Page 1 of 80 Request for Proposal (RFP) For Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important Date & Information 1 RFP Publish Date November 08, 2018. 2 Last date and time for Sending Pre-Bid Queries in writing November 19, 2018 by 2:00 PM. All queries has to be send at [email protected] 3 Cost of RFP Rs.590/- (Rs.500 + 18% GST) (Rupees Five Hundred and Ninety Only) 4 Earnest Money Deposit Rs. 1.80 Lakhs (Rupees One Lakh Eighty Thousand Only) 5 Pre-Bid Meeting date, time & venue November 26, 2018 11:30 AM. Venue : ICSI House, C – 36, Sector 62, Noida – 201309 6 Bid Validity 180 days from the date of submission of bids 7 Last Date of Submission of Bids November 30, 2018 by 02:00 pm 8 Address for submission of Bids The Institute of Company Secretaries of India, ICSI House, C – 36, (5 th Floor: Tender Box), Sector – 62, Noida – 201309 9 Date, time & Venue of opening of Technical Bids. November 30, 2018 at 03.30 PM Address as above. 10 Date and time of opening of commercial bids. Will be intimated in due course to technically short listed bidders only 11 Contact details Dr. Nikhat Khan, Director (IT), ICSI, 0120-408 2019 Email Id: [email protected]. All pre-bid queries has to be send at [email protected] 12 Institute Website www.icsi.edu

Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 1 of 80

Request for Proposal (RFP)

For

Development, Delivery and Maintenance of Web Based Application Software

for ICSI (STIMULATE)

Important Date & Information

1 RFP Publish Date November 08, 2018.

2 Last date and time for Sending

Pre-Bid Queries in writing

November 19, 2018 by 2:00 PM.

All queries has to be send at

[email protected]

3 Cost of RFP Rs.590/- (Rs.500 + 18% GST)

(Rupees Five Hundred and Ninety Only)

4 Earnest Money Deposit Rs. 1.80 Lakhs (Rupees One Lakh Eighty

Thousand Only)

5 Pre-Bid Meeting date, time &

venue

November 26, 2018 11:30 AM.

Venue : ICSI House,

C – 36, Sector 62,

Noida – 201309

6 Bid Validity 180 days from the date of

submission of bids

7 Last Date of Submission of Bids November 30, 2018 by 02:00 pm

8 Address for submission of Bids The Institute of Company Secretaries

of India, ICSI House, C – 36,

(5th Floor: Tender Box),

Sector – 62,

Noida – 201309

9 Date, time & Venue of opening

of Technical Bids.

November 30, 2018 at 03.30 PM

Address as above.

10 Date and time of opening of

commercial bids.

Will be intimated in due course to

technically short listed bidders only

11 Contact details Dr. Nikhat Khan, Director (IT),

ICSI,

0120-408 2019 Email Id:

[email protected].

All pre-bid queries has to be send at

[email protected]

12 Institute Website www.icsi.edu

Page 2: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 2 of 80

Statement of Confidentiality

The information contained in this RFP Document or subsequently provided to

Bidder(s) whether verbally or in documentary form by or on behalf of Institute of

Company Secretaries of India (hereinafter “ICSI”) or by any of their employees

or advisors, shall be subject to the terms and conditions set out in this RFP

Document and all other terms and conditions subject to which such information is

provided. The purpose of this RFP document is to provide the Bidder(s) with

information to assist the formulation of their proposals. This RFP Document does

not purport to contain all the information each Bidder may require. This RFP

document may not be appropriate for all persons, and it is not possible for the

ICSI, their employees or advisors to consider the investment objectives, financial

situation and particular needs of each Bidder who reads or uses this RFP

document. Each Bidder should conduct its own investigations and analysis and

should check the accuracy, reliability and completeness of the information in this

RFP document and where necessary obtain independent advice from appropriate

sources. ICSI, its employees and advisors make no representation or warranty

and shall incur no liability under any law, statue, rules or regulations as to the

accuracy, reliability or completeness of the RFP document. ICSI may in their

absolute discretion, but without being under any obligation to do so, update,

amend or supplement the information in this RFP Document.

Page 3: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 3 of 80

Contents

1. INTRODUCTION .............................................................................................................................................. 4

2. Project Background ........................................................................................................................................ 8

3. SCOPE OF SERVICES ..................................................................................................................................... 16

SCOPE OF WORK IN BRIEF (DETAILS MENTIONED IN ANNEXURES) ............................................... 16

4. High Level Requirement for Application Software ...................................................................................... 22

5. ELIGIBILITY CRITERIA .................................................................................................................................... 27

6. DOCUMENTS ESTABLISHING BIDDER’S ELIGIBILITY: .................................................................................... 29

7. Evaluation of Technical Proposals................................................................................................................ 29

8. GENERAL TERMS & CONDITIONS ................................................................................................................. 30

9. Bid Preparation ............................................................................................................................................ 31

10. Opening of Bids ....................................................................................................................................... 35

11. Bid Evaluation Criteria ............................................................................................................................. 35

Part 1 (Bid Security) ........................................................................................................................ 35

Part 2 (Pre-Qualification criteria) ................................................................................................. 36

12. Award of Contract ................................................................................................................................... 37

13. AMENDMENT OF RFP DOCUMENTS ....................................................................................................... 38

14. Important Information and conditions .................................................................................................... 39

15. Right to Black List: ................................................................................................................................... 43

16. FORCEMAJEURE ....................................................................................................................................... 43

17. Indemnity Clause: .................................................................................................................................... 44

18. Cancellation of Award / Work Order: ...................................................................................................... 44

19. CONFIDENTIALITY .................................................................................................................................... 45

20. ARBITRATION ........................................................................................................................................... 45

21. Jurisdiction:.............................................................................................................................................. 45

Part ‘A’ TECHNICAL BID ......................................................................................................................................... 46

Technical Bid Eligibility Criteria ........................................................................................................................ 47

Technical Evaluation Matrix ............................................................................................................................. 49

Part ‘B’ TENTATIVE COMMERCIAL BID DETAILS ................................................................................................... 51

Annexure I ........................................................................................................................................................ 54

Annexure II ....................................................................................................................................................... 55

Annexure III ...................................................................................................................................................... 59

Annexure IV ...................................................................................................................................................... 60

Annexure V ....................................................................................................................................................... 61

Annexure VI ...................................................................................................................................................... 63

Annexure VII ..................................................................................................................................................... 64

Page 4: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 4 of 80

1. INTRODUCTION:

The Institute of Company Secretaries of India (ICSI / Institute) is a statutory body

constituted under an Act of Parliament i.e. the Company Secretaries Act, 1980 for

the regulation and development of the profession of Company Secretaries It is

functioning under the overall administrative jurisdiction of Ministry of Corporate

Affairs, Government of India, and its Headquarters is located at “ICSI House”, 22

Institutional Area, Lodi Road, New Delhi-110 003. ICSI is also having its office at

“ICSI House”, C-36, Sector - 62, Noida, Uttar Pradesh-201309

ICSI invites Request for Proposal (RFP) from interested bidders’ for the

Development, Maintenance and Implementation of an already partial developed

Web Based Application Software. Sealed RFP are invited by the ICSI for “Development, Delivery and Maintenance of Web Based Application

Software for ICSI” for its office at “ICSI House”, C-36, Sector - 62, Noida, Uttar

Pradesh-201309.

DEFINITIONS

i) The “ICSI” means THE INSTITUTE OF COMPANY SECRETARIES OF

INDIA, New Delhi. ii) The “Contract” means Development, Delivery and Maintenance of

Web Based Application Software for ICSI (STIMULATE), which the

bidder is required to provide to the ICSI under the Contract through

this RFP.

iii) “Bidder” or “Tenderer” means the agency/firm that is engaged in the business of Development, Delivery and Maintenance of Web Based

Application Software for ICSI (STIMULATE) and applies in response

to this notice inviting RFP.

iv) “Vendor” mean the successful bidder who is engaged by ICSI to Development, Delivery and Maintenance of Web Based

Application Software for ICSI (STIMULATE) through this RFP process

by entering into the contract with the ICSI. v) The words “Bid”, “RFP”, “Quotation”, “Tender” to be read intra

alia and the words have been used inter-changeably. Therefore the

words may be understood and interpreted correctly as may be best

applicable. vi) The words “Bidder”, “Tenderer” to be read intra alia and the words

have been used inter-changeably. Therefore the words may be

understood and interpreted correctly as may be best applicable.

Page 5: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 5 of 80

vii) “Party” means ICSI or Vendor individually and “Parties” shall mean

ICSI and Vendor collectively.

viii) “Letter of Intent” means the communication of the intention of the ICSI

to the vendor for the award of work read with tender documents.

ix) “Work Order” means the order placed by the ICSI to the vendor

signed by the authorized officer of ICSI including all attachments and

appendices thereto and all documents incorporated by reference

therein. Work order along with the Letter of Intent if any and tender

documents and the agreement constitutes the contract.

The terms and conditions governing the RFP are as under:

1. The RFP document can be downloaded from the website of the ICSI

(www.icsi.edu).

2. The RFP document may be obtained during working hours from November 08, 2018 to November 30, 2018 (till 01.00 PM) on all

working days of ICSI-HQ on payment of Rs.590 /- (Rs.500 + 18% GST)

from the Reception Counter of the Institute on cash payment or by submitting a demand draft in favour of “The Institute of Company

Secretaries of India”, payable at New Delhi. The tender document

can also be downloaded from the website of the Institute (www.icsi.edu)

for which bidder would be required to enclose a demand draft of Rs.590/- (Rs.500 + 18% GST) towards the cost of the tender document

along with their quotes, failing which the tender shall be out rightly

rejected. If any discrepancies found in the downloaded version of the

tender, the version of the tender document kept at Purchase cell of the

Institute will be treated as authentic correct.

3. Please Note only Technical Bid needs to be submitted at initial

stage. Commercial Bid will be asked at a later date only from those

bidders who will qualify the technical evaluation process. No

Commercial Bid is to be attached along with the Technical Bid.

4. RFP should be submitted in two different phases. In the First phase, the

bid should be submitted in a sealed cover containing "TECHNICAL

BID" (i.e. only technical details as per the requirements in this RFP along

with literature, pamphlets, drawing etc.). In the Second phase, the bid should be submitted in a sealed cover containing "COMMERCIAL

BID", which will be asked from only those bidders who will qualify the

Technical Evaluation Process.

5. The sealed RFP are to be submitted in prescribed format on Bidder’s

business letter head duly stamped, dated and signed on each page of the

RFP as unconditional acceptance to the terms prescribed by the ICSI

therein. Details/supporting documents wherever applicable, if attached

with the bid should be fully authenticated by the Bidder/s.

Page 6: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 6 of 80

6. Earnest Money Deposit (EMD)

i. The Earnest Money Deposit (EMD) of Rs.1.80 Lakhs (Rupees One Lakh

Eighty Thousand only) in the form of Demand Draft/pay order drawn in

favour of “THE INSTITUTE OF COMPANY SECRETARIES OF

INDIA” payable at New Delhi only is to be submitted along with the

bid.

ii. RFPs received without the prescribed Earnest Money Deposit (EMD)

shall not be entertained and shall be rejected summarily.

iii. The EMD of the successful bidder can either be converted as part of the

performance security on request of the bidder or will be refunded after

receipt of Performance Guarantee/Security. In case the selected

bidder/vendor opts to convert the EMD to be part of the performance

security, balance amount towards the performance security will be

recovered from the payable amount to the vendor. The EMD of the

unsuccessful bidders will be refunded without any interest/Bank

commission/collection charges within 30 days after award of the

contract / work order to the successful bidder.

(Note: The bidders having valid registration with NSIC/MSME may avail

exemption from submission of EMD and Cost of Tender but must enclose

valid NSIC / MSME certificate/document in envelope No. 1 instead of

EMD demand draft).

7. The EMDs of the unsuccessful bidders will be refunded without any

interest after completion of tender process. The EMD of the Successful

bidder will be refunded after submission of the Security Deposit/ Bank

Guarantee by the party.

8. The Bidder who was awarded any contract in the past by the Institute but

terminated during the contract period due to unsatisfactory performance

will not be eligible /considered to participate in this tender. Also a

bidder who was awarded any contract earlier but refused to continue the

contract/refused to sign the agreement as given by the Institute will not

be eligible to participate in this tender.

9. Technical Bid containing commercial details will lead to rejection of

Bid without any further notice to the bidder. Bidders shall ensure that

commercial documents are properly filled up and sealed separately as

instructed above. The bidder must ensure that price is not revealed in

any form or by any reason in the technical bid, otherwise bid shall be

rejected without any further notice to the bidder.

Page 7: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 7 of 80

10. The ICSI reserves the right to reject or accept any or all bids without

assigning any reasons. If too many bids are received satisfying the basic

pre-requisite criteria, ICSI may apply any criteria for screening the bids

to restrict the list of pre-qualified bidders to any number deemed

suitable by it. ICSI also reserve its right to cancel or withdraw the whole

RFP process at any stage without assigning any reason thereof.

The sealed Request for Proposal duly superscripted, “Development, Delivery

and Maintenance of Web Based Application Software for ICSI

(STIMULATE)”, should be addressed by name to the Officiating Secretary, ICSI

and sent at the Institute’s address given below either by registered post/speed

post/or by dropping in the tender box placed at 5th floor of ICSI’s Noida Office &

should reach on or before the due date.

Address:

The Officiating Secretary

The Institute of Company Secretaries of India, ICSI House, C-36, (5th Floor: Tender Box)

Sector 62, Noida,

Uttar Pradesh - 201309.

The ICSI will not be responsible for any postal delays. Bid/Application received

after the stipulated date and time shall not be entertained. Bid/Application

through e-mail is not valid. The ICSI reserves the right to accept or reject any or

all the applications without assigning any reasons, whatsoever.

NOTE: Please note that no separate communication will be sent in this regard. In

the event of due date being a closed holiday or declared holiday for Central

Government Offices, the due date for opening of the bids will be the following

working day at the appointed date, time and venue.

Date: November 08, 2018 (Amit Kumar Ghosal)

DIRECTOR (Purchase)

Page 8: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 8 of 80

2. Project Background:

The Institute’s activities have undergone a sea change over the years and its

phenomenal growth in terms of number of stakeholders and activities had

made it absolutely essential to go for a complete transformation of the service

providing mechanism especially the technological interface available with the

users in the Institute as well as with the stakeholders.

It is expected that the new project i.e. Project STIMULATE on its

completion shall bring about major changes in the working of the Institute.

The existing project comprises of various modules. The current status of the

various modules is placed below.

Ite

m

No

Process Name Department

Name Priority Module Requirement

1

Registration Process

/ Registration

Approval

Student

Services

MISC Priority

2

Enhancement (if

required)

2 Pre-Registration Student

Services

MISC Priority

2

Enhancement (if

required)

3 ICLS/US-UK student

registration process

Student

Services

MISC Priority

2

Enhancement (if

required)

4 Cancellation of

Student Registration

Student

Services

MISC Priority

2

Enhancement (if

required)

5

Refund in case of

Rejection of Student

Registration and

others. (All types of

refunds)

Student

Services

MISC Priority

1

Enhancement (if

required)

6 Denovo Request Student

Services

MISC Priority

2

Enhancement (if

required)

7 Extension Process Student

Services

MISC Priority

2

Enhancement (if

required)

8 Switch Over Request Student

Services

MISC Priority

2

Enhancement (if

required)

9 Exemption in case of

Switch Over

Student

Services

MISC Priority

2

Enhancement (if

required)

10 Revert switch over

Process

Student

Services

MISC Priority

2

Enhancement (if

required)

11 Professional

Registration

Student

Services

MISC Priority

2

Enhancement (if

required)

12

Excess-Less Amount -

In Case Of

Registration

Student

Services

MISC Priority

2

Enhancement (if

required)

13 Subject/ Qualification

Based Exemption

Student

Services

MISC Priority

2

Enhancement (if

required)

Page 9: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 9 of 80

14

Cancellation of

Subject /

Qualification Based

Exemption

Student

Services

MISC Priority

2

Enhancement (if

required)

15 Enrolment Student

Services

MISC Priority

1

Enhancement (if

required)

16 Study Dispatch Store MISC Priority

1

Enhancement (if

required)

17 eCart Store MISC Priority

1

Enhancement

18 Grievance/Complain

t Grievance

MISC Priority

2

Enhancement (if

required)

19 Corporate

Communication

Corporate

Communicatio

n

MISC Priority

2

Enhancement (if

required)

20 Payment

Reconciliation F&A

MISC Priority

2

Enhancement

21 PG Integration F&A MISC Priority

1

Enhancement

22 Attendance HR MISC Priority

2

Enhancement (if

required)

23 Surveys Miscellaneous MISC Priority

2

Enhancement (if

required)

24 BLOG, Discussion

Forum Miscellaneous

MISC Priority

2

Enhancement (if

required)

25 Other Audit Log (IT) Other MISC Priority

2

Enhancement (if

required)

26 CS- Journal

Subscription

Student

Services

Student

Service

Priority 1

Development &

Maintenance

27 Verification of Marks Exam

MISC Priority

1 Maintenance &

Enhancement

28 Certified Answer

Books Exam

MISC Priority

1 Maintenance &

Enhancement

29 Inspection of Answer

Books Exam

MISC Priority

1 Maintenance &

Enhancement

30

National level

competition-

Animation

Competition

Student

Services

Student

Service

Priority 2

Development &

Maintenance

31 All India Competition Student

Services

Student

Service

Priority 2

Development &

Maintenance

32 Minority scholarship

application

Student

Services

Student

Service

Priority 2

Development &

Maintenance

Page 10: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 10 of 80

33 Merit Cum Means

assistance

Student

Services

Student

Service

Priority 2

Development &

Maintenance

34

Re-Registration

Process and Revert

Switch over

Student

Services

Student

Service

Priority 1

Development &

Maintenance

35 Coaching Module Student

Services

Student

Service

Priority 1 Partial Development

36 SEFT - Student

Education Fund Trust

Student

Services

Student

Service

Priority 2

Development &

Maintenance

37 Exemption in case of

Re-Registration

Student

Services

Student

Service

Priority 1

Development &

Maintenance

38

Registration of

student Short Term

Training

Keep short training

module as separate

entity for

development &

maintenance) the

following points need

to be cover under

short term training :-

1. Apply for

Short Term

Training

(Student)

2. Training

Calendar by

RO/Chapter

3. Dependency

of various

training while

making

master of

short term

training.

4. Add training

calendar

5. Faculty and

topic mapping

6. Addressing

/compilation

Training

Training &

Placement Partial Development &

Maintenance

Page 11: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 11 of 80

of various

feedback.

7. Attendance of

students /

participants

8. Generation of

completion

certificate

39

Registration of

students in Long term

training,

1) Process of

applying for

long term

training under

PCS,

Companies

and other

entities.

2) Process of

applying 03

months

practical

training

3) Process of

applying

training under

modified

training

structure/swit

chover of the

training

Training

Training &

Placement

Partial Development &

Maintenance

40

Late fees collection

for late intimation

after pursuing

training/ back date

application:

1. List of

documents as

per the

Training

Training &

Placement

Partial Development &

Maintenance

Page 12: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 12 of 80

duration/peri

od of late

submission

2. provision to

configure for

applying

training from

backdate

3. Payment

gateway

Approval

authority/process

41

Leave calculation as

per the period of

training

Training

Training &

Placement

Partial Development &

Maintenance

42

Request for

balance/transfer of

training, approval

system

Training

Training &

Placement

Partial Development &

Maintenance

43 Training companies

and PCS Registration Training

Training &

Placement Partial Development &

Maintenance

44

Membership

Application

(Training)

Training

Training &

Placement Development &

Maintenance

45

Process of Exemption

from Training,

exemption fees

collection

Training

Training &

Placement Partial Development &

Maintenance

46

submission of

Quarterly

report(Training)

Evaluation of

quarterly reports

as per grading

systems

Training

Training &

Placement Partial Development &

Maintenance

47

submission of project

report(Training),

Evaluation of

project report as

per grading

system

Training

Training &

Placement Partial Development &

Maintenance

48 submission of

training certificate Training

Training &

Placement Partial Development &

Maintenance

49

Revised training

structure as per

Vision 2022

Training

Training &

Placement Development &

Maintenance

50

Option to have

variation based on

the changes in the

respective

Committee and

Training

Training &

Placement Development &

Maintenance

Page 13: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 13 of 80

Council

51 Distribution of

Training Kits Training

Training &

Placement Development &

Maintenance

52 Recognition of Best

Trainer Training

Training &

Placement Development &

Maintenance

53

ACS membership

Registration/Approv

al Process (FORM-A).

Membership Membership Development &

Maintenance

54

FCS Member

Registration/Approv

al process

Membership Membership Development &

Maintenance

55 Restoration process

of ACS member's. Membership

Membership Development &

Maintenance

56 Restoration process

of FCS member's. Membership

Membership Development &

Maintenance

57

CSBF Registration/ Approval Process

(FORM-A) / Updation

of dependent details.

Membership Membership

Development &

Maintenance

58

CSBF Assistance

Process in case of

Medical/Death

process/Intimation of

death claim to

insurance agency

Membership Membership

Development &

Maintenance

59

Licentiate Process –

Registration/Renewal

/Change of address;

Licentiate defaulter

process; cancellation

of Licentiate

Membership Membership

Development &

Maintenance

60

Corporate

Compliance

Executive (CCE)

Certificate.

Membership Membership

Development &

Maintenance

61 Election's Candidate

list Membership

MISC Priority

2

Development &

Maintenance

62

Firm management

(Individual,

Proprietorship,

Partnership);

Reconstitution/Conve

rsion/Dissolution of

firm/Change of firm

name/Change of firm

address/Branch

Office/LLP name

approval

Membership Membership

Development &

Maintenance

Page 14: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 14 of 80

63

COP - Issue /

Renewal/

Restoration/Cancella

tion Process (FORM-

D)/COP Defaulter

process.

Membership Membership

Development &

Maintenance

64

Evaluation process

for Best Chapter

Award & Best

Regional Council

Award

Coordination Coordination

Development &

Maintenance

65 Compilation of ICSI

Directory Coordination

Coordination Development &

Maintenance

66 Placement Feature Training &

Placement

Training &

Placement

Partial Development &

Maintenance

67 Peer Review PD, PP &

Studies Membership Development &

Maintenance

68 Member-Transcript Membership Membership Development &

Maintenance

69 Convocation RO Chapter

MISC Priority

1

Development &

Maintenance

70 Event / Seminar for

RO/HO/Convocation RO Chapter

MISC Priority

1

Development &

Maintenance

71 HR Conclave RO Chapter

MISC Priority

2

Development &

Maintenance

72 Recruitment HR

MISC Priority

1

Development &

Maintenance

73

E-procurement,

Management of

contract and

Purchase and Asset

Management

Purchase

MISC Priority

2

Development &

Maintenance

74 Chat Miscellaneous

MISC Priority

2

Development &

Maintenance

75

Enrolment Process –

provision to create

zones for selected

centres/cities and

display the areas

covered in zone,

choose to select area

in the order of

preference,

provision to shift

candidates from one

zone to other zone.

Student

Services

Student

Service

Priority 1

Development &

Maintenance

Page 15: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 15 of 80

Randomization of

existing roll number

process.

76

Offline Payment

Collection System

F&A MISC Priority

2

Development &

Maintenance

77

R/O Chapter Module

(Corporate

Membership)

RO Chapter

MISC Priority

1

Development &

Maintenance

78

Dynamic Reports and

Dashboard for all

Modules

All Modules

MISC Priority

1

Development &

Maintenance

79

Configurable GST

Component

All Modules

except few

like CSBF and

CCEC etc.

Training &

Placement

Development &

Maintenance

80 Quality Review

PD, PP &

Studies

MISC Priority

1

Development &

Maintenance

81 Program Credit Hour

Module

PD, PP &

Studies

MISC Priority

1

Development &

Maintenance

82

Professional

Development

Programmes

PD, PP &

Studies

MISC Priority

1

Development &

Maintenance

Page 16: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 16 of 80

3. SCOPE OF SERVICES

SCOPE OF WORK IN BRIEF (DETAILS MENTIONED IN ANNEXURES)

The selected Organization shall be developing a Software Solution for the

Modules which are either partially developed or not developed. The Software

solution shall be based on User’s requirements and has to be integrated with-

in the existing Software application or it may be a product based which can be

integrated with existing application of ICSI.

Broad scope of the project but not limited to is as follows:

1. The Software application / Online Portal should be based on the

software used in the existing application (MS.Net as Frontend and

MSSQL as backend) with no additional license cost and unlimited logins

or any product based which could be integrated with the existing

system.

2. The Bidder can further develop/modify the Software Web Application

based on the architecture of the existing system, so that existing design

and functionalities of every module should be uniform as a whole. Each

functionality developed by the Bidder should be Service dependent.

The application should be flexible enough to have limited impact

changes throughout the layers of the application. The architecture must

demonstrate loose coupling across layers, and must list flexibility

constraints, if any.

3. Modules for stakeholders like Student Services, Training, Licentiate,

Membership, Placement, Sale of Material, Regional Offices/ Chapter

office Program Management / Seminars & Trainings, Financial

Management (only of fees received) / Reconciliation for individual

offices of fees received from stakeholders etc. may be integrated in a

single web application. It should be totally configurable. The control

could rest with the administrator for enabling the functionality of

Privileges to pay fees with / without login.

4. All the history / existing data of the Institute should migrate in the new

system. There should not be any history / existing data loss.

5. Support & Migration of data during a parallel run: At the time of

Production Deployment both applications (Existing and New) will run

parallel for a certain time period for smooth Functionality Testing. After

successful verification and approval the existing application will be

sunset and the data entered during the pilot run will also have to be

migrated to New System.

Page 17: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 17 of 80

6. Provision for all entitlements / privileges for all types of Profiles like as

End Users, Super Users, IT Users, IT Administrators, DB Administrator

and Super Administrator with password assistance through SMS and

email. Role based access and authorization of various modules.

7. Report Requirement

a. The Application should contain a Dashboard of tailor made MIS

pages which shows output in the form of maps, charts with threshold

limits.

b. There should be dynamic report generation / analysis feature within

the web application. User should be able to select required columns,

filtration, sorting at runtime for any module according to their

access. The template can be saved for future use also.

c. Authoring and Maintaining templates for Email / SMS for each

trigger (action against any updation). The Institute has already hired

a Bulk SMS and Bulk Mailing System / facility from third party

bidder, which is to be integrated by the bidder for this purpose.

Further this is informed that the bidder for Bulk SMS and Bulk

Mailing systems of the Institute may change in future. In view of the

same the bidder has to design and develop the system such that it

may cater to the change of the system of new form with few

configurations here and there which may be documented and

provided to the Institute.

8. The Application should pass OWASP Top10 security check certificate to

stop hacking attempts before going LIVE. A CERT-In empanelled

auditor must certify that the application is found to be free of all OWASP

Top 10 vulnerabilities. Managing security of the new system from all

type of external attacks (like hacking, SQL Injection, Cross Side

Scripting, Denial of Service Attack etc.).

9. The bidder will be responsible for maintaining and managing the

performance and real time display of the hardware / software system

developed and implemented by them by configuring and optimizing

Operating system, Database optimization and log management /

shipping for DR and backup, SSL, software updates / patches, minor

updations etc. of the Production Environment during the contract

period.

10. The Weekly analysis report on traffic / data profiling needs to available

to the Institute on real time basis at no additional cost.

Page 18: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 18 of 80

11. Bidder will be responsible for providing User Training, User Manuals

for all types of users (including Administrator role) and Technical

Documents. (Softcopy should be digitally signed by project manager of

the bidder).

12. Managing the staging and development environment of Software

Application at ICSI data centre (Noida) for each and every release

starting from day one of the development.

13. Developing / Providing generic solution to cater to the following

functionalities:

a. Third party providers’ i.e. multiple Payment Gateway (with /

without login i.e. Quick Payment), SMS and Email.

b. Implementation of GST / other Taxes in services whenever

applicable.

c. Adding / Hiding fields in forms / reports.

d. Dashboard

14. The solution should be scalable and published / accessible without

distortion across the latest three versions / types of browser

(IE/Chrome/Mozilla/Safari etc). The home page should have flash

animation with configurable contents from image repository / database.

15. The site should be tested against a peak load of One lakh users /

transactions on half yearly basis and certified documentation of such

test to be provided during the maintenance phase.

16. Dashboards: Use of extensive dashboards to represent the journey of

the stakeholders in the form of maps, charts, threshold limits. Individual

information showed in different colors in one screen from Foundation to

membership with all payments, complaints, study dispatch, everything,

analysis of movement of student from one stage to another.

17. User management / Role profiling: Robust login system/ Secure Log-in

allowing stakeholders to access the system as per their roles /

authorization thereby having retrieve & reset password facility on email

/ SMS.

18. Secure Online Payment: Payment of fees with or without login for the

existing Student/Member with features such as:

a. Dynamic Integration with different payment gateways

b. Dynamic Integration with different Bank Challan options

Page 19: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 19 of 80

c. Dynamic Fee master creation as per accounting standards.

d. Dynamic Integration of GST / Taxes with any service.

e. Reconciliation of PG data with bank data on the basis of fee

master GL code

The Payment Gateway shall cater to multiple accounts of all offices of

ICSI.

19. Provision to cater offline fee payments like Cheque, Demand draft,

Cash, Postal orders into multiple accounts spread over offices of ICSI

and exception handling

20. Financial reconciliation: Automation of reconciliation with periodic

Reports for online and offline payment transactions through various

payment gateways, cheque, demand draft, cash, postal orders etc. into

multiple accounts spread over offices of ICSI.

21. The application should be configurable enough to visible / enable

certain features / functionalities. Like as Birthday Greetings, various

services pertaining to Training & Membership Modules,

HQ/RO/Chapters Events etc. through control panel with start and end

date with proper authorization.

22. On demand scaling options – The firm shall be responsible for

integrating Load Balancer for the new Software Application. Two

application servers will be provided by the ICSI in the start and the

application system should be scalable to add more.

23. The bidder has to propose a solution wherein the entire system

(including the existing application) can also be hosted on cloud. The

required configuration details must be submitted by the Bidder as a

part of Technical Bid. The ICSI reserves the right to opt for option point

22 or 23.

24. The application should perform consistently during the peak period.

Like as Exam Enrolment, Subsequent registration in next Level after

declaration of results, Student’s Training Application, Membership

Request etc.

25. All pages should customize itself to Mobile (compatible with the iOS,

Android, Windows). Considering existing system also.

Page 20: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 20 of 80

26. Help (Animated Guided tour with screen demo on how to use portal

with existing services and new services, New Users, New Features,

Customization of page, Online Validation).

27. The Software application / SQL should maintain logs and keep a record

of events for later verification with search features for readable output.

The database should be in Normalized form with proper indexing and

exception handling.

28. The application is expected to allow business users to design and

generate reports on the fly for overall application. Bidder to propose a

mechanism and detail how the proposed application will address the

needs of ad-hoc reports.

29. Workflow : The application should preferably have the capability to

develop Pictorial Workflow as Multiple departments during life cycle of

the stakeholder – Student – (Foundation, Executive, Professional),

Training (Trainee, Trainer), Membership (CSBF, Placement)

30. The proposed application should use Social Media and user moderated

Discussion Boards. The bidder is to propose how interaction with Social

Media can benefit the application. Preferably Integration with Face

book, Twitter etc.

31. The software application / processes have to run / interact with

stakeholders without or minimal human intervention. To achieve the

same all validation controls has to be imbibed in the software with

provision to configure the rules.(e.g. City University, State, Country

validation,(if Other then adding in the master after approval), cross

validation of city/ pin code/ chapter of ICSI)( candidates will be shown

the options they deserve)

32. The new Software Application should be able to communicate with the

Institute’s Sharepoint site for fetching / placing some files (images /

documents) and processed afterwards. The firm should maintain a

separate file server as a document repository (for both Students and

Members related data) and shall hold the responsibility of data

migration to this repository. The application should be able to handle

the Workflow of different modules functionality of the new/existing

application.

33. The software application should be designed in such a manner so that it

would cater below listed Strategic Action Points:

Page 21: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 21 of 80

a. Live chat tool before and after login.

b. Integrating existing grievance / call center

c. Feedback monitoring with reminders (SMS/Email) based on

rules for e.g. standard tasks are expected on monthly / weekly

basis.

34. The system should be open to be integrated with any third party

application in future.

35. Implementation of Digital signature in documents wherever required.

For eg.: Some forms like ACS membership, COP request etc. required

digital signature before uploading and validation.

36. The system should be able to link with existing and new Files server

where contents like Photos, Certificate copy is present.

37. ERP / DMS would lay the basic platform for financial & inventory

handling and the module under reference could be developed over the

ERP OR the module could also be developed as an independent entity.

The new system should be able to integrate the stock positions of the

publication/items with ERP stock position so that E-Cart users can view

the stock position on real time basis. Facility of 'Flash' to be provided as

a dashboard notification for any publication/items which reaches buffer

stock on real time basis in the e-Cart system. Scheme for prime

members on ICSI e-cart.

38. The solution should be up and running within the time period specified

by the bidder in the Technical Bid. In case any extension is required

bidder should come with genuine reason or else penalty will be levied.

39. Any software (except for the e-Procurement solution), hardware, data,

awards, certificates, patent, etc. shall be absolute property of ICSI.

Bidder will transfer to ICSI all Intellectual Property Rights in the

Software developed (except for the e-Procurement solution). The

Bidder shall relinquish to ICSI source code of the developed portal

(except for the e-Procurement solution) within fifteen (15) days from the

date of acceptance of the system. The source code supplied to ICSI shall

at all times be a complete, accurate, and up-to-date copy

corresponding exactly to the current production release of the software.

Copyright, IPR and source code of e-Procurement solution won’t be

transferred or handed over to ICSI.

Page 22: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 22 of 80

4. High Level Requirement for Application Software

Common features of application:

My Account Feature for all Stakeholders with all history of

transactions / stages and popup alerts for pending

MIS of all Entities / transactions

Desktop & SMS & Email alerts for failure of any process, database,

threshold limit, crash of system for Admin User.

Privacy Options from open search

The Institute is divided in various verticals at the head office level and has

a three tier organizational structure. The verticals provide services to

stakeholders who are students and members. The life cycle of the student

and members is managed on the following lines:

Students:

1. Registration – Reconciliation of fees with banks and booking in

designated heads, Scholarship Schemes (through Trust and directly)

and its management, Re-registration (after 10 years), National Level

Student Competitions and its Management, Provision for visibility of

Advertisements / Announcements on Student Accounts.

2. Post Registration – Verification, Certified copies, Financial

Reconciliation including management of Credit Balances and its

utilization.

3. Student Education Fund Trust from application to refund Mechanism

which shall synchronize with the registration module and meritorious

student’s scholarship management mechanism.

4. Registration of Students for Classroom Coaching at ROs/Chapters with

respective fees (Coaching Fees may vary for different locations).

Student should be able to choose the locations. Tracking feature of

daily completion of classes. Classroom test by OT Classes. Visibility of

marks to Students.

5. Bonafide Certificate to be issued to the students.

6. Provisional Registration

7. Do not disturb facility for Students

8. Software to handle various Projects like Study Centres, Signature

award, CS Olympiad, Giri Sagar, Shaheed Ki Beti, Student Month,

various Contests for students etc.

9. Registration/ Enrollment for CS Executive Entrance Test and linking the

result with registration to Executive Programme. Registration process

will be linked to CSEET or Exemptions or marks in other examinations.

10. Rejection Process for Examination Enrollment.

Page 23: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 23 of 80

11. Pre examination should be link SMASH enrolment data –reports. Data

of the online test and Coaching in ICSI offices to be integrated with the

new system.

12. Modification in the enrolment form – at the admin & student level (both

side).

13. Tentative enrolment data report in access format (as per the

requirement).

14. Modification in exemption cancellation process.

15. Process for extracting the Exemption data.

16. Enrolment reports:

Generation of following report with the attendance sheet:

16.1 Centre wise / stage wise enrolment application summary

16.2 Roll No. range stage wise with margin

16.3 Roll no. range actually allotted for each center of Hindi

candidates

16.4 Roll no. range actually allotted for each center of English

candidates

16.5 Centre wise provision for seating arrangements

16.6 List of staff & their wards who have been enrolled for

examination

17. Center wise Tentative Report.

18. Center wise Tentative Report Optional subject wise.

19. Roll number generation for single case & roll number generation

accordingly within the range of the center.

20. Process for Verification of Qualification and Issue of Transcripts.

21. Miscellaneous changes due to amendments in Regulations (change in

cut-off dates for registration, CS Executive Entrance Test, Pre-Exam

Test, discontinuation of CS Foundation Programme, etc.).

22. Report Module for generating reports on Registration, Enrollment,

Exemption, Switchover, etc. for regular MIS / Factbook, etc.

23. Request for Verification of Qualification and Issue of Transcripts etc

facility shall be come online... (Including for outside India students as

well).

24. Initiated payment status should have date and time which is not

showing in the current portal.

25. If feasible transaction Fail alerts to be sent to students.

26. Online refund status checking facility for students.

Page 24: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 24 of 80

Class room Coaching:

1. Registration of Students for Classroom Coaching at ROs/Chapters with

respective fees (Coaching Fees may vary for different locations).

Student should be able to choose the locations.

a) Option to be provided for paying the fees for coaching

b) Option for indicating location preference but fees registration for

classes at later stage

2. Module to handle coaching class:

Data should be inputted from respective Chapters/RO on following:

a) Student paying fees only at Chapter & RO: Student name & registration

no--- system should link it with the already registered student

b) Faculty Details

c) Daily Update on conduct of Class

d) Students’ performance data on various tests, conducted at Chapter &

RO

3. Coaching Module including facility for payment of fees directly to the

respective ROs/ Chapters by the Students.

Career Awareness:

The ICSI Counsellors register through the SMASH portal, and there are two

requirements:

1. Activation of Unique Counsellor Code on the Online Student

Registration Form, so that the students registered by Counsellors

would reflect on the Counsellor’s account and can be monitored by

for processing claims for them.

2. Allowing ICSI Counsellor Applicants to edit their online

applications.

3. Mapping districts with only 4 Regions instead of Chapters/RO as the

approving authority is only with 4 Regional Coordinators.

Creating a platform on Counsellor Account for linking the CAPs conducted

by them with the Students Registered by them as per new Career

Counsellor Guidelines.

Page 25: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 25 of 80

Training:

1. Training – Pre Training Requirements, Different type of training from

onsite to company based training with periodic review, Different

syllabus, structure run in parallel. Financial & training data

reconciliation at different sites / offices, registration of all stakeholders

i.e. students, members, corporate, Exemptions, Shifting from one firms,

company / trainer to another and training completion & certification,

training placement management PDP Credit hours, Training

Dashboard, Placement Dashboard.

Members:

1. Licentiate – Registration, welcome, Annual Fees to maintain

Licentiateship and certification, Defaulter, validation Placement.

2. Membership – Pre validation, welcome, Entrance and thereafter

Annual Fee and other related fees, defaulter, re-registration /

restoration, certification like ACS, FCS, COP, firms, LLP CSBF Fund

Management, peer review, journal, elections, convocation, transcript,

verification, Change of address, Change of name, LLP name approval,

Issue of Duplicate certificate, Issue of identity card/duplicate identity

card, Non receipt of monthly CS journal, List of Members 8.

Incorporation of GST component in all the membership fee except

CCEC fee, placement management for members & corporate, campus

placement & HR conclave, PCH credit hours, ID card issue.

3. Seamless Synchronization of Student Data, Examination & Training

history (with all the supporting documents) with the Membership Data.

All stakeholders (Students / Members / Others):

1. Online Recruitment Management Module configurable for Employees

Recruitment / Student / Member Placement.

2. Implementation of GST for all services like Membership fees, Events

fees, E-Cart items, etc.

3. MIS (including Fact Book, All Statistical Reports relating to Registration,

Coaching ,Examination Enrollment, Training, Membership etc.) and

Report Analysis.

4. Financials – Fees received at 70 offices, online, challan to be

reconciled at local level and head office level. Ledger for individual

maintained, MIS and analysis

5. Seminar Handling with delegate registration, Calendar of event, Event

registration, Fiscal and Faculty Management, Event Configuration with

Payment Gateway for all 70 offices with online Payment reconciliation

facility.

Page 26: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 26 of 80

6. Configurable Task Management functionalities with reminder.

7. Integration with the repository of document/Knowledge repository

system.

Kindly refer detailed scope in Annexure I, Annexure II, Annexure III,

Annexure IV, Annexure V, Annexure VI, Annexure VII.

Page 27: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 27 of 80

5. ELIGIBILITY CRITERIA

The following are the conditions, which are to be necessarily fulfilled, to be

eligible for technical evaluation of the proposed solution:

Sl.

No.

Criteria Documents/ Information

to be provided in the

submitted proposal

1 The bidder must be incorporated and

registered in India under the Indian

Companies Act 1956 or 2013 and should

have been operating in India

Certificate of Incorporation /

Copy of Registration

Certificate (s)

2 The bidder must be a profit making

company since the last three financial years:

(2016 – 2017, 2015 – 2016, 2014 – 2015)

Audited P&L statement and

Balance sheet of all the three

years i.e. 2016 – 2017,

2015 – 2016, 2014 – 2015.

3 Bidder should have average annual turnover

of minimum Rs. 10 Crores in the last three

preceding financial years (2016 – 2017, 2015

– 2016, 2014 – 2015) in Software

Development area.

Audited P&L statement and

Balance sheet of all the three

years i.e. 2016 – 2017, 2015

– 2016, 2014 – 2015.

4. The bidder should own the copyright of the

source code of the solution. The bidder

should be able to make changes as and

when required in any of the components of

the software/source code being utilized for

the purpose throughout the term of

Agreement with ICSI.

Declaration from Authorized

Signatory is required

5. The bidder should have on his pay roll

minimum 50 employees for the proper

execution of the contract.

Declaration from Authorized

Signatory is required

Page 28: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 28 of 80

6. The Bidder must have not been blacklisted

by Central/ State Government Ministry/

Department/ PSU/Government Company.

Bidder must not be under any legal action

for indulging in corrupt practice, fraudulent

practice, coercive practice, undesirable

practice or restrictive practice with any

Indian Central/ State Government

Ministry/Department/ PSU/ Government

Company in last 5 years

Self-declaration from the

bidder in company letter

head, signed by authorized

signatory

7. Bidders should have support office

operational in the Delhi-NCR

Relevant address proof

(Electricity Bill, Rent

Agreement) for the same to

be provided. The same may

be verified by ICSI at any

time

8. Power of Attorney / Board Resolution for

signing the bid, letters etc. on behalf of the

firm.

Power of Attorney to be

provided in favour of the

Authorized signatory.

9. The Bidder must have successfully

completed/ executed at least Three (3)

similar contracts of ERP out of which at least

one in Educational institute

Proof Certificate -

Completion certificate (GO-

Live / Implementation /

Support Completion) with

date and

1. Work order with order

value detailing the scope.

OR

2. Agreement copy defining

the scope & value.

Also provide client

reference detailing Name,

Designation, Phone and

Email ids

10. Bidder must be in possession of valid PAN,

ISO Certificate, GST Certificate, at the time

of bidding.

Documentary proof to be

submitted

Page 29: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 29 of 80

6. DOCUMENTS ESTABLISHING BIDDER’S ELIGIBILITY:

The following documents are required to be submitted along with the RFP.

Non-submission of any documents or submission of incomplete, misleading or

false information may render the bidder liable for summarily rejection or

cancellation of its RFP.

1. A copy of Certificate of Incorporation from Registrar of Companies or

constitution document from competent authority in case of foreign

companies signed by the Company Secretary / authorized signatory of

the Bidder Company.

2. Copy of Articles of Association and Memorandum of Association.

3. Audited Annual Financial Statements of the Company for last three

financial years, i.e. Year 2016-17, 2015-16 and 2014-15.

4. Details of Authorized Signatory including attestation of the signatures

of the Authorized Signatory by the company’s bankers or from the

competent authority.

5. Certificate regarding Bidder not being bankrupt/ insolvent from

statutory Chartered Accountant/ Company Secretary of Bidder

Company.

6. Composition of List of Directors/ managing Partners etc.

7. Evaluation of Technical Proposals

a. Proposals which are not supported by adequate proof / Supplementary

documents will not be evaluated.

b. The Evaluation Committee shall evaluate the Technical Proposals only

for those bidders who satisfy the eligibility criteria. The Technical

proposals which are unsigned and incomplete shall not be evaluated.

The technical proposals will be evaluated on the basis of their

responses; evaluations will be based on documentary evidence

submitted by the bidder with respect to selection criteria. A Proposal

shall be rejected at this stage if it does not respond to important

aspects of the RFP.

Page 30: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 30 of 80

c. During the process of evaluation of the technical proposal, the bidder

might be required to make presentation on its Proposal covering

Experience/Technical Proposal including Understanding about the

project, Implementation Methodology, Team Composition, Work

Schedule, and Activity Schedule, arrange client interactions / visits. In

case presentation is required, the date and time of the presentation /

interactions will be intimated individually.

8. GENERAL TERMS & CONDITIONS

1. Bidders must ensure that all the pages in the bid document should have

page no. and authenticated by authorized Person.

2. Hard copy and soft copy (in USB/Pen Drive/CD) of RFP must be

submitted in a sealed cover.

3. The Bidders are advised to study the requirements of the Institute in details

before submitting their bid and the presentation.

4. The Bidder shall be invited for a presentation of their solution

subsequently.

5. Based on the technical presentation, the proposed solutions would be

evaluated by a committee of ICSI constituted for the purpose. The

committee will finalized some of the proposed solutions as

feasible/suitable and meeting ICSI requirements.

6. Bidder shall not use or disclose any Confidential Information of the ICSI

except as specifically contemplated herein. For purposes of this RFP

"Confidential Information" means information that: (i) is sufficiently secret

to derive economic value, actual or potential, from not being generally

known to other persons who can obtain economic value from its disclosure

or use; and (ii) is the subject of efforts that are reasonable under the

circumstances to maintain its secrecy or confidentiality.

7. Bids submitted by the bidders in response to this RFP shall have to

remain valid for 180 days from the date of opening of bids. If required,

ICSI may ask extension of bid validity as suitable from the bidders and in

that case the bidder either may opt out of the bid or may extend the bid as

required.

Page 31: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 31 of 80

9. Bid Preparation

a. Format and Signing of Bids

The bidder shall prepare required number of copies (original plus one copy) of the bid and shall clearly mark each “Original

Bid” or “Copy of Bid” as appropriate. In the event of any

discrepancy between them, the original shall govern.

The original and the copy of the bid shall be typed or written in

indelible ink and shall be signed and sealed by the bidder or a

person duly authorized to bind the bidder to the bid. The

person(s) signing the bid shall initial all pages of the bid with

company seal, except for un-amended printed literature.

The page numbers should be marked on each page of the Bid

with flag for each document which are mandatory to fulfil the

eligibility criteria along with supplied documents.

The Bids without the seal and signatures of the bidder’s

authorised signatory in all pages of all documents are to be

disqualified.

The complete bid shall be without alteration or erasures, except

those accorded with instructions issued by ICSI or as necessary to

correct errors made by the Bidder, in which case such corrections

shall be authenticated by the person or persons authorized to sign

the bid.

b. Format for Queries: For any query related to bids, clarification from

ICSI can be sought in the following format:

Name of the Project:

Name of the Bidder:

S.NO Page No Queries

Signature:

Name of the authorised Signatory:

Company seal:

Note: All the queries should be sent in this format in MS-word only

to: [email protected].

No other format is acceptable apart from this format.

In order to simplify the review process and to obtain the maximum

degree of comparability, the proposal shall include the following

items and be organized in the manner specified on the following

pages.

Page 32: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 32 of 80

c. Letter of Transmittal: A letter of transmittal briefly outlining the

bidder's understanding of the work shall be submitted. The

transmittal letter should also include general information regarding

the firm and individuals involved.

d. Profile of the Bidder: Bidders are required to furnish the details of

the bidder in the format prescribed as under:

S No Particular Response

1 Company Name

Legal Name (if different)

Full Mailing Address

Telephone Number

FAX Number

Web site

Years in Business

Year of establishment

2 Details of Indian Establishment

Registered Office address

Year of establishment

Head of the Indian establishment

3 SPOC (Single point of Contact)

Mobile

E-mail

4

Whether registered with Registrar of

Companies. If so, please furnish details

thereof (Attach certificate of incorporation )

5 Registration with Tax authorities (PAN)

GSTIN

6

Audited Turnover in last three years (2016 –

2017, 2015 – 2016, 2014 – 2015).

7 Number of clients

8 Number of technical/support personnel

e. Details of the projects executed: Please include details of three

similar nature projects executed in last five years ended as on 31st

March, 2018. Sl.

No.

Project Project

executed for

(Name of the

organization

with address,

phone

numbers etc.)

Nature

of work

in brief

Location

of the

work

Actual

value

of the

Project

Duration Status

(on going /

Completed)

Page 33: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 33 of 80

f. Details of Key personnel of Bidding firm:

Sl. No.

Name Qualifications Experience Particulars of Project done

Employed in your firm since

Any other details

g. Client Reference: To be a qualified proposer, the bidder must

include three (3) references in its proposal response. References

will be contacted - please verify information before submitting.

Information to be included in the reference is:

Particular Response

Organization Name

Address

Type of Business

Contact Person

Telephone and Fax #s

Dates of Installation

Description of system

h. Acquaintance with Existing system

The BIDDERs are advised to study the Institute’s complete IT set-

up before quoting for the maintenance charges for the same.

Each BIDDER is expected to get fully acquainted with the existing

system / applications and related factors, which would have any

effect on the performance of the contract and /or the cost.

The BIDDER is expected to know all conditions and factors, which

may have any effect on the execution of the contract after issue of

Letter of Intent/Award as described in the bidding documents.

i. Sealing, Marking and Submission of the BID

At this stage Bidder shall submit only Technical Bid in a sealed

envelope super-scribed with the RFP project name, due date,

time.

Please Note only Technical bid needs to be submitted at this

stage and no Commercial Bid. Commercial Bid will be asked

from only those bidders who will qualify the technical

evaluation process.

Page 34: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 34 of 80

j. Parts of the Technical Bids

PART-I: EMD. Envelope needs to be super scribed as EMD.

PART-II: Pre-Qualification Documents and duly signed and

stamped RFP with all corrigendum’s (if any). Envelope needs to

be super scribed as Pre-Qualification Document.

PART-III: Original plus one copy (total two hard copies) and one

soft copy in usb/cd of TECHNICAL BID complete with all

technical details with all supporting documents. Envelope needs

to be super scribed as “Technical Bid”- Do not open before date

and time given in important date section.

The envelopes containing Part-I, Part-II and Part-III of Technical

Bid shall be enclosed in a larger envelope duly sealed and

marked as Response to Request for Proposal (RFP) with title and

reference number, and a statement "To be opened by addressee

only” and the name and address of the Bidder. The Outer

envelope sealed and should be addressed to

To,

The Officiating Secretary,

The Institute of Company Secretaries of India,

ICSI HOUSE, C-36 (5th Floor),

Sector-62, Noida, Uttar Pradesh – 201309

This RFP Document duly signed on all pages as acceptance of

terms and conditions by the bidder.

Proposal covering letter must be signed in the Bidder’s name by a

representative of the Bidder authorized to commit the bidder to

contractual obligations. All obligations committed by such

signatories must be fulfilled.

Please note that ICSI will not be responsible for in case there is a

discrepancy between the hard copy and the soft version of the bid

submitted by the bidders. In such case, hard copy of the bid will

be taken into consideration and shall be treated as authentic.

The outer and inner envelopes shall indicate the name, address,

email and phone number of the bidder to enable the bid to be

returned unopened in the case it is declared “late” pursuant, and

for similar purposes.

If the outer envelope is not sealed and not marked as above, ICSI

will bear no responsibility for the misplacement or premature

opening of the Bid.

Page 35: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 35 of 80

Only detailed complete bids in the form indicated above received

prior to the closing time and date of the submission of bids shall

be taken as valid.

Bids sent through Telex/Telegrams/Fax/e-mail will not be

acceptable.

Bids should reach ICSI on or before the last date mentioned in the

important dates section by registered post or speed post or

courier only. ICSI will not be responsible for any postal delays.

Bidders submitting any bids in person will also be accepted,

however, those bids must be dropped in the Tender Box kept at 5th Floor at C-36, ICSI House, Sector 62, Noida, Uttar Pradesh -

201309.

Bids are liable for rejection if they don’t comply with the above

mentioned norms regarding sealing, signing, proper packing &

submission without any further reference to the bidder.

The technical proposal should address the following at the

minimum:

o Takeover plan and methodology

o Operations plan and methodology

o Quality parameters of the deliverables

o Daily, weekly and monthly MIS

o Value additions to the existing solution implemented at ICSI

o Detailed CVs (including qualification, certification, experience)

of the key resources assigned to the project

o Escalation matrix up to CEO level along with name,

designation, mobile no, email id, landline numbers.

10. Opening of Bids

ICSI will open bids at time mentioned at important Information sheet.

BIDDER’s representative (only one) with proper authorization must attend

the opening at ICSI. Technical Bid will be considered for those BIDDERs

whose bids shall meet all the eligibility criteria mentioned in the Pre-

qualification documents.

11. Bid Evaluation Criteria

a. The following are the conditions, which are to be necessarily fulfilled, to

be eligible for technical evaluation of the proposed solution:

Part 1 (Bid Security)

Bid without valid EMD shall not be entertained.

Page 36: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 36 of 80

Part 2 (Pre-Qualification criteria)

The Evaluation Committee would evaluate the Pre-qualification.

Bidders should be ready to give any clarification asked by the

evaluation committee. One Representative with proper

Authorization from the bidding firm must be present during the

opening of the Pre-Qualification Documents. If there is no

representative of the bidding firm during the opening of Pre-

Qualification Documents, ICSI will not entertain any

complaint/grievance afterwards. Authorized representatives

should also carry rubber stamp with them.

b. Opening and Evaluation of Technical Bids:

The Evaluation Committee would evaluate the technical bids.

BIDDER’s should be ready to give the presentation on their

proposed solution and the queries raised by the evaluation

committee in front of the Evaluation Committee at a date, time

and location determined by ICSI. They are expected to reply to

all the queries from the Evaluation Committee during the

presentation. The presentation would be part of technical

evaluation process.

ICSI may also undertake oral clarifications with the Bidder. The

primary function of clarifications in the evaluation process is to

clarify ambiguities and uncertainties arising out of the evaluation

of the bid documents.

One Representative with proper Authorization from the bidding

firm must be present during the opening of the Technical

Proposal. If there is no representative of the bidding firm during

the opening of Technical bids, the ICSI will not entertain any

complaint/grievance afterwards.

In order to facilitate the Technical Bid evaluation, the technical

criteria laid down along with the assigned weights have been presented in the Technical Evaluation Matrix (Click Here)

(enclosed in this RFP). The marking scheme presented is an

indication of the relative importance of the evaluation criteria.

Bids which don’t secure the minimum specified technical score

will be considered technically disqualified and will not be

considered for financial evaluation.

Scores of technically qualified Bidder’s shall be weighed prorate

on a scale of 50 and shall be carried forward for evaluation

together with the scores of Financial evaluation; which will get

50% weight-age.

c. Technical Bids Evaluation criteria (kindly refer Part ‘A’

TECHNICAL BID of the document).

Page 37: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 37 of 80

1. The evaluation of Technical Bids is based on the proposed

solution. Bidder is required to submit a Detailed Project Report

with the proposed solution (may be in a CD/Pen drive)

indicating the following:

Complete coverage as covered in the scope

Seamless Data Flow

Data Migration from existing system

Dynamic Report Generation

Possible benefits

Pain points (if any)

Handling change

User Training

Implementation Timelines

Project Execution methodology.

2. The ICSI will then establish shortlisted bidders and invite

interested bidders figuring on this list to participate in further

discussion about the project in due course.

12. Award of Contract

a. ICSI will award the contract to successful BIDDER whose bid has

been determined to be responsive and has been determined to be

most competitive.

b. ICSI will reject a proposal for award if it determines that the BIDDER

recommended for award has engaged in corrupt or fraudulent

practices in competing for, or in executing, the project.

Whereas “Fraudulent Practice” means a misrepresentation of facts in

order to influence a procurement process or the execution of the

project and includes collusive practice among BIDDERs (prior to or

after submission) designed to establish Bid prices at artificial non-

competitive levels and to deprive the ICSI of the benefits of free and

open competition.

Whereas “Corrupt Practice” means the offering, giving, receiving or

soliciting of anything of value, pressurizing to influence the action of

the Official of the ICSI in the process of project execution

c. The price quoted by the Bidder shall contain cost of Development,

Implementation and Warranty for one year.

Page 38: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 38 of 80

d. The maximum duration of entire work would be five(5) years in

following manner:-

Work Time Schedule

1. Development and implementation

of project.

One year from the date of

signing of agreement.

2. Warranty period One year from the date of

handing over of project

3. Annual Maintenance period Three year on yearly basis

from the date of expiry of

warranty period at the sole

discretion of ICSI.

e. Further AMC of the project will be subjected to the yearly

assessment / appraisal of the performance of the Bidder / Vendor

for the previous year by the ICSI. If Bidder / Vendor’s performance

is not found satisfactory, the ICSI may terminate the agreement by

giving 45 days notice otherwise the agreement will automatically

renewed. Decision of the ICSI in this regard shall be final.

13. AMENDMENT OF RFP DOCUMENTS

a. At any time, prior to the date of submission of bids, ICSI may, for any

reason, at its own initiative modify RFP document by amendments.

b. The amendments shall be notified on ICSI’s web site, i.e. at

https://www.icsi.edu and these amendments will be binding on all

the Bidders.

c. In order to afford prospective Bidders a reasonable time to take the

amendment into account in preparing their bids, ICSI, at its

discretion, may extend the deadline for the submission of bids

suitably.

d. The ICSI may at any time during the bidding process but before

opening the Technical bid request the Bidders to submit revised

Technical Bids and/or Supplementary Bids, in case of change in

Scope of Work, without thereby incurring any liability to the affected

Bidder or Bidders.

e. Incomplete bids shall be rejected out rightly. No alterations,

amendments or modifications shall be made by the Bidder in the

RFP documents and if any such alterations are made or any special

Page 39: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 39 of 80

condition is attached, the bid is liable to be rejected at the discretion

of the ICSI without reference to the bidder. Please note that all the

information as desired needs to be provided. Incomplete

information may lead to rejection of Bid.

14. Important Information and conditions

a. Forfeiture of BID Security/EMD

The Bid security may be forfeited either in full or in part, at the

discretion of ICSI on account of one or more of the following reasons:

The BIDDER fails to co-operate in the Bid evaluation process

If the bid or its submission is not in conformity with the instruction

mentioned herein

If the BIDDER violates any of the provisions of the terms and

conditions of the RFP documents.

In the case of a successful BIDDER fails to

o Accept award of work

o Sign the Contract Agreement with ICSI after acceptance of

communication on placement of award

o Furnish performance security

o Sign the Contract Agreement in time

o or the BIDDER violates any of such important conditions of this

RFP document or indulges in any such activities as would

jeopardize the interest of ICSI in timely finalization of this RFP.

The Bidder found guilty of negligence, carelessness, inefficiency,

fraud, mischief, misappropriation or any other type of misconduct

by such bidder or by its employees, staff, agents, representatives

etc. or by any other person directly or indirectly employed by him.

b. Conditional bids will be rejected.

c. All the pages should have page no. and authenticated by authorized

Person.

d. This RFP does not commit the ICSI to award a contract. Further, no

reimbursable cost may be incurred in anticipation of award of Work.

The bidder shall bear all costs associated with the preparation and

submission of its bid, and the ICSI will in no case be responsible or

liable for these costs, regardless of the conduct or the outcome of the

bidding process.

e. The last date for receipt of sealed RFP in the ICSI is November 30, 2018

by 02:00 pm and the date and time for opening of technical bids is

November 30, 2018 at 03:30 PM. No separate communication will be

Page 40: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 40 of 80

issued in this regard. Bids will be opened in the presence of the

intending bidders or their authorized representatives, who wish to be

present. In the event of due date being a closed holiday or declared

Holiday for Central Government offices, the due date for opening of the

RFP will be the following working day at the appointed date, time &

venue.

f. Site for delivery of services are as under or any location as may be

decided by ICSI:

The Institute of Company Secretaries of India,

ICSI HOUSE, C – 36, Sector – 62, Noida,

Uttar Pradesh – 201309

g. ICSI shall have the right to assess the competencies and capabilities of

the bidder by going through the credentials given in the Technical Bid

and on the basis of such credentials, the ICSI may reject the

candidature of the bidder without assigning any reason and decision of

the ICSI shall be final.

h. Submission of Proposal/Bid by way of e-mail is not acceptable.

i. ICSI reserves the right of accepting the RFP in whole or in part without

assigning any reason and such decision shall be final. The part

acceptance of the RFP shall not violate the terms and conditions of the

RFP / contract and the bidder shall execute the work at the specified

rates without any extra charges or compensation within the stipulated

period.

j. The acceptance of RFP shall rest with the ICSI. ICSI does not bind itself

to accept the lowest bidder and reserves to itself the right to reject any

or all the bids received without assigning any reason(s) whatsoever and

any notice to Bidder. Non acceptance of any bid shall not make the ICSI

liable for compensation or damages of any kind. ICSI further reserves

the right to accept a bid other than the lowest or to annul the entire

bidding process with or without notice or reasons. Such decisions by

ICSI shall be final and bear no liability whatsoever consequent upon

such decisions.

k. Time is the essence of the contract: The time allowed for completing

the work under RFP / SLA and handing over the same shall be of the

essence of the Contract and shall be strictly observed by the Bidder.

The Work shall proceed with due diligence until Final Completion. ICSI

would extend all required support and inputs to help the Bidder to meet

the project timelines. For delays which are directly attributable to the

sole actions and / or scope of work of the Bidder, the Bidder shall be

liable to pay penalty and/or liquidated damages as per the provisions

of this Agreement.

Page 41: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 41 of 80

l. Performance Security: The successful Bidder shall be required to give

a security deposit for faithful performance of the RFP.

The successful bidder has to submit the security deposit /performance

guarantee from scheduled bank of equivalent amount of 10% of the

contract value on awarding the contract within 15 days of issue of order

but before execution of the agreement, to cover any loss or damage

caused to or suffered by the Institute due to acts of commission and

omission by the successful bidder or any failure on the part of the

successful bidder in fulfilment of terms and conditions of the contract

and conditions contained in the agreement. The Bank Guarantee shall

have to remain valid for the entire duration of the Contract plus three

months beyond the completion of contract period. The successful

bidder shall not be entitled to any claim or receive any interest on the

amount of performance guarantee. The EMD of the successful bidder

will be refunded after submission of the performance Guarantee /

Security Deposit.

The successful bidder having valid registration with NSIC/MSME on the

date of submission of tender, are also required to submit requisite

security deposit / performance guarantee.

Forfeiture of Security Deposit and Invoking of Bank Guarantee

ICSI shall have the right to invoke the Bank Guarantee and to forfeit the

security deposit if the Service Provider contravene or breach any of

the terms and conditions of the Agreement or if the Service Provider

withdraws or amends, impairs or derogates from Agreement or fails to

execute the work as per the Agreement or fails to deliver the

satisfactory performance during the period of Agreement.

ICSI shall also have the right to invoke the Bank Guarantee and to forfeit

the security deposit and to adjust the damage or loss caused to the ICSI

due to the negligence, carelessness, inefficiency, fraud, mischief and

misappropriation or any other type of misconduct of the Service

Provider or its staff / employee / agent / representative.

Whenever under Agreement any sum of money is recoverable from

and payable by the Service Provider, the ICSI shall have right to

recover such sum by appropriating in part or in whole from the security

deposit / bank guarantee of the Service Provider. In the event of the

security deposit / bank guarantee being insufficient, the balance or the

total sum recoverable, as may be, shall be deducted from any sum due

to the Service Provider or which at any time thereafter may become due

to the Service Provider under this or any other Agreement with the ICSI.

If this sum is not sufficient to cover the full amount recoverable, the

Service Provider shall pay the ICSI on demand the remaining amount.

Page 42: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 42 of 80

m. Termination: Either party may terminate the contract by giving a three

(3) months’ notice in writing to the other party for termination of the

contract.

The ICSI without prejudice to any other remedy, reserves the right to

terminate the agreement in whole or in part by giving thirty (30) days’

notice in writing in case Service Provider fails to discharge its

obligation under this agreement without sufficient grounds or found

guilty for breach of condition(s) of the agreement, negligence,

carelessness, inefficiency, fraud, mischief and misappropriation or any

other type of misconduct by Service Provider or by its staff or agent.

Any pending or unresolved operational issues, performance, unpaid

fees and any other remedies shall continue by the Service Provider

during the period of termination notice and the same must be satisfied

before this agreement is terminated. The ICSI may also put in place any

other agency for carrying out the remaining work and expenditure

incurred on same shall be recovered from the Service Provider.

The Service Provider shall have no claim to any payment or

compensation whatsoever on account of any profit or advantage, which

would have been derived from the performance of this Agreement in

full, but which he did not derive in consequences of the full

performance of this Agreement not having been carried out, nor shall

he have any claim for compensation / damage for the loss suffered by

him by reason of termination of Agreement by the ICSI. No claim for

interest will be entertained by ICSI with respect to any moneys or

balances, which may be in its hands owing to a dispute between itself

and the Service Provider.

n. Blacklisting: The ICSI without prejudice to any other remedy and

rights, reserves the right to blacklist the Service Provider for a suitable

period in case he fails to honour his bid / Work Order / Service Level

Agreement (SLA) or found guilty for breach / violation / contravention

of terms(s) and condition(s) of the RFP / Work Order / Service Level

Agreement (SLA) or negligence, carelessness, inefficiency, fraud,

mischief, misappropriation or any other type of misconduct by Service

Provider or by its staff, agent, employee or officer etc. or by any other

person directly or indirectly employed by him.

o. Whenever under this RFP / Work Order / Service Level Agreement

(SLA), any sum of money is recoverable from and payable by the

Service Provider, the ICSI shall be entitled to recover such sum by

appropriating in part or in whole from the security deposit / bank

guarantee / earnest money deposit of the Service Provider. In the event

of the security deposit / bank guarantee / earnest money deposit being

insufficient, the balance or the total sum recoverable, as may be, shall

be deducted from any sum due to the Service Provider or which at any

time thereafter may become due to the Service Provider under this or

any other RFP / contract with the ICSI. If this sum is not sufficient to

Page 43: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 43 of 80

cover the full amount recoverable, the Service Provider shall pay the

ICSI on demand the remaining balance.

p. The personnel(s) employed / hired / engaged (permanent / regular /

casual / contractual / temporarily / daily wager or whatever be the status / name) by the Service Provider for the execution of work as

provided under this RFP, shall not be employee / officer of the ICSI for any purpose. None of such person of the Service Provider shall have

any right to claim anything against the ICSI.

q. The successful bidder will sign a Service Level Agreement (SLA) on the

basis of the terms of RFP and work order. Standard terms and conditions of Service Level Agreement are at Annexure_VII.

15. Right to Black List: ICSI reserves the right to blacklist a bidder for a suitable period under the

following circumstances:

o Giving false, misleading or fake information / document in the bid;

o Withdrawing the bid after opening of the Commercial Bids;

o Refusal to accept Work Order at the quoted prices;

o Failure to supply goods/services of the ordered quantity / quality /

specifications at the agreed rates within the time schedule;

o Adoption of any unethical or illegal practices; any indiscipline

behavior or hooliganism by the bidder or any of its employee(s)

o Any other justified reason

Where any bidder has been black-listed, his EMD / Performance

Security shall be forfeited by the ICSI after giving him an opportunity of

being heard. The decision of the ICSI shall be the final and binding.

16. FORCEMAJEURE Notwithstanding anything else contained in this RFP, neither party shall be

liable for any delay in performing its obligations hereunder if such delay is

caused by circumstances beyond its reasonable control (including without

limitation any delay caused by the acts of governments, acts of God,

natural or social calamities, strikes, riots in any region, network failure,

terrorist attack, war declared and undeclared) provided however that any

delay by the supplier of the Party so delaying shall not relieve that Party

from liability for delay except where such delay is beyond the reasonable

control of the supplier concerned.

Subject to the party so delaying promptly notifying the other party in

writing of the reasons for the delay (and the likely duration of the delay),

the performance of such party’s obligations shall be suspended during the

Page 44: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 44 of 80

period that the online circumstances persist and such party shall be

granted an extension of time for performance equal to the period of the

delay. Save where such delay is caused by the act or omission of the other

party (in which event the rights, remedies and liabilities of the parties shall

be those conferred and imposed by the other terms of this Agreement and

by law).

17. Indemnity Clause: The bidder will indemnify ICSI against all statutory liabilities present and

future arising out of his bid / work order / contract. In the event of violation

of any contractual or statutory obligations, the successful bidder will be

fully and solely responsible for the same. Further, in the event of any

action, claim, damages, suit initiated against ICSI by any individual, law

enforcement agency or government authority due to acts and omissions,

the bidder will be liable to make good/compensate such claims or

damages to the ICSI. As a result of the bidder action, inaction or any

omissions, if ICSI is required to pay any damages to any individual, law

enforcement agency or government authority, the bidder would be

required to reimburse to ICSI such amount along with other expenses

incurred by ICSI or ICSI reserves the right to recover but not limited to

such amount from the payment(s) due to the bidder while settling its bills

or from the amount of security deposit lying with ICSI. However, ICSI

reserves its right to take legal recourse as permitted under law of the land.

In case of any damage caused to the ICSI due to negligence, carelessness

or inefficiency of staff of the bidder, the bidder shall be responsible to

make good the loss. The ICSI shall have right to adjust the damage / loss

suffered by it from the security deposit or / and to charge penalty as

decided by the Institute. Decision of the ICSI in this respect shall be final &

binding on the bidder.

18. Cancellation of Award / Work Order:

The ICSI without prejudice to any other remedy, reserves the right to

cancel the Award / Work Order in whole or in part by giving one (1)

months’ notice in writing in case the Bidder fails to discharge its obligation

under this RFP / Work Order without sufficient ground or found guilty for

breach of condition(s) of this RFP / Work Order, negligence, carelessness,

inefficiency, fraud, mischief and misappropriation or due to any other type

of misconduct by the successful bidder or by its staff or agent.

Any pending or unresolved operational issues, performance, unpaid fees

and any other remedies shall be continued by the Bidder during the period

of the termination notice and the same must be satisfied / completed

Page 45: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 45 of 80

before the Work Order is cancelled. The ICSI may also put in place any

other agency for carrying out the remaining work and expenditure

incurred on same shall be recovered from the Bidder.

19. CONFIDENTIALITY Bidder shall not use or disclose any Confidential Information of the ICSI

except as specifically contemplated herein. For purposes of this RFP

“Confidential Information” means information that: (i) is sufficiently secret

to derive economic value, actual or potential, from not being generally

known to other persons who can obtain economic value from its disclosure

or use; and (ii) is the subject of efforts that are reasonable under the

circumstances to maintain its secrecy or confidentiality.

20. ARBITRATION In case of any dispute, difference, claim and demands arising under or

pursuant to or touching or in relation to this RFP, the authorized official of

the ICSI and the Bidder shall address the same for mutual resolution, failing

which the matter shall be referred for the arbitration to the sole Arbitrator

to be appointed by the ICSI. The Arbitration proceedings shall be held in

accordance with the provisions of the Arbitration and Conciliation Act,

1996 or any statutory modifications on re-enactment thereof as in force. The

cost of the Arbitration proceedings shall be shared equally by both the

parties. The award of the sole arbitrator shall be final and binding on both

the parties. The venue of such arbitration proceedings shall be at Delhi.

All disputes arising out of this RFP are subject to the jurisdiction of Courts

in New Delhi.

21. Jurisdiction: All disputes arising out of or relating to the bidding shall be deemed to

have arisen in Delhi and only courts having jurisdiction over Delhi shall

determine the same.

For any details / clarifications, Dr.Nikhat Khan, Director (IT), ICSI (0120-4082019)

E-mail Id: [email protected] may be contacted.

Date: November 08, 2018 Amit Kumar Ghosal

DIRECTOR (Purchase)

Page 46: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 46 of 80

Part ‘A’ TECHNICAL BID

Details of the Bidder

S. No. Particulars. Response

1. Name and complete address of

the Company

2. Tele/Fax/E-mail/Cell No. of the

Company

3. Detail of Contact Persons

authorized by the bidder to

execute documents on its behalf,

with ICSI (Designation, Tel, E-

Mail)

4. Details of registered office, if any

along with contact person’s name

and Contact detail (Tel / Mobile

& E-Mail)

5. Income-tax PAN along with

documentary evidence

6. GST Number

7. List of clients to whom services in

last 2 year provided with details

of company, value of business,

concerned person name & his

telephone no. (Please attach full

details)

8. Current similar assignments on

hand, if any

9. Turnover in last three financial

years, i.e. Year 2016-17, 2015-16

and 2014-15.

10. Paid up capital of the Company.

Page 47: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 47 of 80

Technical Bid Eligibility Criteria

S.

No.

Particulars. Response Documents

submitted with

reference

page no.

1 A copy of Certificate of

Incorporation from Registrar of

Companies or constitution

document from competent authority

in case of foreign companies

signed by the Company Secretary /

authorized signatory of the Bidder

Company.

2 Copy of Articles of Association and

Memorandum of Association.

3 Latest audited Annual Financial

Statements of the Company for last

three financial years, i.e. Year

2016-17, 2015-16 and 2014-15.

4 Details of Authorized Signatory

including attestation of the

signatures of the Authorized

Signatory by the company’s

bankers or from the competent

authority

5 Certificate regarding Bidder

Company not being bankrupt/

insolvent from statutory Chartered

Accountant/ Company Secretary of

Bidder Company.

6 Experience / Implementation

Certificate from at least three

separate companies wherein the

Bidder has provided services of

similar nature.

7 Composition of List of Directors etc.

Page 48: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 48 of 80

8 The Bidder must not have been

declared bankrupt / insolvent or

should not have filed for

bankruptcy / insolvency in the past

five years or in the process of being

declared bankrupt / insolvent

before any designated authority in

any country.

9 The Bidder should at least be a 5

year old company or shall have a

minimum audited annual turnover

of INR 10 Crores or equivalent each

year during last three financial

years, i.e. Year 2016-17, 2015-16

and 2014-15.

Page 49: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 49 of 80

Technical Evaluation Matrix

Sl.

No

.

Criteria Level Scor

e

Bidder’s

response

(Please

tick the

applicable

option /

grade

yourself)

Max

Score

1 No. of years the bidder is in

operation

<5 years 0 5

>=5 years and < 8 years 3

>=8 years 5

2 Average Annual Turnover

over the last 3 Financial Years

(2016 – 2017, 2015 – 2016,

2014 – 2015)

=INR 10 Cr 3 10

>INR 10 Cr and <=100 Cr. 5

>INR 100 Cr and <= 500 Cr 7

> 500 Cr 10

3 Technical Team Size Less than 100 2 7

>=100 7

4 Quality certifications No Certification 0 10

ISO/equivalent certificate/

less than CMMi level 3

3

CMMi level 3 certificate 5

CMMi level 4 certificate 7

CMMi level 5 certificate

10

5 Number of Web Based

application software

developed, enhancement and

implemented in the last 5

years for Government / PSU

/Statuary / Institutions of

Higher Education /

Universities / Large

Corporates of cost more than

Rs 25 lakhs.

=>3 projects and <5 for 5 10

=>5 projects and <10 7

=>10 projects 10

6 Presentation of understanding

of the existing application.

Methodology of the

requirement implementation

in responding to the RFP,

Work Plan presentation.

Proposal of **Dashboard and

**Report Writing Tool.

42 42

9 Clients (similar projects)

interactions / visits /

feedback

Feedback from existing

clients

6

6

10 Experience in Data Migration <3 1 5

Page 50: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 50 of 80

(No. of Projects) >=3 and <5 3

>=5 5

11 Experience of Development

Strategy

Load Balancer on non cloud

environment (minimum 2

projects)

3 5

Cloud Hosting (minimum 2

projects)

5

Total Score 100

** Dashboard evaluation will be based on ease of configuration, availability of

free enhancements reports, security features, performance, and acceptability in

market (market share).

** Report writer tool evaluation will be based on ease of configuration,

availability of free enhancements, security features, performance, and

acceptability in market (market share)

Minimum Qualifying Score: The minimum qualifying score in the Technical

evaluation is 75 (out of 100). Bidders scoring less than 75 will not be considered

for further evaluation.

Place: SIGNATURE OF THE BIDDER

Date: NAME & DESIGNATION SEAL OF ORGANISATION

Page 51: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 51 of 80

Part ‘B’ TENTATIVE COMMERCIAL BID DETAILS

(Not to be submitted with Technical Bid)

k. Opening and Evaluation of Commercial Bids

After evaluating the Technical Bids, ICSI shall notify the successful

BIDDERs who have qualified based on Technical Bids and those

Bidders will then be asked to submit Commercial Bids in a format

provided.

ICSI will then notify the successful bidders (in the Technical Bids) about

the opening of the Commercial Bid, indicating the date, time and place

for opening of the Commercial Bids. BIDDER’s representative (one

only) may attend the Commercial Bid opening at ICSI.

l. Evaluation of Commercial Bids:

Scores of the Financial evaluation would be weighed pro-rata on a

scale of 100 with the BIDDER with the lowest financial quote getting 100

(as per below mentioned formula). These Financial scores would then

be added up with the score of the technical evaluation as per below

mentioned formula and the Bidder getting the maximum total score out

of 100 would be considered as the successful BIDDER and called for

negotiations, if required.

Formula for Final Bid Evaluation is

Bm= .5 (TM) + .5 (Fn)

Fn= (Fmin/ Fb)*100

Where

Bm is total marks of the BIDDER in consideration

TM is Technical Marks of the BIDDER in consideration

Fn is Normalized financial score of the BIDDER in consideration

Fb is Evaluated Cost of BIDDER under consideration

Fmin is Minimum evaluated cost of any BIDDER

ICSI reserves the right to negotiate with the BIDDER whose proposal has been

ranked first on the basis of best score.

The tentative BOQ (Bill of Quantities) Activities shall be as per below

format:

S No Activity

1. Implementation of Software application

2. Annual Maintenance Cost after implementation and warranty

period.

Page 52: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 52 of 80

3. *Manpower per day cost to cater any additional requirements

beyond the scope of Work within Warranty / AMC period.

4. *Database Administrator Manpower per day cost to cater

requirements (if needed).

5. Cost of Reporting tool if any

6. Cost of Dashboard tool if any

7. Annual Cloud hosting charges (one time & every year), if

required.

* For the purpose of Commercial Comparison the cost quoted under these heads

would be considered on an annual basis (i.e. 365 days).

The breakup of costing as above is only to ensure that during the currency of the

contract the services of the firm may be taken for the respective head at a

predefined costing at the discretion of the ICSI.

Note: Conditional bids will be rejected.

Declaration

i. We have read and understood the terms and conditions given in the

quotation / RFP Document;

ii. We are eligible for award of the contract as per the qualification criteria

mentioned in the quotation / RFP Document;

iii. We accept and agree to all the terms and conditions of the quotation

/ RFP;

iv. We shall comply with all the terms and conditions of the quotation / RFP;

v. The undersigned certifies he/she is authorized to obligate the represented

firm and further agrees with all terms, conditions, and requirements of the

ICSI’s RFP- for Providing Compliance Checklists of Laws applicable to

Different Industry Sectors.

vi. We have no objection if enquiries are made about the work listed by us in

the accompanying sheets / annexure.

vii. We agree that the decision of the ICSI in selection process will be final and

binding on us.

viii. We confirm that we have not been barred / blacklisted / disqualified by

any Regulators / Statutory Body in India and we understand that if any false

Page 53: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 53 of 80

information is detected at a later date, the assignment shall be cancelled at

the discretion of the ICSI.

ix. All the information / documents provided in this bid/quotation are true to

the best of our knowledge and belief. If at any stage, the information /

documents are found to be false, misleading or incorrect then this Bid /

Work Order shall be cancelled at our cost and risk and we shall indemnify

the Institute (ICSI) for the loss caused due to the cancellation and we shall

be liable for penal / legal action including black listing by ICSI.

x. We understand that ICSI reserves the right to cancel the quotation / RFP at

any stage or cancel / reject any one or more bid without incurring any

liability.

xi. The duly signed copies of all the RFP pages are attached herewith

Place: SIGNATURE OF THE BIDDER

Date: NAME & DESIGNATION SEAL OF ORGANISATION

Page 54: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 54 of 80

Annexure I

Student Services

1. Student’s requests like Re-Registration Request along with uploading of

documents & Request Cancellation at Admin end, Transcripts Requests etc.

The above requests should follow completed approval process.

2. Re Registration facility (After Login).

3. Exemption in case of Re-Registration.

4. Payment of Pre-examination at the time of switch over.

5. SEFT - Student Education Fund Trust Module.

6. Coaching Module.

7. Merit Cum Means assistance Module.

8. Minority scholarship application Module.

9. All India Competition Module.

10. National level competition-Animation Competition Module.

11. Generation of payment Acknowledgment receipt (with or without Login)

12. Facility to check list of Unsuccessful Transactions (After Login)

13. Payment Refund Guidelines and Transaction Guidelines (After Login).

14. Fee Refund process for different Functionalities of the Student.

15. Facility of Dynamic generation of various reports through a generic report

writer. The Reports as such may be categorized as MIS Reports and

reports based on one or more parameters such as Category, City, Chapter,

Region, Qualification, Gender, Occupations, and Religion etc. The report

writer should also facilitate the control break reports.

Student's Training Requests

1. 15 Months Training with Company

2. 15 Months Training with CS in Practice

3. 3 Months Training with Company

4. 3 Months Training with CS in Practice

5. 15 Months Training with Stock Exchange

The duration specified above is just indicative and it varies as per the

regulation change and requirement of the Directorate. Hence, it must be

configurable to cater future requirements.

Page 55: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 55 of 80

Annexure II

Members Services

1. Member's Search

Search on Membership No., City, Organization, name, first name, last

name, gender, qualification, age and so forth.

2. Provision for Automatic Password Generation

3. Manage Profile - Manage Account (all attachments should be

mandatory)

1. Account Summary

2. Request for CSBF Membership

3. Donation from Public for CSBF (without login with separate account)

4. Request for FCS Membership

5. Restoration of Membership (year wise fees should display)

6. Application Status/ Registration Number Request for ACS Membership

7. Credit Hours Certificate(Automatic conversion from ACS to FCS)

8. Duplicate Acknowledgement

9. Letters(with signatures ) with approval system

10. Miscellaneous Query/ Request for Duplicate Letters ;change of address

with drop down selection criteria for chapters; Photo signature upload

11. List of Unsuccessful Transactions

12. Payment Refund Guidelines

13. Payment Transaction Guidelines

14. Request for Monthly Journal

15. Request relating to Certificate of Practice(form D should be mandatory)

16. Request for Firm names (Existing firm names should be displayed

some message should display for duplicate entry)

17. Request for Sole Proprietorship ((Unique identification number should

be given automatically)

18. Request for Partnership (Unique identification number should be given

automatically)

19. Member Training Requests

20. Placement (For Registration for Availing Placement Services)

21. Placement Vacancies (Advertised Vacancies)

22. Submit your Industry Type)

23. Membership Defaulter process / CP process

24. Fee collection for default members.

25. Change of Address of Members

26. Change of Name of Members

27. LLP name approval

28. Issue of Duplicate certificate to Members

29. Issue of identity card/duplicate identity card to Members

Page 56: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 56 of 80

30. Non receipt of monthly CS journal

31. List of Members/List of Voters/List of COP holders

32. Incorporation of GST component in all the membership fee except

CCEC fee.

33. Facility of Dynamic generation of various reports through a generic

report writer. The Reports as such may be categorized as MIS Reports,

Letters, Labels and reports based on one or more parameters such as

Region, Chapter, State, City, Pin, Age, Gender, occupation,

qualification etc. The report writer should also facilitate the control

break reports. Provision to be made for online generation of all types

of membership certificates i.e. ACS, FCS, COP, CSBF, Licentiate and

CCEC.

34. Educational verification of members

35. Non receipt of CS journal

36. Change of address process

37. Change of name process

38. Issue of Duplicate certificate

39. Issue of Identity card/Duplicate id card

40. List of Members/List of Voters/List of COP holders

41. Removal or Cancellation of membership on request/due to

death/discipline or misconduct case/other.

42. Annual membership fee and defaulter process.

LICENTIATES

1. Registration/Renewal/Change of Address

2. Defaulter Process

3. Licentiate to Members conversion option

4. Dynamic generation of reports for MIS, Letters, Labels and list (base

parameters, Region/Chapter/State/City/Pin/Age/Gender etc)

CSBF

1. Registration/Nominee updation

2. Financial Assistance

3. Dynamic generation of reports for MIS, Letters, labels and list (base

parameters, Region/Chapter/State/City/Pin/Age/Gender etc)

4. Non CSBF reports (base parameters, Region / Chapter / State / City / Pin

/ Age / Gender etc)

Training Cell

1. Registration of Students request for different training like Long term

Training, Short term Training, Balance Training, 15 days specialized

training etc.

Page 57: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 57 of 80

2. Capturing of Training data of students including sponsorship certificate

details, completion certificate details, exemption details etc. with

electronic-letter confirmation. Quarterly Reports and Project Report

submission.

3. Capturing of Corporate/Companies/PCS data registered for imparting

training along with their vacancies along with approval system for

making them Active/Dormant.

4. Application of Student for Full / Partial Exemption of Training.

5. Approval process for all the required process by the admin user.

6. Search option to Student/Companies for imparting/providing training to

apply/recruit respectively with an approval system.

7. Dynamic generation of reports for MIS, Letters, labels and list (base

parameters, Region/Chapter/State/City/Pin/Company/PCS/Training

Status (undergoing/complete)/Age/Gender/Qualification/registration

status/date wise etc.).

8. Provide facility of viewing tentative schedule of MSOP and other

training programme proposed/scheduled at various ROs/Chapters. The

facility to Chapter / ROs staff to upload their training schedule to reflect

in the dashboard, which can be viewed by public at large.

9. Duration of different training for different user should be configurable.

The module should be flexible enough so that if there would be any

change user can done the same by themselves only.

Credit Hours

1. RO/Chapter login

2. Add/Modify/Delete Credit hours of specific member.

3. Closing and opening of New Block years.

4. Display of Individual Credit hours Certificate.

5. RO/Chapter wise reports/complete or Incomplete Mandate credit

hours report.

Placement Cell

Integrated Software driven process for Placement that can be

implemented at Regional Office and Chapters Level (preferably upto

A Grade) is the objective of the Institute with all provisions and control

with HQ for smooth monitoring.

1. Creation of Company database

Registration of Companies for Placement and posting of vacancies (the

form be made dynamic to facilitate user to fill up only relevant fields) 2. Creation of Member database (looking for job)

Page 58: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 58 of 80

Creation of database of Members with option for updating/ deleting/

uploading of CV the form is made dynamic to facilitate user to fill up

only relevant fields) 3. Search option

Option to search in the data grid on the basis of on parameters/fields

for members and companies

Based on the two dates for filed earmarked for searching 4. Admin. Interface

1. For approval of Company Registration and Job posting, searching

and generation of report.

2. For giving rights to company for activity viz. Job posting,

downloading of CV

3. Generation of reports 5. RO/Chapter Interface

The facility to Chapter/RCs staff to upload the schedule in the

dashboard, which can be viewed by the Admin user or other.

6. Report generation

1. Facility of Dynamic generation of various reports (e.g. Different

Number of Times members applies in different company and the

number during a period, Number of times profile has been taken by

company, Number of times a company request for

candidates/posted vacancy, No of members registered on

placement portal (Region wise City wise) and during a period, No of

Companies registered on the portal and during a period, Reports

Based on the two dates for filed earmarked for searching etc.).

2. Details about selection of the candidate and closing the requirement

once it is filled up.

3. Fields demarcating Trainee or Member requirement to be

separately created.

4. Provide facility of viewing schedule and completed trainee/job

drives organized at various RCs/Chapters.

Payment Requests

1. Generate Payment Slip

2. Membership Fee Request

3. Duplicate ID Card Request

Page 59: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 59 of 80

Annexure III

RO Chapter module

The development and implementation of a web based generic software module

to meet the requirements pertaining to the activities of ROs / Chapters such as

data management of faculty, billing, visitors and members.

1. Members handling

a. Module for handling bulk invitation and recording the error or

bounced back emails.

b. Module to handle queries (recording the members who have

interest and their feedback if any). Query on a particular name /

company name.

c. Module to handle registration process for the function, fees

submitted ® and acknowledgement issued ®.

d. Module to cater credit hour requirements (Integration with existing

module on web site of ICSI which is presently running).

e. Module for analysis of attendees who are regular for a particular

nature of program.

2. Module to handle Corporate Members.

3. Faculty handling.

a. Databank of faculty with their competence.

b. Module to handle remuneration paid to faculty ®.

4. Seminar details

a. Module to handle the seminar details and credit hours.

5. Form to capture new faculty and finalization of faculty for various offices

6. Cater regional and chapter offices functioning like fee collection,

publication sale, faculty management, seminar scheduler, attendance,

certificates

7. Propagation to Credit hours

8. Draft / cheque / cash collection system

® represents the portion which will be covered by a regular ERP and has to be

integrated in the ERP.

It may be further noted as under:

1. For integration of requirements, the module developed must talk to the

ERP and also to the credit hours module already established on the web

site.

2. ERP / DMS would lay the basic platform for financial & inventory handling

and the module under reference could be developed over the ERP OR the

module could also be developed as an independent entity.

3. Institute has national level events such as National Convention. Delegate

registration and various MIS will be the responsibility of the bidder.

Page 60: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 60 of 80

Annexure IV

Recruitment Module

The development and implementation of a web based generic software module

to meet the requirements pertaining to the activities of Human Resource

department for different recruitment processes and others.

The detail requirement of the module will be provided at the time of requirement

gathering phase. Few of such requirements are as below:

1. The module should capture different details (like Personal Details, Qualification

Details, Experience details, Computer Skills, Miscellaneous Details etc.) of the

candidates in different tabs.

2. The module should capture more than one Qualification Degrees of the

candidate.

3. The module should provide the facility to uploading photograph and signature

by the candidate.

4. An additional column for Grade pay, if in government service should be made.

Page 61: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 61 of 80

Annexure V

FINANCE & ACCOUNTS Module

1. Fee Receipt reversal option/add comments against any fee receipt and

generation of credit notes & related reports: Option for fee Receipt

reversal (in part or full amount for any or all fee heads) to be provided with

generation of Credit/Debit note and reports. Reversed receipts amount is

also to be shown in all Collections/deposits reports also. Option to add

comments against any fee receipt is also to be provided.

2. Fee Query: Fee Query screen to be provided (fee query to be provided

on all available details of the transaction/fee receipt of online transaction,

offline transaction, Bank Challan etc.). Presently, fee query screen

available in SMASH is not provided as per the Dte. of F&A requirements.

3. GL files generation: Option to generate GL files for accounting of

online/offline/Bank Challan related collections and deposits to be

provided (with reset option).

4. Collections, deposits and GST related Reports: Presently, number of

collections/deposits/GST tax related reports required by Dte. of F&A, are

not available in SMASH which are required to be provided in the

system. Four Financial reports available in SMASH are also required to be

updated as same are not provided as per the Dte. of F&A

requirements. Different reports and process available in RAS &CRAS

system are also required in the system.

5. Updation of Acknowledgement Numbers/Deposit slips etc. from time-to-

time is also required in system. Separate Acknowledgement Numbers and

deposit slips series is to be allotted for HQ offline and online receipts and

for local incomes of each location of Region, Chapter, CCGRT, COE etc.

and also user-wise.

6. All online, offline, Challan payment fees etc. are required to be accepted

and processed in single module.

7. Offline Receipts: HQ receipts will be issued at all locations/authorised

locations and only for authorised fee/inventory items (Taxable/Non-

Taxable/All Taxable & Non-Taxable). Local offline receipts will be issued

by concerned Region/Chapter/CCGRT/COE. Multiple users can also

issue/process receipts at same location.

8. Process for Fee acceptance & processing, reports generation, fee

reconciliation for all collections/deposits etc. are required for all taxable

and non-taxable receipts of HQ/Regions/Chapters/CCGRT/COE etc. and

also as per the GST requirements or any other change in future. GST

applicability status can be changed at any time or tax rate can change for

any fee/inventory item. Receipts detail for all successful transactions

Page 62: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 62 of 80

should appear in data on real time basis and duplicate payment for the

same fee should not be generated in the system.

9. Bank Reconciliation Module to be provided in the system for all online and

offline receipts and payments.

10. Cash Management System to be provided in the system.

Page 63: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 63 of 80

Annexure VI

E-procurement, Management of contract and Purchase and Asset

Management Module

Maintenance of Tender Fees and EMD of Bidders

Maintenance of Performance security and BGs of vendors

Standard RFQ Preparation

System generated Purchase Order Nos.

Report on RFQ and Rate Contracts

Asset Register Management System

Report on processed Bills vendor-wise, period-wise, item-wise etc.

a) Service and Capital Purchase Contract Management

b) Scheduling of Purchase/renewal proposal online

c) Online Tender document Preparation template.

Print Orders, Challans of Printing Vendors and Bill processing to be integrated

online

E-crat to be integrated with the Online Stock Management system

Uploading Facility of Dispatch Details of SM in bulk either by excel file or CSV file

through data integration

E-kart stage-wise approval status reflection in the system and notification to the

buyers

***********

Page 64: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 64 of 80

Annexure VII

Proposed Service Level Agreement for Design, Development and

Maintenance of Software Application Project [ICSI –

SMASH]

This Agreement dated --------------------- is made by and between a company

incorporated under the Companies Act 1956, with its registered office located at

___________________ and with its corporate office located at

_______________________ represented by ……………………………….. authorized

vide Board Resolution dated…………………. (hereinafter appropriately referred

to as "Service Provider" which term shall include its successors and permitted

assigns), of the One Part

And The Institute of Company Secretaries of India, a Statutory body constituted

under the Company Secretaries Act, 1980 having its head office at ICSI House,

C - 36, Sector – 62, Noida, Uttar Pradesh – 201309 represented by

…………………………………………………………………………… (hereinafter referred to as "ICSI") which term shall include in its successors and permitted

assigns of the OTHER PART

WHEREAS:

Service Provider is willing to provide ICSI with the Services for Design,

Development and Maintenance of Software Application in accordance with the

terms and conditions of this Agreement;

NOW THEREFORE, in consideration of the mutual promises set forth below, and

in the Attachments hereto which form an integral part of this Agreement, the

Parties hereby agree to the following:

1. SERVICES TO BE PROVIDED

Bidder shall provide services of development and maintenance in

accordance with the specifications set forth in this agreement and the RFP

hereto:

Provide development and maintenance and coordination services for the

Software Application and related work Information Technology

Infrastructure (including application software, training, hand holding and

data preparation including preventive maintenance benchmarking and

generating reports as mentioned in the RFP).

2. The whole work included in the RFP shall be executed by the Bidder and

the Bidder shall not directly or indirectly transfer assign or sublet the

Page 65: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 65 of 80

contract / work or any part thereof or interest therein without the written

consent of ICSI.

3. In case any work for which there is no specification in the RFP, such work

shall be carried out in accordance with the directions of the ICSI without

any extra cost to the Institute.

4. There may be 20% variation in the scope of work which would be mutually

discussed.

5. SECURITY DEPOSIT

The successful Bidder shall be required to give a security deposit for

faithful performance of the RFP.

The successful bidder has to submit the security deposit /performance

guarantee from scheduled bank of equivalent amount of 10% of the

contract value on awarding the contract within 15 days of issue of order but

before execution of the agreement, to cover any loss or damage caused to

or suffered by the Institute due to acts of commission and omission by the

successful bidder or any failure on the part of the successful bidder in

fulfilment of terms and conditions of the contract and conditions contained

in the agreement. The Bank Guarantee shall have to remain valid for the

entire duration of the Contract plus three months beyond the completion of

contract period. The successful bidder shall not be entitled to any claim or

receive any interest on the amount of performance guarantee. The EMD of

the successful bidder will be refunded after submission of the performance

Guarantee/Security Deposit.

The successful bidder having valid registration with NSIC/MSME on the

date of submission of tender, are also required to submit requisite security

deposit / performance guarantee.

Forfeiture of Security Deposit and Invoking of Bank Guarantee

ICSI shall have the right to invoke the Bank Guarantee and to forfeit the

security deposit if the Service Provider contravene or breach any of

the terms and conditions of the Agreement or if the Service Provider

withdraws or amends, impairs or derogates from Agreement or fails to

execute the work as per the Agreement or fails to deliver the satisfactory

performance during the period of Agreement.

ICSI shall also have the right to invoke the Bank Guarantee and to forfeit

the security deposit and to adjust the damage or loss caused to the ICSI

due to the negligence, carelessness, inefficiency, fraud, mischief and

misappropriation or any other type of misconduct of the Service Provider

or its staff / employee / agent / representative.

Whenever under Agreement any sum of money is recoverable from and

Page 66: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 66 of 80

payable by the Service Provider, the ICSI shall have right to recover such

sum by appropriating in part or in whole from the security deposit / bank

guarantee of the Service Provider. In the event of the security deposit /

bank guarantee being insufficient, the balance or the total sum

recoverable, as may be, shall be deducted from any sum due to the Service

Provider or which at any time thereafter may become due to the Service

Provider under this or any other Agreement with the ICSI. If this sum is not

sufficient to cover the full amount recoverable, the Service Provider shall

pay the ICSI on demand the remaining amount.

6. TIME - ESSENCE OF CONTRACT

The time allowed for completing the work under RFP / SLA and handing

over the same shall be of the essence of the Contract and shall be strictly observed by the Bidder. The Work shall proceed with due diligence until

Final Completion. ICSI would extend all required support and inputs to help the Bidder to meet the project timelines. For delays which are

directly attributable to the sole actions and / or scope of work of the

Bidder, the Bidder shall be liable to pay penalty and/or liquidated

damages as per the provisions of this Agreement.

7. TERMINATION

Either party may terminate this Agreement by giving a three (3) months’

notice in writing to the other party for termination of agreement.

The ICSI without prejudice to any other remedy, reserves the right to

terminate the agreement in whole or in part by giving thirty (30) days’

notice in writing in case Service Provider fails to discharge its obligation

under this agreement without sufficient grounds or found guilty for breach

of condition(s) of the agreement, negligence, carelessness, inefficiency,

fraud, mischief and misappropriation or any other type of misconduct by

Service Provider or by its staff or agent.

Any pending or unresolved operational issues, performance, unpaid fees

and any other remedies shall continue by the Service Provider during the

period of termination notice and the same must be satisfied before this

agreement is terminated. The ICSI may also put in place any other agency

for carrying out the remaining work and expenditure incurred on same

shall be recovered from the Service Provider.

The Service Provider shall have no claim to any payment or compensation

whatsoever on account of any profit or advantage, which would have been

derived from the performance of this Agreement in full, but which he did

not derive in consequences of the full performance of this Agreement not

having been carried out, nor shall he have any claim for compensation /

damage for the loss suffered by him by reason of termination of Agreement

by the ICSI. No claim for interest will be entertained by ICSI with respect to

Page 67: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 67 of 80

any moneys or balances, which may be in its hands owing to a dispute

between itself and the Service Provider.

8. BLACKLISTING

The ICSI without prejudice to any other remedy and rights, reserves the right to blacklist the Service Provider for a suitable period in case he fails

to honour his bid / Work Order / Service Level Agreement (SLA) or found

guilty for breach / violation / contravention of terms(s) and condition(s) of

the RFP / Work Order / Service Level Agreement (SLA) or negligence,

carelessness, inefficiency, fraud, mischief, misappropriation or any other type of misconduct by Service Provider or by its staff, agent, employee or

officer etc. or by any other person directly or indirectly employed by him.

9. Whenever under this RFP / Work Order / Service Level Agreement (SLA), any sum of money is recoverable from and payable by the Service

Provider, the ICSI shall be entitled to recover such sum by appropriating

in part or in whole from the security deposit / bank guarantee / earnest money deposit of the Service Provider. In the event of the security deposit

/ bank guarantee / earnest money deposit being insufficient, the balance

or the total sum recoverable, as may be, shall be deducted from any sum due to the Service Provider or which at any time thereafter may become

due to the Service Provider under this or any other RFP / contract with the

ICSI. If this sum is not sufficient to cover the full amount recoverable, the Service Provider shall pay the ICSI on demand the remaining balance.

10. The personnel(s) employed / hired / engaged (permanent / regular /

casual / contractual / temporarily / daily wager or whatever be the status / name) by the Service Provider for the execution of work as

provided under this RFP, shall not be employee / officer of the ICSI for any purpose. None of such person of the Service Provider shall have any right

to claim anything against the ICSI.

11. CONSIDERATION

SNo Project Milestones Payment

Schedule

1 Project Inception NIL

2 Production Movement of Training & Placement

Modules along with Codebase*.(Go Live) 15%

3 Production Movement of Membership Modules

along with Codebase*.(Go Live) 15%

4 Production Movement of Student Service Priority 1

Modules along with Codebase*.(Go Live) 5%

5 Production Movement of MISC Priority 1 Modules

along with Codebase*.(Go Live) 10%

Page 68: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 68 of 80

6 Production Movement of MISC Priority 2 Modules

along with Codebase*.(Go Live) 5%

7 Production Movement of Student Service Priority 2

Modules along with Codebase*.(Go Live) 5%

8 Approval of Integrated System Testing Report 5%

9

Approval of Training Manuals, Systems

Administration Manuals, User manuals, Installation

Manuals, Operational Manuals, Maintenance

Manuals

5%

10 Admin, technical and user training 5%

11

Approval of Final Roll out, submission of complete

source code to ICSI and walkthrough of the code

base and Database.

10%

12 Post Implementation Support for one year 20%

* Wherever applicable.

Payment of Taxes

The Service Provider shall be responsible for and shall pay all taxes,

duties, assessments or other charges of any kind or nature whatsoever

levied by any government or governmental body on or in connection with

the Services including without limitation all statutory levies, taxes, fee,

duties, rate, charges, surcharges etc. and any other tax ("taxes") levied on

service provided by the Service Provider. ICSI may withhold from

payments due to the Service Provider any amounts required with respect to

the aforementioned taxes and to remit the same with the relevant

authorities, in case of failure on the part of the Service Provider.

12. ICSI RESPONSIBILITIES

To facilitate Service Provider's provision of Equipment and Services, ICSI

agrees to perform the following obligations:

12.1 Access: ICSI shall grant access at all times to relevant stakeholders,

source code of existing applications, test & live data, documents

(design, manuals, SRS etc.), other relevant project artifacts,

equipment, related sites, office areas and other facilities to Service

Provider and its authorized representatives, subject to ICSI’s

reasonable security restrictions. ICSI shall arrange for permission

for access to offices of third parties for purposes of carrying out the

work to be performed for use of existing web server in co-located

location.

12.2 Project Contacts: ICSI designates Director, Information Technology

as the responsible person representing ICSI’s management for the

Project. One nodal officer of each department shall represent the

departments in all aspects of the provision of contents.

Page 69: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 69 of 80

13. SERVICE PROVIDER RESPONSIBILITIES

7.1 Services

The Service Provider will depute development team (minimum two

persons) and one coordinator familiar with the technology in

developing the Software application; during development at one

central location at Noida he/she will be responsible for all

coordination with the help of other teams of the Service Provider.

7.2 Maintenance Service

Service Provider shall keep portal operating for all days on behalf of

the Institute. The Service Provider personnel contacts, telephone

numbers, and other procedures of fault reports like call escalation

processes, databases with historical information will be made

available by Service Provider to the ICSI within 7 days of the

acceptance of the site by ICSI. In case of default in any or all of the

mentioned conditions, the penalty of Rs.2500/- per day or part of the

day will be levied on Service Provider by ICSI.

In case, there is any breach in the security from external threats due

to any vulnerability of the software application developed and

delivered by the Service Provider, including Denial of Service

Attacks (DoS) / Distributed Denial of Service (DDoS) attacks

malware, the penal provisions will be Rs. 50,000/- (Rupees Fifty

Thousand Only) (except for DoS/DDoS attack) and in addition Rs.

5,000 per two hours for all cases including DoS and DDoS, till the

time remedial action is taken by the bidder. Service Provider will

support the software solution delivered for a period of 1 year as per

the terms and conditions of the RFP. One coordinator and one

developer would be deployed at ICSI NOIDA office during the 1

year maintenance period.

7.3 Corrective Maintenance

In accordance with the terms of this Agreement, Service Provider

shall perform corrective maintenance on the Software application for

all components as provided and implemented by service provider.

Service Provider shall maintain delivered software application using

the procedures of corrective maintenance as required:

a) Reconfigurations of the system /portal (as and when new updates

of software version are released) by the Service Provider.

b) If any new technological updations are duly taken care by the

bidder without the permission/approval of the ICSI, such

incidents can be ratified during the monthly reporting and the

financial grants subject to those incidents shall be at the

discretion of the Institute on equitable basis.

For the applications/ portal supplied by Service Provider, the

fault should be resolved addressed as per below matrix. In case

of default in any or all of the mentioned conditions, a penalty of

Rs. 500/- per incident per day will be levied on Service Provider.

Page 70: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 70 of 80

Defect Severity Defect Report /

Acknowledgement

Temporary

resolution or

Workaround *

Permanent

resolution*

SLA

Adherence

Critical – Severe defect

that renders application

completely unavailable

2 hours(All Days) 24 hours 48 hours 100%

High – Major defect on

the application’s core

Functionality however

Manual work around is

available/in place.

2 hours (Business)

4 hours (Non -

Business)

24 hours 72 hours 95%

Medium – Defect on

non-critical module or

feature of the

application. Manual

work around may or not

be in place

4 hours (All Days) 48 hours 96 hours 90%

Low – Cosmetic or UI

related defect that does

not impact the

functionality of the

application or affected

module

24 hours (Business

only)

NA Change

Management

Process

95%

* If there is a dependency on third party for

resolution/analysis/deployment, their turnaround time will be added to

this.

* Low – Cosmetic or UI related defect that does not impact the functionality

of the application or affected module will be managed through Release

Management Process.

7.4 Preventive Maintenance

Service Provider shall perform preventive maintenance for the web site for

all components provided and implemented by Service Provider. The

preventive Maintenance includes normal checks on a monthly basis to

check the quality of the performance of the against benchmark test. The

preventive maintenance means benchmarking and generating reports

pertaining to satisfactory through put in the network once in a fortnight

during the warranty period. In case of default of any or all of the mentioned

conditions a penalty of Rs.2500/- per day or part of day will be levied on

Service Provider.

7.5 Service Calls

Service Provider will configure the Web Servers / services such that the

fault is communicated immediately to their firm and designated official of

Page 71: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 71 of 80

ICSI through SMS or / and E-mail (SMS and Email charges to be paid by

ICSI). Service Provider will record necessary action taken till the

rectification of such fault and till due acknowledgment taken in writing from

concerned representative of ICSI. Monthly MIS of all such faults to the

action taken closing date and time will also be provided by Service

Provider on the first working day of the next month by 11:00 AM. The

replacement / addition / removal of manpower deputed at ICSI will be with

the prior approval of ICSI. Confidentiality of the data and

information/records of the ICSI will be maintained by the deputed staff of

Service Provider and in case of failure of maintaining the same, Service

Provider will be fully responsible. Service Provider will be responsible for

any act of omission or commission on the part of its employees.

14. FORCE MAJEURE

The Parties shall not be liable for any failure to perform, any of its

obligations under the Agreement if the performance is prevented,

hindered or delayed by a Force Majeure event (defined below) and in such

case its obligations shall be suspended for so long as the Force Majeure

Event continues. Each party shall promptly inform the other of the

existence of a Force Majeure Event and shall consult together to find a

mutually acceptable solution.

"Force Majeure Event" means any event due to any cause beyond the

reasonable control of the Party, including, without limitation, unavailability

of any communication system, sabotage, fire, flood, explosion, acts of God,

civil commotion, strikes or industrial action of any kind, riots, insurrection,

war or acts of government.

15. CONFIDENTIALITY

a. During the term of the Agreement and thereafter, any disclosing party's

Confidential Information received by the receiving party, under and by

virtue of the Agreement, shall be maintained in the strictest confidence

and trust and shall not be disclosed to a third party without the prior

written consent of the disclosing party, unless such information is

required to be disclosed in pursuance of the order of a competent court,

tribunal or other regulatory authority exercising valid jurisdiction, in

which case the party required to make the disclosure shall promptly

notify the other Party in writing of such disclosure. For purposes of this

agreement "Confidential Information" means information that: (i) is

sufficiently secret to derive economic value, actual or potential, from not

being generally known to other persons who can obtain economic value

from its disclosure or use; and / or (ii) is the subject of efforts that are

reasonable under the circumstances to maintain its secrecy or

confidentiality.

Page 72: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 72 of 80

b. Any software / hardware material, product specifications, financial

information, documents covered under Agreement shall be confidential

information and deemed to be in private domain and it shall not be

made public or shared with any other party without the prior written

consent of the ICSI.

c. Provided that upon the expiration, cancellation, or termination of

Agreement, each party shall, upon the written request of the other party,

return or destroy, to the satisfaction of the other Party, all Confidential

Information, documents, manuals and other materials specified by the

other Party.

Blacklisting

The ICSI may by notice in writing and after giving an opportunity of being

heard, blacklist the Service Provider for suitable period in case Service

Provider fails to discharge its obligation under Agreement without

sufficient grounds or found guilty for breach of condition(s) of the

Agreement, negligence, carelessness, inefficiency, fraud, mischief and

misappropriation or any other type of misconduct by the Service Provider

or by its staff or agent.

Governing Law

The Agreement shall be interpreted in accordance with and governed by

the laws of India.

16. INDEMNITY

a. The Service Provider shall be solely liable for and shall indemnify ICSI,

its officers, servants, employees and agents against all liabilities, losses,

claims and expenses of any nature whatsoever arising from any personal

injury or illness (including death) of any nature whatsoever and any

penalty, loss, damage or destruction to any property whether real or

personal where such liability arises out of or in connection with the

rendering of the Services under the Agreement whether under common

law, under statute or otherwise. The Service Provider further covenants

and agrees to indemnify and keep at all times indemnified the ICSI

against any loss or damage that the ICSI may sustain directly or

indirectly as a result of the failure or negligence of the Service Provider

or its employees to faithfully carry out its obligations under Agreement

and further to pay for all loses, damages, costs, charges and expenses

which the ICSI may reasonably incur or suffer and to indemnify and

keep indemnified the ICSI in all respects.

Page 73: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 73 of 80

b. The indemnifying party shall be granted immediate and complete

control of any claim of indemnity and the indemnified party shall not

prejudice the indemnifying party's defense of the claim.

The indemnified party shall give the indemnifying party all reasonable

assistance at the expense of the indemnifying party on such claim of

indemnity.

17. INDEPENDENT CONTRACTOR OR SUBCONTRACTOR

The relationship of Service Provider to ICSI under this Agreement shall

be that of an independent contractor. The acts/performance and actions

taken by either party in furtherance of their respective activities of

operation shall not bind the other except to the extent provided under

Agreement. The acts performed and action taken by either party that do

not fall under the Agreement shall have binding effect on the other to the

extent they are reduced to writing and the prior consent of the other party

is obtained.

18. ADDITIONAL CONDITIONS

18.1 Complete Agreement:

This RFP and Agreement and all of its Attachments [and Annexures]

constitute the complete Agreement between the Parties and replace

any written or oral Agreement or understanding with respect to the

subject matter. Changes, amendments or interpretations of this

Agreement shall be valid only if they are in writing and signed by

both parties, except that each Party may make a change of domicile

or change of the name of the person to whom notifications shall be

sent. This notification shall be made through a written document to

the other Party to this Agreement.

18.2 Non-Exclusive Agreement:

The Agreement between the ICSI and the Service Provider is a non-

exclusive agreement. The ICSI shall be free to enter into any such

agreement with any other Service Provider during currency or the

extended currency of Agreement.

18.3 Representations and Warranties:

The Parties represent and warrant that they have relevant authority

and permission under the applicable laws/ rules/ notifications or by

virtue of the order/ instruction/ directive from the relevant authority

to enter into this Agreement.

Page 74: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 74 of 80

18.4 Severability:

If any provision of the Agreement is held invalid, unenforceable or

illegal for any reason, the Agreement will remain otherwise in full

force apart from that provision(s) which shall be deemed deleted.

18.5 Assignment & Sub-Letting:

Neither party shall assign or sub-let any of its rights and obligations

hereunder whether in whole or in part without the prior written

consent of the other. However, nothing in the foregoing shall be

affected in the event of there being a merger, amalgamation or

takeover of the business/ management of a party. In such an

eventuality all the rights and obligations shall automatically be

vested with the entity with which such party has been merged or is

taken over.

18.6 Alteration and Modification:

Any alteration or modification or waiver in connection with the

Agreement will not be effective unless made in writing and signed

by both the parties.

18.7 Non Waiver:

Failure to exercise by either party of any right under this Agreement

in one or more instances shall not constitute a waiver of those rights

in another instance. Such waiver by one Party of any of the rights

established herein shall not be considered as a waiver of another

right established herein.

18.8 Notices & Notifications:

All notifications or notices related to this Agreement shall be made in

writing and shall be effective when they are delivered personally or

sent by registered mail to the addresses indicated in this

Agreement. Any change of Address should be notified.

18.9 Headings:

The headings used in this Agreement are for purposes of

convenience only and shall not control the language or meaning of

the provision following.

18.10 Precedence:

In the event of any ambiguity or doubt or dispute on the terms and

conditions applicable the order of precedence for the purposes of

Page 75: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 75 of 80

resolving such ambiguity, doubt or dispute shall be:

(1) This Agreement

(2) The Attachments (if any)

(3) The Work Order (if any)

(4) The RFP

19. ARBITRATION

Any dispute, difference, controversy or claim (“Dispute”) arising between

the Parties out of or in relation to or in connection with Agreement, or the

breach, termination, effect, validity, interpretation or application of this

Agreement or as to their rights, duties or liabilities hereunder, shall be

addressed for mutual resolution by the authorised official of the parties. If,

for any reason, such Dispute cannot be resolved amicably by the Parties,

the matter shall be referred for the arbitration to the sole Arbitrator to be

appointed by both the parties on mutual consensus. If both the parties do

not arrive on mutual consensus for appointment of sole arbitrator, each

party shall appoint one arbitrator. Both these arbitrators shall appoint third

arbitrator and said Panel of three arbitrators shall adjudicate the dispute.

The provisions of the Arbitration and Conciliation Act, 1996 or any statutory

modifications on re-enactment thereof as in force will be applicable to the

arbitration proceedings. The venue of the arbitration shall be at New Delhi.

The cost of the Arbitration proceedings shall be shared equally by both the

parties. The language of the arbitration and the award shall be English. The

decision / award of the arbitrator shall be final and binding.

20. PENALITIES

The firm will bear full responsibility for delays, which can be directly

attributable to the sole actions and scope of work of the Service Provider,

in the project timelines.

The timelines as provided by the ICSI is to be strictly followed for each and every activity. In case, the Service Provider fails to adhere to the timeline

submitted in the technical bid / or as approved by ICSI, a penalty of Rs.

3500/- per day will be levied. Total grace allowed in the project is thirty

(30) days. In case, it is justified by the firm and approved by the Institute

that the delay is on account of any inaction on the part of the Institute and

written communication has been provided to the Institute on this account,

the penalty will not be enforced. Total Penalty in any case can’t exceed

10% of the Contract Value. In case of delay beyond 365 days in design,

development and implementation, the Institute reserves the right to

terminate the agreement and recover the cost paid plus damages (capped

at a upper limit of 10% of the Contract Value) from the Bank guarantee /

Page 76: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 76 of 80

security / EMD / other measures.

21. DELIVERY AND ACCEPTANCE

Deliverables will be formally accepted after ICSI certifies acceptance of the deliverables and recommends for payments to the Service Provider

within thirty (30) days from the date of submission of the deliverables. ICSI

would generally not take more than four weeks for the acceptability of the

deliverables. Any queries with regard to the deliverables will need to be answered by the Service Provider within a week.

22. Documentation

The Service Provider shall provide the following documentations in

digitally signed soft copies (in USB / CD):

1. Application Architecture Document.

2. Detail Project Plan

3. Fortnightly progress reports

4. System Requirement Specification (SRS) document containing detailed

requirement capture and analysis including functional requirement,

Detail Design Document, Interface Specifications, application security

requirements.

5. Complete Source Code with documentation (except for the e-

Procurement application)

6. Test Plans and Test cases (including Unit Test Plan, System/Integration

Test Plan, User Acceptance Test Plan, Security Test Plan, Load Test

Plan)

7. Training Manuals

8. Systems Administration Manuals

9. User manuals

10. Installation / Deployment Manuals

11. Operational / Functional Manuals

12. Maintenance / Troubleshooting Manuals

13. Security policy and procedure for Portal including Password security,

logical access security, operating system security, data classification,

and application security and data backups.

Documents mentioned from Sno. 7 to 13 should be provided in two stages

1. Before Training (payment milestone 7)

2. After Rollout (payment milestone 9)

23. Security Audit

It is the responsibility of the selected bidder to get the security audit of the

portal and should share the complete details of the audits along with copies

Page 77: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 77 of 80

of all communication and bug reports / removal, written or otherwise.

24. Inspection and Testing

The inspection of installation of services shall be carried out to check

whether the services are in conformity with the mentioned in the RFP. The Service Provider will test all operations and accomplish all adjustments

(tuning) necessary for successful and continuous operation of the systems

to the satisfaction of the ICSI.

The acceptance test will be conducted by ICSI or any other person

nominated by ICSI, at its option. There shall not be any additional charges

for conducting acceptance tests. All software should be complete. The Service Provider shall maintain necessary log in respects of results of the

tests to establish to the entire satisfaction of ICSI, the successful completion

of the test specified.

25. Intellectual Property Rights

The Service Provider shall ensure that it holds all necessary copyrights,

license rights and other proprietary rights required in respect of any

device or method used by it while providing the Services. The Service

Provider shall indemnify and hold ICSI harmless from and against any

liability, penalty, cost or expense suffered or incurred as a result of Service

Provider failing to comply with his obligation under the Agreement.

26. Genuine Software

Both parties agree that the software that is required to be used for the

purposes as envisaged under Agreement shall be genuine and registered

software and not a pirated version of any nature. Service Provider

undertakes that the software developed/ to be developed by it for the work

shall be its own and that there shall no infringement of copy

right/intellectual right of any other person. Service Provider further

undertakes that it shall indemnify, and keep the ICSI at all time indemnified

against any such infringement.

27. Copyright

Any software (except for the e-Procurement solution), hardware, data,

awards, certificates, patent, etc. shall be absolute property of ICSI. The

Service Provider will transfer to ICSI all Intellectual Property Rights in the

Software developed (except for the e-Procurement solution). The Service

Provider shall relinquish to ICSI source code of the developed portal

(except for the e-Procurement solution) within fifteen (15) days from the

date of acceptance of the system. The source code supplied to ICSI shall at

all times be a complete, accurate, and up-to-date copy corresponding

exactly to the current production release of the software. Copyright, IPR

and source code of e-Procurement solution won’t be transferred or handed

Page 78: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 78 of 80

over to ICSI.

28. Compliances of Law

A. The Service Provider shall provide the Services in strict compliance with

all relevant laws and regulations of the State or Territory within India

where the Services are being rendered and in accordance with the

conditions of any permit, license or concession relating to any part of the

Services, whether held by the Service Provider, ICSI or any other

concerned party.

B. The Service Provider shall indemnify and hold ICSI harmless at all times

from and against any liability, penalty, cost or expense suffered or

incurred as a result of the Service Provider failing to comply with any

law, or regulation, or such permit or license relating to any part of the

Services.

29. Operational Acceptance

Successful completion of the contract will be gauged through a series of

formal acceptance tests performed on all aspects of the system/sub

systems:

In the go-live phase, Service Provider will have to manage and roll out a

beta stage where the system will be made available and restricted only to

the users in ICSI through an appropriate mechanism on the web, and

conduct user acceptance testing of the System based on test cases developed by the Service Provider in consultation with ICSI and validated

by ICSI. Based on the test results, required changes will be carried out and

tested. Post this, ICSI portal will be officially launched and operational

acceptance will be complete.

30. Unit Test and System integration test

1. Each module or Component should be fully tested independently

before integration.

2. All specified functionality should exist. This testing verifies the as-built

program's functionality and performance with respect to the

requirements for the software product.

3. All System functions that are accessed through menus should be tested

4. After each module has been fully integrated to create a larger system,

each module or sub-module must have a defined interface which will

be used to call another program component.

5. Measuring response time, throughput and availability of Application.

Page 79: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 79 of 80

31. Complete System Acceptance

At the end of the System Acceptance period, ICSI will acknowledge

complete system acceptance in writing to the successful bidder upon

completion of the following:

1. All of the required activities defined in the bid document including all

change requests agreed by ICSI and delivered by the bidder and

accepted by ICSI.

2. All the requisite documentation as defined in this bid document

including all changes agreed by ICSI and delivered by the bidder and

accepted by ICSI.

3. All required training as defined in this bid document and delivered by

the bidder and accepted by ICSI.

4. All identified shortcomings/defects in the systems have been

addressed to ICSI’s complete satisfaction.

5. In order to accept the system, ICSI must be satisfied that all of the work

has been completed and delivered to ICSI’s complete satisfaction such

that all aspects of the system perform acceptably. The functional /

logical acceptance of the system will only be certified when the

proposed system is installed and configured according to the design

and that all the detailed procedures of operating them have been

carried out by the Bidder in the presence of ICSI staff.

32. Training

The successful bidder shall provide the following training:

1. Overview of the portal and Online forms to all ICSI users

2. A detailed technical demonstration to the IT team

33. Operations and Maintenance

The Service Provider shall maintain and Support the supplied software for

a period of one year after the successful operational acceptance, including:

1. Maintenance for the portal.

2. Resolution of errors/bugs (if any), software updates.

3. Deploy adequate Technical Personnel to maintain the Portal as per

the service level requirements

Page 80: Request for Proposal (RFP) For Development, Delivery and … · 2018-11-08 · Development, Delivery and Maintenance of Web Based Application Software for ICSI (STIMULATE) Important

Page 80 of 80

34. LIQUIDATED DAMAGES

If the Service Provider fails to complete the implementation of full-fledged

system within the period specified in the purchase order, ICSI, shall

without prejudice to its other remedies, deduct as liquidated damage

1.0(one) percent of the price of the delayed goods/services for every week

of delay or part thereof subject to a maximum overall cap of 10% of the

contract value. Completion of Implementation means the successful

working of the System in live environment up to the satisfaction of the users

and issue of written acceptance by the ICSI.

35. Jurisdiction

All disputes arising out of at any time, in connection with construction,

meaning operation, effect, interpretation or out of this agreement or breach

thereof are subject to the jurisdiction of Courts in Delhi.

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be

executed in duplicate as of the day and month and year first written above.

FOR M/s _________________ FOR ICSI

AUTHORISED SIGNATORY AUTHORISED SIGNATORY

NAME: NAME:

DESIGNATION: DESIGNATION:

DATE: DATE:

In presence of

1. 2.