2
REPUBLIC OF THE PHILIPPINES DEPARTMENT OF FINANCE BUREAU OF CUSTOMS Port Area, Manila Bids and Awards Committee Supplemental Bid Bulletin Addendum No. 1 RENOVATION OF THE OLD NPO BUILDING This Addendum No. 1 dated 17 December 2014 is issued to clarify, modify or amend items in the Bid Documents. This shall form an integral part of the Bid Documen~s. ISSUE A. Item 12.1 (a) Single Largest Contract B. Item 12.1 (b )(ii.2) CLARIFICATION! AMENDMENTS A photocopy ofl the Single Largest Completed Contract must be submitted i.e. similar contract completed within the last five (5) years prior to December 8, 2014, whose value must be at least fifty percent (50%) of the ABC supported by the Constructors P~rformance Evaluation System (CPES) rating sheet which must have a satisfactorY rating or a certificate of satisfactory cOl1lpletion of the project. Tax Clearance Certificate from the Bureau of Internal I Revenue shall also be submitted as parf of the eligibility and technical documents contained in the first envelope. I The List of Contractor's personnel to be assigned to th~ Contract must be supported by thelr respective updated resumes, photodopy of Professional Regulations Corrimission (PRC) valid license, DPWH Accreditation and Occupational and Safety Certificate, if applicable. 1. Materials EngiJneer - Valid PRC License - Updated esume - DPWH acc~editation 2. Safety Officer I - Valid PRC ~icense - Updated rfsume - Occupational and Safety Certificate

REPUBLIC OF THE PHILIPPINES DEPARTMENT OF FINANCE … · - Updated resume I C. Additional Scopeof Work For guidance and information of all concerned. ~ 1~~ AI URO M. LACHICA, CESO

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REPUBLIC OF THE PHILIPPINES DEPARTMENT OF FINANCE … · - Updated resume I C. Additional Scopeof Work For guidance and information of all concerned. ~ 1~~ AI URO M. LACHICA, CESO

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF FINANCE

BUREAU OF CUSTOMSPort Area, Manila

Bids and Awards CommitteeSupplemental Bid Bulletin

Addendum No. 1

RENOVATION OF THE OLD NPO BUILDING

This Addendum No. 1 dated 17 December 2014 is issued to clarify, modify or amend items inthe Bid Documents. This shall form an integral part of the Bid Documen~s.

ISSUEA. Item 12.1 (a) Single Largest

Contract

B. Item 12.1 (b )(ii.2)

CLARIFICATION! AMENDMENTS• A photocopy ofl the Single Largest

Completed Contract must be submittedi.e. similar contract completed within thelast five (5) years prior to December 8,2014, whose value must be at least fiftypercent (50%) of the ABC supported bythe Constructors P~rformance EvaluationSystem (CPES) rating sheet which musthave a satisfactorY rating or a certificateof satisfactory cOl1lpletion of the project.

• Tax Clearance Certificate from theBureau of Internal I Revenue shall also besubmitted as parf of the eligibility andtechnical documents contained in thefirst envelope. I

• The List of Contractor's personnel to beassigned to th~ Contract must besupported by thelr respective updatedresumes, photodopy of ProfessionalRegulations Corrimission (PRC) validlicense, DPWH Accreditation andOccupational and Safety Certificate, ifapplicable.1. Materials EngiJneer

- Valid PRC License- Updated esume- DPWH acc~editation

2. Safety Officer I- Valid PRC ~icense- Updated rfsume- Occupational and Safety

Certificate

Page 2: REPUBLIC OF THE PHILIPPINES DEPARTMENT OF FINANCE … · - Updated resume I C. Additional Scopeof Work For guidance and information of all concerned. ~ 1~~ AI URO M. LACHICA, CESO

3. Master Plumber I- Valid PRCLicense- Updated resume

IC. Additional Scope of Work

For guidance and information of all concerned.

~

1~~AI URO M. LACHICA, CESO 11D~ uty Commissioner, IAG fCl airperson, SCC-SAC

• Include scope ~f work for therehabilitation of structural columns,beams and slabs Iand non-destructivetesting to verify the structural soundnessand stability ofl the rehabilitatedstructure.

• The contractor shall provide a certificateof non-destructive I test, indicating thatthe rehabilitation made with the buildingstructure is structurally sound,conducted by a separate privateconsultant who has the technicalexpertise and modern equipment.