
cove
rage
, in
clud
ing
man
dato
ry w
ater
ing
afte
r w
ork
is
done
for
the
day
, w
ith a
dditi
onal
w
ater
ing
if ne
cess
ary
to
adeq
uate
ly c
ontr
ol d
ust.
2.13
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
AQ
-2-c
A
ll m
ater
ial
tran
spor
ted
on s
ite o
r of
f si
te w
ill b
e ei
ther
su
ffici
ently
w
ater
ed
or
secu
rely
co
vere
d to
pr
even
t ex
cess
ive
amou
nts
of d
ust.
2.13
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
AQ
-2-d
T
he
area
di
stur
bed
by
clea
ring,
gr
adin
g,
eart
h m
ovin
g,
or e
xcav
atio
n op
erat
ions
will
be
m
inim
ized
so
as
to
pr
even
t ex
cess
ive
amou
nts
of d
ust.
2.13
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-3
4
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
AQ
-2-e
Vis
ible
dus
t be
yond
the
pr
oper
ty l
ine
eman
atin
g fr
om t
he
proj
ect
will
be
prev
ente
d to
the
m
axim
um
exte
nt
feas
ible
, co
nsis
tent
w
ith
appl
icab
le
Dep
artm
ent
stan
dard
sp
ecifi
catio
ns.
2.13
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
The
CE
M P
lan
will
als
o in
clud
e th
e fo
llow
ing
mea
sure
s to
red
uce
PM
10:
AQ
-2-f
A
pply
no
n-to
xic
soil
stab
ilize
rs
acco
rdin
g to
m
anuf
actu
rers
’ sp
ecifi
catio
ns
to
all
inac
tive
cons
truc
tion
area
s,
(pre
viou
sly
grad
ed a
reas
ina
ctiv
e fo
r te
n da
ys
or
mor
e),
all
unpa
ved
park
ing
or
stag
ing
area
s, o
r un
pave
d ro
ad s
urfa
ces.
2.13
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
AQ
-2-g
Sw
eep
str
eets
at
the
end
of t
he d
ay i
f vi
sibl
e so
il is
car
ried
onto
ad
jace
nt
publ
ic
road
s (r
ecom
men
d w
ater
sw
eepe
rs
with
rec
laim
ed w
ater
). S
wee
pers
m
ust
com
ply
with
S
CA
QM
D
Rul
es 1
186
and
1186
.1.
2.13
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
AQ
-2-h
Con
trol
of
mat
eria
l on
all
truc
ks
haul
ing
exca
vate
d or
gr
aded
mat
eria
l fr
om t
he s
ite b
y co
mpl
ianc
e w
ith
Sta
te
Veh
icle
C
ode
Sec
tion
2311
4, w
ith s
peci
al
2.13
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-35
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
at
tent
ion
to
Sec
tions
23
114(
b)(F
), (
e)(2
), a
nd (
e)(
4) a
s am
ende
d,
rega
rdin
g th
e pr
even
tion
of
such
m
ater
ial
spill
ing
onto
pu
blic
st
reet
s an
d ro
ads.
AQ
-2-i
T
empo
raril
y co
ver
stoc
kpile
s an
d m
ake
addi
tiona
l st
abili
zer/
wat
er
appl
icat
ions
w
hen
sus
tain
ed w
ind
spee
ds,
or
gust
s, e
xcee
d 25
mph
.
2.13
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
AQ
-3
Equ
ipm
ent
stag
ing
or
stor
age
area
s sh
all
be l
ocat
ed a
t le
ast
500
feet
aw
ay
from
an
y oc
cupi
ed
resi
denc
e,
scho
ol,
hosp
ital,
licen
sed
child
ca
re
faci
lity,
or
ot
her
licen
sed
heal
th
care
fac
ility
thr
ough
out
the
perio
d of
con
stru
ctio
n.
2.13
-32
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
AQ
-4
The
C
EM
P
lan
will
al
so
incl
ude
the
follo
win
g m
easu
res
to
redu
ce v
ehic
ular
em
issi
ons:
2.13
-32
See
AQ
-4a
thru
A
Q-4
e fo
r re
spon
sibi
lity
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
AQ
-4-a
In
stru
ct
the
desi
gn-
build
er t
o m
inim
ize
truc
k id
ling
to
the
max
imum
ex
tent
fe
asib
le,
and
to c
ompl
y at
min
imum
with
A
RB
on
- an
d of
f-ro
ad
vehi
cle
regu
latio
ns (
max
imum
5 m
inut
es
of i
dlin
g un
less
mee
ting
one
of
2.13
-32
Dep
artm
ent
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-3
6
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
th
e ru
les’
exe
mpt
ions
).
AQ
-4-b
U
se
elec
tric
ity
from
po
we
r po
les
rath
er
than
te
mpo
rary
di
esel
or
ga
solin
e po
we
r ge
nera
tors
, to
th
e m
axim
um e
xten
t fe
asib
le.
2.13
-32
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
AQ
-4-c
A
s pa
rt
of
the
Con
stru
ctio
n T
raffi
c M
anag
emen
t P
lan,
rou
te h
aul t
ruck
s aw
ay f
rom
co
nges
ted
stre
ets
or
sens
itive
ar
eas*
to
th
e m
axim
um
exte
nt
feas
ible
.
* S
ensi
tive
area
s ar
e th
ose
with
oc
cupi
ed
resi
denc
es,
scho
ols,
ho
spita
ls,
child
car
e fa
cilit
ies,
or
othe
r he
alth
ca
re
faci
litie
s,
and
activ
e-us
e pa
rks
such
as
pl
aygr
ound
s, c
onsi
sten
t w
ith t
he
AR
B L
and
Use
Han
dboo
k.
2.13
-32
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
AQ
-4-d
C
ontr
ol
of
ozon
e
prec
urso
r em
issi
ons
from
co
nstr
uctio
n eq
uipm
ent
vehi
cles
by
m
aint
aini
ng
equi
pmen
t en
gine
s in
goo
d co
nditi
on a
nd i
n pr
oper
tu
ne
per
the
m
anuf
actu
rer’s
spe
cific
atio
ns.
2.13
-32
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
AQ
-4-e
O
zone
pr
ecur
sor
emis
sion
s fr
om
cons
truc
tion
equi
pmen
t ve
hicl
es
will
be
2.13
-32
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l D
urin
g D
esig
n-B
uild
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-37
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
co
ntro
lled
by
mai
ntai
ning
eq
uipm
ent
engi
nes
in
good
co
nditi
on a
nd i
n pr
oper
tun
e pe
r m
anuf
actu
rer’s
sp
ecifi
catio
ns.
Com
plia
nce
with
th
is
mea
sure
w
ill
be
subj
ect
to
perio
dic
insp
ectio
ns
of
cons
truc
tion
equi
pmen
t ve
hicl
es
by
the
Dep
artm
ent.
Eng
inee
ring
AQ
-5
All
Die
sel
fuel
ed
cons
truc
tion
equi
pmen
t, w
heth
er
stat
iona
ry o
r m
obile
, w
ill c
ompl
y w
ith
the
late
st
appl
icab
le
regu
latio
ns
prom
ulga
ted
by
the
Cal
iforn
ia
Air
Res
ourc
es
Boa
rd
(CA
RB
).
2.13
-32
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
No
ise
N-1
T
he
cont
rol
of
nois
e fr
om
cons
truc
tion
activ
ities
sh
all
conf
orm
to
th
e D
epar
tmen
t’s
Sta
ndar
d S
peci
ficat
ions
in
S
ectio
n 14
-8.0
2, “
Noi
se C
ontr
ol,”
an
d al
so
by
Sta
ndar
d S
peci
al
Pro
visi
ons
S5-
310,
“N
oise
C
ontr
ol.”
N
oise
co
ntro
l sh
all
conf
orm
to
th
e pr
ovis
ions
in
S
ectio
n 14
- 8.0
2 an
d th
e
Sta
ndar
d S
peci
al
Pro
visi
on
in
S5-
310.
The
noi
se l
evel
fro
m t
he
Con
trac
tor’s
ope
ratio
ns,
betw
een
th
e ho
urs
of 9
:00
p.m
. an
d 6:
00
2.14
-17
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-3
8
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
a.
m.,
shal
l no
t ex
ceed
86
dB
A
L max
at
a di
stan
ce o
f 50
ft.
The
C
ontr
acto
r sh
ould
us
e an
al
tern
ativ
e w
arni
ng
met
hod
inst
ead
of a
sou
nd s
igna
l un
less
re
quire
d by
sa
fety
la
ws.
In
ad
ditio
n,
the
Con
trac
tor
shal
l eq
uip
all
inte
rnal
co
mbu
stio
n en
gine
s w
ith
the
man
ufac
ture
r-re
com
men
ded
muf
fler
and
shal
l no
t op
erat
e an
y in
tern
al
com
bust
ion
engi
ne
on
the
job
site
w
ithou
t its
ap
prop
riate
m
uffle
r.
N-2
In
ac
cord
ance
w
ith
the
C
ount
y of
S
an
Ber
nard
ino
Cou
nty
Cod
e,
cons
truc
tion
activ
ities
sh
all
be
limite
d to
be
twee
n th
e ho
urs
of
7:00
a.m
. an
d 7:
00 p
.m.,
Mon
day
thro
ugh
S
atur
day,
ex
clud
ing
Sun
days
an
d F
eder
al h
olid
ays.
2.14
-18
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
N-3
P
orta
ble
equi
pmen
t sh
ould
be
lo
cate
d as
fa
r as
po
ssib
le
from
the
noi
se-s
ensi
tive
loca
tions
as
is fe
asib
le.
2.14
-18
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict E
nviro
nmen
tal
Dur
ing
Des
ign-
Bui
ld
N-4
Con
stru
ctio
n ve
hicl
e st
agin
g ar
eas
and
equi
pmen
t m
aint
enan
ce
area
s sh
ould
be
lo
cate
d as
far
as
poss
ible
fro
m
2.14
-18
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-39
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
se
nsiti
ve r
ecei
ver
loca
tions
.
N-5
P
rior
to
com
plet
ion
of
the
Env
ironm
enta
l D
ocum
ent
and
Pro
ject
A
ppro
val,
the
soun
d ba
rrie
rs
dete
rmin
ed
to
be
reas
onab
le a
nd f
easi
ble
shal
l be
co
ordi
nate
d w
ith
the
affe
cted
pr
oper
ty o
wne
rs.
2.14
-41
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Prio
r to
PA
&E
D
No
soun
d ba
rrie
rs
are
cons
ider
ed
reas
onab
le
and
feas
ible
fo
r th
e P
refe
rred
A
ltern
ativ
e;
ther
efor
e,
this
m
easu
re i
s no
lo
nger
ap
plic
able
.
N-6
Fea
sibl
e so
und
barr
iers
tha
t ar
e no
t re
ason
able
bas
ed o
n a
co
st p
ersp
ectiv
e or
int
erio
r no
ise
abat
emen
t m
easu
res,
su
ch
as
win
dow
an
d do
or
upgr
ades
, sh
ould
be
co
nsid
ered
fo
r R
ecei
ver
R-6
be
caus
e th
is
rece
iver
wou
ld b
e e
xpos
ed t
o a
se
vere
tra
ffic
noi
se i
mpa
ct o
f 75
dB
A L
eq o
r hi
gher
und
er a
ll fo
ur
build
alte
rnat
ives
. S
ound
bar
rier
24
for
Alte
rnat
ive
3A,
the
Pre
ferr
ed A
ltern
ativ
e, i
s fe
asib
le,
but
not r
easo
nabl
e.
2.14
-41
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Env
ironm
enta
l E
ngin
eerin
g
Dur
ing
Des
ign-
Bui
ld
Sim
ilarly
, so
und
barr
iers
N
os.
2,
14,
and
32,
unde
r th
eir
resp
ectiv
e al
tern
ativ
es,
are
also
fe
asib
le
but
not
reas
onab
le,
how
eve
r,
sinc
e th
ey
do
not
pert
ain
to
Alte
rnat
ive
3A,
they
ar
e no
w
rem
oved
fr
om
refe
renc
e in
th
is m
easu
re.
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-4
0
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
BIO
LO
GIC
AL
RE
SO
UR
CE
S
Nat
ura
l C
om
mu
nit
ies
NC
-1 T
he f
inal
pro
ject
des
ign
will
no
t e
xcee
d th
e gr
adin
g
limits
id
entif
ied
in
the
prel
imin
ary
proj
ect
plan
s w
ithou
t ad
ditio
nal
envi
ronm
enta
l ass
essm
ent.
2.15
-19
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict
Bio
logi
st
/ D
istr
ict
Env
ironm
enta
l P
lann
ing
Dur
ing
Des
ign-
Bui
ld
NC
-2 A
ppro
pria
te w
ildlif
e fe
ncin
g w
ill b
e in
stal
led
to d
irect
wild
life
tow
ard
exi
stin
g un
derc
ross
ing
stru
ctur
es
and
to
inhi
bit
wild
life
mov
emen
t on
to
the
I-15
an
d I-
215
free
way
s, a
s de
term
ined
by
the
Dis
tric
t B
iolo
gist
. E
quip
men
t m
aint
enan
ce,
light
ing,
an
d st
agin
g m
ust
be
in
desi
gnat
ed
area
s, a
way
fro
m w
ildlif
e co
rrid
or
entr
ance
s. T
he c
orrid
ors
will
be
kept
cl
ear
of
all
equi
pmen
t or
st
ruct
ures
th
at
coul
d po
tent
ially
se
rve
as
barr
iers
to
w
ildlif
e pa
ssag
e.
2.15
-19
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
NC
-3
Con
stru
ctio
n st
agin
g an
d st
orag
e ac
tiviti
es w
ill b
e lo
cate
d in
upl
and
area
s so
as
to p
reve
nt
the
runo
ff
from
an
y sp
ills
from
en
terin
g w
ater
s of
the
U.S
. an
d S
tate
.
2.15
-20
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-41
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
N
C-4
In o
rder
to
avoi
d im
pact
s to
ne
stin
g bi
rds,
an
y na
tive
vege
tatio
n re
mov
al
or
tree
tr
imm
ing
activ
ities
w
ill
occu
r ou
tsid
e of
th
e ne
stin
g bi
rd
seas
on
(Feb
ruar
y 15
–Aug
ust
31).
In
the
even
t th
at v
eget
atio
n
clea
ring
is n
eces
sary
dur
ing
the
ne
stin
g se
ason
, a
qual
ified
bi
olog
ist
mus
t co
nduc
t a
pre-
cons
truc
tion
surv
ey t
o id
entif
y th
e lo
catio
ns
of
nest
s.
Sho
uld
nest
ing
bird
s be
fo
und,
an
ex
clus
iona
ry
buff
er
will
be
es
tabl
ishe
d by
the
bio
logi
st.
Thi
s bu
ffer
w
ill
be
clea
rly m
arke
d in
th
e fie
ld
by
cons
truc
tion
pers
onne
l un
der
guid
ance
of
the
biol
ogis
t, an
d co
nstr
uctio
n or
cl
earin
g w
ill
not
be
cond
ucte
d w
ithin
thi
s zo
ne u
ntil
the
biol
ogis
t de
term
ines
tha
t th
e yo
ung
have
fle
dged
or
the
nest
is
no l
onge
r ac
tive.
2.15
-20
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
NC
-5
A
biol
ogis
t w
ill
mon
itor
cons
truc
tion
for
the
dura
tion
of
the
proj
ect
to
ensu
re
that
ve
geta
tion
rem
oval
, B
MP
s,
ES
As,
an
d al
l av
oida
nce
and
min
imiz
atio
n m
easu
res
are
prop
erly
co
nstr
ucte
d an
d fo
llow
ed.
2.15
-20
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
NC
-6
The
e
xist
ing
culv
ert
stru
ctur
es t
hat
will
be
exte
nded
2.
15-2
0 D
esig
n Bu
ilder
R
esid
ent
Eng
inee
r /
Dis
tric
t D
esig
n /
Dur
ing
Des
ign-
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-4
2
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
or
mod
ified
by
the
proj
ect
will
be
de
sign
ed
to
be
at
leas
t as
co
mpa
tible
with
wild
life
usag
e as
th
e ex
istin
g cu
lver
ts.
For
ex
ampl
e,
to
crea
te
trac
tion
for
wild
life,
tex
ture
d co
ncre
te w
ill b
e us
ed
with
in
the
culv
ert
and
on
culv
ert
inle
t/ou
tlet
stru
ctur
es.
Exi
stin
g cu
lver
ts
will
be
da
y-lig
hted
or
sky-
light
ed t
o en
hanc
e w
ildlif
e vi
sibi
lity,
as
dete
rmin
ed t
o be
fe
asib
le
by
the
Dep
artm
ent
Pro
ject
Man
ager
. V
eget
atio
n w
ill
be
rem
oved
fr
om
culv
ert
area
s w
ith h
ydro
logi
cal
flow
. H
owe
ver,
be
caus
e ve
geta
tion
arou
nd
culv
erts
pr
ovid
es
cove
r fo
r an
imal
s, r
outin
e m
aint
enan
ce o
f cu
lver
ts
will
in
volv
e cl
earin
g
vege
tatio
n m
ainl
y in
the
flo
w l
ine
so u
se b
y w
ildlif
e is
not
inh
ibite
d.
The
fo
llow
ing
avoi
danc
e an
d m
inim
izat
ion
mea
sure
s w
ill
be
inco
rpor
ated
:
Dis
tric
t Bio
logi
st
Bui
ld
NC
-6-a
F
ollo
win
g pr
ojec
t co
nstr
uctio
n, a
ll di
stur
bed
habi
tat
adja
cent
to
1a
- Pitt
man
C
anyo
n
(Mat
thew
s R
anch
Roa
d) a
nd 1
b-P
ittm
an
Can
yon
(cul
vert
),
2-M
iddl
eman
C
anyo
n,
8-C
ajon
C
reek
, an
d 9-
BN
SF
an
d U
P
Rai
lroad
w
ill
be
rest
ored
w
ith
nativ
e ve
geta
tion
to
the
best
ex
tent
fea
sibl
e.
2.15
-20
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-43
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
N
C-6
-b E
quip
men
t m
aint
enan
ce,
light
ing,
and
sta
ging
mus
t be
in
desi
gnat
ed
area
s,
away
fr
om
wild
life
cros
sing
s.
2.15
-20
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
NC
-6-c
If
wor
k m
ust
be d
one
at
nigh
t,
nois
e an
d di
rect
lig
htin
g w
ould
be
dire
cted
aw
ay f
rom
the
cr
ossi
ngs.
2.15
-21
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
NC
-6-d
The
cro
ssin
gs w
ould
be
ke
pt
clea
r of
al
l eq
uipm
ent
or
stru
ctur
es
that
co
uld
pote
ntia
lly
serv
e as
ba
rrie
rs
to
wild
life
pass
age.
2.15
-21
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
/
Dur
ing
Des
ign-
Bui
ld
NC
-6-e
T
he
exi
stin
g cu
lver
t st
ruct
ures
th
at
wou
ld
be
ex
tend
ed
or
mod
ified
by
th
e pr
ojec
t w
ould
be
de
sign
ed
so
that
th
ey
wou
ld
be
at
leas
t as
co
mpa
tible
with
wild
life
usag
e as
th
e ex
istin
g cu
lver
t. W
here
fe
asib
le,
the
final
de
sign
w
ill
inco
rpor
ate
the
use
of
text
ured
co
ncre
te w
ithin
the
cul
vert
, an
d on
cul
vert
inle
t/out
let s
truc
ture
s.
2-15
-21
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
NC
-6-f
T
o m
axim
ize
wild
life
mov
emen
t in
eac
h of
the
cul
vert
s id
entif
ied
in
Tab
le
2.15
- C,
any
culv
erts
lis
ted
in t
he t
able
sha
ll in
clud
e na
tura
l or
smoo
th c
emen
t bo
ttom
s in
th
e ex
tend
ed
segm
ents
.
2.15
-21
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
NC
-6-g
Win
g-w
alls
will
be
utili
zed
to
th
e m
axim
um
exte
nt
2.15
-21
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
urin
g D
esig
n-
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-4
4
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
pr
actic
able
to
m
inim
ize
culv
ert
exte
nsio
n le
ngth
s fo
r ea
ch o
f th
e cu
lver
ts i
dent
ified
in
Tab
le 2
.15-
C.
Dis
tric
t Bio
logi
st
Bui
ld
NC
-6-h
D
urin
g th
e fin
al
desi
gn
stag
e, e
ach
of t
he m
ajor
wild
life
cros
sing
s sh
own
in T
able
2.1
5-C
w
ill
be
eval
uate
d to
de
term
ine
the
feas
ibili
ty o
f da
y-lig
htin
g an
y po
rtio
ns o
f th
e cu
lver
t or
add
ing
sk
y-lig
hts,
w
here
fe
asib
le,
to
enha
nce
wild
life
mov
emen
t.
2.15
-21
Des
ign
Build
er
Res
iden
t E
ngin
eer
Dis
tric
t Bio
logi
st
Dur
ing
Des
ign-
Bui
ld
NC
-6-i
A
ppro
pria
te
wild
life
fenc
ing
will
be
inst
alle
d to
dire
ct
wild
life
tow
ard
e
xist
ing
unde
rcro
ssin
g st
ruct
ures
, as
de
term
ined
by
th
e D
istr
ict
Bio
logi
st,
to
inhi
bit
wild
life
mov
emen
t on
to
the
I-15
an
d I
215.
2.15
-21
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
NC
-6-j
V
eget
atio
n w
ill
be
rem
oved
fr
om
the
flow
lin
e.
How
eve
r,
beca
use
it is
be
st
to
have
ve
geta
tion
arou
nd
the
cu
lver
ts
to
prov
ide
cove
r fo
r an
imal
s, r
outin
e m
aint
enan
ce o
f cu
lver
ts b
y cl
earin
g ve
geta
tion
in
the
flow
lin
e w
ith m
inim
al i
mpa
ct
to w
ildlif
e w
ill b
e pr
ovid
ed,
so u
se
by w
ildlif
e is
not
inhi
bite
d.
2.15
-21
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Bio
logi
st
/ D
istr
ict M
aint
enan
ce
Dur
ing
Des
ign-
Bui
ld
NC
-6-k
P
rior
to
clea
ring
or
cons
truc
tion,
hi
ghly
vi
sibl
e ba
rrie
rs
(suc
h as
or
ange
co
nstr
uctio
n fe
ncin
g)
will
be
2.15
-21
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
P
rior
to a
ny g
rou
nd
dist
urbi
ng a
ctiv
ities
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-45
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
in
stal
led
arou
nd
the
proj
ect
foot
prin
t to
des
igna
te E
SA
s to
be
pres
erve
d.
No
grad
ing
or
fill
activ
ity
of
any
type
w
ill
be
perm
itted
with
in t
hese
ES
As.
In
addi
tion,
he
avy
equi
pmen
t, in
clud
ing
mot
or v
ehic
les,
will
not
be
allo
wed
to
oper
ate
with
in t
he
ES
As.
All
cons
truc
tion
equi
pmen
t sh
ould
be
oper
ated
in
a m
anne
r so
as
to
pr
even
t ac
cide
ntal
da
mag
e to
ne
arby
pr
eser
ved
ar
eas.
No
stru
ctur
e of
any
kin
d,
or
inc i
dent
al
stor
age
of
equi
pmen
t or
su
pplie
s,
will
be
al
low
ed
with
in
thes
e pr
otec
ted
zone
s. S
ilt f
ence
bar
riers
will
be
inst
alle
d at
the
ES
A b
ound
ary
to
prev
ent
acci
dent
al d
epos
ition
of
fill
mat
eria
l in
ar
eas
whe
re
vege
tatio
n is
im
med
iate
ly
adja
cent
to
pl
anne
d gr
adin
g ac
tiviti
es.
NC
-7
Noi
se
sam
plin
g w
ill
be
cond
ucte
d be
fore
an
d af
ter
cons
truc
tion
in
Pitt
man
C
anyo
n in
3-
5 lo
catio
ns
as
dire
cted
by
th
e D
istr
ict
biol
ogis
t in
th
e up
stre
am
drai
nage
to
pr
ovid
e
data
re
late
d to
th
e w
ildlif
e en
hanc
emen
t mea
sure
s.
2.15
-22
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Bio
logi
st
/ D
istr
ict D
esig
n
Dur
ing
Des
ign-
Bui
ld
NC
-8
A
min
imum
5’
pa
ssag
e (s
idew
alk
or
trai
l) w
ill
be
inco
rpor
ated
ad
jace
nt
to
the
2.15
-22
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
urin
g D
esig
n-B
uild
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-4
6
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
ne
wly
co
nstr
ucte
d C
ajon
R
oad
unde
r th
e I-
15
Brid
ge
to
allo
w
wild
life
mov
emen
t in
th
e ar
ea
whe
n th
e C
reek
is
fil
led
with
w
ater
in n
orm
al s
torm
con
ditio
ns.
Dis
tric
t Bio
logi
st
NC
-9 R
ubbe
rized
asp
halt
will
be
used
on
Caj
on R
oad
in t
he a
rea
ad
jace
nt
to
Caj
on
Cre
ek
as
it tr
aver
ses
unde
r th
e I-
15 B
ridge
to
red
uce
nois
e
2.15
-22
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
NC
-10
No
light
ing
will
be
in
stal
led
on
Caj
on
Bou
leva
rd
betw
een
100
feet
wes
t of
Dev
ore
R
oad/
Gle
n H
elen
P
arkw
ay
and
10
0 fe
et
east
of
th
e K
enw
ood
A
venu
e in
ters
ectio
n. A
ny l
ight
ing
at
the
Ken
woo
d A
venu
e
inte
rsec
tion
shal
l be
lim
ited
to
requ
isite
saf
ety
light
ing
only
.
2.15
-22
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
NC
-11
No
light
ing
will
be
in
stal
led
on t
he I
-15
brid
ges
over
C
ajon
Cre
ek t
hat
will
shi
ne d
own
be
low
the
brid
ges.
2.15
-22
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
NC
-12
The
P
ittm
an
Can
yon
cu
lver
t do
wns
trea
m
(sou
th
and
wes
t of
I-
15)
will
be
re
cons
truc
ted
utili
zing
3:1
– 4
:1
side
sl
opes
w
ithin
th
e D
epar
tmen
t’s
right
-of-
way
, an
d
will
inc
lude
a s
tepp
ed t
rans
ition
do
wn
to
the
drai
nage
fr
om
the
culv
ert.
2.15
-22
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-47
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
N
C-1
3 T
he D
istr
ict
will
wor
k w
ith
US
FS
to
id
entif
y w
ildlif
e en
hanc
emen
t m
easu
res
in
the
Pitt
man
C
anyo
n ar
ea
and
U
nnam
ed
Dra
inag
e 4
prio
r to
co
nstr
uctio
n.
2.15
-22
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict
Bio
logi
st
/ D
istr
ict
Env
ironm
enta
l P
lann
ing
Dur
ing
Des
ign-
Bui
ld
NC
-14
Dur
ing
cons
truc
tion,
so
il an
d ve
geta
tion
dist
urba
nce
will
be
m
inim
ized
to
th
e gr
eate
st
exte
nt f
easi
ble.
2.15
-22
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict
Bio
logi
st
/ D
istr
ict
Env
ironm
enta
l P
lann
ing
Dur
ing
Des
ign-
Bui
ld
Wet
lan
ds
and
Wat
ers
WA
T-1
Im
plem
enta
tion
of a
ny o
f th
e B
uild
Alte
rnat
ives
will
req
uire
ob
tain
ing
the
follo
win
g pe
rmits
re
late
d to
Wat
ers
of t
he U
.S.
and
Wat
ers
of th
e S
tate
:
2.16
-40
Des
ign
Bui
lder
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Prio
r to
C
onst
ruct
ion
WA
T-1
-a S
ectio
n 40
4 P
erm
it fr
om th
e U
SA
CO
E
2.16
-40
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Prio
r to
C
onst
ruct
ion
WA
T-1
-b S
ectio
n 40
1 W
aive
r of
C
ertif
icat
ion
of th
e S
ectio
n 40
4 P
erm
it fr
om t
he R
WQ
CB
2.16
-40
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Prio
r to
C
onst
ruct
ion
WA
T-1
-c S
ectio
n 16
02
Agr
eem
ent f
rom
the
CD
FG
2.
16-4
0 D
esig
n Bu
ilder
R
esid
ent E
ngin
eer
/ D
istr
ict B
iolo
gist
P
rior
to
Con
stru
ctio
n
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-4
8
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
W
AT
-2 C
ompe
nsat
ory
miti
gatio
n is
ant
icip
ated
to b
e re
quire
d to
of
fset
the
loss
of
fede
ral
juris
dict
iona
l wat
ers
and
will
be
at
a m
inim
um 2
:1 m
itiga
tion
ratio
. O
f the
76
acre
s be
ing
purc
hase
d fo
r im
pact
s to
allu
vial
fan
sag
e sc
rub,
the
Dep
artm
ent p
lans
to
utili
ze 3
.5 a
cres
of t
he 7
6 to
ad
dres
s im
pact
s to
wat
ers
of t
he
U.S
.
2.16
-40
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
WA
T-3
Com
pens
ator
y m
itiga
tion
is a
ntic
ipat
ed to
be
requ
ired
to
offs
et th
e lo
ss o
f Sta
te
juris
dict
iona
l wat
ers
and
will
be
at
a m
inim
um 2
:1 m
itiga
tion
ratio
. O
f the
76
acre
s be
ing
purc
hase
d fo
r im
pact
s to
allu
vial
fan
sag
e sc
rub,
the
Dep
artm
ent p
lans
to
utili
ze 2
4.25
acr
es o
f the
76
to
addr
ess
impa
cts
to w
ater
s of
the
S
tate
.
2.16
-41
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
An
imal
s
AN
I-1
To
avo
id p
oten
tial
effe
cts
to
spec
ial
stat
us
rapt
ors
and
othe
r ne
stin
g bi
rds
prot
ecte
d by
th
e M
igra
tory
B
ird
Tre
aty
Act
(M
BT
A),
veg
etat
ion
clea
ring
and
prel
imin
ary
grou
nd
dist
urba
nce
wor
k w
ill b
e c
ompl
eted
out
side
of
bird
br
eedi
ng
seas
on
(typ
ical
ly
set
as
Feb
ruar
y 15
th
roug
h
2.18
-6
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
P
rior
to
grou
nd
dist
urbi
ng a
ctiv
ities
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-49
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
A
ugus
t 31
).
In
the
even
t th
at
initi
al
grou
ndw
ork
cann
ot
be
cond
ucte
d ou
tsid
e th
e bi
rd
bree
ding
se
ason
, fo
cuse
d su
rvey
s w
ill b
e co
nduc
ted
prio
r to
gr
ound
di
stur
bing
ac
tiviti
es.
Sho
uld
nest
ing
bird
s be
fo
und,
an
ex
clus
iona
ry
buff
er
will
be
es
tabl
ishe
d by
the
bio
logi
st.
The
bu
ffer
may
be
up t
o 50
0 fe
et i
n di
amet
er
depe
ndin
g on
th
e sp
ecie
s of
ne
stin
g bi
rd
foun
d.
Thi
s bu
ffer
will
be
clea
rly m
arke
d in
th
e fie
ld
by
cons
truc
tion
pers
onne
l un
der
guid
ance
of
the
biol
ogis
t, an
d co
nstr
uctio
n or
cl
earin
g w
ill
not
be
cond
ucte
d w
ithin
thi
s zo
ne u
ntil
the
biol
ogis
t de
term
ines
tha
t th
e yo
ung
have
fle
dged
or
the
nest
is
no l
onge
r ac
tive.
AN
I-2
Sur
veys
for
the
pre
senc
e of
spe
cial
sta
tus
bat-
spec
ies
will
be
re
quire
d pr
ior
to
the
co
mm
ence
men
t of
co
nstr
uctio
n.
Bec
ause
the
spe
cies
of
bat
may
ch
ange
bet
wee
n cu
rren
t su
rvey
s an
d th
e tim
e of
con
stru
ctio
n, a
nd
beca
use
avoi
danc
e an
d m
inim
izat
ion
mea
sure
s ar
e sp
ecie
s sp
ecifi
c,
the
prec
ise
mea
sure
s ca
nnot
be
dete
rmin
ed
at
this
tim
e.
The
refo
re,
the
2.18
-7
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Prio
r to
gr
ound
di
stur
bing
act
iviti
es
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-5
0
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
ap
plic
atio
n of
ap
prop
riate
av
oida
nce
and
min
imiz
atio
n m
easu
res
rega
rdin
g ba
ts
will
re
quire
fur
ther
inv
estig
atio
n an
d po
tent
ial
miti
gatio
n as
sp
ecifi
ed
belo
w:
AN
I-2-
a A
qua
lifie
d ba
t bi
olog
ist
shal
l su
rvey
the
pro
ject
are
a in
th
e 20
12
Spr
ing
seas
on
to
asse
ss t
he p
oten
tial f
or it
s us
e as
a
day
and
nigh
t ro
ost
whi
ch
wou
ld a
llow
tim
e to
dea
l with
any
ba
t is
sues
th
at
may
ar
ise
and
coul
d be
de
alt
with
pr
ior
to
cons
truc
tion.
S
ince
ba
t ro
osts
ca
n ch
ange
se
ason
ally
, if
bats
ar
e de
term
ined
to
be
pr
esen
t du
ring
the
2012
S
prin
g su
rvey
, th
e qu
alifi
ed b
at b
iolo
gist
will
als
o pe
rfor
m p
re-c
onst
ruct
ion
surv
eys
each
sub
sequ
ent
sprin
g pr
ior
to
cons
truc
tion
activ
ities
in
volv
ing
exis
ting
brid
ge
stru
ctur
es.
The
su
rvey
s w
ill
incl
ude
a co
mbi
natio
n of
st
ruct
ure
insp
ectio
n, s
ampl
ing,
exi
t co
unts
, an
d ac
oust
ic
surv
eys.
T
he
acou
stic
su
rvey
as
sess
es
the
freq
uenc
y of
sou
nds
emitt
ed b
y th
e ba
ts a
nd is
use
d to
det
erm
ine
the
spec
ies
of
bats
th
at
are
pres
ent.
2.18
-7
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Prio
r to
gr
ound
di
stur
bing
act
iviti
es
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-51
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
AN
I-2-
b A
nig
ht r
oost
ref
ers
to a
st
ruct
ure
(nat
ural
or
bu
ilt)
in
whi
ch
bats
ro
ost
durin
g th
e
even
ing
betw
een
fora
ging
bou
ts.
The
re
wou
ld
be
min
imal
or
no
im
pact
s to
ba
ts
if co
nstr
uctio
n ac
tivity
is
lim
ited
to
dayt
ime
hour
s,
the
exis
ting
stru
ctur
es
utili
zed
by t
he b
ats
for
roos
ting
are
not
rem
oved
or
al
tere
d,
vege
tatio
n ad
jace
nt
to
thes
e st
ruct
ures
is
not
clea
red,
and
the
ai
rspa
ce t
o ac
cess
the
str
uctu
res
is
not
rest
ricte
d.
If ni
ghtti
me
cons
truc
tion
activ
ity
is
antic
ipat
ed,
or
if m
ajor
m
odifi
catio
ns w
ill b
e m
ade
to t
he
brid
ges
or
culv
erts
th
at
may
re
duce
th
eir
suita
bilit
y fo
r ni
ght
roos
ting,
th
e po
tent
ial
nigh
t ro
ostin
g ar
eas
with
in t
he B
SA
will
re
quire
fu
rthe
r in
vest
igat
ion
durin
g th
e pr
epar
atio
n of
the
fin
al
proj
ect
plan
s th
roug
h ac
oust
ic
mon
itorin
g to
yie
ld m
ore
prec
ise
info
rmat
ion
with
re
gard
to
pr
esen
ce,
spec
ies
com
posi
tion,
an
d th
e ap
pro
xim
ate
num
ber
of
bats
ut
ilizi
ng
the
stru
ctur
es
for
roos
ting.
Thi
s in
form
atio
n w
ould
th
en
be
used
to
de
term
ine
the
appr
opria
te
avoi
danc
e an
d
min
imiz
atio
n m
easu
res
that
w
ould
min
imiz
e im
pact
s to
nig
ht-
2.18
-7
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
P
rior
to
cons
truc
tion
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-5
2
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
ro
ostin
g ba
ts.
AN
I-2-
c
Alth
ough
br
idge
an
d
culv
ert
roos
ts
can
be
rela
tivel
y ea
sy t
o id
entif
y, t
ree
roos
ts a
re
mor
e su
btle
an
d re
quire
cl
ose
exam
inat
ion.
In
or
der
to
avoi
d po
tent
ial
dire
ct
impa
cts
to
roos
ting
bats
, if
tree
rem
oval
or
trim
min
g is
nec
essa
ry f
or p
roje
ct
cons
truc
tion,
la
rge
tree
s an
d sn
ags
shou
ld b
e ex
amin
ed b
y a
ba
t bi
olog
ist
in t
he s
prin
g se
ason
pr
eced
ing
cons
truc
tion
prio
r to
re
mov
al
or
trim
min
g to
en
sure
th
at n
o ro
ostin
g ba
ts a
re p
rese
nt.
2.18
-8
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Prio
r to
gr
ound
di
stur
bing
act
iviti
es
AN
I-2-
d
An
addi
tiona
l da
ytim
e as
sess
men
t sh
ould
be
cond
ucte
d in
the
spr
ing
prio
r to
the
sta
rt o
f co
nstr
uctio
n to
re
exam
ine
the
crev
ices
tha
t m
ay b
e su
itabl
e fo
r us
e by
day
roo
stin
g ba
ts.
If d
ay
roos
ting
bats
are
pre
sent
or
thei
r pr
esen
ce
is
assu
med
in
st
ruct
ures
th
at
will
be
di
rect
ly
affe
cted
by
co
nstr
uctio
n ac
tiviti
es,
excl
usio
nary
de
vice
s m
ay n
eed
to b
e pl
aced
in
the
fall
(Sep
tem
ber
or O
ctob
er)
to a
void
po
tent
ial d
irect
impa
cts
to b
ats.
2.18
-8
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Prio
r to
gr
ound
di
stur
bing
act
iviti
es
AN
I-2-
e
The
bi
olog
ist
will
st
ipul
ate
the
appr
opria
te t
ime
of
year
(no
rmal
ly t
he f
all a
nd w
inte
r)
for
cons
truc
tion
at
pote
ntia
l
2.18
-8
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
P
rior
to
grou
nd
dist
urbi
ng a
ctiv
ities
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-53
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
ro
ostin
g si
tes
(e.g
., br
idge
st
ruct
ures
) to
av
oid
impa
cts
to
roos
ting
bats
. A
fter
surv
eys
are
com
plet
ed d
urin
g th
e sp
ring
2012
se
ason
, de
pend
ing
on
the
resu
lts,
appr
opria
te
avoi
danc
e an
d m
inim
izat
ion
mea
sure
s w
ill
be
spec
ified
by
a
qual
ified
ba
t bi
olog
ist.
Avo
idan
ce
and
min
imiz
atio
n m
easu
res
may
in
clud
e so
me
or
all
of
the
follo
win
g:
excl
usio
nary
de
vice
s an
d ch
angi
ng
stag
ing
area
s,
acce
ss r
oute
s, a
nd li
ghtin
g.
AN
I-3
Prio
r to
com
men
cem
ent
of
any
cons
truc
tion
in C
ajon
Cre
ek,
the
Dep
artm
ent
shal
l re
view
and
ap
prov
e a
sp
eckl
ed
dace
re
loca
tion
plan
th
at
will
in
clud
e th
e fo
llow
ing
elem
ents
:
2.18
-8
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Prio
r to
gr
ound
di
stur
bing
act
iviti
es
AN
I-3-
a O
ngoi
ng
surv
eyi
ng
for
the
pres
ence
of
spec
kled
dac
e in
C
ajon
C
reek
by
a
qual
ified
bi
olog
ist.
2.18
-8
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
AN
I-3-
b
Rev
iew
of
pr
opos
ed
grad
ing
activ
ities
to
ensu
re t
hat
no p
onds
are
cre
ated
tha
t m
ight
en
trap
spe
ckle
d da
ce.
2.18
-8
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
AN
I-3-
c
Pla
ns
for
wat
er
dive
rsio
n, if
nee
ded.
2.
18-8
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-5
4
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
AN
I-3-
d R
eloc
atio
n pl
ans
for
any
spec
kled
da
ce
that
m
ight
be
id
entif
ied.
2.18
-8
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Prio
r to
gr
ound
di
stur
bing
act
iviti
es
AN
I-4
P
rior
to
the
co
mm
ence
men
t of
an
y co
nstr
uctio
n in
Caj
on C
reek
, th
e D
epar
tmen
t sh
all
revi
ew
and
ap
prov
e a
tw
o-st
riped
ga
rter
sn
ake
relo
catio
n pl
an
that
w
ill
incl
ude
the
follo
win
g el
emen
ts:
2.18
-9
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Prio
r to
gr
ound
di
stur
bing
act
iviti
es
AN
I-4-
a T
he S
BK
R m
onito
rs w
ill
be
trai
ned
to
surv
ey
for
the
pr
esen
ce
of
the
two-
strip
ed
gart
er
snak
e.
Any
su
ch
snak
es
foun
d w
ill
be
app
ropr
iate
ly
relo
cate
d ou
tsid
e th
e co
nstr
uctio
n ar
ea.
2.18
-9
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
AN
I-4-
b P
lans
for
wat
er d
iver
sion
an
d th
e po
tent
ial
to
enco
unte
r th
e sn
ake
will
be
deve
lope
d.
2.18
-9
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Prio
r to
gr
ound
di
stur
bing
act
iviti
es
Th
reat
ened
an
d E
nd
ang
ered
Sp
ecie
s
Effo
rts
for S
an B
erna
rdin
o K
anga
roo
Rat
- M
easu
res
Inco
rpor
ated
into
Pro
ject
Des
ign
ES
-1 W
iden
ing
of I
-15
sout
h of
C
ajon
Cre
ek w
as s
hift
ed i
nto
the
med
ian
rath
er
than
ou
tsid
e w
iden
ing
to
avo
id
impa
cts
to
SB
KR
hab
itat
and
wat
ers
of t
he
U.S
. and
Sta
te.
2.19
-26
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-55
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
ES
-2 I
n ar
eas
whe
re f
easi
ble,
the
pr
ojec
t fo
otpr
int
was
m
inim
ized
th
roug
h th
e us
e of
2:
1 sl
opes
ra
ther
th
an
the
Dep
artm
ent
stan
dard
4:1
slo
pes.
2.19
-26
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-3
To
min
imiz
e po
tent
ial
impa
cts
to S
BK
R h
abita
t an
d to
w
ater
s of
the
U.S
and
Sta
te,
the
follo
win
g de
sign
re
finem
ents
ha
ve b
een
inco
rpor
ated
int
o th
e
prop
osed
rec
onne
ctio
n of
Caj
on
Bou
leva
rd:
2.19
-26
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-3-a
The
des
ign
spee
d of
the
ro
adw
ay w
as r
educ
ed t
o al
low
for
tig
hter
cur
ves.
Thi
s re
duct
ion
in
desi
gn
spee
d al
low
ed
for
redu
ced
habi
tat
impa
cts
as
follo
ws:
2.19
-27
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-3-a
-i
Wes
t of
th
e I-
15
unde
rcro
ssin
g,
Caj
on
Bou
leva
rd
was
alig
ned
as c
lose
as
poss
ible
to
the
I-1
5 fr
eew
ay t
o m
inim
ize
the
exte
nt
of
the
habi
tat
isla
nd
crea
ted
betw
een
Caj
on
Bou
leva
rd a
nd I
-15.
2.19
-27
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-3-a
-ii
Eas
t of
th
e I-
15
unde
rcro
ssin
g C
ajon
B
oule
vard
w
as a
ligne
d as
clo
se a
s po
ssib
le
to t
he e
xist
ing
deve
lope
d pa
rcel
s th
at f
ront
on
Old
Caj
on B
oule
vard
2.19
-27
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-5
6
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
to
lim
it im
pact
s to
th
e ha
bita
t be
twee
n C
ajon
B
oule
vard
an
d
the
Cre
ek.
ES
-3-a
-iii
The
ed
ge
of
the
emba
nkm
ent
for
Caj
on
Bou
leva
rd
adja
cent
to
C
ajon
C
reek
w
ill
be
prot
ecte
d by
a
reta
inin
g w
all
rath
er
than
by
sl
opes
, re
duci
ng t
he i
mpa
cts
to
SB
KR
hab
itat.
2.19
-27
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-3-a
-iv
An
appr
oxi
mat
ely
3-fo
ot s
olid
wal
l w
ill b
e co
nstr
ucte
d al
ong
the
reco
nnec
tion
of C
ajon
B
oule
vard
, to
shi
eld
Caj
on C
reek
an
d ad
jace
nt S
BK
R h
abita
t fr
om
car
light
s.
2.19
-27
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-4 I
mpa
cts
of t
he r
eope
ning
of
the
clos
ed
port
ion
of
exis
ting
Caj
on
Bou
leva
rd
betw
een
K
enw
ood
Ave
nue
and
its c
urre
nt
sout
hern
ter
min
us w
ere
redu
ced
by
the
fol
low
ing
mea
sure
s:
2.19
-27
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-4-a
Mai
ntai
ning
an
d ut
ilizi
ng
the
exis
ting
clos
ed
road
bed
as
muc
h as
pos
sibl
e.
2.19
-27
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-4-b
Li
miti
ng
capa
city
on
C
ajon
B
oule
vard
be
twee
n
Ken
woo
d A
venu
e an
d D
evor
e
2.19
-27
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Des
ign
/ D
urin
g D
esig
n-B
uild
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-57
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
R
oad/
Gle
n H
elen
Par
kway
to
one
la
ne i
n ea
ch d
irect
ion
(inst
ead
of
the
orig
inal
ly p
ropo
sed
four
-lane
ro
adw
ay,
two
lane
s in
ea
ch
dire
ctio
n).
Dis
tric
t Bio
logi
st
Effo
rts
for S
an B
erna
rdin
o K
anga
roo
Rat
- C
ompe
nsat
ory
Mea
sure
for P
erm
anen
t Tak
e of
Hab
itat
ES
-5
To
offs
et
perm
anen
t an
d te
mpo
rary
im
pact
s to
S
BK
R
suita
ble
habi
tat
(occ
upie
d an
d po
tent
ially
oc
cupi
ed),
th
e D
epar
tmen
t w
ill p
urch
ase
cred
its
with
in
the
Caj
on
Cre
ek
Con
serv
atio
n B
ank
or
anot
her
accr
edite
d co
nser
vatio
n ba
nk f
or
SB
KR
ac
cord
ing
to
the
ratio
s sp
ecifi
ed
in
the
tabl
e be
low
. In
ad
ditio
n, t
empo
rary
eff
ects
will
be
of
fset
by
rest
orin
g ha
bita
t to
pre
- pr
ojec
t co
nditi
ons.
P
leas
e se
e A
ppen
dix
M i
n th
e D
epa
rtm
ent’s
B
A (
2011
).
2.19
-27
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Bio
logi
st
/ La
ndsc
ape
Arc
hite
ctur
e
Dur
ing
Des
ign-
Bui
ld
Dep
artm
ent
will
be
re
spon
sibl
e fo
r pu
rcha
sing
cr
edits
an
d th
e D
esig
n B
uild
er w
ill b
e
resp
onsi
ble
for
rest
orin
g ha
bita
t.
Effo
rts
for S
an B
erna
rdin
o K
anga
roo
Rat
- M
easu
res
to R
educ
e Im
pact
s D
urin
g C
onst
ruct
ion
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-5
8
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
ES
-6 A
bio
logi
st w
ith k
now
ledg
e
abou
t S
BK
R a
nd i
ts h
abita
t w
ill
be
reta
ined
to
fu
nctio
n as
a
biol
ogic
al m
onito
r. T
he b
iolo
gica
l m
onito
r w
ill h
old
a va
lid S
ectio
n 10
(a)(
1)(A
) pe
rmit
for
SB
KR
. A
t le
ast
30
days
pr
ior
to
initi
atin
g pr
ojec
t ac
tiviti
es,
the
nam
e(s)
, an
y pe
rmit
num
bers
, an
d re
sum
es
of
all
pros
pect
ive
biol
ogic
al
mon
itors
w
ill
be
subm
itted
, in
writ
ing,
to
the
Pal
m
Spr
ings
Fis
h an
d W
ildlif
e O
ffice
(P
SF
WO
).
Pro
ject
ac
tiviti
es
will
no
t be
gin
until
th
e P
SF
WO
ap
prov
es a
bio
logi
cal
mon
itor
or
mon
itors
. If
no
res p
onse
is
re
ceiv
ed
with
in
30
days
, th
e D
epar
tmen
t w
ill
cont
act
the
US
FW
S r
egar
ding
sta
tus.
2.19
-28
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Prio
r to
gr
ound
di
stur
bing
act
iviti
es
ES
-7
Prio
r to
cl
earin
g or
co
nstr
uctio
n an
d un
der
the
su
perv
isio
n of
th
e ap
prov
ed
biol
ogic
al m
onito
r,
high
ly
visi
ble
barr
iers
(s
uch
as
oran
ge
cons
truc
tion
fenc
ing)
w
ill
be
inst
alle
d ar
ound
sc
aleb
room
sc
rub
com
mun
ities
(L
epid
ospa
rtum
sq
uam
atum
, A
llian
ce,
Saw
yer
et
al.
2009
)
2.19
-28
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Prio
r to
gr
ound
di
stur
bing
act
iviti
es
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-59
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
ad
jace
nt t
o th
e pr
ojec
t foo
tprin
t to
desi
gnat
e E
nviro
nmen
tally
S
ensi
tive
Are
as
(ES
As)
to
be
pr
otec
ted
from
co
nstr
uctio
n im
pact
s. N
o gr
adin
g or
fill
act
ivity
of
any
typ
e w
ill o
ccur
with
in t
hese
E
SA
s.
In
addi
tion,
he
avy
equi
pmen
t, in
clud
ing
mot
or
vehi
cles
, w
ill n
ot d
rive
or o
pera
te
with
in t
he E
SA
s. A
ll co
nstr
uctio
n eq
uipm
ent
will
be
oper
ated
in
a
man
ner
to
prev
ent
acci
dent
al
dam
age
to
near
by
prot
ecte
d ar
eas.
No
stru
ctur
e of
any
kin
d,
or
inci
dent
al
stor
age
of
equi
pmen
t or
sup
plie
s, w
ill o
ccur
w
ithin
the
se p
rote
cted
zon
es
ES
-8 T
he b
iolo
gica
l m
onito
r w
ill
ensu
re
com
plia
nce
with
th
e pr
ojec
t de
scrip
tion
eval
uate
d in
th
e pr
ojec
t bi
olog
ical
op
inio
n,
incl
udin
g al
l co
nser
vatio
n m
easu
res
and
term
s an
d co
nditi
ons,
an
d w
ill
have
th
e
auth
ority
to
ha
lt/su
spen
d al
l ac
tiviti
es
until
ap
prop
riate
co
rrec
tive
mea
sure
s ha
ve
been
ta
ken.
2.19
-28
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
P
rior
to
grou
nd
dist
urbi
ng a
ctiv
ities
ES
-9 T
he b
iolo
gica
l m
onito
r w
ill
repo
rt a
ny n
on-c
ompl
ianc
e w
ithin
24
ho
urs
to
the
Pal
m
Spr
ings
F
ish
and
Wild
life
Offi
ce
(PS
FW
O).
2.19
-29
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-6
0
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
ES
-10
The
bio
logi
cal
mon
itor
will
de
velo
p an
d
cond
uct
an
envi
ronm
enta
l aw
aren
ess
educ
atio
n pr
ogra
m
for
all
cons
truc
tion
pers
onne
l (in
clud
ing
tem
pora
ry
desi
gn- b
uild
ers
and
subc
ontr
acto
rs)
befo
re a
ny w
ork
is
begu
n on
or
ad
jace
nt t
o th
e pr
ojec
t si
te.
At
a m
inim
um,
the
info
rmat
ion
pres
ente
d w
ill in
clud
e (1
) th
e pu
rpos
e of
re
sour
ce
prot
ectio
n;
(2)
a de
scrip
tion
of
SB
KR
an
d its
ha
bita
t;
(3)
a de
scrip
tion
of
the
arro
yo
toad
an
d its
cr
itica
l ha
bita
t; (4
) th
e co
nser
vatio
n m
easu
res
that
w
ill
be
impl
emen
ted
in
conj
unct
ion
with
pr
ojec
t co
nstr
uctio
n;
(5)
delin
eatio
n an
d fla
ggin
g of
th
e pr
ojec
t ar
ea,
and
limita
tions
on
m
ovem
ent
of
pers
onne
l an
d eq
uipm
ent
and;
(6
) th
e ge
nera
l pr
ovis
ions
of
th
e A
ct
incl
udin
g th
e le
gal
stat
us o
f S
BK
R,
arro
yo
toad
and
the
mea
ning
of
“tak
e.”
2.19
-29
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-11
Bef
ore
any
grou
nd
dist
urba
nce
begi
ns a
nd u
nder
the
su
perv
isio
n of
th
e ap
prov
ed
biol
ogic
al
mon
itor,
th
e de
sign
-bu
ilder
will
del
inea
te a
nd m
ark
all
limits
of
cons
truc
tion
to b
e cl
early
vi
sibl
e to
al
l pe
rson
nel.
All
cons
truc
tion-
rela
ted
activ
ities
by
2.19
-29
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Pos
t con
stru
ctio
n
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-61
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
de
sign
-bui
lder
s,
subc
ontr
acto
rs
or
thei
r ag
ents
, an
d eq
uipm
ent
(incl
udin
g ve
geta
tion
rem
oval
, gr
adin
g, e
quip
men
t la
y-do
wn
and
st
orag
e,
and
desi
gn-b
uild
er
park
ing)
will
be
rest
ricte
d to
the
de
sign
ated
lim
its o
f co
nstr
uctio
n an
d st
agin
g ar
eas.
Con
stru
ctio
n st
agin
g a n
d eq
uipm
ent
stor
age
will
be
lo
cate
d ou
tsid
e of
an
y po
tent
ial
habi
tat
area
s.
All
mov
emen
t of
de
sign
-bui
lder
s,
subc
ontr
acto
rs
or
thei
r ag
ents
, an
d eq
uipm
ent
will
be
rest
ricte
d to
the
lim
its o
f co
nstr
uctio
n an
d st
agin
g ar
eas.
B
lack
m
esh
silt
fenc
ing
will
be
in
stal
led
to
prev
ent
acci
dent
al d
epos
ition
of
fill
mat
eria
l in
ar
eas
whe
re
vege
tatio
n is
im
med
iate
ly
adja
cent
to
pl
anne
d gr
adin
g ac
tiviti
es.
The
bio
logi
cal
mon
itor
will
in
spec
t th
e fe
ncin
g at
th
e cl
ose
of
each
bu
sine
ss
day
thro
ugho
ut
the
cons
truc
tion
phas
e.
The
de
sign
-bui
lder
w
ill
impl
emen
t an
y re
quire
d re
pairs
to
the
fen
cing
with
in 2
4 ho
urs
of
rece
ivin
g no
tific
atio
n of
th
e re
quire
d re
pair.
Sho
uld
any
wor
k oc
cur
beyo
nd
the
fenc
ed
or
dem
arca
ted
limits
of
impa
ct,
the
biol
ogic
al
mon
itor
will
re
ques
t th
at
the
resi
dent
en
gine
er
halt
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-6
2
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
w
ork
until
the
pro
blem
has
bee
n re
med
ied.
The
bio
logi
cal
mon
itor
will
no
tify
the
PS
FW
O
of
the
prob
lem
w
ithin
24
ho
urs
of
its
occu
rren
ce.
ES
-12
Prio
r to
pr
ojec
t-re
late
d ve
geta
tion
clea
ring
and
grad
ing
with
in
SB
KR
su
itabl
e ha
bita
t ar
eas,
an
excl
usio
nary
fen
ce w
ill
be
inst
alle
d,
as
nece
ssar
y,
arou
nd
the
limits
of
S
BK
R
suita
ble
habi
tat
(cat
egor
y 1)
ar
eas.
T
he
excl
usio
nary
fe
nce
will
con
sist
of
a 5-
feet
-tal
l ch
ain
link
fenc
e w
ith
a ¼
-inch
ga
uge
wire
m
esh
strip
(e
.g.,
hard
war
e
clot
h) a
ttac
hed
to t
he i
nsid
e ba
se
of t
he c
hain
lin
k fe
nce.
The
wire
m
esh
will
be
burie
d to
a m
inim
um
dept
h of
12
in
ches
be
low
th
e gr
ound
su
rfac
e an
d ha
ve
a
min
imum
hei
ght
of 4
fee
t ab
ove
grou
nd le
vel.
The
pro
pose
d fe
nce
desi
gn w
ill b
e su
bmitt
ed t
o an
d ap
prov
ed b
y th
e P
SF
WO
at
leas
t 30
da
ys
prio
r to
em
plac
emen
t an
d gr
adin
g.
The
qu
alifi
ed
biol
ogis
t ex
perie
nced
with
SB
KR
w
ill b
e pr
esen
t on
-site
whe
n th
e fe
nce
is i
nsta
lled
to m
inim
ize
the
dist
urba
nce
of
SB
KR
bu
rro
ws
from
the
fen
ce in
stal
latio
n. D
urin
g fe
nce
cons
truc
tion,
the
bio
logi
cal
2.19
-30
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Prio
r to
gr
ound
di
stur
bing
act
iviti
es
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-63
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
m
onito
r or
ot
her
qual
ified
bi
olog
ist
hold
ing
a 10
(a)(
1)(A
) pe
rmit
will
han
d-ex
cava
te m
arke
d bu
rro
ws
with
in
100
feet
in
ad
vanc
e of
th
e tr
ench
ing
back
hoe;
if
nece
ssar
y,
anot
her
biol
ogis
t w
ill
stan
d by
th
e ba
ckho
e to
obs
erve
any
ani
mal
s ca
ught
up
in t
he b
ackh
oe b
ucke
t. T
he S
BK
R p
erm
itted
bio
logi
st w
ill
rem
ove
any
SB
KR
fou
nd i
n th
e bu
rro
w
or
back
hoe
buck
et
and
rele
ase
them
ou
tsid
e th
e fe
nce
alig
nmen
t. A
fen
ce d
esig
n w
ill b
e su
bmitt
ed
to
the
PS
FW
O
for
appr
oval
at
leas
t 30
day
s pr
ior
to
empl
acem
ent.
ES
-13
Afte
r an
y re
quire
d
excl
usio
nary
fe
nce
is
in
plac
e,
and
befo
re
initi
al
grou
nd
dist
urba
nce
cons
truc
tion
activ
ities
, th
e fe
nced
are
a w
ill b
e tr
appe
d an
d al
l sm
all
mam
mal
s ca
ptur
ed
will
be
re
mov
ed
and
rele
ased
ou
tsid
e th
e pr
ojec
t fo
otpr
int
to
adja
cent
su
itabl
e ha
bita
t. T
he b
iolo
gica
l m
onito
r or
ot
her
qual
ified
bio
logi
st h
oldi
ng a
va
lid
sect
ion
10(a
)(1)
(A)
perm
it w
ill li
ve-t
rap
and
rem
ove
as m
any
SB
KR
as
poss
ible
fro
m w
ithin
the
en
clos
ed
cons
truc
tion
area
an
d re
capt
ure
any
SB
KR
tha
t re
turn
2.19
-30
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
P
rior
to
grou
nd
dist
urbi
ng a
ctiv
ities
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-6
4
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
to
the
site
. T
rapp
ing
will
con
tinue
fo
r at
lea
st 5
con
secu
tive
nigh
ts,
or
until
th
ere
have
b
een
2
cons
ecut
ive
nigh
ts
of
trap
ping
w
ith n
o S
BK
R c
aptu
res,
or
until
P
SF
WO
has
pro
vide
d w
ritte
n or
ve
rbal
ap
prov
al
to
disc
ontin
ue
trap
ping
. T
he
SB
KR
pe
rmitt
ed
biol
ogis
t w
ill
mar
k al
l S
BK
R
capt
ures
on
the
ches
t w
ith a
red
S
harp
ie p
en (
or c
ompa
rabl
e pe
n)
to i
dent
ify a
ny r
ecap
ture
s th
at r
e-en
ter
the
fenc
ed
area
an
d w
ill
repo
rt
the
num
ber
of
capt
ures
an
d re
capt
ures
to
the
PS
FW
O.
ES
-14
At
the
begi
nnin
g an
d cl
ose
of e
ach
wor
k da
y th
roug
hout
the
du
ratio
n of
co
nstr
uctio
n,
the
desi
gn-b
uild
er
or
biol
ogic
al
mon
itor
will
in
spec
t un
fille
d ex
cava
tions
, un
burie
d pi
pes,
and
so
ils s
tock
pile
s fo
r th
e pr
esen
ce
of
any
SB
KR
th
at
may
be
en
trap
ped.
T
he
SB
KR
-per
mitt
ed
biol
ogis
t w
ill r
emov
e an
d re
leas
e th
e en
trap
ped
anim
als
outs
ide
the
proj
ect
foot
prin
t to
ad
jace
nt
habi
tat.
At
the
clos
e of
eac
h w
ork
day,
an
d af
ter
any
disc
over
ed
SB
KR
ha
ve
been
re
mov
ed,
the
desi
gn-b
uild
er w
ill b
ackf
ill,
cove
r,
or o
ther
wis
e cl
ose
all e
xcav
atio
ns
or
unbu
ried
pipe
s;
tem
pora
rily
2.19
-30
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
P
rior
to
grou
nd
dist
urbi
ng a
ctiv
ities
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-65
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
st
ore
and
cove
r so
ils
stoc
kpile
s w
ithin
the
des
igna
ted
tem
pora
ry
wor
k ar
ea (
and
not
outs
ide
that
ar
ea
whe
re
SB
KR
m
ay
burr
ow
ov
erni
ght)
; an
d in
spec
t th
e ex
clus
iona
ry
fenc
ing
and
imm
edia
tely
re
pair
any
gaps
la
rger
tha
n 0.
5 in
.
ES
-15
Dur
ing
cons
truc
tion,
th
e bi
olog
ical
m
onito
r w
ill
cond
uct
wal
k-ov
er s
urve
ys o
f th
e pr
ojec
t ar
ea a
t le
ast
2 da
ys a
wee
k (o
r ot
her
inte
rval
ap
prov
ed
by
the
P
SF
WO
) be
fore
the
sta
rt o
f da
ily
activ
ities
fo
r th
e pu
rpos
e of
de
tect
ing
any
evid
ence
th
at
SB
KR
ar
e en
terin
g th
e co
nstr
uctio
n fo
otpr
int.
Dur
ing
thes
e w
alk-
over
su
rvey
s,
the
biol
ogic
al m
onito
r w
ill r
emov
e an
y liv
e S
BK
R f
rom
the
con
stru
ctio
n ar
ea
and
lo
cate
an
y de
ad
or
inju
red
SB
KR
with
in t
he l
imits
of
cons
truc
tion.
2.19
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
P
rior
to
grou
nd
dist
urbi
ng a
ctiv
ities
ES
-16
Whe
n tr
appi
ng,
colle
ctin
g,
and
rele
asin
g an
y S
BK
R f
ound
in
the
cons
truc
tion
area
or
vici
nity
du
ring
the
cour
se
of
wo
rk,
the
biol
ogic
al
mon
itor/
biol
ogis
t w
ill
impl
emen
t th
e fo
llow
ing
m
easu
res:
2.19
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-6
6
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
ES
-16-
a Lo
cate
all
trap
s in
are
as
that
be
st
typi
fy
SB
KR
ha
bita
t, an
d pl
ace
them
in
su
ffic
ient
nu
mbe
rs
to
prov
ide
adeq
uate
co
vera
ge
of
suita
ble
habi
tat.
Mar
k al
l tr
ap
loca
tions
w
ith
flagg
ing,
ref
lect
ive
tape
, or
oth
er
tech
niqu
e th
at
is
visi
ble
unde
r da
y an
d ni
ght
cond
ition
s, a
nd a
t a
dist
ance
of
at le
ast 1
6.3
ft.
2.19
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-16-
b
Use
on
ly
12-in
ch
She
rman
or
wire
-mes
h liv
e tr
aps;
9-
inch
mod
els
may
be
used
onl
y if
obta
ined
be
fore
M
arch
13
, 19
90.
Ens
ure
all
trap
mod
els
are
mod
ified
to
el
imin
ate
or
subs
tant
ially
re
duce
th
e ris
k of
S
BK
R i
njur
y (e
.g.,
tai
l la
cera
tions
or
exc
isio
ns).
Do
not
plac
e an
y ba
ttin
g in
the
tra
ps.
2.19
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-16-
c S
teril
ize
trap
s pr
evio
usly
us
ed o
utsi
de o
f S
an B
erna
rdin
o C
ount
y.
2.19
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-16-
d C
ondu
ct t
rapp
ing
only
if
the
nigh
tly
low
te
mpe
ratu
re
is
fore
cast
to
be
50
de
gree
s F
ahre
nhei
t or
ab
ove,
an
d if
no
exte
nded
pe
riods
of
w
ind,
ra
in,
fog,
or
othe
r in
clem
ent
wea
ther
w
ill
occu
r to
m
ake
cond
ition
s un
suita
ble
for
trap
ping
or
w
ill
2.19
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-67
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
un
duly
im
peril
th
e liv
es
of
the
anim
als.
ES
-16-
e A
djus
t tr
aps
by
hand
ea
ch t
ime
they
are
pla
ced,
set
, an
d ba
ited,
at
a se
nsiti
vity
lev
el
appr
opria
te f
or c
aptu
ring
SB
KR
. V
isua
lly i
nspe
ct a
ll tr
aps
befo
re
clos
ing,
and
clo
se th
em b
y ha
nd.
2.19
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
ES
-16-
f C
heck
all
trap
s at
lea
st
twic
e ea
ch
nigh
t, on
ce
near
m
idni
ght
and
agai
n at
sun
rise.
2.19
-31
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
ES
-16-
g I
dent
ify a
ll tr
ap lo
catio
ns
with
a u
niqu
e id
entif
icat
ion
code
on
a lo
g sh
eet,
not
e th
e da
te a
nd
time
each
tra
p is
che
cked
, an
d pe
riodi
cally
rev
iew
the
log
she
et
to
ensu
re
no
trap
s ar
e in
adve
rten
tly
mis
sed.
F
ield
do
cum
enta
tion
shal
l be
ava
ilabl
e to
S
ervi
ce
pers
onne
l up
on
requ
est.
2.19
-32
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
ES
-16-
h
Hol
d in
divi
dual
S
BK
R
for
no l
onge
r th
an 1
hou
r be
fore
re
leas
ing
them
, an
d re
loca
te
them
as
quic
kly
as p
ossi
ble.
Do
not
plac
e th
e an
imal
in
a pl
astic
ba
g;
tran
sfer
it
in
a cl
ean,
st
ruct
ural
ly
soun
d,
brea
thab
le
cont
aine
r w
ith
adeq
uate
ve
ntila
tion.
D
o no
t at
an
y tim
e al
low
th
e an
imal
to
be
com
e st
ress
ed
due
to
tem
pera
ture
ex
trem
es (
eith
er h
ot o
r co
ld).
2.19
-32
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-6
8
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
ES
-17
The
ap
prov
ed
biol
ogic
al
mon
itor
will
pr
epar
e a
wee
kly
mon
itorin
g m
emo
to
docu
men
t th
e co
nstr
uctio
n ac
tiviti
es,
desc
ribe
the
cons
erva
tion
mea
sure
s ut
ilize
d, a
nd r
epor
t an
y ob
serv
atio
ns
of
live
or
dead
S
BK
R
for
tran
smitt
al
to
the
Dep
artm
ent
an
d P
SF
WO
un
til
cons
truc
tion
is c
ompl
ete.
2.19
-32
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
ES
-18
The
ap
prov
ed
biol
ogic
al
mon
itor
will
su
bmit
annu
al
repo
rts
on v
eget
atio
n re
stor
atio
n ac
tiviti
es a
nd r
esul
ts a
s sp
ecifi
ed
in
the
rest
orat
ion
plan
fo
r th
e te
mpo
rary
impa
ct a
reas
.
2.19
-32
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Bio
logi
st
/ La
ndsc
ape
Arc
hite
ctur
e /
Dis
tric
t M
aint
enan
ce
Dur
ing
Des
ign-
Bui
ld
Any
re
port
s w
ith
dura
tion
requ
irem
ents
m
ust
satis
fy
said
re
quire
men
ts.
ES
-19
The
de
sign
-bui
lder
w
ill
ensu
re
that
S
ervi
ce
pers
onne
l ha
ve
the
right
to
ac
cess
an
d in
spec
t th
e pr
ojec
t si
te
durin
g pr
ojec
t im
plem
enta
tion
(with
prio
r no
tific
atio
n fr
om t
he S
ervi
ce)
for
com
plia
nce
with
th
e pr
ojec
t de
scrip
tion,
co
nser
vatio
n m
easu
res,
an
d te
rms
and
cond
ition
s of
th
e B
iolo
gica
l O
pini
on.
2.19
-32
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
P
rior
to
cons
truc
tion
ES
-20
No
nigh
t w
ork
will
be
co
nduc
ted
in
SB
KR
ha
bita
t ar
eas.
W
hen
nigh
t w
ork
is
cond
ucte
d ad
jace
nt
to
SB
KR
ha
bita
t ar
eas,
noi
se a
nd l
ight
ing
2.19
-32
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-69
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
w
ill b
e di
rect
ed a
wa
y fr
om t
hese
ha
bita
ts.
E
S-2
1 A
fter
cons
truc
tion
is
com
plet
e, a
nd a
t th
e di
rect
ion
of
the
Dep
artm
ent
Bio
logi
st,
the
desi
gn-b
uild
er
will
re
med
iate
co
mpa
cted
soi
ls in
the
tem
pora
ry
wor
k ar
ea b
y rip
ping
all
area
s no
t di
rect
ly
in
the
activ
e ch
anne
ls
(ord
inar
y hi
gh w
ater
mar
k) t
o a
dept
h of
abo
ut 1
foo
t. S
tock
pile
d sa
nd a
nd c
obbl
e to
psoi
l w
ill b
e pl
aced
to
an
ap
prop
riate
de
pth
(abo
ut 1
foo
t) t
o pr
ovi
de S
BK
R
burr
ow
ing
subs
trat
es
of
soil
dens
ities
si
mila
r to
pr
e-co
nstr
uctio
n co
nditi
ons.
2.19
-32
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
P
ost
Con
stru
ctio
n
ES
-22
The
fo
llow
ing
Bes
t M
anag
emen
t P
ract
ices
(B
MP
s)
will
be
im
plem
ente
d du
ring
proj
ect c
onst
ruct
ion:
2.19
-32
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Bio
logi
st
/ D
istr
ict S
torm
Wat
er
Dur
ing
Des
ign-
Bui
ld
ES
-22-
a A
ccor
ding
to
the
Wat
er
Qua
lity
Ass
essm
ent
prep
ared
for
th
e pr
ojec
t, te
mpo
rary
co
nstr
uctio
n ef
fect
s to
w
ater
qu
ality
ar
e su
bjec
t to
th
e D
epar
tmen
t S
torm
Wat
er Q
ualit
y H
andb
ooks
, w
hich
pr
ovid
e th
e w
orki
ng
deta
ils
for
criti
cal,
tem
pora
ry
Con
stru
ctio
n S
ite
BM
Ps.
T
he
hand
book
s pr
ovid
e
guid
elin
es f
or t
he p
rope
r de
sign
, im
plem
enta
tion,
an
d
2.19
-33
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Bio
logi
st
/ D
istr
ict S
torm
Wat
er
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-7
0
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
m
aint
enan
ce
of
cons
truc
tion
BM
Ps.
T
he
Sto
rm
Wat
er
Pol
lutio
n P
reve
ntio
n P
lan
(SW
PP
P)
for
the
prop
osed
pr
ojec
t w
ill
iden
tify
the
spec
ific
BM
Ps
to b
e im
plem
ente
d du
ring
proj
ect
cons
truc
tion
so a
s no
t to
ca
use
or
cont
ribut
e to
an
ex
ceed
ance
of
an
y ap
plic
able
w
ater
qua
lity
stan
dard
con
tain
ed
in
a S
tate
wid
e W
ater
Q
ualit
y C
ontr
ol
Pla
n an
d/or
th
e S
anta
A
na R
WQ
CB
Bas
in P
lan.
The
se
BM
Ps
will
m
eet
the
Bes
t A
vaila
ble
Tec
hnol
ogy/
Bes
t C
ontr
ol
Tec
hnol
ogy
requ
irem
ent
as s
tipul
ated
in
the
Dep
artm
ent
Nat
iona
l P
ollu
tion
Dis
char
ge
Elim
inat
ion
Sys
tem
Per
mit.
ES
-22-
b
All
equi
pmen
t m
aint
enan
ce
and
disp
ensi
ng
of
fuel
, oi
l, co
olan
t, or
an
y ot
her
such
act
iviti
es w
ill b
e re
stric
ted
to
desi
gnat
ed
stag
ing
a rea
s to
pr
even
t th
e re
leas
e of
haz
ardo
us
subs
tanc
es
into
th
e pr
ojec
t si
te
or d
rain
ages
(i.e
., C
ajon
Cre
ek,
Cab
le C
reek
, Ly
tle C
reek
or
thei
r tr
ibut
arie
s).
Any
acc
iden
tal
spill
s w
ill
be
imm
edia
tely
co
ntai
ned
and
prop
erly
dis
pose
d of
.
2.19
-33
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Bio
logi
st
/ D
istr
ict S
torm
Wat
er
Prio
r to
co
nstr
uctio
n
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-71
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
ES
-22-
c N
o pe
ts w
ill b
e al
low
ed
in,
or a
djac
ent t
o, t
he p
roje
ct s
ite.
2.19
-33
Des
ign
Build
er
Res
iden
t Eng
inee
r
Dur
ing
Des
ign-
Bui
ld
ES
-22-
d
No
rode
ntic
ides
, he
rbic
ides
, in
sect
icid
es,
or o
ther
ch
emic
als
will
be
used
tha
t co
uld
be h
arm
ful t
o th
e S
BK
R o
r S
BK
R
or a
rroy
o to
ad c
ritic
al h
abita
ts.
2.19
-33
Des
ign
Build
er
Res
iden
t Eng
inee
r
Dur
ing
Des
ign-
Bui
ld
ES
-22-
e T
rash
will
be
stor
ed i
n cl
osed
con
tain
ers
so t
hat
it is
not
re
adily
acc
essi
ble
to s
cave
nger
s,
(e.g
., c
row
s an
d ra
ccoo
ns)
and
will
be
re
mov
ed
from
th
e co
nstr
uctio
n si
te o
n a
daily
bas
is
so
as
not
to
attr
act
pote
ntia
l S
BK
R p
reda
tors
.
2.19
-33
Des
ign
Build
er
Res
iden
t Eng
inee
r
Dur
ing
Des
ign-
Bui
ld
ES
-22-
f S
poils
and
rub
ble
will
not
be
dep
osite
d ou
tsid
e th
e lim
its o
f co
nstr
uctio
n an
d al
l fil
l m
ater
ial
and
was
te
will
be
di
spos
ed
of
prop
erly
an
d re
mov
ed
from
th
e co
nstr
uctio
n si
te o
n a
daily
bas
is.
2.19
-33
Des
ign
Build
er
Res
iden
t Eng
inee
r
Dur
ing
Des
ign-
Bui
ld
ES
-22-
g E
rosi
on c
ontr
ol, f
uel s
pill
clea
nup,
an
d m
anda
ted
equi
pmen
t no
ise
cont
rol
mea
sure
s w
ill
be
used
at
al
l tim
es.
2.19
-33
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-23
Impl
emen
t th
e co
nser
vatio
n m
easu
res
as
spec
ified
in
th
e pr
ojec
t
2.19
-33
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
P
rior
to
grou
nd
dist
urbi
ng a
ctiv
ities
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-7
2
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
de
scrip
tion
eval
uate
d in
th
e bi
olog
ical
op
inio
n.
If
the
biol
ogic
al
mon
itor
dete
cts
impa
cts
to
SB
KR
fr
om
proj
ect-
rela
ted
activ
ities
in
ex
cess
of
th
ose
desc
ribed
in
the
inci
dent
al
take
sta
tem
ent,
the
Dep
artm
ent,
thei
r ag
ents
, or
th
e bi
olog
ical
m
onito
r w
ill c
onta
ct t
he P
SF
WO
im
med
iate
ly.
Effo
rts
for S
an B
erna
rdin
o K
anga
roo
Rat
- R
esto
ratio
n Ac
tiviti
es a
fter C
onst
ruct
ion
ES
-24
Prio
r to
in
itiat
ing
proj
ect
impa
cts,
deve
lop
a re
stor
atio
n pl
an
for
the
tem
pora
ry
impa
ct
area
s. T
he p
lan
will
be
subm
itted
to
th
e P
SF
WO
fo
r re
view
an
d
appr
oval
no
la
ter
than
30
da
ys
prio
r to
in
itial
gr
ound
-dis
turb
ing
activ
ities
.
2.19
-34
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-25
Fol
low
ing
Pro
ject
co
nstr
uctio
n, a
ll di
stur
bed
habi
tat
adja
cent
to
P
ittm
an
Can
yon,
M
iddl
eman
C
anyo
n,
Caj
on
Cre
ek,
and
Bur
lingt
on
Nor
ther
n S
anta
F
e R
ailro
ad
wild
life
cros
sing
s w
ill
be
rest
ored
w
ith
nativ
e ve
geta
tion.
2.19
-34
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-26
Dev
elop
ap
prop
riate
re
stor
atio
n pl
ans
for
any
tem
pora
rily
impa
cted
ar
eas
2.19
-34
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Bio
logi
st/
Dis
tric
t La
ndsc
ape
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-73
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
w
ithin
S
BK
R
suita
ble
habi
tat.
Suc
h re
stor
atio
n pl
ans
will
be
im
plem
ente
d im
med
iate
ly
follo
win
g th
e co
mpl
etio
n of
co
nstr
uctio
n fo
r th
at
loca
tion.
R
esto
ratio
n pl
ans
will
be
su
bmitt
ed
to
PS
FW
O
for
appr
oval
no
la
ter
than
30
da
ys
prio
r to
gr
ound
-dis
turb
ing
activ
ities
.
In
som
e ar
eas
durin
g in
itial
gr
ound
-dis
turb
ing
activ
ities
, th
e up
per
6 in
ches
of
tops
oil
will
be
salv
aged
and
sto
ckpi
led
for
use
in a
reas
to
be r
eveg
etat
ed.
Upo
n co
mpl
etio
n of
co
nstr
uctio
n,
the
tem
pora
ry
impa
ct
area
s w
ill
be
reve
geta
ted
with
na
tive
plan
t sp
ecie
s co
nsis
tent
w
ith
thos
e fo
und
adja
cent
to
affe
cted
are
as.
A
Dep
artm
ent
biol
ogis
t w
ill
appr
ove
the
nativ
e pl
ant
pale
tte
to
be
used
in
ar
eas
to
be
reve
geta
ted.
No
spec
ies
liste
d on
C
al- I
PC
’s
Cal
iforn
ia
Inva
sive
P
lant
Inv
ento
ry t
hat
have
a h
igh
or
mod
erat
e ra
ting
will
be
used
fo
r re
vege
tatio
n. C
ompo
nent
s of
th
e re
stor
atio
n pl
an s
hall
incl
ude
met
hods
fo
r re
cont
ourin
g th
e la
nd,
repl
acin
g th
e to
psoi
l (if
it
was
co
llect
ed),
pl
antin
g se
ed
and/
or
cont
aine
r st
ock,
an
d m
aint
aini
ng
(i.e.
, w
eedi
ng,
Arc
hite
ct/D
istr
ict
Des
ign
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-7
4
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
re
plac
emen
t pl
antin
g,
supp
lem
enta
l w
ater
ing,
etc
.) a
nd
mon
itorin
g th
e re
stor
ed a
rea
for
a
perio
d of
fiv
e ye
ars
(or
less
if t
he
rest
orat
ion
mee
ts
all
succ
ess
crite
ria).
A
lso,
th
is
plan
w
ill
incl
ude
a de
taile
d de
scrip
tion
of
rest
orat
ion
met
hods
, sl
ope
stab
iliza
tion
and
eros
ion
cont
rol,
crite
ria
for
rest
orat
ion
to
be
cons
ider
ed
succ
essf
ul,
and
mon
itorin
g pr
otoc
ol(s
). F
ollo
win
g
the
com
plet
ion
of
cons
truc
tion
activ
ities
, th
ese
tem
pora
ry im
pact
ar
eas
will
be
plan
ted
as s
oon
as
poss
ible
to
pr
even
t en
croa
chm
ent
by
nonn
ativ
e
inva
sive
wee
ds.
The
res
tora
tion
plan
w
ill
be
impl
emen
ted
for
a m
inim
um o
f 5
year
s, u
nles
s th
e S
ervi
ce
agre
es
that
su
cces
s cr
iteria
ar
e m
et
earli
er
and
no
artif
icia
l w
ater
has
bee
n us
ed f
or
at le
ast 2
yea
rs.
ES
-27
Fol
low
ing
cons
truc
tion,
all
perm
anen
t lig
htin
g in
stal
led
alon
g th
e ne
w f
ree
wa
y al
ignm
ent
will
be
perm
anen
tly s
hiel
ded
and
dire
cted
ont
o th
e ro
adw
ay.
2.19
-35
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
Effo
rts
for A
rroy
o To
ad
ES
-28
The
Dep
artm
ent
will
fun
d
the
habi
tat
enha
ncem
ent
effo
rt
2.19
-35
R
esid
ent
Eng
inee
r /
Dur
ing
Des
ign-
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-75
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
by
en
terin
g in
to
an
agre
emen
t w
ith I
nlan
d E
mpi
re C
onse
rvat
ion
Dis
tric
t (I
ER
CD
) an
d th
e S
anta
A
na
Wat
ersh
ed
Aut
horit
y (S
AW
A)
to
perf
orm
in
-str
eam
en
hanc
emen
t of
ar
royo
to
ad
habi
tat
with
in
Caj
on
Was
h up
stre
am o
f th
e pr
opos
ed p
roje
ct
site
. T
he
Dep
artm
ent
will
fu
nd
the
enha
ncem
ent
of o
ne a
cre
of
arro
yo t
oad
habi
tat
with
in C
ajon
W
ash
to
offs
et
0.15
ac
re
of
perm
anen
t ef
fect
s an
d 0.
06 a
cre
of
tem
pora
ry
effe
cts
to
arro
yo
toad
cr
itica
l ha
bita
t.
Thi
s in
-st
ream
enh
ance
men
t lo
catio
n w
ill
be w
ithin
the
sam
e cr
itica
l hab
itat
unit
as t
he a
rea
affe
cted
. P
rior
to
grou
nd- d
istu
rbin
g ac
tiviti
es,
the
Dep
artm
ent
will
pr
ovid
e th
e
PS
FW
O
with
a
copy
of
th
e ag
reem
ent
with
th
e In
land
E
mpi
re
Res
ourc
e C
onse
rvat
ion
Dis
tric
t an
d S
anta
A
na
Wat
ersh
ed A
utho
rity.
Dep
artm
ent
Dis
tric
t Bio
logi
st
Bui
ld
ES
-29
A b
iolo
gist
with
kno
wle
dge
of
arr
oyo
toad
and
its
hab
itat
will
be
re
tain
ed
to
func
tion
as
a bi
olog
ical
m
onito
r fo
r w
ork
in
area
s w
ithin
or
adja
cent
to
arro
yo
toad
crit
ical
hab
itat.
2.19
-35
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-29-
a T
he
biol
ogic
al
mon
itor
will
ens
ure
com
plia
nce
with
the
pr
ojec
t de
scrip
tion
incl
udin
g an
y
2.19
-35
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-7
6
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
C
onse
rvat
ion
Mea
sure
s an
d T
erm
s an
d C
ondi
tions
ide
ntifi
ed
in
the
Janu
ary
27,
2012
, B
iolo
gica
l O
pini
on
issu
ed
for
proj
ect
effe
cts
to
liste
d sp
ecie
s di
scus
sed
in t
he p
roje
ct B
SA
.
ES
-29-
b
The
bi
olog
ical
m
onito
r w
ill
deve
lop
and
impl
emen
t a
desi
gn-b
uild
er
educ
atio
n pr
ogra
m
to
be
prov
ided
to
al
l pe
rson
nel
(incl
udin
g te
mpo
rary
de
sign
-bui
lder
s an
d su
bcon
trac
tors
) ov
er
the
life
of
the
proj
ect.
P
rior
to
cond
uctin
g an
y w
ork
on t
he s
ite,
pers
onne
l w
ill b
e in
stru
cted
reg
ardi
ng:
• T
he
purp
ose
of
reso
urce
pr
otec
tion
• D
escr
iptio
n of
the
arr
oyo
toad
an
d its
crit
ical
hab
itat
• C
onse
rvat
ion
mea
sure
s th
at
will
be
im
plem
ente
d in
co
njun
ctio
n w
ith
proj
ect
cons
truc
tion
• G
ener
al
prov
isio
ns
of
the
FE
SA
2.19
-35
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-29-
c T
he
biol
ogic
al
mon
itor
will
be
pres
ent
durin
g ve
geta
tion
clea
ring
and
grad
ing
prio
r to
pr
ojec
t co
nstr
uctio
n an
d du
ring
co
nstr
uctio
n to
m
onito
r ha
bita
t
2.19
-35
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-77
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
co
nditi
ons
and
cons
truc
tion
impa
cts
as d
eem
ed n
eces
sary
in
coor
dina
tion
with
the
PS
FW
O.
ES
-30
Prio
r to
an
y gr
ound
di
stur
banc
e,
all
limits
of
pr
ojec
t co
nstr
uctio
n w
ill
be
delin
eate
d an
d m
arke
d so
as
to b
e cl
early
vi
sibl
e to
per
sonn
el o
n fo
ot a
nd
in
heav
y eq
uipm
ent.
All
cons
truc
tion-
rela
ted
activ
ities
(e
.g.,
ve
geta
tion
rem
oval
, gr
adin
g, e
quip
men
t la
y-do
wn
and
st
orag
e,
and
desi
gn-b
uild
er
park
ing)
w
ill
occu
r in
side
th
e lim
its
of
cons
truc
tion.
C
onst
ruct
ion
stag
ing
and
equi
pmen
t st
orag
e w
ill b
e lo
cate
d ou
tsid
e of
an
y po
tent
ial
habi
tat
area
s. A
ll m
ovem
ent
of d
esig
n-bu
ilder
s, s
ubco
ntra
ctor
s, o
r th
eir
agen
ts
and
equi
pmen
t w
ill
be
rest
ricte
d to
th
e lim
its
of
cons
truc
tion
and
stag
ing
and
equi
pmen
t sto
rage
are
as.
2.19
-36
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
ES
-31
No
nigh
t w
ork
will
be
co
nduc
ted
in a
rroy
o to
ad c
ritic
al
habi
tat.
Whe
n ni
ght
wor
k is
co
nduc
ted
adja
cent
to
ar
royo
to
ad c
ritic
al h
abita
t ar
eas,
noi
se
and
light
ing
wou
ld
be
dire
cted
aw
ay
from
crit
ical
hab
itat a
reas
.
2.19
-36
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-7
8
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
ES
-32
To
impl
emen
t re
ason
able
an
d pr
uden
t m
easu
re n
umbe
r 2
(mon
itor
and
repo
rt
on
co
mpl
ianc
e/ef
fect
iven
ess
of
cons
erva
tion
mea
sure
s),
the
follo
win
g sh
all b
e pr
ovid
ed:
2.19
-36
See
ES-3
2a th
ru
ES-3
2c fo
r re
spon
sibi
lity
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
ES
-32-
a S
ubm
it a
mon
thly
rep
ort
to P
SF
WO
cov
erin
g re
sults
of t
he
biol
ogic
al m
onito
r’s v
isits
to
the
Pro
ject
site
dur
ing
all
phas
es o
f pr
ojec
t co
nstr
uctio
n,
until
co
nstr
uctio
n is
com
plet
e.
2.19
-36
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
ES
-32-
b
Sub
mit
annu
al
repo
rts
on
vege
tatio
n re
stor
atio
n ac
tiviti
es a
nd r
esul
ts a
s sp
ecifi
ed
in
the
rest
orat
ion
plan
fo
r th
e te
mpo
rary
impa
ct a
reas
.
2.19
-36
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
A
ny
repo
rts
with
du
ratio
n re
quire
men
ts
mus
t sa
tisfy
sa
id
requ
irem
ents
.
ES
-32-
c E
nsur
e S
ervi
ce
pers
onne
l ha
ve
the
right
to
ac
cess
an
d in
spec
t th
e P
roje
ct
site
du
ring
proj
ect
impl
emen
tatio
n (w
ith
prio
r no
tific
atio
n fr
om t
he S
ervi
ce)
for
com
plia
nce
with
th
e pr
ojec
t de
scrip
tion,
co
nser
vatio
n m
easu
res,
an
d te
rms
and
cond
ition
s of
th
e pr
ojec
t bi
olog
ical
opi
nion
.
2.19
-36
Des
ign
Build
er/
Dep
artm
ent
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-79
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
Gen
eral
Mea
sure
to P
rote
ct S
peci
es D
urin
g St
ruct
ure
Dem
oliti
on
ES
-33
Dur
ing
dem
oliti
on o
f an
y st
ruct
ure,
if
liste
d or
se
nsiti
ve
spec
ies
are
foun
d w
ithin
th
e st
ruct
ure,
non
-leth
al m
etho
ds o
f re
mov
al m
ust
be u
nder
take
n to
re
mov
e th
e se
nsiti
ve
or
liste
d sp
ecie
s fr
om
the
stru
ctur
e.
Spe
cies
with
no
stat
us m
ay b
e ex
term
inat
ed
aft e
r id
entif
icat
ion
by
the
biol
ogic
al
mon
itor.
R
eloc
atio
n of
lis
ted
spec
ies
will
fo
llow
spe
cific
atio
ns f
ound
with
in
the
Bio
logi
cal
Opi
nion
; se
nsiti
ve
spec
ies
shal
l be
re
loca
ted
in
area
s of
su
itabl
e ha
bita
t at
the
m
axim
um p
ossi
ble
dist
ance
fro
m
resi
dent
ial
or
com
mer
cial
st
ruct
ures
with
in t
he p
roje
ct a
rea.
In
cas
es w
here
no
spec
ial
stat
us
spec
ies
are
foun
d w
ithin
a
stru
ctur
e to
be
dem
olis
hed,
leth
al
exte
rmin
atio
n m
etho
ds
will
be
ch
osen
to
ta
rget
th
e in
terio
r of
th
e st
ruct
ure.
2.19
-36
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict
Bio
logi
st
/ S
truc
ture
s D
esig
n /
Str
uctu
res
Con
stru
ctio
n
Dur
ing
Des
ign-
Bui
ld
Inva
sive
Sp
ecie
s
Mea
sure
s to
be
Impl
emen
ted
Prio
r to
the
Beg
inni
ng o
f Con
stru
ctio
n
INV
-1
Prio
r to
th
e st
art
of
any
grad
ing:
2.
20-2
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-8
0
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
INV
-1-a
T
he
cons
truc
tion
site
sh
all
be
surv
eyed
w
ell
in
adva
nce
of
cons
truc
tion
(12
mon
ths
if po
ssib
le),
and
exi
stin
g na
tive
plan
t m
ater
ials
w
ill
be
colle
cted
on
site
. S
uffic
ient
tim
e sh
ould
be
al
loca
ted
for
a pr
ofes
sion
al
seed
co
mpa
ny
to
visi
t th
e pr
ojec
t si
te
durin
g th
e ap
prop
riate
se
ason
an
d co
llect
th
e na
tive
plan
t se
ed.
If a
deci
sion
is
mad
e to
col
lect
see
d fr
om
US
FS
la
nds,
a
fore
st
prod
ucts
per
mit
will
be
obta
ined
be
fore
hand
. S
eeds
will
be
stor
ed
appr
opria
tely
unt
il us
e.
2.20
.2
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
Prio
r to
co
nstr
uctio
n
INV
-1-b
The
loc
atio
n of
exi
stin
g in
vasi
ve
spec
ies
with
in
the
plan
ned
cons
truc
tion
foot
prin
t w
ill
be
map
ped
and
docu
men
ted
(incl
udin
g,
but
not
limite
d to
, fe
nnel
, ta
mar
isk
and
tree
of
he
aven
).
Inva
sive
sp
ecie
s oc
curr
ence
do
cum
enta
tion
will
in
clud
e:
• U
SF
S l
ocat
ion
info
rmat
ion
for
the
proj
ect
area
• F
ield
Sur
veys
• D
escr
iptio
n of
th
e m
etho
ds
used
to
dete
ct a
nd d
ocum
ent
inva
sive
spe
cies
occ
urre
nces
2.20
-2
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Prio
r to
co
nstr
uctio
n
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-81
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
INV
-1-c
A F
inal
Inv
asiv
e S
peci
es
Rem
oval
M
ap
will
be
pr
epar
ed
base
d on
the
abo
ve,
whi
ch w
ill
be
conf
irmed
an
d ac
cept
ed
by
the
Dep
artm
ent B
iolo
gist
.
2.20
-3
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Prio
r to
co
nstr
uctio
n
INV
-1-d
The
des
ign-
build
er s
hall
appo
int
an
Inva
sive
S
peci
es
Mon
itor
task
ed w
ith e
nsur
ing
that
th
e m
easu
res
that
fo
llow
ar
e
impl
emen
ted
durin
g al
l pha
ses
of
cons
truc
tion.
2.20
-3
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Prio
r to
co
nstr
uctio
n
Mea
sure
s to
be
Impl
emen
ted
durin
g In
itial
Cle
arin
g an
d G
rubb
ing
INV
-2
Dur
ing
all
initi
al
clea
ring
and
grub
bing
op
erat
ions
, th
e In
vasi
ve
Spe
cies
M
onito
r sh
all
ensu
re
that
th
e fo
llow
ing
m
easu
res
are
impl
emen
ted:
2.20
-3
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Prio
r to
gr
ound
di
stur
bing
act
iviti
es
INV
-2-a
Inv
asiv
e sp
ecie
s in
the
w
ork
area
sha
ll be
rem
oved
fro
m
the
site
prio
r to
see
d se
t ba
sed
upon
th
e m
appi
ng
crea
ted
in
INV
-1.
2.20
-3
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Prio
r to
gr
ound
di
stur
bing
act
iviti
es
INV
-2-b
F
or
all
spec
ies
of
inva
sive
wo
ody
plan
ts in
are
as o
f po
tent
ial
dist
urba
nce
with
in
the
cons
truc
tion
foot
prin
t, ei
ther
re
mov
e th
e w
hole
pla
nt i
nclu
ding
al
l ro
ots
if fe
asib
le,
or
cut
and
stum
p tr
eat
with
a
De
part
men
t
2.20
-3
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-8
2
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
ap
prov
ed a
quat
ic h
erbi
cide
usi
ng
the
cut
and
daub
met
hod
with
in
min
utes
of
cutti
ng.
Res
ultin
g cu
t bi
omas
s sh
ould
be
appr
opria
tely
di
spos
ed
of
off-
site
. If
seed
is
pr
esen
t w
hen
cu
t,
the
vehi
cles
ca
rryi
ng t
he c
ut b
iom
ass
shal
l be
cove
red
wel
l en
oug
h to
pre
vent
lo
ss o
f se
ed o
r ro
ot m
ater
ial
in
tran
spor
t. I
f he
rbic
ide
appl
icat
ion
is
not
feas
ible
, cu
tting
is
no
t re
com
men
ded
unle
ss t
he s
tum
ps
will
be
perm
anen
tly b
urie
d un
der
at l
east
4 f
eet
of f
ill o
r co
vere
d w
ith p
avem
ent.
INV
-2-c
S
oil
and
vege
tatio
n di
stur
banc
e w
ill b
e m
inim
ized
to
the
grea
test
ext
ent f
easi
ble.
2.20
-3
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
INV
-2-d
D
urin
g in
itial
gr
ound
di
stur
bing
act
iviti
es,
the
uppe
r si
x in
ches
of
tops
oil
will
be
salv
aged
an
d st
ockp
iled
for
pote
ntia
l re
us
e in
are
as t
o be
rev
eget
ated
(e
xcep
t fo
r ar
eas
curr
ently
in
fest
ed w
ith in
vasi
ve s
peci
es).
2.20
-3
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
INV
-2-e
E
xcav
ated
so
il fr
om
area
s w
ith
inva
sive
sp
ecie
s po
pula
tions
will
be
kept
sep
arat
e fr
om o
ther
soi
l an
d re
mov
ed a
nd
appr
opria
tely
dis
pose
d of
1)
off-
site
or
2) p
lace
d in
are
as t
o be
2.20
-3
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict B
iolo
gist
D
urin
g D
esig
n-B
uild
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-83
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
co
vere
d w
ith c
oncr
ete
or a
t le
ast
four
fee
t of a
dditi
onal
fill
.
Mea
sure
s to
be
Impl
emen
ted
durin
g A
ll Pe
riods
of C
onst
ruct
ion
INV
-3
Dur
ing
all
cons
truc
tion
oper
atio
ns,
the
Inva
sive
Spe
cies
M
onito
r sh
all
ensu
re
that
th
e fo
llow
ing
mea
sure
s ar
e im
plem
ente
d.
2.20
-3
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Dur
ing
Des
ign-
Bui
ld
INV
-3-a
N
o st
orag
e or
st
agin
g ar
eas
will
be
lo
cate
d on
U
SF
S
land
s.
2.20
-4
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Dur
ing
Des
ign-
Bui
ld
INV
-3-b
T
ruck
s w
ith
load
s ca
rryi
ng
vege
tatio
n sh
all
be
cove
red
and
veg
etat
ive
mat
eria
ls
rem
oved
fr
om
the
site
sh
all
be
disp
osed
of
in
ac
cord
ance
w
ith
all
appl
icab
le
law
s an
d re
gula
tions
.
2.20
-4
Des
ign
Build
er
Res
iden
t E
ngin
eer
/ D
istr
ict D
esig
n /
Dis
tric
t Bio
logi
st
Dur
ing
Des
ign-
Bui
ld
INV
-3-c
Dur
ing
cons
truc
tion,
the
co
nstr
uctio
n de
sign
- bui
lder
w
ill
ensu
re
impl
emen
tatio
n of
ap
prop
riate
du
st
cont
rol
mea
sure
s, t
o pr
even
t ex
cess
ive
amou
nts
of d
ust,
and
to
cont
rol
the
aeol
ian
rem
oval
of
w
eeds
an
d se
eds
from
st
ockp
iled
mat
eria
ls.
All
activ
e po
rtio
ns
of
the
cons
truc
tion
site
are
wat
ered
a
min
imum
of
thre
e tim
es d
aily
,
2.20
-4
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-8
4
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
co
nsis
tent
w
ith
dust
co
ntro
l m
easu
res
spec
ified
in
air
qual
ity
Mea
sure
s A
Q-1
thr
ough
AQ
-4 i
n S
ectio
n 2.
13. 4
(A
ir Q
ualit
y)
of
this
Env
ironm
enta
l D
ocum
ent,
to
prev
ent
exc
essi
ve
amou
nts
of
dust
an
d to
co
ntro
l th
e ae
olia
n re
mov
al
of
wee
ds
and
se
eds
from
sto
ckpi
led
mat
eria
ls.
INV
-3-d
All
mat
eria
l st
ockp
iled
is
suffi
cien
tly w
ater
ed o
r co
vere
d to
pr
even
t e
xces
sive
am
ount
s of
du
st.
2.20
-4
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Dur
ing
Des
ign-
Bui
ld
INV
-3-e
Soi
l/gra
vel/r
ock
shal
l be
ob
tain
ed
from
w
eed-
free
so
urce
s,
to
the
exte
nt
prac
ticab
le.
2.20
-4
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Dur
ing
Des
ign-
Bui
ld
INV
-3-f
The
des
ign-
build
er s
hall
iden
tify
the
sour
ce o
f fil
l m
ater
ial
for
cons
truc
tion
wor
k pe
rfor
med
on
US
FS
lan
d an
d im
med
iate
ly
adja
cent
(1
00’)
and
will
ob
tain
ap
prov
al f
rom
US
FS
prio
r to
its
us
e.
2.20
-4
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Prio
r to
gr
ound
di
stur
bing
act
iviti
es
INV
-3-g
To
the
exte
nt p
ract
icab
le
only
ce
rtifi
ed
wee
d-fr
ee
stra
w,
mul
ch,
and/
or f
iber
ro
lls
will
be
us
ed
for
eros
ion
cont
rol
to
the
max
imum
ext
ent
prac
ticab
le.
2.20
-4
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Dur
ing
Des
ign-
Bui
ld
INV
-3-h
E
rosi
on
and
sedi
men
t co
ntro
l de
vice
s,
incl
udin
g ce
rtifi
ed w
eed
-fre
e st
raw
, m
ulch
,
2.20
-4
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-85
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
fib
er
rolls
, an
d bo
nded
fib
er
mat
rix,
will
be
m
ade
from
bi
odeg
rada
ble
mat
eria
ls s
uch
as
jute
, w
ith
no
plas
tic
mes
h,
to
avoi
d cr
eatin
g a
wild
life
enta
ngle
men
t ha
zard
.
INV
-3-i
The
des
ign-
build
er w
ill b
e
resp
onsi
ble
for
ensu
ring
the
insp
ectio
n an
d cl
eani
ng
of
cons
truc
tion
equi
pmen
t at
th
e be
ginn
ing
of e
ach
wor
k da
y an
d pr
ior
to
tran
spor
ting
equi
pmen
t fr
om
one
proj
ect
loca
tion
to
anot
her.
All
equi
pmen
t us
ed o
n th
e pr
ojec
t si
te
shal
l be
fie
ld
clea
red
of
dirt
an
d ve
geta
tion
debr
is
with
in
the
infe
sted
ar
ea
prio
r to
m
ovin
g th
e eq
uipm
ent
into
no
n-in
fest
ed
area
s of
th
e pr
ojec
t an
d do
cum
ente
d in
a
form
ap
prov
ed
by
De
part
men
t bi
olog
ist.
2.20
-4
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Dur
ing
Des
ign-
Bui
ld
INV
-3-j
Sho
uld
an i
nvas
ion
occu
r du
ring
cons
truc
tion,
ap
prop
riate
er
adic
atio
n st
rate
gies
w
ill
be
empl
oyed
.
2.20
-4
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t Bio
logi
st
Dur
ing
Des
ign-
Bui
ld
Mea
sure
s to
be
Impl
emen
ted
durin
g R
eveg
etat
ion
and
Res
tora
tion
Act
iviti
es
INV
-4 D
urin
g al
l la
ndsc
apin
g an
d re
stor
atio
n ac
tiviti
es,
the
follo
win
g m
easu
res
shal
l be
im
plem
ente
d.
2.20
-5
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t B
iolo
gist
/
Land
scap
e A
rchi
tect
ure
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-8
6
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
INV
-4-a
T
o th
e ex
tent
pr
actic
able
, re
stor
atio
n se
edin
g w
ill
be
cond
ucte
d in
th
e fa
ll to
m
axim
ize
natu
ral
rain
fall
for
wat
erin
g.
2.20
-5
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t B
iolo
gist
/
Land
scap
e A
rchi
tect
ure
Dur
ing
Des
ign-
Bui
ld
INV
-4-b
S
oil
that
w
as
colle
cted
un
der
mea
sure
IN
V-2
-d s
hall
be
rest
ored
to
crea
te n
ew t
op s
oil.
2.20
-5
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t B
iolo
gist
/
Land
scap
e A
rchi
tect
ure
Dur
ing
Des
ign-
Bui
ld
INV
-4-c
In
co
mpl
ianc
e w
ith
the
Exe
cutiv
e O
rder
o
n In
vasi
ve
Spe
cies
, E
.O.
1311
2,
the
land
scap
ing
and
eros
ion
cont
rol
incl
uded
in
th
e pr
ojec
t w
ill
not
use
spec
ies
liste
d on
Cal
-IP
C’s
C
alifo
rnia
In
vasi
ve
Pla
nt
Inve
ntor
y.
The
D
epar
tmen
t B
iolo
gist
will
app
rove
the
nat
ive
pl
ant
palle
t to
be
used
in a
reas
to
be
reve
geta
ted.
In
ar
eas
of
part
icul
ar
sens
itivi
ty,
extr
a
prec
autio
ns
will
be
ta
ken
if in
vasi
ve s
peci
es a
re f
ound
in
or
adja
cent
to
th
e co
nstr
uctio
n ar
eas.
2.20
-5
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t B
iolo
gist
/
Land
scap
e A
rchi
tect
ure
Dur
ing
Des
ign-
Bui
ld
INV
-4-d
B
are
soil
will
be
re
vege
tate
d w
ith t
he f
ollo
win
g (in
or
der
of p
refe
renc
e):
• T
he
seed
co
llect
ed
abov
e un
der
miti
gatio
n m
easu
re I
NV
-
2.20
-5
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t B
iolo
gist
/
Land
scap
e A
rchi
tect
ure
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-87
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
1-
a.
If
ad
ditio
nal
seed
is
ne
eded
, th
e se
ed
mix
sh
all
be
take
n fr
om n
ativ
e pl
ant
spec
ies
from
lo
cal
Sou
ther
n C
alifo
rnia
ge
noty
pes
(but
not
sto
ck f
rom
co
asta
l ge
noty
pes)
, an
d ap
prov
ed
by
the
De
part
men
t. S
eed
purit
y w
ill b
e ce
rtifi
ed b
y pl
antin
g se
ed
labe
led
unde
r th
e C
alifo
rnia
F
ood
and
Agr
icul
tura
l C
ode
or
that
ha
s be
en t
este
d w
ithin
a y
ear
by a
se
ed la
bora
tory
cer
tifie
d by
the
A
ssoc
iatio
n of
O
ffici
al
See
d A
naly
sts
or
by
a se
ed
tech
nolo
gist
ce
rtifi
ed
by
the
Soc
iety
of
C
omm
erci
al
See
d T
echn
olog
ists
. A
ny s
uch
seed
w
ill b
e co
llect
ed f
rom
with
in a
25
m
ile
radi
us
of
the
proj
ect
site
, an
d w
ithin
an
el
evat
ion
rang
e of
90
0 to
1,50
0 fe
et
mea
n se
a le
vel
(MS
L)
and
av
aila
ble
for
the
sche
dule
d pl
antin
g tim
e.
If
loca
l pr
opag
ules
are
not
ava
ilabl
e or
ca
nnot
be
co
llect
ed
in
suffi
cien
t qu
antit
ies,
m
ater
ials
co
llect
ed o
r gr
own
from
oth
er
sour
ces
with
in
sout
hern
C
alifo
rnia
sha
ll be
sub
stitu
ted
at t
he d
iscr
etio
n of
the
Dis
tric
t B
iolo
gist
.
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
E-8
8
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
Mea
sure
s to
be
Impl
emen
ted
afte
r Com
plet
ion
of C
onst
ruct
ion
and
Rev
eget
atio
n
INV
-5
Afte
r co
mpl
etio
n of
co
nstr
uctio
n an
d re
vege
tatio
n,
the
Dep
artm
ent
Bio
logi
st
shal
l en
sure
th
e fo
llow
ing
mea
sure
s ar
e co
mpl
eted
.
2.20
-5
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t B
iolo
gist
/
Land
scap
e A
rchi
tect
ure
Dur
ing
Des
ign-
Bui
ld
INV
-5-a
Id
entif
y an
y ne
cess
ary
erad
icat
ion
proc
edur
es
(e.g
., sp
rayi
ng,
hand
wee
ding
) sh
ould
an
in
vasi
on
of
nonn
ativ
e pl
ants
oc
cur;
the
use
of
herb
icid
es w
ill
be p
rohi
bite
d w
ithin
and
adj
acen
t to
na
tive
vege
tatio
n,
exce
pt
as
spec
ifica
lly
auth
oriz
ed
by
the
P
SF
WO
an
d m
onito
red
by
a
Dep
artm
ent
biol
ogis
t.
2.20
-6
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t B
iolo
gist
/
Land
scap
e A
rchi
tect
ure
Dur
ing
Des
ign-
Bui
ld
INV
-5-b
M
onito
r th
e er
osio
n co
ntro
l an
d re
vege
tatio
n si
tes
twic
e ye
arly
(sp
ring
and
fall)
for
th
ree
year
s fr
om
date
of
re
vege
tatio
n in
stal
latio
n in
a
spec
ific
area
, to
de
tect
an
d co
ntro
l th
e in
trod
uctio
n/in
vasi
on
of n
onna
tive
spec
ies.
2.20
-6
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t B
iolo
gist
/
Land
scap
e A
rchi
tect
ure
Dur
ing
Des
ign-
Bui
ld
INV
-5-c
Id
entif
y an
y ne
cess
ary
erad
icat
ion
proc
edur
es
(e.g
., sp
rayi
ng
and/
or
hand
w
eedi
ng)
shou
ld a
n in
fest
atio
n oc
cur;
the
us
e of
he
rbic
ides
w
ill
be
2.20
-6
Des
ign
Build
er
Res
iden
t Eng
inee
r /
Dis
tric
t B
iolo
gist
/
Land
scap
e A
rchi
tect
ure
Dur
ing
Des
ign-
Bui
ld
App
endi
x E
: Env
ironm
enta
l Com
mitm
ents
Rec
ord
I-15/
I-215
Inte
rcha
nge
Impr
ovem
ents
Pro
ject
Initi
al S
tudy
/Env
ironm
enta
l Ass
essm
ent
E
-89
Da
te:
Feb
rua
ry 2
012
E
NV
IRO
NM
EN
TA
L C
OM
MIT
ME
NT
S R
EC
OR
D
(I-1
5 / I
-215
Int
erch
ange
Impr
ove
men
ts P
roje
ct)
08-S
Bd-
15
PM
14.
0 /
R16
.4
08-S
Bd-
215
PM
16.
0 /
17.8
E
A 0
8-0K
7100
P
N
0800
0003
66
Av
oid
ance
, Min
imiz
atio
n,
and
/or
Mit
igat
ion
Mea
sure
s
Pag
e #
in E
nv.
D
oc.
R
esp
on
sib
le f
or
Co
mp
lian
ce a
nd
im
ple
men
tati
on
of
mea
sure
D
epar
tmen
t
Co
nta
ct /
Su
pp
ort
T
imin
g/
Ph
ase
If a
pp
lica
ble
, co
rres
po
nd
ing
co
nst
ruct
ion
p
rovi
sio
n:
(sta
nd
ard
, sp
ecia
l, n
on
-st
and
ard
)
Ac
tio
n(s
) T
aken
to
Im
ple
men
t M
easu
re
Mea
sure
C
om
ple
ted
(D
ate
and
In
itia
ls)
Rem
arks
En
viro
nm
enta
l C
om
pli
ance
YE
S
NO
pr
ohib
ited
with
in a
nd a
djac
ent
to
nativ
e ve
geta
tion,
ex
cept
as
sp
ecifi
cally
au
thor
ized
an
d m
onito
red
by
the
Dep
artm
ent
Bio
logi
st.
Whe
re
herb
icid
e ap
plic
atio
n is
no
t ac
cept
able
or
fe
asib
le,
woo
dy
stum
ps
will
be
re
mov
ed
from
th
e si
te
and
appr
opria
tely
dis
pose
d of
off-
site
, pe
rman
ently
bu
ried
unde
r at
le
ast
4 fe
et o
f fil
l, or
cov
ered
with
pa
vem
ent
to
avoi
d re
-spr
outs
fr
om s
tum
ps.
Fol
low
-up
herb
icid
e
trea
tmen
t of
re-
spro
uts
from
cut
st
umps
sha
ll be
con
duct
ed f
or a
m
inim
um
of
thre
e ye
ars
from
st
ump
rem
oval
.
UTILITY DISPOSITION UTILITY
APPROX. STATION FROM
APPROX. STATION TO
APPROX.LENGTH (LF) NOTES
Dement St. (I-215), 'DEM' Line
Protect in Place SCG 4"/6" Gas Line (Xing I-215) 24+50.0 28+00.0 365Extend Casing SCG 4"/6" Gas Line (Xing I-215) 24+50.0 24+50.0 18 Extend 10" casing to edge of R/W
RelocateSCE OH (Xing I-215, 2 wood poles w/12kV Lines; 3 circuits) 19+00.0 19+00.0
Shift poles by the amount that Dement St is being shifted.
Relocate Verizon OH - 2 lines 29+00.0 29+00.0 Pole in center of proposed Dement St alignment.
Extend CasingVerizon, Sprint FOC - 4-2" conduits in 30" Sleeve (Xing I-215) 19+50.0 19+50.0 35 Extend 30" casing to edge of R/W
Extend CasingVerizon Business (MCI) 2-4" Conduits in 30" Sleeve (Xing I-215) 19+00.0 19+00.0 55 Extend 30" casing to edge of R/W
Relocate Verizon Business (MCI) 1-4" conduit 19+00.0 28+00.0 1,050 Relocate into new Dement align.
Protect in Place Verizon, Sprint FOC UG (4-2" conduits) 19+50.0 30+50.0 1,190
Protect in Place Verizon Business (MCI) 1-4" conduit 28+00.0 30+50.0 190 NW end of Demont
Protect in Place Verizon UG telephone 17+00.0 26+00.0 900
Protect in Place SCE UG Single Circuit Cable 26+50.0 26+50.0
Relocate SCE Poles (26+00, 27+50, 29+00) 3 poles. 26+00 may be a Verizon pole.
Protect in Place SCE Poles 15+00.0 27+50.0Check to make sure not in new Dement align. Also check guying (existing) for conflicts.
Devore Road Bridge, 'DEV' Line
Relocate 8" DWC Water 10+00.0 22+00.0 872
Relocate into new Devore Road OC. Includes a service line on the southeast corner of the bridge.
Relocate Verizon 4 Conduits Telco UG 9+80.0 21+00.0 872 Relocate into new Devore Road OC
Protect in Place TWT & L3, 6-2" Conduit HDPE in 20" Sleeve 9+80.0 20+00.0 872
Relocate SCE Poles (20+50, 22+10) 20+50.0 22+10.0
May affect guying on pole N of 22+10 as well. May be able to abandon if line is no longer needed on Arrowhead Blvd.
N/o Devore Rd Bridge & E/o I215,'D2' Line
Relocate SCG 2" Gas Line 410+50.0 414+00.0 310 In Arrowhead Blvd. May be able to abandon.
Relocate DWC 2" Water Line 410+30.0 416+00.0 520 In Arrowhead Blvd. May be able to abandon.
Relocate SCE OH & Verizon Telco, Poles & anchors 410+50.0 417+50.0
In Arrowhead Blvd. Would be best to abandon this (Remove), rather than save with a R/W line shift, because it helps with other relocs.
E/o I215 & S/o I15 ('SF' and 'MRN' Lines)
Protect in place SCE OH poles & anchors (from end of Santa Fe) Also includes OH telephone (V) and TV lines.
Protect in place SCG 2" Gas Line (end of Sante Fe Ave.) 10+00.0 12+00.0
Protect in place 4" Water Line (end of Sante Fe Ave.) 10+00.0 12+00.0
Relocate SCE OH & 2 poles & anchors (end of Marion Ave.) Also includes OH telephone (V) and TV lines.
Relocate DWC 1.25" Steel Water Line (end of Marion Ave.) 10 Cap end.
Relocate DWC 2" Steel Water Line (end of Marion Ave.) 10 Cap end.
UTILITY TRACKING REPORT (Last update: 5/3/2012)
UTILITY DISPOSITION UTILITY
APPROX. STATION FROM
APPROX. STATION TO
APPROX.LENGTH (LF) NOTES
UTILITY TRACKING REPORT (Last update: 5/3/2012)
Relocate SCG 2" Gas Line (end of Marion Ave.) 60 Remove service connection
Nedlee Ave, 'NED' Line
Protect in Place SCG 2" Gas Line 30+00.0 33+05.0 305
Protect in Place TWT and L3 6-2" Conduits HDPE 30+00.0 35+50.0 550
Relocate TWT and L3 6-2" Conduits HDPE 35+50.0 46+00.0 1,070 Relocate into new Nedlee Ave alignment
Protect/Relocate
TWT/L3 6-2: Conduits HDPE in 20" steel sleeve (Xing I-15) 46+00 46+00.0 450
Existing portion in sleeve will be protected in place, but sleeve will need to be extended to R/W line.
Relocate SCE & Verizon OH to Greenwood Ave (19 poles) 37+30.0past Greenwood
Ave 3,800
SCE stops at Greenwood. Verizion extends past end of Nedlee Ave and Greenwood, almost to Kenwood
Protect in Place Sprint & Verizon 4 -2" Conduits PVC 30+00.0 35+00.0 500
Relocate Sprint & Verizon 4 -2" Conduits PVC 35+00.0past Greenwood
Ave 3,800Extends past end of Nedlee Ave and Greenwood, almost to Kenwood
Protect in Place Verizon Bus. (MCI) 1-4" Conduit PVC 30+00.0 35+00.0 500
Relocate Verizon Bus. (MCI) 1-4" Conduit PVC 35+00.0past Greenwood
Ave 3,800
Extends past end of Nedlee Ave and Greenwood, almost to Kenwood. There also is an empty casing crossing I-15 that will need to be extended.
Protect in Place DWC 6" Water 30+00.0 32+60.0 260
Protect in Place DWC 10" Steel Sleeve 35+75.0 35+75.0 Empty sleeve
Greenwood Ave, 'GND' Line
Relocate SCE OH I-15 Xing - Steel Lattice Poles & 3 circuits
Will cross on a slightly new alignment (Still from the end of Greenwood Ave). Currently working with SCE to finalize relocation plan.
Kenwood Ave, 'KEN' Line
Relocate 1 Manhole (Verizon) 786+00.0 786+00.0 Adjust height only
Protect in Place SCG 2" PE Gas 779+50.0 779+50.0 Crosses Kenwood Ave.
Protect in Place ATT 4" Multiduct 775+64.3 798+81.6 2,320
Protect in Place 1 SCE Pole (Kenwood) 782+00.0 782+00.0
Protect in Place Verizon Business 1-4" conduit, 2-1 1/8" conduit 786+00.0 798+81.6 1,280
Protect in Place Sprint & Verizon 4-2" conduits 786+00.0 798+81.6 1,280
I-15 N/o Kenwood Ave, 'A4' Line
Relocate SCG 36" Gas Line 28+00.0 28+00.0Relocation necessary due to significant fill heights.
Protect in Place SCE OH Line Xing 37+00.0 37+00.0
Cajon Rd N/o Devore Rd, 'CAJ' Line
Relocate 1 SCE Pole, btw Cajon Blvd and I-15 156+00.0 156+00.0 Pole conflicts with toe of I-15 fill slope
Protect in Place Sprint, VB, WT; 4-4" conduits 139+50.0 146+00.0 650 May require some manhole adjustments
Protect in Place VB 3-4" empty conduits 117+30.0 139+50.0 2,220
Relocate VB 3-4" empty conduits 117+30.0 117+30.0 Extend case on both sides of I-15
Protect in Place Level 3/TWT 12-2" 106+25.0 146+00.0 3,980 May require some manhole adjustments.
Protect in Place SCE UG 2-5" & 6" Conduits 136+50.0 146+00.0 950 May require some manhole adjustments
UTILITY DISPOSITION UTILITY
APPROX. STATION FROM
APPROX. STATION TO
APPROX.LENGTH (LF) NOTES
UTILITY TRACKING REPORT (Last update: 5/3/2012)
Protect in Place 14" Oil Line - Kinder Morgan 75+00.0 146+00.0 7,300
Protect in Place 14" Oil Line - Kinder Morgan 60+80.0 75+00.0May require retaining wall at toe of slope along 'CD' Line
Protect in Place 8" Oil Line - Kinder Morgan 119+80.0 146+00.0 2,620
Relocate SCE - Relocate multiple poles outside of R/W 128+00.0 136+00.0Poles are between Cajon Blvd and I-15. See relocation plans for SCE xing of I-15.
Protect in Place SBMW - 16" Water line 79+00.0 93+00.0 1,650Some adjustments to manholes, valve boxes required.
Relocate SBMW - 16" Water line 57+00.0 79+00.0 2,210 Relocate into Cajon Blvd
Protect in Place SBMW - 16" Water line 46+00.0 57+00.0 1,100Some adjustments to manholes, valve boxes required.
Protect in Place SBMW - 12" Water line 46+00.0 52+50.0 650
Protect in Place Verizon FO line 49+00.0 59+00.0 1,230
Protect in Place Verizon telephone line 49+00.0 59+00.0 1,230
Protect in Place SBMW - 24" Water line 48+00.0 55+00.0 700
Protect in Place SCE 1-5" Conduit 49+00.0 58+00.0 1,220
I-15, S of 15/215 IC, 'A1' line
Protect in Place SCE OH Lines Xing I-15 762+50.0 762+50.0
Protect in Place TWT, Verizon and VB lines in Glen Helen Parkway 780+00.0 780+00.0
Extend Casings SCG 2 36" Gas lines Xing under I-15 814+00.0 816+00.0 May need to extend casings
Protect in Place VB 1-2" Conduit in Glen Helen Road 826+50.0 826+50.0
Protect in Place Verizon OH TV line on Glen Helen Road 826+50.0 826+50.0
Protect in Place Verizon 1-3" Telephone in Glen Helen Road 827+00.0 827+00.0
Protect in Place SCE 1-5" Conduit in Glen Helen Road 827+00.0 827+00.0
Protect in PlaceSCE OH line on Glen Helen Road and along I-15 (NB) 827+00.0 836+30.0
Extend CasingKinder Morgan 8" oil line in 24" STL Casing E/o RR Xing 843+00.0 843+00.0 200 At RR Crossing
Cajon Junction, 'CJNCT' Line
RelocateDWC 2" Water (South side), continues past end of street 10+00.0
20+11.94 and beyond 1,720
Abandon DWC 2" Water (North side) 10+00.0 18+00.0 2,210
Protect in Place SCE, V OH Electric, Telephone 10+00.0 20+11.9 1,340
RelocateSCE, V OH Electric, Telephone, next to 'CD' Line (5 poles) Near Station 923+00 of 'CD' Line.
Protect in Place Verizon Fiber Optic 10+00.020+11.94 and
beyond 1,340
Relocate Verizon Fiber Optic, next to 'CD' Line 55Near Station 923+00 of 'CD' Line. Relocate into new driveway.
Cajon Rd S/o Devore Rd. 'CAJ' Line
Relocate SCE, Verizon OH, 5 wood poles & anchors 45+50.0 47+50.0 Relocate outside of planned intersection
Relocate SCE, Verizon OH, 1 pole, N side of street 43+50.0 43+50.0
UTILITY DISPOSITION UTILITY
APPROX. STATION FROM
APPROX. STATION TO
APPROX.LENGTH (LF) NOTES
UTILITY TRACKING REPORT (Last update: 5/3/2012)
Relocate SCE, 6 poles, N side of street 39+00.0 41+00.0Line heads toward fwy, paralleling gas line. Relocate outside new R/W or may just remove.
Protect in Place SBMW 16" Water Steel 33+09.0 49+00.0 1,600
Protect in Place DWC 8" Water 40+50.0 49+00.0 860
Protect in Place SBMW 12" Water 37+50.0 49+00.0 1,150Crosses Cajon Blvd at 37+50 and reduces to 6" line
Protect in Place SBMW 24" Water DIP 33+09.0 49+00.0 1,600
Protect in Place Verizon Telco OH (S side of street) 38+50.0 44+50.0 600
Protect in Place Charter fiber optic OH (S side of street) 33+09.0 49+00.0 1,600
Protect in Place Verizon fiber optic (2 conduits), S side of street 33+09.0 49+00.0 1,600
Protect in Place SCG 16" Gas 33+09.0 38+20.0 520
Relocate SCG 6" Gas 38+00.0 41+00.0 470
Move outside of new R/W. Extend casing at I-215 freeway. Relocate reg. station at end of new ramps. May relocate into new Devore OC.
Protect in Place SCG 4" Gas 33+09.0 38+20.0 520
Protect in Place 6" Water 33+09.0 37+50.0 492
I-215 South of I-15, 'B1' Line
Relocate MCI 2-4" conduits in 30" sleeve 897+50.0 897+50.0 130 Extend casing on each side of freeway
Relocate Sprint & Verizon, 4-2" Conduits in 30" sleeve 898+00.0 898+00.0 130 Extend casing on each side of freeway
Relocate SCE pole, Xing I-215 897+50.0 897+50.0 Move poles on each side outside of R/W.
Relocate SCE pole, S side of freeway 867+70.0 867+70.0 Relocate pole outside of new R/W
Notes- Distances and stations are approximate. Design-Builder to verify exact locations.- Stations reference to the alignment called out by the heading of a section, as found on the Preliminary Engineering Drawings- Abbreviation definitions are found on the utility plan sheets
Department of Transportation Book 2 - I-15/I-215 Devore Interchange Improvements E.A.: 08-0K7104
Project ID: 08000003664
Exhibit 13-C - Transverse Reinforcement Requirements for Columns and Piles
EXHIBIT 13-C
Transverse Reinforcement Requirements for Columns and Piles
Element Name Seismic Type Transverse
Reinforcement Type
Bridge columns, pile extensions, and piles with cage diameter > 24 inches
Seismic Critical Hoops
Bridge columns, pile extensions, and piles with cage diameter < 24 inches
Seismic Critical Spirals
Piles/pile shafts in liquefiable soils Seismic Critical Hoops
Prismatic or enlarged pile shaft (diameter > 24 inches) supporting a column
See MTD 20-9 Hoops
Dep
artm
ent
of
Tra
nsp
ort
atio
n
RID
– I-
15/I-
215
I/C Im
pro
vem
ents
(D
evo
re)
Pro
ject
E.A
. 08-
0K7
104
P
roje
ct ID
080
000
0366
4
___
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
___
___
_
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
Inde
x of
Ref
eren
ce In
form
atio
n D
ocu
men
ts
1
Inde
x of
Ref
eren
ce I
nfo
rmat
ion
Doc
um
ents
A
“W
” un
der
avai
labl
e co
lum
n in
dica
tes
docu
men
ts th
at c
an b
e fo
und
on th
e In
tern
et, a
n “E
” in
dica
tes
the
docu
men
t wil
l be
prov
ided
el
ectr
onic
ally
, and
“C
O”
indi
cate
s th
e D
esig
n-B
uild
er s
hall
obt
ain
the
docu
men
t. W
eb s
ites
are
not
gua
rant
eed
but a
re s
uppl
ied
for
info
rmat
ion.
It
is u
ltim
atel
y th
e D
esig
n-B
uild
er’s
res
pons
ibil
ity to
loca
te th
e do
cum
ents
.
Tit
le
Ava
ilab
le
EX
IST
ING
IN
FO
RM
AT
ION
As-
Bu
ilt
Pla
ns
As-
Bui
lt P
lans
.zip
– Z
ippe
d fo
lder
con
tain
ing
the
follo
win
g:
E
I-15
SB
d 15
-Ind
ex.p
df –
Ind
ex o
f A
s-B
uilt
Pla
ns a
long
I-1
5 E
I-15
.zip
– Z
ippe
d fo
lder
con
tain
ing
As-
Bui
lt P
lans
for
var
ious
pro
ject
s al
ong
I-15
in P
DF
for
mat
E
I-21
5
SB
d 21
5-In
dex.
– In
dex
of A
s-B
uilt
Pla
ns a
long
I-2
15
E
I-21
5.zi
p –
Zip
ped
fold
er c
onta
inin
g A
s-B
uilt
Pla
ns f
or v
ario
us p
roje
cts
alon
g I-
215
in P
DF
for
mat
E
Str
uct
ure
s
Str
uctu
res.
zip
- Z
ippe
d fo
lder
con
tain
ing
As-
Bui
lt P
lans
for
the
foll
owin
g:
E
54-0
525
Dev
ore
Rd
OC
– D
evor
e R
d O
verc
ross
ing
E
54-7
71 C
ente
r C
onn
UC
– I
-15
to I
-215
Con
nect
or
E
54-7
72 K
enw
ood
Ave
UC
– K
enw
ood
Ave
Und
ercr
ossi
ng
E
54-0
779
Gle
n H
elen
Pkw
y U
C.p
df –
Gle
n H
elen
Pkw
y U
nder
cros
sing
E
Dep
artm
ent
of
Tra
nsp
ort
atio
n
RID
– I-
15/I-
215
I/C Im
pro
vem
ents
(D
evo
re)
Pro
ject
E.A
. 08-
0K7
104
P
roje
ct ID
080
000
0366
4
___
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
___
___
_
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
Inde
x of
Ref
eren
ce In
form
atio
n D
ocu
men
ts
2
Tit
le
Ava
ilab
le
54-0
780
Gle
n H
elen
Rd
UC
– G
len
Hel
en R
oad
Und
ercr
ossi
ng
E
54-0
781
Caj
on C
reek
– C
ajon
Cre
ek B
ridg
es R
ehab
ilit
atio
n E
54-0
782
N21
5-S
15 C
onn
UC
– N
B I
-215
to S
B I
-15
Con
nect
or
E
54-0
783
15,2
15 S
ep.p
df –
15/
215
Sep
arat
ion
E
54-0
818
Dev
ore
OH
– D
evor
e R
d O
verh
ead
E
54-0
844
Dev
ore
Rd
OC
,215
S C
oll.p
df –
Dev
ore
Rd/
S21
5 C
olle
ctor
Ove
rcro
ssin
g E
Su
rvey
Mai
nlin
e L
ocal
Roa
ds A
lign
men
ts.z
ip –
Zip
ped
fold
er c
onta
inin
g s
urve
y in
form
atio
n on
the
Con
nect
ors,
Loc
al r
oads
and
th
e M
ainl
ine
Ali
gnm
ents
E
RR
Tie
s to
Bri
dge.
zip
– Z
ippe
d fo
lder
con
tain
ing
DG
N F
iles
for
Rai
lroa
d T
ies
to B
ridg
es
E
Uti
liti
es
Uti
lity
Pla
ns-p
df_w
_lay
ers.
zip
– Z
ippe
d fo
lder
con
tain
ing
Key
Map
s, I
ndex
& U
tili
ty P
lans
E
Uti
lity
Cor
resp
onde
nce.
zip
– Z
ippe
d fo
lder
con
tain
ing
vari
ous
corr
espo
nden
ce w
ith
util
ity c
ompa
nies
E
SC
E R
eloc
atio
n 1.
–Sou
ther
n C
alif
orni
a E
diso
n re
loca
tion
pla
n E
SC
E R
eloc
atio
n 2.
– S
outh
ern
Cal
ifor
nia
Edi
son
relo
cati
on p
lan
E
RID
Sam
ple
Uti
lity
Agr
eem
ent.p
df
E
Dev
ore
Wat
er L
ine
Gui
deli
nes.
– G
ener
al g
uide
line
s fo
r w
ater
line
con
stru
ctio
n E
Sub
mit
tal R
equi
rem
ents
for
Joi
nt R
eloc
atio
ns.p
df –
Req
uire
men
ts f
or r
eloc
atio
n of
Sou
ther
n C
alif
orni
a E
diso
n fa
cili
ties
E
CS
FM
– C
alF
ire
Info
rmat
ion
Bul
leti
n 03
-001
Enc
roac
hmen
ts in
to o
r on
Pip
elin
e E
asem
ents
E
Dep
artm
ent
of
Tra
nsp
ort
atio
n
RID
– I-
15/I-
215
I/C Im
pro
vem
ents
(D
evo
re)
Pro
ject
E.A
. 08-
0K7
104
P
roje
ct ID
080
000
0366
4
___
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
___
___
_
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
Inde
x of
Ref
eren
ce In
form
atio
n D
ocu
men
ts
3
Tit
le
Ava
ilab
le
LO
-M 2
00-2
9.pd
f –
Kin
der
Mor
gan
Gui
deli
nes
for
Des
ign
and
Con
stru
ctio
n ne
ar H
azar
dous
Liq
uid
Ope
rate
d F
acil
itie
s E
Uti
lity
Con
tact
s L
ist.p
df –
Con
tact
list
for
uti
lity
com
pani
es w
ith
faci
liti
es w
ithi
n th
e pr
ojec
t lim
its.
E
DW
C P
reli
min
ary
Rel
ocat
ion
Pla
n.pd
f –
Dev
ore
Wat
er C
ompa
ny p
ropo
sed
relo
cati
on
E
PR
OJE
CT
ST
UD
IES
En
viro
nm
enta
l
Fin
al E
D 2
-29-
12.p
df –
Ini
tial
Stu
dy w
ith
Mit
igat
ed N
egat
ive
Dec
lara
tion
/ E
nvir
onm
enta
l Ass
essm
ent w
ith
Fin
ding
of
No
Sig
nifi
cant
Im
pact
dat
ed F
ebru
ary
29, 2
012
E
Fin
al E
D A
ppen
dice
s 2-
29-1
2.pd
f
E
Des
ign
Pro
ject
Stu
dy R
epor
t.pdf
E
App
rove
d P
roje
ct R
epor
t.pdf
E
Mod
ifie
d A
cces
s R
epor
t – Z
ippe
d fo
lder
con
tain
ing
file
s fo
r th
e M
odif
ied
Acc
ess
Rep
ort (
MA
R)
and
Att
achm
ents
A-H
E
Val
ueA
naly
sisL
8002
5.12
5_I1
5&I2
15_C
onne
ctor
s.pd
f E
I15-
215D
evor
eIC
-Sli
pRam
pCon
side
rati
on-F
HW
AS
ubm
itta
l_03
-18-
10.p
df –
Jus
tifi
cati
on f
or th
e us
e of
sli
p ra
mps
E
TE
CH
NIC
AL
RE
PO
RT
S
En
viro
nm
enta
l
VIA
app
rove
d_01
-28-
11.p
df –
Vis
ual I
mpa
ct A
sses
smen
t E
AD
L_S
tudy
_wit
hin_
exis
tRW
_PA
ED
Pha
se.p
df –
Aer
ial D
epos
ited
Lea
d S
tudy
E
Dep
artm
ent
of
Tra
nsp
ort
atio
n
RID
– I-
15/I-
215
I/C Im
pro
vem
ents
(D
evo
re)
Pro
ject
E.A
. 08-
0K7
104
P
roje
ct ID
080
000
0366
4
___
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
___
___
_
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
Inde
x of
Ref
eren
ce In
form
atio
n D
ocu
men
ts
4
Tit
le
Ava
ilab
le
Haz
Was
te_I
SA
– H
azar
dous
Was
te I
niti
al S
ite
Ass
essm
ent
E
HW
IS
A A
ppen
dice
s.pd
f –
Haz
ardo
us W
aste
Ini
tial
Sit
e A
sses
smen
t App
endi
ces
E
Asb
esto
s C
onta
inin
g M
ater
ials
Rep
ort_
Bri
dges
_050
3201
1.pd
f –
Asb
esto
s C
onta
inin
g M
ater
ials
Sur
vey
Rep
ort
E
Sec
tion
404
Per
mit
Opt
ions
--
U.S
. Arm
y C
orp
of E
ngin
eers
Sec
tion
404
Per
mit
Opt
ions
E
Bio
logi
cal A
sses
smen
t.pdf
– I
nter
stat
e 15
/Int
erst
ate
215
Inte
rcha
nge
Bio
logi
cal A
sses
smen
t E
BO
__re
visi
on.p
df –
U.S
. Fis
h an
d W
ildli
fe B
iolo
gica
l Opi
nion
E
AP
E_S
urve
yAre
a_w
orki
ng_0
6-07
-12c
ombi
ned.
– M
ap s
how
ing
Are
a of
Pot
enti
al E
ffec
ts s
tudy
are
a E
Geo
tech
nic
al S
tud
ies
& A
rch
ives
Geo
tech
-Arc
hive
s.zi
p –
Zip
ped
fold
er c
onta
inin
g ar
chiv
ed g
eote
chni
cal r
ecor
ds f
or v
ario
us s
truc
ture
s E
Fau
lt R
uptu
re S
tudy
.zip
– Z
ippe
d fo
lder
con
tain
ing
file
s fo
r th
e F
ault
Rup
ture
Stu
dy th
at w
as p
erfo
rmed
for
this
pro
ject
in
clud
ing
the
Fin
al F
ound
atio
n D
esig
n R
ecom
men
dati
ons
for
Ken
woo
d A
ve U
C
E
Hyd
rau
lics
Cab
le C
reek
Loc
atio
n H
ydra
ulic
Stu
dy.p
df
E
Caj
on C
reek
Loc
atio
n H
ydra
ulic
Stu
dy.p
df
E
Caj
on C
reek
CS
U L
ong
Bea
ch S
tudy
E
Exi
stin
g_D
rain
age.
E
Pre
lim
inar
y D
rain
age
Rep
ort.p
df
E
Wil
dlif
eMit
igat
ion.
zip
– W
ildl
ife
mit
igat
ion
wal
l and
tunn
el/c
ulve
rt a
t Pit
tman
Can
yon
and
Mat
thew
s R
anch
Roa
d E
Exi
stin
g D
rain
age
Pho
tos.
zip
– Z
ippe
d fo
lder
con
tain
ing
phot
os o
f ex
isti
ng d
rain
age
syst
ems
E
Dep
artm
ent
of
Tra
nsp
ort
atio
n
RID
– I-
15/I-
215
I/C Im
pro
vem
ents
(D
evo
re)
Pro
ject
E.A
. 08-
0K7
104
P
roje
ct ID
080
000
0366
4
___
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
___
___
_
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
Inde
x of
Ref
eren
ce In
form
atio
n D
ocu
men
ts
5
Tit
le
Ava
ilab
le
Mat
eria
l En
gin
eeri
ng
LC
CA
_PA
ED
pha
se.p
df –
Lif
e C
ycle
Cos
t Ana
lysi
s fo
r th
e P
AE
D p
hase
E
Pre
lim
inar
y M
ater
ials
Rep
ort.p
df
E
Op
erat
ion
s
TO
A R
epor
t_Ja
nuar
y 20
10.p
df –
Tra
ffic
Ope
rati
ons
Ana
lysi
s (T
OA
) E
TO
A A
ppen
dice
s_Ja
nuar
y 20
10.p
df –
TO
A A
ppen
dice
s E
Exi
stin
g.zi
p –
Zip
fil
e co
ntai
ning
traf
fic
mod
el f
iles
for
exi
stin
g E
NoB
uild
.zip
– Z
ip f
ile
cont
aini
ng tr
affi
c m
odel
fil
es f
or N
o B
uild
Alt
erna
tive
E
PR
Alt
3Mod
.zip
– Z
ip f
ile
cont
aini
ng tr
affi
c m
odel
fil
es f
or A
lter
nati
ve 3
E
Roa
dw
ay –
Pre
lim
inar
y G
eote
chn
ical
Rep
ort
Roa
dway
PG
R.p
df –
Pre
limin
ary
Geo
tech
nica
l Rep
ort (
PG
R)
E
Add
endu
m-N
o-1-
PG
R.p
df –
Add
endu
m N
o. 1
to P
GR
E
Rig
ht
of W
ay
Dev
ore
r-w
dat
a sh
eet 1
1-16
-11
sign
ed p
art 1
of
2.pd
f E
Dev
ore
r-w
dat
a sh
eet 1
1-16
-11
sign
ed p
art 2
of
2.pd
f E
Cou
nty
Map
s fo
r G
len
Hel
en P
ark
Bou
ndar
ies.
E
GH
R P
ark
Dev
elop
men
t Pla
n_P
arki
ng L
ot_1
993.
E
R_W
Act
ivit
ies
Pla
n R
ID.p
df –
Rig
ht o
f W
ay A
ctiv
ities
Pla
n sh
owin
g ta
rget
com
plet
ion
date
s
E
Dep
artm
ent
of
Tra
nsp
ort
atio
n
RID
– I-
15/I-
215
I/C Im
pro
vem
ents
(D
evo
re)
Pro
ject
E.A
. 08-
0K7
104
P
roje
ct ID
080
000
0366
4
___
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
___
___
_
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
Inde
x of
Ref
eren
ce In
form
atio
n D
ocu
men
ts
6
Tit
le
Ava
ilab
le
Sto
rmw
ater
Sto
rmw
ater
Dat
a R
epor
t_P
AE
D P
hase
– S
torm
wat
er D
ata
Rep
ort f
or th
e P
A&
ED
pha
se
E
Str
uct
ure
s –
Ad
van
ce P
lan
nin
g S
tud
ies
Str
uctu
res.
zip
- Z
ippe
d fo
lder
con
tain
ing
the
foll
owin
g A
dvan
ce P
lann
ing
Stu
dies
:
CC
_FIN
AL
AP
S R
epor
t.pdf
– C
ajon
Cre
ek B
ridg
e (W
iden
) E
DO
H_F
INA
L A
PS
Rep
ort.p
df –
Dev
ore
Ove
rhea
d (W
iden
) E
DR
OC
_FIN
AL
AP
S R
epor
t.pdf
– D
evor
e R
oad
Ove
rcro
ssin
g (R
epla
ce)
E
GH
P_F
INA
L A
PS
Rep
ort.p
df –
Gle
n H
elen
Par
kway
Und
ercr
ossi
ng (
Wid
en)
E
GH
R_F
INA
L A
PS
Rep
ort.p
df –
Gle
n H
elen
Roa
d U
nder
cros
sing
(W
iden
) E
INT
_FIN
AL
AP
S R
epor
t.pdf
– I
-15/
I-21
5 In
terc
hang
e B
ridg
es
E
KA
_FIN
AL
AP
S R
epor
t.pdf
– K
enw
ood
Ave
nue
Inte
rcha
nge
Bri
dges
E
MR
R_F
INA
L A
PS
Rep
ort.p
df –
Mat
thew
s R
anch
Roa
d U
nder
cros
sing
(L
engt
hen)
E
Str
uct
ure
s –
Pre
lim
inar
y G
eote
chn
ical
Rep
orts
SP
GR
.zip
- Z
ippe
d fo
lder
con
tain
ing
the
foll
owin
g P
reli
min
ary
Geo
tech
nica
l Rep
orts
: E
Caj
on_C
reek
_Bri
dges
_3A
_Wid
enin
g_SP
GR
_9-1
0-10
E
Dev
ore_
OH
_3A
_SP
GR
_9-1
0-10
E
Dev
ore_
Rd_
OC
_3A
_Rep
lace
_SP
GR
_9-1
0-10
E
Gle
n_H
elen
_PK
WY
_UC
_3A
_SP
GR
_9-1
0-10
E
Dep
artm
ent
of
Tra
nsp
ort
atio
n
RID
– I-
15/I-
215
I/C Im
pro
vem
ents
(D
evo
re)
Pro
ject
E.A
. 08-
0K7
104
P
roje
ct ID
080
000
0366
4
___
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
___
___
_
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
Inde
x of
Ref
eren
ce In
form
atio
n D
ocu
men
ts
7
Tit
le
Ava
ilab
le
Gle
n_H
elen
_RO
AD
_UC
_3A
_SP
GR
_9-1
0-10
E
I-21
5_D
evor
e_R
d_U
C_N
o_3A
-8_S
PG
R_9
-10-
10.p
df
E
Kim
bark
_Can
yon_
Bri
dge_
No_
3A-1
3_S
PG
R_9
-10-
10.p
df
E
Mat
thew
s_R
anch
_Rd_
UC
_3A
_Wid
enin
g_S
PG
R_9
-10-
10.p
df
E
NB
_15_
Tru
ck_B
P_a
t_K
enw
ood_
Ave
_3A
-11_
SP
GR
_9-1
0-10
E
Rou
te_2
15-1
5_S
epar
atio
n_3A
_Wid
enin
g_S
PG
R_9
-10-
10.p
df
E
SB
_15_
Tru
ck_B
P_a
t_K
enw
ood_
Ave
_3A
-10A
_SPG
R_9
-10-
10.p
df
E
SB
_215
_ML
_Ove
r_K
enw
ood_
Ave
_3A
-10_
SP
GR
_9-1
0-10
E
SB
_I-2
15_C
onne
ctor
_No_
3A-9
_SP
GR
_9-1
0-10
E
Wes
t_C
onne
ctor
_UC
_3A
_Wid
enin
g_SP
GR
_9-1
0-10
E
W-S
_Con
nect
or_U
C_N
o_3A
-7_S
PG
R_9
-10-
10.p
df
E
MIS
CE
LL
AN
EO
US
Con
cept
ual P
lan
Rev
iew
Fro
m C
ount
y.pd
f –
Con
cept
ual P
lan
Dra
win
g R
evie
w C
omm
ents
fro
m S
an B
erna
rdin
o C
ount
y E
Fee
Sch
edul
e 20
11-2
012-
FC
D.p
df –
San
Ber
nard
ino
Cou
nty
Con
trol
Dis
tric
t Sch
edul
e of
Fee
s E
Let
ter
to C
ount
y_07
2920
11.p
df –
Let
ter
to S
an B
erna
rdin
o C
ount
y da
ted
July
29,
2011
E
SB
dCou
nty_
Cul
deS
ac_D
etai
ls01
– S
an B
erna
rdin
o C
ount
y C
ul-d
e-sa
c de
sign
det
ails
E
SB
dCou
nty_
Cul
deS
ac_D
etai
ls02
– S
an B
erna
rdin
o C
ount
y O
ffse
t Cul
-de-
sac
desi
gn d
etai
ls
E
Dep
artm
ent
of
Tra
nsp
ort
atio
n
RID
– I-
15/I-
215
I/C Im
pro
vem
ents
(D
evo
re)
Pro
ject
E.A
. 08-
0K7
104
P
roje
ct ID
080
000
0366
4
___
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
___
___
_
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
Inde
x of
Ref
eren
ce In
form
atio
n D
ocu
men
ts
8
Tit
le
Ava
ilab
le
Tra
nspo
rtat
ion
Fee
Sch
edul
e -
07 2
7 20
06.p
df –
Dep
artm
ent o
f P
ubli
c W
orks
Sch
edul
e of
Fee
s fo
r T
rans
port
atio
n P
erm
its
E
EZ
Gui
de_2
006.
– Q
uick
Ref
eren
ce G
uide
to P
lan
Pre
para
tion
and
CA
DD
E
why
_fac
t_sh
eets
_fai
l.pdf
E
CO
NC
EP
TU
AL
PL
AN
S
Geo
met
ric
Ap
pro
val D
raw
ings
(A
lso
avai
lab
le in
DG
N f
orm
at)
GA
D-C
ut-S
heet
s.zi
p –
Dev
ore
Rec
onst
ruct
ion
Key
Map
& P
ropo
sed
Pro
ject
Lay
out P
lan
Shee
ts
E
Pro
file
s.zi
p –
Con
cept
ual P
rofi
le S
heet
s E
Sup
erel
evat
ion
Dia
gram
s.zi
p –
Con
cept
ual S
uper
elev
atio
n D
iagr
ams
E
Ove
rhea
d S
igni
ng C
once
pt P
lan.
– O
verh
ead
Sig
ning
Con
cept
Pla
n E
Mis
cell
aneo
us
Pla
ns
Mis
cell
aneo
us C
once
ptua
l Pla
ns.z
ip –
Zip
ped
fold
er c
onta
inin
g th
e fo
llow
ing
file
s E
Aer
ial.p
df –
Aer
ial m
ap o
f pr
ojec
t vic
inity
E
Cen
terl
ine
Cal
lout
– A
lignm
ent n
amin
g E
Day
ligh
t_L
ines
– C
ut/F
ill l
ines
bas
ed o
n co
ncep
tual
dra
win
gs
E
Exi
stin
g_D
rain
age_
line
– E
xist
ing
drai
nage
fac
ilit
ies
E
Exi
stin
g_R
ight
-of-
Way
– E
xist
ing
righ
t of
way
line
s E
ITS
Ele
men
ts.p
df –
Exi
stin
g IT
S E
lem
ents
E
Dep
artm
ent
of
Tra
nsp
ort
atio
n
RID
– I-
15/I-
215
I/C Im
pro
vem
ents
(D
evo
re)
Pro
ject
E.A
. 08-
0K7
104
P
roje
ct ID
080
000
0366
4
___
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
___
___
_
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
Inde
x of
Ref
eren
ce In
form
atio
n D
ocu
men
ts
9
Tit
le
Ava
ilab
le
Ove
rall
Pla
n.pd
f –
Ove
rall
pro
ject
pla
n st
rip
map
E
Pla
n.pd
f –
Pro
ject
str
ip m
ap
E
Pro
p_L
ocal
-Rig
ht-o
f-W
ay.p
df –
Pro
pose
d lo
cal r
ight
of
way
line
s E
Pro
p_R
ight
-of-
Way
– P
ropo
sed
proj
ect r
ight
of
way
line
s E
Pro
pose
d D
rain
age_
line
s.pd
f –
Con
cept
ual d
rain
age
plan
s E
Ret
aini
ng W
alls
– C
once
ptua
l ret
aini
ng w
alls
E
Typ
ical
Cro
ss S
ecti
on.p
df –
Typ
ical
Cro
ss S
ecti
ons
E
Gle
nHel
enP
kwyP
roje
cta.
– P
lans
for
Gle
n H
elen
Par
kway
Pro
ject
E
Arr
ayo
Toa
d.dg
n –
Arr
ayo
Toa
d ha
bita
t
SB
KR
Cri
tica
l Hab
itat
.dgn
– C
riti
cal H
abit
at f
or S
an B
erna
rdin
o K
anga
roo
Rat
SB
KR
Hab
itat
.dgn
– H
abita
t for
San
Ber
nard
ino
Kan
garo
o R
at
Gen
eral
Bri
dge
Pla
n
Gen
eral
Bri
dge
Pla
ns.z
ip –
Zip
ped
fold
er c
onta
inin
g th
e fo
llow
ing
fold
er a
nd p
lans
E
Str
uctu
re C
all-
outs
– B
ridg
e N
ame
Cal
l-ou
ts
E
Gen
eral
Bri
dge
Pla
ns_A
lt3A
– G
ener
al B
ridg
e P
lans
E
Dev
ore_
OH
_Wid
en_1
of2_
upda
ted-
0804
11.p
df –
Dev
ore
Ove
rhea
d-R
evis
ed
E
Dev
ore_
OH
_Wid
en_2
of2_
upda
ted-
0804
11.p
df –
Dev
ore
Ove
rhea
d-R
evis
ed
E
03_P
R-3
A-9
_1.p
df –
SB
I-2
15 C
onne
ctor
ove
r I1
5 P
lann
ing
Stu
dy 1
of
2 E
Dep
artm
ent
of
Tra
nsp
ort
atio
n
RID
– I-
15/I-
215
I/C Im
pro
vem
ents
(D
evo
re)
Pro
ject
E.A
. 08-
0K7
104
P
roje
ct ID
080
000
0366
4
___
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
___
___
_
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
____
Inde
x of
Ref
eren
ce In
form
atio
n D
ocu
men
ts
10
Tit
le
Ava
ilab
le
04_P
R-3
A-9
_2.p
df –
SB
I-2
15 C
onne
ctor
ove
r I1
5 P
lann
ing
Stu
dy 2
of
2 E
Rai
lroa
d S
ubm
itta
ls
BN
SF
Con
cept
ual A
ppro
val P
acka
ge.z
ip –
Pac
kage
sub
mit
ted
to B
NS
F to
obt
ain
conc
eptu
al a
ppro
val
E
UP
RR
Con
cept
ual A
ppro
val P
acka
ge.z
ip –
Pac
kage
sub
mit
ted
to U
PR
R to
obt
ain
conc
eptu
al a
ppro
val
E
Rai
lroa
d A
gree
men
ts.z
ip –
Cur
rent
and
sam
ple
rail
road
agr
eem
ents
E
DT
M F
iles
InR
oads
Fil
es.z
ip –
Zip
ped
fold
er c
onta
inin
g va
riou
s In
road
s D
TM
fil
es
E
SN
BG
0703
Alt
3A
GA
D M
ainl
ines
.ird
– R
oadw
ay m
odel
er f
iles
for
mai
nlin
e
SN
BG
0703
Alt
3A
GA
D R
amps
.ird
– R
oadw
ay m
odel
er f
iles
for
ram
ps
Dev
ore.
itl –
tem
plat
e fi
les