Republic of the Philippines
Autonomous Region in Muslim Mindanao
D E P A R T M E N T O F P U B L I C W O R K S A N D H I G H W A Y S ARMM Complex, Cotabato City
BONGAO, TAWI-TAWI
BONGAO, TAWI-TAWI BIOSONG, LDS TALIPAO, SULU TUBURAN, BASILAN
PARANG, SULU LUUK, SULU
E M I L K . S A D A I N , C E S O I I
R e g i o n a l S e c r e t a r y
1 1T H
E X P A N D E D C A B I N E T M E E T I N G
W a t e r f r o n t H o t e l , D a v a o C i t y , D e c e m b e r 2 1 - 2 2 , 2 0 1 3
Hon. MUJIV S. HATAMAN ARMM Regional Governor
H.E. BENIGNO S. AQUINO, III President of the Philippines
SULTAN KUDARAT, MAG.
PERSPECTIVE OF NEW ORG BUILDING
I. MANDATE
MANDATE DPWH-ARMM as the infra arm implement infrastructure programs and projects within the region.
LEGAL BASES
RA 6734. The Organic Act for the Autonomous Region in Muslim Mindanao was approved by then President Corazon C. Aquino last August 1, 1989 and ratified through a plebiscite last November 19, 1989 by the constituents of the region. RA 9054. An act to strengthen and expand the organic act for the Autonomous Region in Muslim Mindanao, amending for the purpose Republic Act No. 6734, entitled “An act providing for the Autonomous Region in Muslim Mindanao” as amended. Executive Order No. 426. Issued by President Corazon C. Aquino on October 12,1990 devolved the Department of Public Works and Highways to the Autonomous Region in Muslim Mindanao. Muslim Mindanao Autonomy Act (MMA). An act providing for a Regional Public Works Act for ARMM Infra 2012/2013.
VISION
An effective and efficient DPWH-ARMM mandated to deliver basic infrastructure facilities and services in the ARMM government through sustainable developmental programs toward upliftment of socio- economic well being of its constituents by the end of 2015.
MISSION To carry out the implementation of infrastructure programs and projects within the ARMM.
CORE VALUES Public Service, Integrity, Professionalism, Excellence and Team Work.
KEY RESULT AREAS Road Network and Other Public Infrastructure Facilities.
II. EXECUTIVE SUMMARY
1. INITIATED AMENDMENT/ REVISION OF 2012 PUBLIC
WORKS ACT
No more Lump sum funding
No more regravelling
No more MOA on Major Infra
2. 2012, 2013 & 2014 INFRA PROGRAMS AND TARGETS IMPLEMENTED/FOR IMPLEMENTATION.
CY 2012 costing P1 Billion involved construction/rehab of 37.872 kms national and local roads; construction/rehab of 9 sea ports; and construction of 5 bridges, 5 water supply projects and 2 other structures.
CY 2013 costing P1.5 Billion involved construction/rehab of 85.521 kms national and local roads; construction/rehab of 7 sea ports; and construction of 3 bridges, 2 drainage structures, 11 water supply projects and 6 other structures.
CY 2014 costing P5.025 Billion consist of rehab/ construction of 431 kms of national and local roads; construction/rehab of 13 bridges; construction/expansion of 17 sea ports and 30 water supply projects; and construction of 12 drainage structures.
3. GENERATED SAVINGS FROM PRUDENT FISCAL MANAGEMENT
P190.797 M as of November 30, 2013.
DBM lauded DPWH-ARMM for the prudent used of its 2012 budget.
4. ENSURED CLEAN AND HONEST COMPETITIVE PUBLIC BIDDING WITH SAVINGS GENERATED
I. EQUIPMENTS AND VEHICLES (All Budget derived from savings)
CONTRACT UNITS /
PROJECTS ABC
AMOUNT OF CONTRACT
CONTRACTOR / SUPPLIER
DATE OF CONTRACT
SIGNING
VARIANCE / SAVINGS
1) 1st Tranche 23 P47,700,000.00 P43,868,000.00 P3,832,000.00
a. Lot I - Supply and Delivery of Heavy Equipments
8 P38,100,000.00 P34,290,000.00 Tiger Motor Sales, Cebu City
Oct. 11, 2012
P3,810,000.00
b. Lot II - Supply and Delivery of Motor Vehicles
6 P6,500,000.00 P6,500,000.00 Toyota & Ford, Davao City
c. Lot III - Supply and Delivery of Survey Instruments
9 P3,100,000.00 P3,078,000.00 N.R. Estaquio, Davao City
Dec. 21, 2012
P22,000.00
2) 2nd Tranche 13 P23,094,000.00 P22,307,000.00 P786,577.00
a. Lot I - Supply and Delivery of Heavy Equipments
5
P9,594,000.00
P8,809,343.00
United Asia Automotive Group, Inc. (UAAGI)
Mar. 26, 2013 P784,657.00
b. Lot II - Supply and Delivery of Motor Vehicles
8 P13,500,000.00 P13,498,080.00 United Asia Automotive Group, Inc. (UAAGI)
Mar. 26, 2013 P1,920.00
3) 3rd Tranche 11 P27,419,000.00 P26,918,500.00 P500,500.00
a. Lot I - Supply and Delivery of Various Types of Heavy Equipment
9 P24,715,000.00 P24,215,000.00 D'Limitless Vehicles Oct. 4, 2013 P500,000.00
b. Lot II - Supply and Delivery of Motor Vehicles
2 P2,704,000.00 P2,703,500.00 MTL Gensan Motors, Inc.
Nov. 19, 2013 P500.00
4) 4th Tranche 11 P54,236,000.00 (Request for reallignment of MOOE Savings to Equipment Outlay, currently under process by the Department of Budget and Management)
SUB TOTAL 58 P152,449,000.00 P93,093,923.00 P5,119,077.00
CONTRACT UNITS / PROJECTS
ABC AMOUNT OF CONTRACT
CONTRACTOR / SUPPLIER
DATE OF CONTRACT
SIGNING
VARIANCE / SAVINGS
1. Contract Package 1: 2 P23,317,970.27 P23,262,482.37 FIAT Const. Jan. 10, 2013 P55,487.90
a) Construction of Ganassi-Tubod Road, Madamba Section, Lanao del Sur II
b) Construction of Masiu Ganassi Road, Bayang section, Lanao del Sur
2. Contract Package 2: 2 P33,465,014.23 P33,299,355.81 MUST Ent. & Const. Feb. 12, 2013 P165,658.42
a) Reblocking along Cotabato - Lanao / Davao Road (Macaguiling to Dalumangcob Section) with exeptions, Sultan Kudarat, Maguindanao
b) Reblocking along Marbel –Ala Valley Road (Bitu to Dulungan Section), Datu Ondin Sinsuat, Maguindanao
3. Contract Package 3: 1 P11,154,984.93 P9,467.593.98 BAMEC Developer March 14, 2013 P1,687,391.92
a) Concrete Pavement Widening of Marbel - Ala - Cotabato Road (Poblacion Shariff Aguak Section), Maguindanao
4. Contract Package 4A: DESIGN AND BUILD 1 P22,310,000.00 P22,309,999.98 Basilan C & J Const. March 14, 2013 P0.02
a) Road Upgrading (Gravel to Paved) Concrete Pavement, Lamitan - Tuburan Road, Km. 26+690 to Km. 37+690, (Net Length = 1.00 Km.)
5. Contract Package 4B: DESIGN AND BUILD 1 P56,671,000.00 P54,970,870.00 BSP & Co./ March 14, 2013 P1,700,130.00
a) Road Concreting of Sumisip Junction to Proposed Buli - Buli Port, (Length=3.063 km.)
M. Abubakar Const.
II. CIVIL WORKS
4. ENSURED CLEAN AND HONEST COMPETITIVE PUBLIC BIDDING WITH SAVINGS GENERATED
CONTRACT UNITS / PROJECTS
ABC AMOUNT OF CONTRACT
CONTRACTOR / SUPPLIER
DATE OF CONTRACT
SIGNING
VARIANCE / SAVINGS
6. Contract Package 4C: DESIGN AND BUILT 3 P91,181,000.00 P91,160,211.60 ESR Const. & Supply March 14, 2013 P20,788.40
a) Construction of Bacung Bridge, Sumisip, Basilan, Km. 67+986
b) Construction of Limbo Candiis Bridge, Sumisip, Basilan, Km. 76+950
c) Construction of Giong Bridge, Sumisip, Basilan, Km. 70+950
7. Repair of National Road along 1 P15,531,432.27 P15,378,752.00 BAMEC Developer July 10, 2013 P152,680.37
a) Lanao Road (Parang - Malabang Section), Brgy. Bayanga, Matanog, Maguindanao
8. Contract Package 4G: DESIGN AND BUILT 2 P63,050,000.00 P63,021,744.18 Roge Basilan C&J JV Nov. 19, 2013 P28,255.82
a) Construction of Road from Lamitan Proper - Brgy.Kulay Bato - Brgy.Bulanting - Brggy.Bato-Bato - Brgy. Semmut Phase I, Akbar, Basilan (1.250 Km.)
b) Construction of 2.5 Km. Sironggon – Buton Road, Muhammad Ajul, Basilan
9. Contract Package 1: 2 P38,703,000.00 P38,590,894.30 FFJJ Const. Nov. 25, 2013 P112,015.70
a) Concrete Reblocking along Marbel-Ala-Cotabato Road (Margues-Bitu-Dulangan Sections), KM.1836+000 to Km.1841+000 w/ exceptions, Datu Odin Sinsuat, Maguindanao
b) Concrete Reblocking along Cotabato-Lanao/Davao Road (Sultan Kudarat, Maguindanao Section ) w/ exception Sultan Kudarat, Maguindanao
II. CIVIL WORKS
4. ENSURED CLEAN AND HONEST COMPETITIVE PUBLIC BIDDING WITH SAVINGS GENERATED
CONTRACT UNITS / PROJECTS
ABC AMOUNT OF CONTRACT
CONTRACTOR / SUPPLIER
DATE OF CONTRACT
SIGNING
VARIANCE / SAVINGS
10. Contract Package 2: 1 P62,105,220.00 P62,036,982.70 FFJJ Construction Nov. 25, 2013 P68,236.30
a) Construction/Concreting of Paglas - Columbio Provincial Road, Sta. 0+000 to Sta. 4+322, Paglas - Columbio Provincial Road, Maguindanao
11. Contract Package 3: 1 P58,200,000.00 P57,961,110.30 FFJJ Construction Nov. 25, 2013 P238,889.70
a) Construction/Concreting of Maslabeng Provincial Road, Sta. 0+000 to Sta. 3+740, Buluan, Maguindanao
12. Contract Package 4D: DESIGN AND BUILD 2 P87,300,000.00 P87,279,966.64 ESR Const. & Supply Nov. 25, 2013 P20,033.36
a) Construction of Road from Bato - Bato Port Al-barka - Kaili Ginanta - Magkawa (Phase I), Al-barka, Basilan (4.0 Km. Concreting and 6.0 Km. Road Opening), Basilan
b) Construction of Bato-Bato Port, Al-Barka, Basilan
13. Contract Package 4E: DESIGN AND BUILD 2 P53,482,000.00 P53,399,838.47 ASAP Gen. Trading Nov. 25, 2013 P82,161.53
a) Construction of Water System, Level III, Sumisip, Basilan
b) Concreting of 1 Km. Circumferential Road from Bitayan – Basak , Phase II, Sumusip, Basilan
Construction and Maintenance
14. Contract Package 4F: DESIGN AND BUILD 2 P9,700,000.00 P9,669,394.44 RAIN Construction Nov. 25, 2013 P30,605.56
a) Construction of Tinusa Port, Sumisip, Basilan
b) Construction of Sullo Port, Tabuan Lasa, Basilan
and APPLE Const Joint Venture
II. CIVIL WORKS
4. ENSURED CLEAN AND HONEST COMPETITIVE PUBLIC BIDDING WITH SAVINGS GENERATED
CONTRACT UNITS / PROJECTS
ABC AMOUNT OF CONTRACT
CONTRACTOR / SUPPLIER
DATE OF CONTRACT
SIGNING
VARIANCE / SAVINGS
15. Contract Package 4I: DESIGN AND BUILD 3 P14,550,000.00 P14,536,460.97 RAIN Construction Nov. 25, 2013 P13,539.03
a) Construction of Steel Bridge Sub-structure, Buli-Buli - Tekos Coastal Road, Sumisip, Basilan
b) Construction of Steel Bridge Sub-structure, Basak – Babag Bato Coastal Road, Sumisip, Basilan
c) Construction of Steel Bridge Sub-structure, Brgy. Road, Sumisip, Basilan
and APPLE Const Joint Venture
16. Contract Package 4J: DESIGN AND BUILD 2 P38,800,000.00 P38,732,950.26 ASAP Gen. Trading Nov. 25, 2013 P67,194.74
a) Concreting of 1.20 Km. Circumferential Road from Bitayan - Basak, Sumisip, Basilan
b) Construction of Buli – Buli Port, Sumisip, Basilan
Construction and Maintenance
SUB TOTAL 28 P679,521,621.80 P675,078,698.03 P4,442,923.77
CONTRACT UNITS / PROJECTS
ABC AMOUNT OF CONTRACT
CONTRACTOR / SUPPLIER
DATE OF CONTRACT
SIGNING
VARIANCE / SAVINGS
1. Contract Package 5A: 4 P13,500,000.00 P13,498,080.00 Woodfields March 26, 2013 P1,920.00
Consultancy Services for the Conduct of Feasibility Studies and Detailed Eng'g Designs of High Impact Infrastructure Projects
a) Sumisip Water System Project and Drainage Improvement
b) Rehabilitation and Expansion of Jolo Water Supply Project under Public Private Partnership Program
Consultants Inc.
II. CIVIL WORKS
III. CONSULTANCY
4. ENSURED CLEAN AND HONEST COMPETITIVE PUBLIC BIDDING WITH SAVINGS GENERATED
CONTRACT UNITS / PROJECTS
ABC AMOUNT OF CONTRACT
CONTRACTOR / SUPPLIER
DATE OF CONTRACT
SIGNING
VARIANCE / SAVINGS
1. Contract Package 5A: (Cont.) c) Jolo National Road and Drainage
Improvement Project
d) Development of Lamitan-Sumisip Trancentral Road
2. Consulting Services for the Development of Expanded ARMM Roads Mapping and Management System (e-ARMM)
1 P2,500,000.00 P2,498,000.00 Woodfields Consultants Inc.
Oct. 4, 2013 P2,000.00
3. For Bidding Process Conducting Feasibility Study Inclusive of Detailed Design and Program of Works
a) Expansion of Lamitan City Water System, Basilan
b) Sagay-Sagay Water System serving the Municipality of Talipao, Panamao, Omar, Panglima Estin and Kalingalan Caluang, all of Sulu Province
c) Expansion of Datu Odin Sinsuat Water System serving Mun. of DOS, Kabuntalan and nearby Municipality, all of Maguindanao
d) Urban Planning of Buli-Buli, Sumisip, Basilan
4 P9,700,000.00
SUB TOTAL 9 P25,700,000.00 P15,996,080.00 P3,920.00
GRAND TOTAL P857,670,621.80 P784,168,701.03 P9,565,920.77
CONSULTANCY
4. ENSURED CLEAN AND HONEST COMPETITIVE PUBLIC BIDDING WITH SAVINGS GENERATED
(Bidding in progress)
5. ACQUIRED EQUIPMENT AND VEHICLES WITH FUNDING FROM SAVINGS.
PROCURED 22 UNITS HEAVY EQUIPMENT, 16 UNITS MONITORING VEHICLES AND 9 UNITS SURVEY INSTRUMENTS. ABOUT 11 MORE NEW HEAVY EQUIPMENT BEING PIPELINED FOR PROCUREMENT IN JANUARY 2014.
TOTAL COST IS P150 MILLION.
6. DEVELOPED POLICY & INSTITUTIONAL REFORMS AND CAPACITY BUILDING/ENHANCEMENT
ADOPTED DPWH-ARMM REFORM AGENDA 2012 AND BEYOND
CONSTRUCTION OF NEW BUILDING FOR NEWLY DEVOLVED BASILAN DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF NEW BUILDING FOR LANAO DEL SUR 2ND DISTRICT ENGINEERING OFFICE
NEW LANAO SUR 2ND DEO
NEW BASILAN SATELLITE DEO
LAUNCHING OF DPWH-ARMM REFORM AGENDA 2012 AND BEYOND
6. DEVELOPED POLICY & INSTITUTIONAL REFORMS AND CAPACITY BUILDING/ENHANCEMENT
CONSTRUCTION OF MANAGEMENT INFORMATION
SYSTEM BUILDING AND DPWH-ARMM STAFF HOUSE.
RENOVATION/EXPANSION OF DPWH-ARMM BUILDINGS, DEOs AND AEOs.
MAIN BUILDING OPERATIONS BUILDING
STAFF HOUSE
MIS BUILDING
6. DEVELOPED POLICY & INSTITUTIONAL REFORMS AND CAPACITY BUILDING/ENHANCEMENT
CREATION OF NEW PLANTILLA FOR BASILAN DISTRICT ENGINEERING OFFICE, MAGUINDANAO 1ST DISTRICT ENGINEERING OFFICE AND LANAO DEL SUR 2ND DISTRICT ENGINEERING OFFICE.
CONDUCTED TRAININGS ON PROCUREMENT,
CONTRACT MANAGEMENT, MATERIALS QUALITY CONTROL, RoCon SURVEY, VALUES FORMATION AND INTEGRITY DEVELOPMENT. ALSO PIPELINED IN 2014 ARE DISTRICT ENGINEERS TRAINING COURSE, PROJECT ENGINEERS TRAINING COURSE, TRAINING ON PROJECT CONSTRUCTION MANAGEMENT AND FLOOD CONTROL MITIGATION.
III. THE REPORT
3.1 DETAILED TECHNICAL REPORT
DISTRICT ENGINEERING OFFICE
APPROPRIATION IN MILLION PESOS
(1)
% OF ACTUAL ACCOMPLISHMENT
BY DEO
(2)
EQUIVALENT WEIGHTED % BY DEO
PROGRAM (3)
ACCOMPLISHMENT (4)=(2X3)/100
1. BASILAN DEO* 345.471 26.50 35.11 9.39
2. SULU 1ST DEO 123.810 90.47 12.58 11.38
3. SULU 2ND DEO 84.00 63.39 8.54 5.41
4. TAWI-TAWI DEO 155.995 71.09 15.85 11.27
5. MAGUINDANAO 1ST DEO 70.500 77.90 7.18 5.59
6. MAGUINDANAO 2ND DEO 67.550 73.18 6.69 4.89
7. LANAO DEL SUR 1ST DEO 75.634 86.50 7.69 6.63
8. LANAO DEL SUR 2ND DEO 62.040 59.62 6.37 3.79
TOTAL 985.00 100.00 58.34
SUMMARY STATUS OF 2012 REGULAR INFRA
As of December 16, 2013
BASILAN DEO
SULU-I DEO SULU-II DEO
TAWI-TAWI DEO
MAG. I DEO
MAG. II DEO
LANAO-I DEO LANAO-II DEO
*NEWLY DEVOLVED DEO TO ARMM/DPWH-ARMM
P345.471M (35.11%)
P62.040M (6.37%)
P75.634M (7.69%)
P67.55M (6.69%)
P70.50M (7.18%)
P155.995M (15.85%)
P84M (8.54%)
P123.81M (12.58%)
CAPITAL OUTLAY: P1 Billion (less P15 M PDES)
SUMMARY MODE OF 2012 IMPLEMENTATION
As of December 16, 2013
MODE OF IMPLEMENTATION
NO. OF PROJ.
(1)
APPROPRIATION BY MODE
IN MILLION PESOS
(2)
PHYSICAL % ACCOM. /MODE
(3)
EQUIVALENT WEIGHTED % OF ACCOM./MODE
(4)
TOTAL WEIGHTED % OF
ACCOM./MODE (5)=(3X4)/100
By Administration 28 430.86 71.25 43.74 31.17
By MOA 16 270.43 65.31 27.455 17.93
By Contract 12 283.71 32.08 28.80 9.24
TOTAL 56 985.00 100.00 58.34
MODE OF IMPLEMENTATION
ADMIN MOA CONTRACT
APPROPRIATION BY MODE
P430.86 M (43.74%)
P283.71 M (28.80%) P270.43 M
(27.455%)
16 PROJ. 12 PROJ. 28 PROJ.
CAPITAL OUTLAY: P1 Billion (less P15 M PDES)
SUMMARY STATUS OF 2013 REGULAR INFRA
As of December 16, 2013
BASILAN DEO
SULU-I DEO
SULU-II DEO
TAWI-TAWI DEO
MAG. I DEO
MAG. II DEO
LANAO-I DEO LANAO-II DEO
DISTRICT ENGINEERING OFFICE
APPROPRIATION IN MILLION PESOS
(1)
% OF ACTUAL ACCOMPLISHMENT
BY DEO
(2)
EQUIVALENT WEIGHTED % BY DEO
PROGRAM (3)
ACCOMPLISHMENT (4)=(2X3)/100
1. BASILAN DEO* 398.637 3.75 26.57 1.00
2. SULU 1ST DEO 364.118 20.65 24.27 5.01
3. SULU 2ND DEO 88.00 15.95 5.87 0.94
4. TAWI-TAWI DEO 169.00 62.25 11.27 7.01
5. MAGUINDANAO 1ST DEO 99.90 16.22 6.66 1.08
6. MAGUINDANAO 2ND DEO 191.526 27.78 12.77 3.55
7. LANAO DEL SUR 1ST DEO 115.00 54.11 7.67 4.15
8. LANAO DEL SUR 2ND DEO 74.00 50.40 4.93 2.48
TOTAL 1,500.181 100.00 25.22
*NEWLY DEVOLVED DEO TO ARMM/DPWH-ARMM
P74 M (4.93%)
P115 M (7.67%)
P191.526M (12.77%)
P99.9M (6.66%)
P169M (11.27%)
P88M (5.87%)
P364.118M (24.27%)
P398.637M (26.57%)
CAPITAL OUTLAY: P1,510.181 Million (less P10 M PDES)
MODE OF IMPLEMENTATION
NO. OF PROJ.
(1)
APPROPRIATION BY MODE
IN MILLION PESOS
(2)
PHYSICAL % ACCOM. /MODE
(3)
EQUIVALENT WEIGHTED % OF ACCOM./MODE
(4)
TOTAL WEIGHTED % OF
ACCOM./MODE (5)=(3X4)/100
By Administration 56 830.32 28.45 54.68 15.56
By MOA 35 280.80 51.62 18.718 9.66
By Contract 15 399.06 0 26.60 0
TOTAL 106 1,500.181 100.00 25.22
SUMMARY MODE OF 2013 IMPLEMENTATION
As of December 16, 2013
MODE OF IMPLEMENTATION
ADMIN MOA CONTRACT
APPROPRIATION BY MODE
P830.32M (54.68%)
P399.06 M (26.60%)
P280.80 M (18.718%)
35 PROJ. 15 PROJ. 56 PROJ.
CAPITAL OUTLAY: P1,510.181 Million (less P10 M PDES)
SUMMARY STATUS OF 2014 REGULAR INFRA/OPAPP
As of December 16, 2013
BASILAN DEO
SULU-I DEO
SULU-II DEO
TAWI-TAWI DEO
MAG. I DEO
MAG. II DEO LANAO-I DEO
LANAO-II DEO
DISTRICT ENGINEERING OFFICE
APPROPRIATION IN MILLION PESOS
% OF ACTUAL ACCOMPLISHMENT
BY DEO
(2)
EQUIVALENT WEIGHTED % BY DEO
REGULAR OPAPP TOTAL
(1) PROGRAM
(3) ACCOMPLISHMENT
(4)=(2X3)/100
1. BASILAN DEO* 902.80 655.00 1,557.80 31.10 2. SULU 1ST DEO 606.60 502.60 1,109.20 22.15 3. SULU 2ND DEO 189.20 50.00 239.20 4.78 4. TAWI-TAWI DEO 347.60 121.40 469.00 9.36 5. MAGUINDANAO 1ST DEO 364.80 260.83 625.63 12.49 6. MAGUINDANAO 2ND DEO 174.80 270.00 444.80 8.89 7. LANAO DEL SUR 1ST DEO 251.80 63.00 314.80 6.28 8. LANAO DEL SUR 2ND DEO 118.40 129.57 247.97 4.95 TOTAL 2,956.000 2,052.40 5,008.40 100.00 *NEWLY DEVOLVED DEO TO ARMM/DPWH-ARMM
P247.97M (4.95%)
P314.80 M (6.28%)
P444.80M (8.89%)
P625.63M (12.49%)
P469.00M (9.36%)
P239.20M (4.78%)
P1,109.20M (22.15%)
P1,557.80 M (31.10%)
CAPITAL OUTLAY: 5.0234 Billion (less P15 M PDES)
MODE OF IMPLEMENTATION
NO. OF PROJ.
(1)
APPROPRIATION BY MODE
IN MILLION PESOS
(2)
PHYSICAL % ACCOM. /MODE
(3)
EQUIVALENT WEIGHTED % OF ACCOM./MODE
(4)
TOTAL WEIGHTED % OF
ACCOM./MODE (5)=(3X4)/100
By Administration 167 3,505.88 70
By MOA 24 500.84 10
By Contract 48 1,001.68 20
TOTAL 239 5,008.40 100.00
SUMMARY MODE OF 2014 IMPLEMENTATION
As of December 16, 2013
MODE OF IMPLEMENTATION
ADMIN MOA CONTRACT
APPROPRIATION BY MODE
P3,505.88M (70%)
P1,001.68 M (20%)
P500.84 M (10%)
24 PROJ. 48 PROJ. 167 PROJ.
CAPITAL OUTLAY: 5.0234 Billion (less P15 M PDES)
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE IN MILLION PESOS
EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 1 32.00 9.26 22.68 2.10
By MOA 4 99.80 28.888 53.08 15.33
By Contract 7 213.671 61.85 14.65 9.062
TOTAL 12 345.471 100.00 26.50
2012 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
BASILAN DISTRICT ENGINEERING OFFICE
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE IN MILLION PESOS
EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 8 132.50 33.24 11.28 3.75 By MOA 1 31.00 7.776 0 0 By Contract 11 235.137 58.99 0 0 TOTAL 20 398.637 100.00 3.75
2013 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
BASILAN DISTRICT ENGINEERING OFFICE
Lamitan Port
Basilan National
Park Asphalting Work by
AFP
Concreting of Lamitan-Tuburan Road Sta. 36+690 – Sta 37+690 Length : 1.00 Km. Project Cost : P 23.00 M
TABUAN LASA
HJI. MUHTAMAD
Concreting of Al-Barka Road Sta. 36+690 – Sta 37+690 Length : 1.88 Km. Project Cost : P 34.80 M
Construction of Bacung Bridge Sumisip Sta. 67+986 Length : 34.60 l.m.
Project Cost : P 29.00 M
Construction of Limbo-Candiis Bridge Sta. 76+950 Length : 39.62 l.m.
Project Cost : P 34.00 M
Construction of Giong Bridge Sumisip Sta. 70+953 Length : 34.60 l.m.
Project Cost : P 31.00 M
Construction of Buli-Buli Port Project Cost : P 20.00 M
Expansion of Lamitan Port Project Cost : P 40.00 M
Concreting of Road from Sumisip Junction Natl Road to
Buli-Buli Port Length : 3.063 km
Project Cost : P 56.671 M
Concreting of Isabela-Lantawan Rd Length : 1.081 km
Project Cost : P 20.00 M
Concreting of Limook-Balobo-Bulingan-Look Road Length : 0.270 km Project Cost : P 5.00 M
Concreting of Bitayan-Basak Circumferential Rd Length : 1.20 km
Project Cost : P 20.00 M
Construction of Km 18-Lantawan Proper-Baungis-Tairan-Pangasaan, Lantawan
Length : 2.00 km Project Cost : P32.00 M
LOCATION MAP CY-2012 REGULAR INFRA
BASILAN DISTRICT ENGINEERING OFFICE
LOCATION MAP CY-2013 REGULAR INFRA
BASILAN DISTRICT ENGINEERING OFFICE
Lamitan Port
Basilan National
Park Asphalting Work by
AFP
Concreting of Lamitan-Tuburan Road Sta 37+690 – Sta 43+780 w/exceptions Length : 5.543Km. Project Cost : P 127.50 M
TABUAN LASA
HJI. MUHTAMAD
Concreting of Al-Barka Road Length : 3.00 Km. Project Cost : P 30.00 M
Construction of Brgy Matikang-Atong-Atong Road, Lantawan Length : 1.00 km Project Cost : P 10.00 M
Concreting of Tipo-Tipo –Bato-Bato Road, Al Barka Length : 1.00 km Project Cost : P 10.00 M
Construction of Water System, Level III Sumisip Project Cost : P 40.00 M
Concreting of Bohi-Ibu-Cabobo-Bohe-Bessey Road, Lamitan Length : 1.000 km Project Cost : P 10.00 M
Concreting of Lamitan City-Balas Road Length : 1.00 km Project Cost : P 18.50 M
Construction of Road from Lamitan Proper-Brgy. Kulay Bato-Brgy. Buianting-Brgy. Bato
Bato-Brgy. Semmul Phase 1 Akbar Length : 1.250 Km.
Project Cost : P20.00 M
Construction of Manaul Box Culvert Sumisip
Project Cost : P 4.00 M
Concreting of Circumferential Road from Bitayan-Basak Phase II Sumisip
Length : 1.00 Km. Project Cost : 15.137 M
Construction of Prov’l Road, Sayugan Lamitan-Bulanting Lamitan City
Length : 2.00 Km. Project Cost : P31.00 M
Concreting of Magkawa-Ginanta Albarka
Length : 1.00 Km. Project Cost : P10.00 M
Construction of Bato-Bato Port Albarka
Project Cost : P10.00 M
Construction of Road from Bato-Bato Port Albarka-Kaili-Ginanta-Magkawa
Albarka Phase 1 Length : 10.00 Km.
Project Cost : P80.00 M
Construction of Tinusa Port Sumisip
Project Cost : P5.00 M
Construction of Sullo Port Tubuan Lasa
Project Cost : P5.00 M
Construction of Sirongon-Buton Prov’l Road
Muhammad Ajul Length : 20.250
Km. Project Cost :
P45.00 M Construction of 3 units Modular Steel Bridge Sub-Structure Bulibuli-Tekos
Coastal Road, Basak Babag Bato Coastal Road and Limbo Candiis-
Manggal Sumisip Project Cost : P15.00 M/P5.00 M each
Concreting of Bulibuli-Lower Manaul Tikes Brgy. Road Sumisip
Length : 3.50 Km. Project Cost : P35.00 M
Concreting of Basak-Babagbato Brgy. Road Sumisip Length : 1.50 Km.
Project Cost : P15.00 M
LOCATION MAP CY-2014 REGULAR INFRA
BASILAN DISTRICT ENGINEERING OFFICE
Concreting of .345 km ARMM Learning Center Road, Inner Lagasan, Lamitan City
Concrete Road Widening of 4.982 km unpaved shoulder, Isabela – Lamitan Road
Construction of 3.5 km road from Kulay Bato, Lamitan – Bulanting-U. Batobato, Akbar
Concreting of 4.5 km Natl Road –Marang-Tong Sengal , Tikes Road, Sumisip
Construction /Expansion of Lamitan Water District, Lamitan City
Construction/Expansion of Sumisip Seaport
Concreting of 3.0 km Parangbasak-Bohe baka-Bohe Lebbeng Road, Tipo-Tipo
Construction of 2.9 km Bohe Bohe Mambung-Kalut Road, Tuburan
Concreting of 5 km Mohammad Adjul –Akbar Road
Construction of 3.53 km Road from Magkawa to Kaili, Al barka
Construction of 1 km Road from Natl Highway-Tungbato, Unkaya Pukan
Concreting of Maluso Port to Maluso Fish Port
Concreting of 3.125 km lantawan Proper Baungis-Tairan-Pangasaan, Lantawan
Construction/Expansion of Maluso Water District
Concreting of Limook-Balobo-Bulingan Road, Lamitan City , Phase I and II
Construction of Drainage Structure, Bulibuli, Sumisip
Construction of Single Barrel Box Culvert, Basak, Sumisip
Construction of1.0 km Road from Natl Highway-Tumahubong, Sumisip
Construction of Seaport, Brgyu. Bana, Tipo-Tipo
Construction of Water Supply Project for Ungkaya Pukan-Tipo-Tipo
Municipalities
Concreting of of 2.88km Lantawan Proper baungis-Tairan-
Pangasaan Provl Road
Construction of Seawall along Atong Atong-Matikang Road, Lantawan
Construction of Road from basak-Sahaya-Bohe Bato, Sumisip
Concreting of of Parang-Basak Lamita0Bohelebbeng Road
Concreting of of Badja-Bohelebbeng-Banah Road
Concreting of of Natl Higway-Lower Cabengbeng Road
Concreting of of Lagayas-Pipil Road
Concreting of Natl Highway-Bohesuyak-Tongbato-Amaluy Road
TOTAL COST P902.80 M
BASILAN PROVINCE
Name of Project : Concreting of Brgy. Matikang-Atong Atong Road, Lantawan
Mode of Implementation : By Administration
Implementing Agency : Basilan District Engineering Office
Project Cost : Php 10,000,000.00
Length : 1.00 Km
Physical Accomplishment : 25.377% as of Nov. 28, 2013
BASILAN PROVINCE
Name of Project : Construction of 2.00 km Provincial Road from Basilan Circumferential Road Km 18 – Lantawan Proper-Baungis-Tairan-Pangasaan, Lantawan
Mode of Implementation : By Administration
Implementing Agency : Basilan District Engineering Office
Project Cost : Php 32,000,000.00
Length : 2.00 Km
Physical Accomplishment : 22.68% as of Nov. 28, 2013
BASILAN PROVINCE
Name of Project : Construction of Manaul Box Culvert, Sumisip
Mode of Implementation : By Administration
Implementing Agency : Basilan District Engineering Office
Project Cost : Php 4,000,000.00
Length : 1-Unit
Physical Accomplishment : 28.853% as of Nov. 28, 2013
BASILAN PROVINCE
Name of Project : Concreting of Lamitan City-Balas Road, Lamitan City
Mode of Implementation : By Administration
Implementing Agency : Basilan District Engineering Office
Project Cost : Php 18,500,000.00
Length : 1.00 Km
Physical Accomplishment : 33.56% as of Nov. 28, 2013
BASILAN PROVINCE
Name of Project : Concreting of Bohe-Ibu-Cabobo-Bohe-Bessey Road, Lamitan
Mode of Implementation : By Administration
Implementing Agency : Basilan District Engineering Office
Project Cost : Php 10,000,000.00
Length : 1.00 Km
Physical Accomplishment : 35.30% as of Nov. 28, 2013
BASILAN PROVINCE
Name of Project : Concreting of Road from Sumisip Junction National Road to Buli Buli Port, Sumisip
Mode of Implementation : By Contract
Implementing Agency : Basilan District Engineering Office
Contractor : BSP & Company/MACE Inc. (Joint Venture)
Project Cost : Php 56,671, 000.00
Length : 3.063 Km
Physical Accomplishment : 13.60% as of Nov. 28, 2013
BASILAN PROVINCE
Name of Project : Improvement/Concrete Paving of Isabela- Lantawan Road, Balatanay-Manggas Section, Lantawan Municipality, Basilan
Mode of Implementation : By MOA
Implementing Agency : Provincial Government of Basilan
Project Cost : Php 20.000, 000.00
Length : 1.081 Km
Physical Accomplishment : 78.19% as of Nov. 28, 2013
BASILAN PROVINCE
Name of Project : Concreting of Al-barka Road (Tipo-Tipo Proper- Limbo Kassah-Magkawa-Kuhon Lenno) Tipo- Tipo Municipality, Basilan
Mode of Implementation : By MOA
Implementing Agency : L.G.U. of Tipo-Tipo Municipality
Project Cost : Php 34,800, 000.00
Length : 1.880 Km
Physical Accomplishment : 54.72% as of Nov. 28, 2013
BASILAN PROVINCE
Name of Project : Road Upgrading (Gravel to Concrete Pavement) Lamitan-Tuburan Road, (Km 36+690—Km 37+690)
Mode of Implementation : By Contract
Implementing Agency : Basilan District Engineering Office
Contractor : Basilan C&J Construction
Project Cost : Php 34,800, 000.00
Length : 1.880 Km
Physical Accomplishment : 41.55% as of Nov. 28, 2013
BASILAN PROVINCE
Name of Project : Concreting of Limook-Balobo-Bulingan- Look Road, Lamitan City
Mode of Implementation : By MOA
Implementing Agency : L.G.U. of Lamitan City
Project Cost : Php 5,000, 000.00
Length : 0.270 Km
Physical Accomplishment : 45.99% as of Nov. 28, 2013
BASILAN PROVINCE
Name of Project : Expansion of Lamitan Port Lamitan City
Mode of Implementation : By MOA
Implementing Agency : City Government of Lamitan
Project Cost : Php 39,600,000.00
Length : 1-Unit
Physical Accomplishment : 39.99% as of Nov. 28, 2013
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE IN MILLION PESOS
EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 7 88.81 71.73 100.00 71.73
By MOA 2 35.00 28.269 66.29 18.74
By Contract 0 0 0 0 0
TOTAL 9 123.81 100.00 90.47
2012 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
SULU 1ST DISTRICT ENGINEERING OFFICE
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE IN MILLION PESOS
EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 10 306.32 84.13 12.29 10.34 By MOA 5 57.80 15.874 64.95 10.31 By Contract 0 0 0 0 0 TOTAL 15 364.118 100.00 20.65
2013 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
SULU 1ST DISTRICT ENGINEERING OFFICE
42
Road Upgrading of Jolo-Indanan-Parang-Silangkan Road
Sta. 28+970– Sta 30+540 Length : 1.75 Km.
Project Cost : P 40.21 M
Road Upgrading of Jolo Port-Bud Daho-Romandier Road
Sta. 9+000– Sta 17+200 w/ exceptions Length : 2.0304 Km.
Project Cost : P 46.70 M
Const of Deep Well Brgy. Lupah Abo, Parang Project Cost : P 0.400 M Const of Deep Well
Brgy. Samak, Talipao Project Cost : P 0.400 M
Const of Spring Development
Brgy. Tagbak, Indanan Project Cost : P 0.300 M
Const of Deep Well Brgy. Pangdanaon, Patikul Project Cost : P 0.400 M
Const of Deep Well Brgy. D. Jambangan, Maimbung
Project Cost : P 0.400 M
Construction of Tuyang Seaport Talipao, Municipality
Project Cost : 15.00 M
Construction of Prov. Road, Brgy. Laum Maimbung-Brgy.
Kulasi-Parang Rd Phase 1 Length : 1.2 km
Project Cost : 20.00 M
LOCATION MAP CY-2012 REGULAR INFRA
SULU 1ST DISTRICT ENGINEERING OFFICE
Const./Repair of Panglima Tahil Port Project Cost : P 10.00 M
Road Upgrading of Jolo-Indanan-Parang-Silangkan Road Km 26+030 – km 28+455 w/ exemptions Length : 0.870 Km. Project Cost : P 20.00 M
LOCATION MAP CY-2013 REGULAR INFRA
SULU 1ST DISTRICT ENGINEERING OFFICE
Const of Tumantangis-Jolo Level III Water System Project Cost : P 30.00 M
Repair and Dredging Works of Jolo Drainage
System Length : 0.8 Km.
Project Cost : P10.00 m Concreting of Municipal Road, Maimbung Project Cost : P 10.00 M
Road Upgrading of Jolo-Indanan-Parang-Silangkan Road Km 26+030– km 28+455 w/ exceptions Length : 1.47 Km. Project Cost : P 33.80 M
Construction of Road from brgy. Laum Maimbung Junction Brgy.
Kulasi Phase II Parang Road Length : 1.30 km.
Project Cost : p22.80 M
Construction of Mapallam-Bangalan
Bridge Indanan Length : 10 m
Project Cost : P10.00M
43
Construction of Suwa-Suwa Single Box Culvert Patikul
Project Cost : P3.80 M
Jolo-Cadre-Capitol Road Km 0+510 – km 1+740 Length = 1.23 km Project Cost : P 40.150 M
Const of Anuling Box Culvert, Patikul Project Cost : P 4.00 M
Road Upgrading of Jolo Port-Bud Daho-Romandier Road Km 0+630 – km 2+000 Length : 1.37 Km. Project Cost : P 44.70 M
Concreting of Tuyang Road, Talipao Project Cost : P 10.00 M
Concreting of Kannaway-Tumangas Road Phase 1 Parang
Length : 1.00 Km. Project Cost : P20.00 M
Road Upgrading of Jolo-Indanan-Parang-Silangkan Road Km 0+650 – km 5+514
Length : 4.864 Km. Project Cost : P 123.668 M
LOCATION MAP CY-2014 REGULAR INFRA
SULU 1ST DISTRICT ENGINEERING OFFICE
Rehabilitation/Reconstruction/Upgrading of 1.626 km Damaged
National Road – Junction Timbangan-Romandier Road
Construction of Maimbung Seaport
Concreting of 20 km Sulu Curcumferential Road
Upgrading of Parang – Maimbung Road
Construction of Sagay Sagay Water Supply System, Phase I (Talipao-Patikul-Jolo Mun.
Upgrading/Rehabilitation of Busbus Gandasuli Road, Jolo
Upgrading of 0.5 km Buntod Road, Talipao
Concreting of Jolo Pantao Road
Upgrading of Sapah Bunuan-Kabungkol Road
Rehabilitation of Pagsalipangan-Maimbung Road
Construction of Tumantangis –Lasuwag Spring Development,
Indanan
Rehab/Improvement of Tulay Open Canal, Jolo
Upgrading of Jolo-Silangkan Road
Rehabilitation of of Kasalamatan Road, Jolo
Upgrading of Pangdanon-Taong Road
Rehabilitation of Kahatian Road, Indanan
Construction /Improvement of Lagasan Dakulah Road, Parang
Rehabilitation of Barrio Militar Road, Jolo
Rehabilitation of Bunbun Road, Patikul
Concreting of Tuyang Road, Talipao
Rehabilitation of Asturias Road, Jolo
Concreting of Langtad-Kan Islam Road, Indanan
TOTAL COST P606.60 M
SULU PROVINCE
Name of Project : Road Upgrading (gravel to paved) Jolo Port-Bud Daho Romandier Road Km. 9+000—Km. 17+200 with exceptions
Mode of Implementation : By Administration
Implementing Agency : Sulu 1st DEO
Project Cost : Php 46,700,000.00
Length : 2.0304 Km
Physical Accomplishment : 100% as of Nov. 28, 2013
Name of Project : Road Upgrading (gravel to paved) Jolo-Indanan-Parang-Silangkan Road Km. 28+970—Km. 30+540
Mode of Implementation : By Administration
Implementing Agency : Sulu 1st DEO
Project Cost : Php 40,210,000.00
Length : 1.75 Km
Physical Accomplishment : 100% as of Nov. 28, 2013
SULU PROVINCE
Name of Project : Construction of Tuyang Seaport Talipao, Sulu
Mode of Implementation : By MOA
Implementing Agency : L.G.U. of Talipao Municipality
Project Cost : Php 14,850,000.00
Length : 1-Unit
Physical Accomplishment : 85% as of Nov. 28, 2013
SULU PROVINCE
Name of Project : Construction of Tuyang Road Talipao, Sulu
Mode of Implementation : By MOA
Implementing Agency : Sulu 1st DEO
Project Cost : Php 10,000,000.00
Length : 1.000 Km
Physical Accomplishment : 100% as of Nov. 28, 2013
SULU PROVINCE
Name of Project : Concreting of Kannaway-Tumangas Road Parang, Sulu
Mode of Implementation : By Administration
Implementing Agency : Sulu 1st DEO
Project Cost : Php 19,800,000.00
Length : 1.000 Km
Physical Accomplishment : 60% as of Nov. 28, 2013
SULU PROVINCE
Name of Project : Construction of Deep Well Barangay D. Jambangan, Maimbung
Mode of Implementation : By Administration
Implementing Agency : Sulu 1st DEO
Project Cost : Php 400,000.00
Length : 1-Unit
Physical Accomplishment : 100% as of Nov. 28, 2013
SULU PROVINCE
Name of Project : Construction of Deep Well Barangay Lupah Abo, Parang
Mode of Implementation : By Administration
Implementing Agency : Sulu 1st DEO
Project Cost : Php 400,000.00
Length : 1-Unit
Physical Accomplishment : 100% as of Nov. 28, 2013
SULU PROVINCE
Name of Project : Construction of Deep Well Barangay Pangdanon, Patikul
Mode of Implementation : By Administration
Implementing Agency : Sulu 1st DEO
Project Cost : Php 400,000.00
Length : 1-Unit
Physical Accomplishment : 100% as of Nov. 28, 2013
SULU PROVINCE
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE IN MILLION PESOS
EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 3 67.00 79.76 74.98 59.81
By MOA 2 17.00 20.238 17.74 3.59
By Contract 0 0 0 0 0
TOTAL 5 84.00 100.00 63.39
2012 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
SULU 2ND DISTRICT ENGINEERING OFFICE
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE IN MILLION PESOS
EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 2 68.00 77.27 18.44 14.25 By MOA 3 20.00 22.727 7.50 1.70 By Contract 0 0 0 0 0 TOTAL 5 88.00 100.00 15.95
2013 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
SULU 2ND DISTRICT ENGINEERING OFFICE
54
Concreting (Rehab) of Romandier-Camp Andres Tandu Bato Road
Sta. 26+000– Sta 55+000 w/ exceptions Length : 1.550 Km.
Project Cost : P 35.65 M
Concreting of Seit Tayungan-Camp Andres Road
Sta. 36+000– Sta 45+000 w/ exceptions Length : 0.580 Km.
Project Cost : P 13.35 M
Construction of Sapah Malaum Bridge along Seit Tayungan-Camp
Andres National Road Sta. 39+150 – Sta 39+170
Length : 20 m Project Cost : 18.00 M
Improvement of Siasi Port and access Road Project Cost : 10.00 M
Rehabilitation of Subasuba Port and
Access Road Project Cost : 7.00 M
LOCATION MAP CY-2012 REGULAR INFRA
SULU 2ND DISTRICT ENGINEERING OFFICE
LOCATION MAP CY-2013 REGULAR INFRA
SULU 2ND DISTRICT ENGINEERING OFFICE
55
Concreting of Seit Tayungan-Camp Andres Road Sta. 36+000– Sta 45+000 w/ exceptions Length : 2.522 Km. Project Cost : P 58.00 M
Concreting of Brgy. Andalan-Saimbangon Road, Pata Length = 0.650 Project Cost : P 6.50 M
Concreting of Brgy. Kipot-Saimbangon Road, Pata Length = 0.350 Project Cost : P 3.50 M
Concreting of Duhul-Duhul Road, Siasi Length = 1.00 Project Cost : P 10.00 M
Concreting of Minapan Road, Siasi Length = 1.00 Project Cost : P 10.00 M
Rehabilitation of/Upgrading of 1 km Siet Tayungan-Camp Andres Road
Upgrading of 0.75 km Camp Andres – Sucuban Road, Luuk
Construction of Water Supply project level II System Phase I
Expansion of Sagay Sagay Water Supply System Phase II
Construction of Pata Seaport
Construction of Tapul Seaport
Construction of Lugus Seaport
Construction of Omar Seaport
Concreting of Siasi Tausan Road
Construction of Lahing Lahing Camp Andres Provincial Road
Construction of Pang karungdong-Kalingalan Caluang Road
Construction of Water Supply Project, Bangingi
Construction of Water Supply Project, Tapul
Construction of Water Supply Project, Lugus
Construction of Water Supply Project, Siasi
Construction of Water Supply Project, Pata
Construction of Water Supply Project, Pandami
Construction of Panamao Seaport
LOCATION MAP CY-2014 REGULAR INFRA
SULU 2ND DISTRICT ENGINEERING OFFICE
TOTAL COST P189.20 M
Name of Project : Concreting of Seit-Tayungan-Camp Andres Road
Mode of Implementation : By Administration
Implementing Agency : Sulu 2nd DEO
Project Cost : Php 13,216,500.00
Length : 0.580 Km
Physical Accomplishment : 92.66% as of Nov. 28, 2013
SULU PROVINCE
Name of Project : Concreting of Romandier Camp Andres- Tandu Bato Road
Mode of Implementation : By Administration
Implementing Agency : Sulu 2nd DEO
Project Cost : Php 35,293,500.00
Length : 1.55 Km
Physical Accomplishment : 100% as of Nov. 28, 2013
SULU PROVINCE
Name of Project : Concreting of Duhol-Duhol Road Siasi, Sulu
Mode of Implementation : By Administration
Implementing Agency : Sulu 2nd DEO
Project Cost : Php 9,900,000.00
Length : 1.000 Km
Physical Accomplishment : 30.15% as of Nov. 28, 2013
SULU PROVINCE
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE IN MILLION PESOS
EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 6 155.995 100.00 71.09 71.09
By MOA 0 0 0 0 0
By Contract 0 0 0 0 0
TOTAL 6 155.995 100.00 71.09
2012 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
TAWI-TAWI DISTRICT ENGINEERING OFFICE
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE IN MILLION PESOS
EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 11 166.00 98.22 63.37 62.25 By MOA 2 3.00 1.775 0 0 By Contract 0 0 0 0 0 TOTAL 13 169.00 100.00 62.25
2013 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
TAWI-TAWI DISTRICT ENGINEERING OFFICE
61
Road Upgrading of Sanga-Sanga – Lapid-Lapid Road Sta. 004+578.216– Sta 22+325 w/ exceptions
Length : 1.478 Km. Project Cost : P 33.995 M
Construction of Water Supply Panglima Sugala
Project Cost : P 70.00 M
Concreting of Circumferential Causeway and Docking Port Phase 1
Length : 315 m Project Cost : P37.00 M
Shore Protection Works along National Road approach to Sanga-Sanga Bridge
Length : 400 m Project Cost : 8.50 M
Repair/Rehabilitation of Simunul Port
Project Cost : 5.00M
Construction of Community Water Brake
Tangngah Project Cost : 1.50 M
LOCATION MAP CY-2012 REGULAR INFRA
TAWI-TAWI DISTRICT ENGINEERING OFFICE
62
Road Upgrading of Sanga-Sanga – Lapid-Lapid Road Km 06+551.216– km 9+166.216 w/ exceptions Length : 1.695 Km. Project Cost : P 39.00 M
Concreting of Tubig-Indangan Port Road, Simunul Length = 0.50 Project Cost : P 5.00 M
Construction of Pierhead, Tabawan, South Ubian Project Cost : P2.00 M
Concreting of MSU Campus Access Road, MSU Bongao Length = 0.500 Project Cost : P 5.00 M
Concreting of Likud Tabawan, Likud Dampong to Putat Road South Ubian
Length : 0.50 Km. Project Cost : P5.00 M
Concreting of Malassa Road Bongao
Length : 0.20 Km. Project Cost : P2.00 M
Concreting of Sapa Sapa Pokkoan to Likud
Sicubong Road, Sapa Sapa
Length : 0.10 Km. Project Cost : P1.00 M
Concreting of Prov’l Road, Bato Bato, Panglima
Sugala-Kapatagan, Bongao Length : 5.00 Km.
Project Cost : P80.00 M
Construction of Sapa Sapa Port Road
Length : 0.25 Km. Project Cost : P5.00 M
Construction of Sibutu Municipal Road
Length : 0.25 Km. Project Cost : P 5.00 M
Concreting of Parangan to Balimbing Road, Panglima Sugala
Length : 1.00 Km. Project Cost : P10.00 M
LOCATION MAP CY-2013 REGULAR INFRA
TAWI-TAWI DISTRICT ENGINEERING OFFICE
Construction of Tandubas Municipal Road Length : 0.25 Km. Project Cost : P5.00 M
Construction of Mapun Municipal Road
Length : 0.25 Km. Project Cost : P5.00 M
Concreting of Circumferential Causeway and Docking Port, Bongao
Concrete Paving of Tandubas-Ungus Matata national Road
Concrete Paving of Tampakan-Tongusong Road, Simunul
Concreting of LiLigayan-Tando Owak Road
Concrete paving of SangaSanga-Lapid-Lapid
Natl Road
Concreting of Sowangkagang-Nalil Road,
Bongao
Concreting of Patal-karungdong Road, Bongao
Concreting of Tanggah Road, Tandubas
Concreting of Tubig Indangan Road, Simunul
Concreting of Bato Bato –Tarawakan Natl Road, Panglima Sugala
Const of Ungus Matata_Buton Road, Tandubas
Construction ofTongsinah-Lagasan Road, Bongao
Concreting of Tongmaging-Larap Road, Sitangkai
Construction of Mantabuan Footbridge w/ Pierhead, Sapa Sapa
Construction of Palate Footbridge w/ Pierhead,
Sapa Sapa
Construction of Tandubato Footbridge w/ Pierhead, Bongao
Concreting of Boki-Tabulian Road, Mapun
Concreting of Bato Bato –Parangan Road, Panglima
Sugala
Construction of Seaport, Mapun
Construction of Mandulan Footbridge w/ Pierhead, Bongao
Const./Rehab of Sowangkagang Shore Protection, Bongao
LOCATION MAP CY-2014 REGULAR INFRA
TAWI-TAWI DISTRICT ENGINEERING OFFICE Concrete Paving of Lupa Pula-Um,us Mataha Road, Mapun
TOTAL COST P347.60 M
TAWI-TAWI PROVINCE
Name of Project : Road Upgrading (Gravel to Paved) Sanga-Sanga - Lapid-Lapid Road Km. 13+789 – Km. 15+683 w/ exemptions
Mode of Implementation : By Administration
Implementing Agency : Tawi-Tawi District Engineering Office
Project Cost : Php 32,975,150.00
Length : 1.478 Km
Physical Accomplishment : 100% as of Nov. 28, 2013
TAWI-TAWI PROVINCE
Name of Project : Concreting of Circumferential Causeway and Docking Port, Bongao-Phase I
Mode of Implementation : By Administration
Implementing Agency : Tawi-Tawi District Engineering Office
Project Cost : Php 35,890,000.00
Length : 1-Unit
Physical Accomplishment : 45% as of Nov. 25, 2013
TAWI-TAWI PROVINCE
Name of Project : Road Upgrading (Gravel to Paved) Sanga-Sanga - Lapid-Lapid Road Km. 15+683-KM 20+140 w/ exemptions
Mode of Implementation : By Administration
Implementing Agency : Tawi-Tawi District Engineering Office
Project Cost : Php 67,900,000.00
Length : 3.043 Km.
Physical Accomplishment : 75% as of Nov. 25, 2013
TAWI-TAWI PROVINCE
Name of Project : Road Upgrading (Gravel to Paved) Sanga-Sanga - Lapid-Lapid Road Km. 23+541 – Km. 25+241
Mode of Implementation : By Administration
Implementing Agency : Tawi-Tawi District Engineering Office
Project Cost : Php 37,830,000.00
Length : 1.695 Km.
Physical Accomplishment : 70% as of Nov. 25, 2013
TAWI-TAWI PROVINCE
Name of Project : Concreting of Provincial Road, Bato-Bato, Panglima Sugala-Kapatagan,Bongao
Mode of Implementation : By Administration
Implementing Agency : Tawi-Tawi District Engineering Office
Project Cost : Php 77,600,000.00
Length : 5.00 Km.
Physical Accomplishment : 45% as of Nov. 28, 2013
TAWI-TAWI PROVINCE
Name of Project : Construction of Sapa-Sapa Port Road Sapa-Sapa, Tawi-Tawi
Mode of Implementation : By Administration
Implementing Agency : Tawi-Tawi District Engineering Office
Project Cost : Php 4,850,000.00
Length : 0.250 Km.
Physical Accomplishment : 90% as of Nov. 28, 2013
TAWI-TAWI PROVINCE
Name of Project : Construction of Sibutu Municipal Road Sibutu, Tawi-Tawi
Mode of Implementation : By Administration
Implementing Agency : Tawi-Tawi District Engineering Office
Project Cost : Php 4,850,000.00
Length : 0.250 Km.
Physical Accomplishment : 100% as of Nov. 28, 2013
TAWI-TAWI PROVINCE
Name of Project : Construction of Tandubas Municipal Road Tandubas, Tawi-Tawi
Mode of Implementation : By Administration
Implementing Agency : Tawi-Tawi District Engineering Office
Project Cost : Php 4,850,000.00
Length : 0.250 Km.
Physical Accomplishment : 90% as of Nov. 28, 2013
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 4 31.00 43.97 59.83 26.31
By MOA 1 5.00 7.092 100.00 7.092
By Contract 2 34.50 48.94 90.94 44.50
TOTAL 7 70.50 100.00 77.90
2012 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
MAGUINDANAO 1ST DISTRICT ENGINEERING OFFICE
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 5 50 50.05 21.00 10.51 By MOA 3 10 10.010 56.99 10.51 By Contract 2 39.90 39.94 0 0 TOTAL 10 99.90 100.00 16.22
2013 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
MAGUINDANAO 1ST DISTRICT ENGINEERING OFFICE
73
Concreting of Poblacion Dalican Road Length : 0.333 Km.
Project Cost : P 5.00 M
Rehabilitation/Reconst./Upgrading of Damaged Paved Roads
Concrete Reblocking along Cotabato-Lanao Road
Sta. 1855– Sta 1865 w/ exceptions Length : 1.30 Km.
Project Cost : P 19.50 M
Rehabilitation/Reconst./Upgrading of Damaged Paved Roads
Concrete Reblocking alongMarbel-Ala- Cotabato-Road, Bitu-Dulangan Section
Sta. 1837+000– Sta 1839 w/ exceptions Length : 1.00 Km.
Project Cost : P 15.00 M
Concreting of Padang-Padang Adventure Park Road, Brgy
Moro Point, Parang Length : 0.333 Km.
Project Cost : P 5.00 M
Concreting of Matanog Road Length : 1 km
Project Cost : 10.00 M
Concreting of Datu Talusan Road including retrofitting of
double barrel box Culvert, Sultan Kudarat
Project Cost : 13.00 M
LOCATION MAP CY-2012 REGULAR INFRA
MAGUINDANAO 1ST DISTRICT ENGINEERING OFFICE
Riprapping of Sarakan Bridge Matanog
Project Cost : 3.00 M
74
Rehabilitation/Reconst./Upgrading of Damaged Paved Roads Concrete Reblocking alongMarbel-Ala- Cotabato-Road, Bitu-Dulangan Section Sta. 1837+000– Sta 1839 w/ exceptions Length : 1.327 Km. Project Cost : P 19.90 M
Construction of Water System Sitio Mereges, Darugao, Upi Project Cost : P 10.00 M
Concreting of Brgy Rempis-Poblacion Road, North Upi Length= 0.500 Project Cost : P 5.00 M
LOCATION MAP CY-2013 REGULAR INFRA
MAGUINDANAO 1ST DISTRICT ENGINEERING OFFICE
Concreting of Miramar-Poblacion Road Parang Length = 0.500 Project Cost : P 5.00 M
Construction of Matanog Buldon Drainage, Matanog Length = 2.00 Km. Project Cost : P 20.00 M
Concreting of Water System Access Rd, Macasandag, Parang Length = 0.300 Project Cost : P 3.00 M
Construction of Water System Level II Brgy Pinguiaman and Bugawas Datu Odin Sinsuat Project Cost : P 5.00 M
Concreting of Campo Uno Road Brgy. Pinantao, Parang Length : 0.20 Km. Project Cost : P2.00 M
Construction of Water System Kabuntalan Mother Project Cost : P 10.00 M
Rehabilitation/Reconst./Upgrading of Damaged Paved Roads Concrete Reblocking along Cotabato-Lanao Road Sultan Kudarat Section Length : 1.333 Km. Project Cost : P 20.00 M
Reblocking of 1.34 km Awang-Upi –Lebak Road
Reblocking of Marbel-Ala Cotabato Road
Construction of Parang Water Supply Level III
Concreting of Pob. Natl Highway – Pob Old Market, Datu Odin Sinsuat
Rehab/Development of Polloc Port
Concreting of Pinaring-Ibotegen Road
Concreting of Highway Macabiso-Solon Road, Sultan Mastura
Concreting of Sitio Kawa Bugawas, Datu Odin Sinsuat
Concreting of Lagumbingan-Labio Road, Northern Kabuntalan
Concreting of Taviran-Ganta –Tuka Road
Concreting of Tinendana-Pob. Road, rempis, North Upi
Construction of Fish Landing, Montay, Northern Kabuntalan
Concreting of Highway-Bago Inged Road, Datu Odin Sinsuat
Construction of Water System, Bago Inged, Datu
Odin Sinsuat
Concreting of Padang-Padang Road, Parang
Construction of Parang-Barira Road
Construction of Water System, Gayunga, Kabuntalan
Construction of North Upi-Datu Blah Sinsuat Road
Concrete Drainage along Cotabato-Lanao Road
LOCATION MAP CY-2014 REGULAR INFRA
MAGUINDANAO 1ST DISTRICT ENGINEERING OFFICE Upgrading of Parang-Buldon Road
Construction of Fish Port, Water System and Concreting of Barangay Road, Sitio Kalutan,
Making, Parang
TOTAL COST P364.80 M
MAGUINDANAO PROVINCE
Name of Project : Concreting of Padang Padang Adventure Park, Brgy. Moro Point, Parang, Maguindanao
Mode of Implementation : By Administration
Implementing Agency : Maguindanao 1st District Engineering Office
Project Cost : Php 4,950,000.00
Length : 0.333 Km
Physical Accomplishment : 100% as of Nov. 28, 2013
MAGUINDANAO PROVINCE Name of Project : Concrete Reblocking Along Marbel-Ala Valley-
Cotabato Rd Bitu-Dulangan Section, DOS Mag. Km. 1837+000 – Km. 1839+000 w/exceptions.
Mode of Implementation : By Contract
Implementing Agency : Maguindanao 1st District Engineering Office
Contractor : MUST Construction
Project Cost : Php 14,467,102.79
Length : 1.00 Km
Physical Accomplishment : 79.71% as of Nov. 28, 2013
MAGUINDANAO PROVINCE Name of Project : Concreting of Poblacion Dalican Rd., Datu
Odin Sinsuat, Maguindanao
Mode of Implementation : By MOA
Implementing Agency : L.G.U.
Project Cost : Php 4,950,000.00
Length : 0.333 Km
Physical Accomplishment : 100% as of Nov. 28, 2013
MAGUINDANAO PROVINCE Name of Project : Concreting of Datu Talusan Road including
Retrofitting of Double-Barrel Box Culvert, Sultan Kudarat, Maguindanao
Mode of Implementation : By Administration
Implementing Agency : Maguindanao 1st District Engineering Office
Project Cost : Php 12,870,000.00
Length : 1-Unit
Physical Accomplishment : 72% as of Nov. 28, 2013
MAGUINDANAO PROVINCE Name of Project : Riprapping of Sarakan Bridge Approaches,
Km. 1897+653, Matanog Maguindanao
Mode of Implementation : By Administration
Implementing Agency : Maguindanao 1st District Engineering Office
Project Cost : Php 2,970,000.00
Length : 1-Unit
Physical Accomplishment : 80% as of Nov. 28, 2013
MAGUINDANAO PROVINCE Name of Project : Construction of Water System Sitio Mereges,
Brgy. Darugao, North Upi, Maguindanao
Mode of Implementation : By Administration
Implementing Agency : Maguindanao 1st District Engineering Office
Project Cost : Php 9,900,000.00
Length : 1-Unit
Physical Accomplishment : 10% as of Nov. 28, 2013
MAGUINDANAO PROVINCE Name of Project : Construction of Water System at Mother
Kabuntalan, Maguindanao
Mode of Implementation : By Administration
Implementing Agency : Maguindanao 1st District Engineering Office
Project Cost : Php 9,900,000.00
Length : 1-Unit
Physical Accomplishment : 30% as of Nov. 28, 2013
MAGUINDANAO PROVINCE Name of Project : Concreting of Water System Access Road,
Macasandag, Parang, Maguindanao
Mode of Implementation : By Administration
Implementing Agency : Maguindanao 1st District Engineering Office
Project Cost : Php 2,970,000.00
Length : 0.300 km
Physical Accomplishment : 86% as of Nov. 28, 2013
MAGUINDANAO PROVINCE Name of Project : Concrete Reblocking Along Cotabato-Lanao/
Davao Road Km. 1858+000-Km. 1862+000 w/exceptions Sultan Kudarat, Maguindanao
Mode of Implementation : By Contract
Implementing Agency : Maguindanao 1st District Engineering Office
Contractor : MUST Construction
Project Cost : Php 18,832,253.02
Length : 1.300 km
Physical Accomplishment : 90.89% as of Nov. 28, 2013
MAGUINDANAO PROVINCE Name of Project : Concreting of Brgy. Rempis-Poblacion Road,
North Upi, Maguindanao
Mode of Implementation : By Administration
Implementing Agency : Maguindanao 1st District Engineering Office
Project Cost : Php 4,950,000.00
Length : 0.500 Km
Physical Accomplishment : 50% as of Nov. 28, 2013
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE IN MILLION PESOS
EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 2 23.05 34.123 69.77 17.76
By MOA 3 33.00 48.853 66.23 32.35
By Contract 1 11.50 17.024 100.00 17.024
TOTAL 6 67.55 100.00 73.18
2012 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
MAGUINDANAO 2ND DISTRICT ENGINEERING OFFICE
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE IN MILLION PESOS
EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 9 57.50 30.022 80.86 24.28 By MOA 2 10 5.221 67.08 3.50 By Contract 2 124.03 64.757 0 0 TOTAL 13 191.526 100.00 27.78
2013 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
MAGUINDANAO 2ND DISTRICT ENGINEERING OFFICE
87
Concreting of Poblacion Buluan- Maslabing Road, Buluan
Length : 1.081 Km. Project Cost : P 20.00 M
Rehabilitation/Reconst./Upgrading of Damaged Paved Roads
Reblocking along Marbel-Ala- Cotabato Road DAS-DAM Section
Sta. 1781+000– Sta 1821+838 w/ exceptions Length : 0.67 Km.
Project Cost : P 10.05 M
Concreting Pandag Road Length : 13.00 Km.
Project Cost : 13.00 M
LOCATION MAP CY-2012 REGULAR INFRA
MAGUINDANAO 2ND DISTRICT ENGINEERING OFFICE
Rehabilitation/Reconst./Upgrading of Damaged Paved Roads
Concrete Pavement Widening of Marbel-Ala- Cotabato Road, Shariff Aguak Section
Sta. 1797+113– Sta 1799+113 w/ exceptions Length : 0.767 Km.
Project Cost : P 11.50 M
Concreting of Talitay Road Length : 1.30 Km.
Project Cost : 13.00 M
88
Construction of Water System Datu Saudi Ampatuan Project Cost : P 10.00 M
Construction of Water System Banaba, Abdullah Sangki Project Cost : P 1.00 M
Construction of Water System Sitio Malibacao, Romongaob, South Upi Project Cost : P 1.00 M
Concreting of Poblacion-Municipal Cemetery Road Shariff Aguak, L= 0.200 Project Cost : P 2.00 M
Concreting of Pandag Road Section 2 Pandag Length : 0.500 km Project Cost : P 5.00 M
Concreting of Pandag Road Section 1 Pandag Length : 0.500 km Project Cost : P 5.00 M
Concreting of Paglas-Columbio Prov’l Road Length : 4.268 Km.
Project Cost : P64.026 M
Concreting of Maslabeng Provincial Road
Length : 4.00 Km. Project Cost : P60.00 M
LOCATION MAP CY-2013 REGULAR INFRA
MAGUINDANAO 2ND DISTRICT ENGINEERING OFFICE
Rehabilitation/Reconst./Upgrading of Damaged Paved Roads Concrete Pavement Widening of Marbel-Ala- Cotabato Road, Datu Saudi Ampatuan Section Km 1805+455 – Sta 1807+455 w/ exceptions Length : 1.00 Km. Project Cost : P 15.00 M
Rehabilitation/Reconst./Upgrading of Damaged Paved Roads Reblocking along Marbel-Ala- Cotabato Road DAS-DAM Section Sta. 1781+000– Sta 1821+838 w/ exceptions Length : 1.50 Km. Project Cost : P 22.50 M
Concreting of Matagabong Rd Ampatuan Length : 0.300 km Project Cost : P 3.00 M
Concreting of Sitio Binibedan Road, Ampatuan Length= 0.100 km Project Cost : P 1.00 M
Construction of Road Dike Paglat, L= 0.200 km Project Cost : P 2.00 M
Rehabilitation of Dulawan Bridge along Midsayap-Dulawan-Makar Road, Datu
Piang Section
Concrete Widening along Kidapawan-Ala-Junction Road, Datu Paglas Section
Concrete Widening with line canal along Marbel-Ala-Cotabato Road
Concreting of Pandag Road
Concrete Slope Protection of Alip Section, Datu Paglas
Rehab./Improvement of Meta Bridge Datu Unsay
Concrete Pavement of Libutan Road
Construction of Water System, Brgy. Sapakan, Rajah Buayan
Construction of Water Supply Project, Guindulungan
Construction of Water Supply Project,Datu Anggal M
Construction of Water Supply Project,Shariff Aguak
Construction of Water Supply Project,Buluan
Construction of Water Supply Project,Pagalungan
LOCATION MAP CY-2014 REGULAR INFRA
MAGUINDANAO 2ND DISTRICT ENGINEERING OFFICE Construction of Water
Supply Project,Datu Piang
Concreting of Banaba –Paitan , Datu Abdullah SangkiRoad Upgrading and Concreting of Road Dike,
Brgy Buayan-Brgy Balong, Datu Piang
TOTAL COST P174.80 M
MAGUINDANAO PROVINCE
Name of Project : Concrete Reblocking along Marbel-Ala- Cotabato Road Datu Abdullah Sangki-Datu Anggal Midtimbang Section
Mode of Implementation : By Administration
Implementing Agency : Maguindanao 2nd District Engineering Office
Project Cost : Php 22,500,000.00
Length : 1.500 Km
Physical Accomplishment : 75% as of Nov. 28, 2013
MAGUINDANAO PROVINCE
Name of Project : Concrete Pavement Widening along Marbel- Ala-Cotabato Road, Datu Saudi Ampatuan, Maguindanao, Km. 1805 + 675 – Km. 1806 + 675
Mode of Implementation : By Administration
Implementing Agency : Maguindanao 2nd District Engineering Office
Project Cost : Php 15,000,000.00
Length : 1.000 Km
Physical Accomplishment : 70% as of Nov. 28, 2013
MAGUINDANAO PROVINCE
Name of Project : Concreting of Matagabong Road Ampatuan, Maguindanao
Mode of Implementation : By Administration
Implementing Agency : Maguindanao 2nd District Engineering Office
Project Cost : Php 3,000,000.00
Length : 0.300 Km
Physical Accomplishment : 50% as of Nov. 28, 2013
MAGUINDANAO PROVINCE
Name of Project : Concreting of Barangay Binibedan Road Ampatuan, Maguindanao
Mode of Implementation : By Administration
Implementing Agency : Maguindanao 2nd District Engineering Office
Project Cost : Php 1,000,000.00
Length : 0.100 Km
Physical Accomplishment : 85% as of Nov. 28, 2013
MAGUINDANAO PROVINCE
Name of Project : Construction of Water System (Level II) @ Barangay Romangaob, Sitio Malibacao, Maguindanao
Mode of Implementation : By Administration
Implementing Agency : Maguindanao 2nd District Engineering Office
Project Cost : Php 1,000,000.00
Length : 1-Unit
Physical Accomplishment : 100% as of Nov. 28, 2013
MAGUINDANAO PROVINCE
Name of Project : Construction of Water System (Level II) @ Brgy Banaba, Datu Abdullah Sangki, Maguindanao
Mode of Implementation : By Administration
Implementing Agency : Maguindanao 2nd District Engineering Office
Project Cost : Php 1,000,000.00
Length : 1-Unit
Physical Accomplishment : 70% as of Nov. 28, 2013
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE IN MILLION PESOS
EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 0 0 0 0 0
By MOA 3 75.634 100.00 86.5 86.50
By Contract 0 0 0 0 0
TOTAL 3 75.634 100.00 86.50
2012 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
LANAO 1ST DISTRICT ENGINEERING OFFICE
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE IN MILLION PESOS
EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 8 30.00 26.09 11.79 3.077 By MOA 12 85.00 73.913 69.05 51.04 By Contract 0 0 0 0 0 TOTAL 20 115.00 100.00 54.11
2013 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
LANAO 1ST DISTRICT ENGINEERING OFFICE
97
Road Upgrading Molundo-Wao Road (Bukidnon Bdry.-North Cotabato Brdy.)
Km 1619+790 – km 1621+890 Length : 2.158 Km. Project Cost : P 49.634 M
Construction of Dilausan-Polo Bridge Ditsaan Ramain Project Cost : P 13.00 M
Concreting of Dilabayan-Ririk Road Taraka Length : 1.250 Km
Project Cost : P 13.00 M
LOCATION MAP CY-2012 REGULAR INFRA
LANAO DEL SUR 1ST DISTRICT ENGINEERING OFFICE
98
Concreting of Malungun-Buadiadingun Road, Taraka Length : 0.50 Km. Project Cost : P5.00 M
Concreting of Dilabayan-Ririk Road, Taraka Length : 0.50 Km. Project Cost : P5.00 M
Concreting of Buot-Milaya Catolongan Road, Wao Length : 1.250 Km. Project Cost : P20.00 M
Concreting of Port, Lumbac Madaya, Marawi City Project Cost : P5.00 M
Tourism Development for Plaza Cabili Banggolo, Marawi City Project Cost : P5.00 M
Concreting of Saguiran-Piagapo Prov’l Road Length : 0.625 Km. Project Cost : P10.00 M
Concreting of Buadi-Buntong Road
Length : 0.20 Km. Project Cost : P2.00 M
Concreting of Kalaw Road, Marantao
Length : 0.20 Km. Project Cost : P2.00 M
LOCATION MAP CY-2013 REGULAR INFRA
LANAO DEL SUR 1ST DISTRICT ENGINEERING OFFICE Construction of Water System Saguiaran Project Cost : P 2.00 M
Construction of Water System, Lumba Bayabao Project Cost : P 10.00 M
Concreting of Ditsaan Ramain Road
Length : 0.20 Km. Project Cost : P2.00 M
Concreting of Bubong Road
Length : 0.20 Km. Project Cost : P2.00 M
Concreting of Wao Road
Length : 0.20 Km. Project Cost :
P2.00 M
Concreting of Bumbaran Road
Length : 0.10 Km. Project Cost :
P1.00 M
Concreting of Maguing Road
Length : 0.10 Km. Project Cost : P1.00 M
Concreting of Ditsaan Ramain-Buapuso Buntong
Road Length : 0.75 Km.
Project Cost : P12.00 M
99
Road Upgrading Marawi-Pantar Diversion Road Length : 1.00 Km. Project Cost : P 23.00 M
Rehabilitation of Rizal Park, Gomisa Ave., Marawi City Project Cost : P2.00 M Realigned to Road Concreting of Brgy Dialonga Cawayan Marantao, Lanao del Sur per approved RLA Resolution
Construction of Water System and Public Toilet Brgy. Tolali, Marawi City Project Cost : P2.00 M
Concreting of Malimono Road. Brgy. Malimono, Marawi City Length : 0.200 Km. Project Cost : P2.00 M
LOCATION MAP CY-2013 REGULAR INFRA
LANAO DEL SUR 1ST DISTRICT ENGINEERING OFFICE MARAWI CITY
Rehab./Upgrading of Pugaan Bridge, Ditsaan Ramain
Rehab./Upgrading of Ramain Bridge, Ditsaan Ramain
Rehab./Reconst./Upgrading of Marawi-Maranatao Road
Concreting of Ditsaan Ramain-Buadi Puso Buntong Road
Concreting of 1.087 km Tagoloan Road
Concreting of Marawi-Cabasaran Diversion Road, Phase II
Upgrading of Saguiaran Water System
Concreting of Saguiaran-Radapan Road, Piagapo
Concreting of 0.50 km Poona Bayabao Road
Concreting of Bout – Milaya-Catotongan Circumferential Road, Wao
Buadi Ulok-Buisan Road, Masiu
Concreting of Tamparan Road
Repair & Completion of Ramain Water System, Ditsaan Ramain
Concreting of Dimayon-Pagalamatan Provincial Road, Taraka
Concreting of Biaba Damag-Amito Road. Marawi City
Concreting of Cadayonan-Kawit Road, Taraka
Concreting of Piagapo Road
LOCATION MAP CY-2014 REGULAR INFRA
LANAO DEL SUR 1ST DISTRICT ENGINEERING OFFICE
Rehabilitation of Pugaan Port
Rehabilitation of Sumndad-Buadi Sacayo Flod Control
TOTAL COST P251.80 M
LANAO DEL SUR PROVINCE
Name of Project : Road Upgrading (Gravel to Paved), Mulondo-Wao Road, Bukidnon bdry-North Cotabato Bdry
Mode of Implementation : By MOA
Implementing Agency : L.G.U. Lanao del Sur
Project Cost : Php 48,144,980.00
Length : 1.92 Kms
Physical Accomplishment : 100% as of Nov. 28, 2013
LANAO DEL SUR PROVINCE
Name of Project : ROAD UPGRADING (Gravel to Paved), PANTAR DIVERSION ROAD, Cabasaran, Marawi City
Mode of Implementation : By MOA
Implementing Agency : L.G.U. Lanao del Sur
Project Cost : Php 22,310,000.00
Length : 1.20 Kms
Physical Accomplishment : 65% as of Nov. 28, 2013
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE IN MILLION PESOS
EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 5 33.00 53.19 45.91 24.42
By MOA 1 5.00 8.059 100.00 8.059
By Contract 2 24.04 38.75 70.03 27.14
TOTAL 8 62.04 100.00 59.62
2012 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
LANAO 2ND DISTRICT ENGINEERING OFFICE
MODE OF IMPLEMENTATION
NO. OF PROJ.
APPRO./MODE IN MILLION PESOS
EQUIVALENT WEIGHTED %
OF ACC./MODE
PHYSICAL % ACC. /MODE
TOTAL WEIGHTED %
OF ACC./MODE
By Administration 1 10.00 13.51 25.00 3.38 By MOA 9 64.00 86.486 54.37 47.03 By Contract 0 0 0 0 0 TOTAL 10 74.00 100.00 50.40
2013 ACCOMPLISHMENT AND MODE OF IMPLEMENTATION BY DISTRICT
As of December 16, 2013
LANAO 2ND DISTRICT ENGINEERING OFFICE
104
Concreting of Sultan Pandapatan-Parao Road
Bayang Length : 0.550 Km. Project Cost : P 5.50 M
Concreting of Tagoranao-Tangcal Road Tubaran
Length : .550 Km. Project Cost : P 5.50 M
Concreting of Highway-Dibarosan Bualan Road, Balindong
Length : .550 Km. Project Cost : P 5.50 M
Concreting of Lumbayanague-Butig Road
Length : .550 Km. Project Cost : P 5.50 M
Concreting of Taliogan-Ririk Road Ganassi
Length : .550 Km. Project Cost : P 5.50 M
Road Upgrading Const. of Masiu - Ganassi-Road Km 1616+000 – km 1624+000
Length : 0.497 Km. Project Cost : P 11.44 M
Rehabilitation/Reconstruction Repair of Cotabato-Lanao Road
Biosong, Picong Section Km 1616+000 – km 1624+000
Length : 0.500 Km. Project Cost : P 12.00 M
LOCATION MAP CY-2012 REGULAR INFRA
LANAO DEL SUR 2ND DISTRICT ENGINEERING OFFICE Road Upgrading
Const. of Ganassi-Tubod Road Km 1607+000 – km 1620+944
Length : 0.548 Km. Project Cost : P 12.60 M
105
Concreting of Bayang-Marogong Road Length : 1.50 Km. Project Cost : P 24.00 M
Concreting of Road Curahab, Malabang Length = 0.25 km Project Cost : P 2.50 M
Concreting of Road Pantao-on, Calanogas Length = 0.35 km Project Cost : P 3.50 M
Concreting of Provincial Road Lumbatan-Macadar Road Length = 0.667 km Project Cost : P 10.00 M
Concreting of Lumbatan-Lumbaca Unayan Road Length : 1.25 Km. Project Cost : P 20.00 M
Concreting of Gadungan Road Gadungan, Madalum Length = 0.30 km Project Cost : P 3.00 M
LOCATION MAP CY-2013 REGULAR INFRA
LANAO DEL SUR 2ND DISTRICT ENGINEERING OFFICE Concreting of Road Gadungan, Madalum Length = 0.25 km Project Cost : P 2.50 M
Concreting of Road Liangan, Picong Length = 0.25 km Project Cost : P 2.50 M
Concreting of Road Balintad, Madamba Length = 0.25 km Project Cost : P 2.50 M
Construction of of Concrete Line Canal along Cotabato-Lanao del Norte Road,
Balabagan Section
Construction of Barorao Bridge, Balabagan
Construction of Tubaran Water System
Construction of Taliogon Water System, Ganassi
Construction of Bacolod-Kalawi Water System
Concreting of Sultan Pandapatan-Parao Road, Bayang
Concreting of Lumbatan-Marogong Road
Concreting of Binidayan-Bayang-Tubaran Road
Rehab./Reconst.of Damaged Paved National Road along Cotabato-Lanao Norte Road, Itil,
Balabagan Section
Reblocking of Marawi-Malabang Road (Madalum-Madamba section
Concrete Widening of of Luayan-Taliogon Road, Ganassi
LOCATION MAP CY-2014 REGULAR INFRA
LANAO DEL SUR 2ND DISTRICT ENGINEERING OFFICE
TOTAL COST P118.40 M
LANAO DEL SUR PROVINCE
Name of Project : Repair of Cotabato-Lanao Norte Road, Biosong, Picong Section, (Km.1957+900 – Km. 1958+400) a. Const. of two (2) Barrel box culvert b. Embankment (2m high) c. Concrete paving
Mode of Implementation : By Administration
Implementing Agency : Lanao del Sur 2nd District Engineering Office
Project Cost : Php 12,000,000.00
Length : 0.500 Km
Physical Accomplishment : 100% as of Nov. 28, 2013
LANAO DEL SUR PROVINCE
Name of Project : Concreting of Taliogan-Ririk Road, Ganassi
Mode of Implementation : By MOA
Implementing Agency : L.G.U. Lanao del Sur
Project Cost : Php 5,000,000.00
Length : 0.500 Km
Physical Accomplishment : 100% as of Nov. 28, 2013
LANAO DEL SUR PROVINCE
Name of Project : Concreting of Lumbatan-Lumbaca Unayan Road
Mode of Implementation : By MOA
Implementing Agency : L.G.U. Lanao del Sur
Project Cost : Php 5,000,000.00
Length : 0.500 Km
Physical Accomplishment : 55% as of Nov. 28, 2013
3.2 DETAILED FINANCIAL REPORT
YEAR ALLOTMENT NCA RELEASED OBLIGATED DISBURSED % UTILIZED
2011 PS 189,444,284.00 184,428,620.00 189,444,284.00 184,428,620.00 100.00% MOOE 232,480,000.00 218,246,380.00 232,480,000.00 218,246,380.00 100.00% CO 1,000,000,000.00 745,896,543.97 1,000,000,000.00 615,386,703.33 82.50% Total 1,421,924,284.00 1,148,571,543.97 1,421,924,284.00 1,018,061,703.33 88.64%
2012
PS 205,159,438.00 193,634,767.37 205,159,438.00 193,634,767.37 100.00% MOOE 176,712,360.00 151,168,788.28 176,712,360.00 151,168,788.28 100.00% CO 1,000,000,000.00 600,899,000.00 1,000,000,000.00 474,223,864.85 78.92% CO (Equipment) 96,629,640.00 91,453,550.15 96,629,640.00 64,503,942.63 70.53%
Total 1,478,501,438.00 1,037,156,105.80 1,478,501,438.00 883,531,363.13 85.19%
2013
PS 198,293,000.00 177,535,471.00 183,872,065.00 176,474,395.70 99.40%
MOOE 275,380,000.00 239,759,667.00 157,216,332.62 136,362,852.84 56.87%
CO 1,510,181,000.00 225,627,000.00 1,510,181,000.00 280,686,117.73 124.40%
Total 1,983,854,000.00 642,922,138.00 1,851,269,397.62 593,523,366.27 92.32%
FINANCIAL UTILIZATION OF REGULAR FUNDS FY 2011 – 2013 NOVEMBER 31, 2013
Note : Pursuant to Sec. 3.4.2 of NBC 545 re: Guidelines on the Release of Funds of FY 2013.
BUDGET ALLOCATION TO DISTRICT/AREA OFFICES FY 2012 As of December 31, 2012
OFFICE PS MOOE CO
TOTAL
Basilan Engineering District - 4,984,235.00 345,471,000.00 350,455,235.00
Maguindanao Engineering District I - 11,073,285.51 70,500,000.00 81,573,285.51
Maguindanao Engineering District II 23,552,315.56 31,607,699.41 67,550,000.00 122,710,014.97
Lanao Sur Engineering District I 29,828,040.68 16,069,888.26 75,634,000.00 121,531,928.94
Lanao Sur Engineering District II - 19,329,189.18 62,040,000.00 81,369,189.18
Sulu Engineering District I 23,848,992.98 16,761,080.00 123,810,000.00 164,420,072.98
Sulu Engineering District II 15,117,630.58 12,732,500.00 84,000,000.00 111,850,130.58
Tawi-Tawi Engineering District 19,009,764.84 12,653,116.00 155,995,000.00 187,657,880.84
Maguindanao Area Equipment Services 9,838,158.18 5,575,013.09 15,413,171.27
Lanao Area Equipment Services 9,429,534.40 3,561,492.90 12,991,027.30
Sulu Area Equipment Services 10,084,466.10 6,040,007.39 16,124,473.49
Tawi-Tawi Area Equipment Services 2,855,614.02 3,811,919.40 6,667,533.42
PDES ARMM REGIONWIDE 15,000,000.00
GRAND TOTAL 143,564,517.34 144,199,426.14 1,000,000,000.00 1,272,763,943.48
BUDGET ALLOCATION TO DISTRICT/AREA OFFICES FY 2013 As of November 31, 2013
OFFICE PS MOOE CO TOTAL
Basilan Engineering District 5,846,357.90 398,637,000.00 404,483,357.90
Maguindanao Engineering District I 9,031,053.61 99,900,000.00 108,931,053.61
Maguindanao Engineering District II 21,671,281.72 15,980,375.19 191,526,000.00 229,177,656.91
Lanao Sur Engineering District I 24,164,666.07 14,051,497.91 115,000,000.00 153,216,163.98
Lanao Sur Engineering District II - 17,259,050.84 74,000,000.00 91,259,050.84
Sulu Engineering District I 21,842,314.36 13,433,684.27 364,118,000.00 399,393,998.63
Sulu Engineering District II 14,775,291.12 10,526,052.66 88,000,000.00 113,301,343.78
Tawi-Tawi Engineering District 18,968,089.60 11,392,750.56 169,000,000.00 199,360,840.16
Maguindanao Area Equipment Services 9,348,223.32 5,419,839.67 14,768,062.99
Lanao Area Equipment Services 8,985,215.45 2,896,098.52 11,881,313.97
Sulu Area Equipment Services 9,542,788.98 4,970,724.09 14,513,513.07
Tawi-Tawi Area Equipment Services 2,784,471.84 3,515,093.27 6,299,565.11
PDES ARMM REGIONWIDE 10,000,000.00
GRAND TOTAL 132,082,342.46 114,322,578.49 1,510,181,000.00 1,746,585,920.95
CY IMPLEMENTATION
TOTAL NO. OF
PROJECTS APPROPRIATION
DBM OBLIGATED DISBURSED
NCA Released Balance Request Amount % Amount %
Utilization (1) (2) (3) (4) (5) (6) = (5) / (1) (7) (8) = (7) / (2)
2010 (1st Tranche) 294 659,000,000.00 659,000,000.00 - - 659,000,000.00 100% 659,000,000.00 100%
2010 (2nd Tranche) 55 191,000,000.00 114,764,000.00 69,446,084.06 33,019,600.00 191,000,000.00 100% 116,071,557.44 101%
2011 426 1,000,000,000.00 745,896,543.97 219,951,269.11 125,649,700.00 1,000,000,000.00 100% 615,386,703.33 83%
2012 57 1,000,000,000.00 600,899,000.00 371,520,077.90 247,061,500.00 1,000,000,000.00 100% 474,223,864.85 79%
2013 107 1,510,181,000.00 225,627,000.00 1,284,554,000.00 854,228,400.00 1,510,181,000.00 100% 280,686,117.73 124%
TOTAL 939 4,360,181,000.00 2,346,186,543.97 1,945,471,431.07 1,259,959,200.00 4,360,181,000.00 100% 2,145,368,243.35 91.44%
DPWH-ARMM 2010-2013 INFRASTRUCTURE PROJECT ACCOMPLISHMENT As of December 15, 2013
Note: Column (2) excluding Tax Withheld (TRA) by DBM
11.82%
10.60%
15.70%
33.45%
6.05%
3.63%
7.27%
17.97%
5.08%
20.65%
46.44%
91.44%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100% • The average disbursement ratio of the agency for the year is 21.79%.
• The financial performance is on the rise. We had the lowest in June at only 3.63%. But performance picked up by October and steadily rose to 46.44% in November and finally rest at 91.44% as of date.
Disbursement Ratio for the period covering January 1 to December 15, 2013
Productive Use of Savings FY 2012 & FY 2013
Projects FY 2012 Allotment FY 2013 Allotment Total
1st Tranche procurement of Heavy Equipment ₱47,700,000.00 ₱47,700,000
2nd Tranche procurement of Heavy Equipment 22,318,480.00 22,318,480
3rd Tranche procurement of Heavy Equipment 26,611,160.00 26,611,160
4th Tranche Procurement* ₱54,236,000.00 54,236,000.00
Renovation of ORG Building 10,526,315.79 10,526,315.79 21,052,631.58
Building and Structures - Regional Office ₱3,347,957.21 3,347,957.21
Repair of Bayanga Road 15,531,432.37 15,531,432.37
Total ₱110,503,913.00 ₱80,293,748.16 ₱190,797,661.16
16%
18%
38%
15%
2%
11% 0%
1st Tranche procurement of Heavy Equipment2nd Tranche procurement of Heavy Equipment3rd Tranche procurement of Heavy Equipment4th Tranche ProcurementRenovation of ORG BuildingBuilding and Structures - Regional OfficeRepair of Bayanga Road
*REQUEST FOR REALIGNMENT OF FUND FROM MOOE SAVINGS TO EQUIPMENT OUTLAY IS UNDER PROCESS BY DBM.
Expenditure 2012 2013 2014 2015 2016 2017
(Actual) (Current) (NEP) (Proposed) (Proposed) (Proposed)
PS 205,159 198,293 194,256 252,130 252,486 253,198
MOOE 176,712 275,380 317,289 387,603 419,332 451,061
CO
Equipment Outlay 96,630
Regular Infra
Basilan Engineering District 345,471 398,637 902,800
Mag. Eng'g. District I 70,500 99,900 364,800
Mag. Eng'g. District II 67,550 191,526 174,800
Lanao Sur Eng'g. District I 75,634 115,000 251,800
Lanao Sur Eng'g. District II 62,040 74,000 118,400
Sulu Eng'g. District I 123,810 364,118 606,600
Sulu Eng'g. District II 84,000 88,000 189,200
Tawi-Tawi Eng'g. District 155,995 169,000 347,600
ARMM Region 15,000 10,000 15,000
1,000,000 1,510,181 2,971,000 15,149,290 14,634,290 13,063,190 PAMANA
Basilan 655,000
Maguindanao 530,830
Lanao del Sur 192,570
Sulu 552,600
Tawi-Tawi 121,400
- - 2,052,400 - - -
GRAND TOTAL 1,478,501 1,983,854 5,534,945 15,789,023 15,306,108 13,767,449
DPWH-ARMM
Previous and Current Budget and Forward Agency Estimates CY 2012-2017
(In Thousand Pesos)
PROGRAMS/
PROJECTS
2014
2015 2016 2017
ARMM INFRA BUDGET OPAPP Projects (Road to Peace)
No. of
Proj
Length
(km)
Amount
(in Million)
No. of
Proj
Length
(km)
Amount
(in Million) No. of Proj
Length
(km)
Amount
(in Million) No. of Proj
Length
(km)
Amount
(in Million) No. of Proj
Length
(km)
Amount
(in Million)
National Road
(Repair/Rehab/
Reblocking)
18 14.923 241.299 - - - - - - - - -
Local Roads 107 179.554 1,944.095 34 205.24 2,052.40
Provincial 147 434.75 8,695.00 147 434.75 8,695.00 147 356.195 7,123.90
Municipal/Brgy. - 464.08 5,568.96 - 464.08 5,568.96 - 464.08 5,568.96
Bridge 13 - 124.420 - - -
Ports 17 - 288.520 - - -- 10 - 515.00 - - -
Water Supply 30 - 264.075 - - - 370 brgys - 370.33 370 brgys - 370.33 370 brgys - 370.33
Drainage/Canal
Improvements 12 - 59.010 - - - - - - - - -
Other Structures 9 - 49.581 - - - - - - - - -
Total 206 226.044 2,971.00 34 205.24 2,052.40 898.83 15,149.29 898.83 14,634.29 820.275 13,063.10
Summary of DPWH-ARMM Priority Investment Programs/Projects
DISTRICT
ARMM
NATIONAL ROADS
(Per DPWH-ARMM Records)
DPWH-ARMM
ARMM INFRA BUDGET
(Road Upgrading Only)
DPWH
(National)
2013
Regular Infra
DPWH (National)
Transition Investment Support
Program – ARMM
(TISP-ARMM)
STIMULUS FUND
(Road Upgrading Only)
Concrete (km)
Asphalt
(km)
Gravel
(km)
Total
(km)
Approved 2012 Approved 2013 1ST Tranche -
2011
Proposed 2nd
Tranche
Length
(km)
Amount
(million)
Length
(km)
Amount
(million)
Length
(km)
Amount
( million)
Length
(km)
Amount
(million)
Length
(km)
Amount
(million)
Basilan 125.237 0.667 28.013 153.922 1.000 23.000 - - 9.072 300.00 15.52 434.130 8.910 319.855
Sulu I 68.299 0.240 21.336 89.875 3.7804 86.9100 8.334 228.518 4.536 150.00 2.5725 93.680 8.523 323.874
Sulu II 38.680 - 6.220 44.900 1.5500 35.6500 - - 4.536 150.00 2.6962 99.360 - -
Tawi-Tawi 52.6391 - 62.460 115.099 4.978 103.9950 5.549 103.995 4.536 150.00 - - 15.556 653.352
Maguindanao I 137.337 - 7.262 144.599 - - - - 9.829 325.00 - - 5.12 117.760
Maguindanao II 117.830 9.446 10.400 137.676 - - - - 2.268 75.00 9.970 234.255 - -
Lanao del Sur I 116.331 - 29.604 145.935 2.1580 49.6340 - - 4.536 150.00 4.580 155.480 25.474 637.000
Lanao del Sur II 146.262 - 14.322 160.584 1.0450 24.0400 - - 3.024 100.00 2.4200 72.679 7.552 190.000
ARMM Total 802.615 10.353 179.617 992.590 14.5114 323.229 13.883 332.513 42.34 1,400.00 37.75 1089.584 71.135 2,241.841
Total Length of National Road & Investment for ARMM
IV. SPECIAL CONCERNS
1. GOVERNANCE/ADMINISTRATION 1.1 DPWH-ARMM REFORM AGENDA 2012 AND BEYOND
1. GOVERNANCE/ADMINISTRATION 1.1 DPWH-ARMM REFORM AGENDA 2012 AND BEYOND
1. GOVERNANCE/ADMINISTRATION 1.2 DPWH-ARMM MANCOM
CHAIRMAN – Regional Secretary EMIL K. SADAIN, CESO II
MEMBERS – Asst. Regional Secretary DON MUSTAPHA A. LOONG
– Asst. Regional Secretary NASRUDIN D. MAKABINTA
– Head Planning Division DANILO A. ONG
– Head Construction Division NAZER P. EBUS
– Head Maintenance Division BARLIE S. NAHUDAN
– Head Finance Division MANGODA SINDAB
– Head Admin Division TONY J. KAMLANI
– Head Equipment Division HECTOR CELIS
– Head Survey and Design Division MALDAMIN B. DECAMPONG
– Head MQCH Division YAHIYA A. ABDULCALIM
– District Engineers of the eight (8) DEOs
– Area Equipment Engineers of the four (4) AEOs
CONDUCT OF DPWH-ARMM OUTBOUND MANCOM/STAFF MEETINGS (January 2012 – December 2013)
PARTICULARS LOCATION ATTENDANCE DATE
1. 1st Outbound Mancom/Staff Meeting
Tawi-Tawi DEO Bongao, Tawi-Tawi
Regional Secretary, Division Heads, District Engineers and Area Equipment Engineers
March 8-10, 2012
2. 2nd Outbound Mancom/Staff Meeting
Sulu 1st DEO Jolo, Sulu
Regional Secretary, Division Heads, District Engineers and Area Equipment Engineers
May 10-13, 2012
3. 3rd Outbound Mancom/Staff Meeting
MSU Campus Marawi City
Regional Secretary, Division Heads, District Engineers and Area Equipment Engineers
June 28-July 1, 2012
4. 4th Outbound Mancom/Staff Meeting
Al-nor Complex Cotabato City
Regional Secretary, Division Heads, District Engineers and Area Equipment Engineers
August 30, 2012
5. 5th Outbound Mancom/Staff Meeting
Sulu 1st DEO Jolo, Sulu
Regional Secretary, Division Heads, District Engineers and Area Equipment Engineers
September 24-25, 2012
6. 6th Outbound Mancom/Staff Meeting
Zamboanga City Regional Secretary, Division Heads, District Engineers and Area Equipment Engineers
December 21-22, 2012
7. 7th Outbound Mancom/Staff Meeting
Zamboanga City Regional Secretary, Division Heads, District Engineers and Area Equipment Engineers
February 21-23, 2013
8. 8th Outbound Mancom/Staff Meeting
Zamboanga City Regional Secretary, Division Heads, District Engineers and Area Equipment Engineers
March 22-23, 2013
9. 9th Outbound Mancom/Staff Meeting
Lamitan City, Basilan
Regional Secretary, Division Heads, District Engineers and Area Equipment Engineers
November 28-29, 2013
10.10th Outbound Mancom/Staff Meeting
Tawi-Tawi DEO Bongao, Tawi-Tawi
Regional Secretary, Division Heads, District Engineers and Area Equipment Engineers
December 16-17, 2013
2. ARMM HELPS/Convergence Cluster
Priority Barangays for 2013
BASILAN 1. Concreting of Sayugan Lamitan-Bulanting Lamitan City Php 31.00 Million (2013 Infra Budget)
2. Construction of Sullo Port Tabuan Lasa Php 5.00 Million (2013 Infra Budget)
TAWI-TAWI 1. Concreting of Tubig Indangan Port Road Tubig Indangan, Simunul Php 5.000 Million (2013 Infra Budget)
2. Concreting of Tubig Indangan Road Tubig Indangan, Simunul Php 10.00 Million (2014 Infra Budget)
MAGUINDANAO 1. Const. of Water System Sitio Kalutan, Making, Parang Php 1.675 Million (2014 Infra Budget)
2. Const. of Fish Port Sitio Kalutan, Making, Parang Php 2.00 Million (2014 Infra Budget)
3. Concreting of 100 meters- Barangay Road Sitio Kalutan, Making, Parang Php 1.00 Million (2014 Infra Budget)
4. Road Opening/Concreting of10 km Laguitan-
Highway Road Datu Blah Sinsuat Php 100.00 Million (2014 Road to Peace Projects/OPAPP)
5. Road Concreting of 5 km Poblacion -Tubak Road Ampatuan Php 50.00 Million (2014 Road to Peace Projects/OPAPP
2. ARMM HELPS/Convergence Cluster
Priority Barangays for 2013
LANAO DEL SUR 1. Concreting of Taliogon-Ririk Road Ganassi Php 5.000 Million (2012 Infra Budget) 2. Construction of Taliogon Water System Ganassi Php 6.26 Million (2014 Infra Budget) 3. Concreting Widening of Luayan-Taliogon Road Ganassi Php 5.000 Million (2014 Infra Budget)
SULU 1. Construction of Tuyang Seaport Talipao, Sulu Php 15.000 Million (2012 Infra Budget)
3. DPWH-ARMM OPLAN LINIS BAYAN PROGRAM Generated summer job April-June 2013 for out of school youth and students on vacation
BASILAN DISTRICT ENGINEERING OFFICE
SULU 1ST AND 2ND DISTRICT ENGINEERING OFFICES
3. DPWH-ARMM OPLAN LINIS BAYAN PROGRAM Generated summer job April-June 2013 for out of school youth and students on vacation
SULU 1ST AND 2ND DISTRICT ENGINEERING OFFICES
3. DPWH-ARMM OPLAN LINIS BAYAN PROGRAM Generated summer job April-June 2013 for out of school youth and students on vacation
SULU 1ST AND 2ND DISTRICT ENGINEERING OFFICES
3. DPWH-ARMM OPLAN LINIS BAYAN PROGRAM Generated summer job April-June 2013 for out of school youth and students on vacation
SULU 1ST AND 2ND DISTRICT ENGINEERING OFFICES
3. DPWH-ARMM OPLAN LINIS BAYAN PROGRAM Generated summer job April-June 2013 for out of school youth and students on vacation
TAWI-TAWI DISTRICT ENGINEERING OFFICE
3. DPWH-ARMM OPLAN LINIS BAYAN PROGRAM Generated summer job April-June 2013 for out of school youth and students on vacation
TAWI-TAWI DISTRICT ENGINEERING OFFICE
3. DPWH-ARMM OPLAN LINIS BAYAN PROGRAM Generated summer job April-June 2013 for out of school youth and students on vacation
MAGUINDANAO 1ST AND 2ND DISTRICT ENGINEERING OFFICES
3. DPWH-ARMM OPLAN LINIS BAYAN PROGRAM Generated summer job April-June 2013 for out of school youth and students on vacation
MAGUINDANAO 1ST AND 2ND DISTRICT ENGINEERING OFFICES
3. DPWH-ARMM OPLAN LINIS BAYAN PROGRAM Generated summer job April-June 2013 for out of school youth and students on vacation
LANAO DEL SUR 1ST AND 2ND DISTRICT ENGINEERING OFFICES
3. DPWH-ARMM OPLAN LINIS BAYAN PROGRAM Generated summer job April-June 2013 for out of school youth and students on vacation
LANAO DEL SUR 1ST AND 2ND DISTRICT ENGINEERING OFFICES
3. DPWH-ARMM OPLAN LINIS BAYAN PROGRAM Generated summer job April-June 2013 for out of school youth and students on vacation
Strategy Collaborative undertaking between DPWH-ARMM and DPWH -National
Actions
DPWH-ARMM will construct 30 kms national roads using regular budget.
DPWH National will construct 38 kms national roads using regular budget.
DPWH National TISP I using special funds.
DPWH ARMM/National TISP II using special funds.
2013 30 kms
38 kms
38 kms
______ 106 kms
2014
73 kms _________
73 kms
Measure 919 kms (93% Paved)
992 kms (100% Paved)
Resource Requirements
P2.734 Billion (2013) P2.247 Billion (2014)
Support Agencies DBM, DPWH-National, ORG, NGOs.
A. Sector Outcome : 100% Paved National Roads by end of 2014 ARMM has 992 kms National Roads 813 kms paved (82%) and 179 kms unpaved (18%).
4. RAPID INFRASTRUCTURE DEVELOPMENT ASSISTANCE (RIDA) for ARMM
Strategy Collaborative undertaking between DPWH-ARMM and the 5 Provincial Government Offices of ARMM
Actions
DPWH-ARMM and 5 Provincial Govt. Offices will construct provincial roads under following funds: Regular Budget
OPAPP PAMANA ARMM funds (Roads to Peace)
Special funds/ODA
2013
39.836 kms
________ 39.836 kms
2014
30.309 kms
78.55 kms
________ 108.859 kms
2015
100 kms
200 kms
925.695 kms 1225.695kms
Measure 317.606 kms (19.22% Paved)
426.465 kms (25.81% Paved)
1652.16 kms (100 %Paved)
Resource Requirements
P588.13 Million (2013) P1,959.462 Million (2014); P24,513.9 Million (2015)
Support Agencies OP intervention, DBM, ORG, 5 Provincial Gov’t. offices, possible ODA assistance, NGOs.
B. Sector Outcome : 100% Paved Provincial Roads by end of 2015
JICA Study 2008, ARMM has 1,652.16 kms Provincial Roads.
Only 277.77 kms paved (16.81%) and 1,374.39 kms unpaved (83.19%).
4. RAPID INFRASTRUCTURE DEVELOPMENT ASSISTANCE (RIDA) for ARMM
Strategy Collaborative undertaking between DPWH-ARMM and the 116 LGUs of ARMM.
Actions DPWH-ARMM and selected technically capable LGUs will construct local roads under following funds: Regular Budget
OPAPP PAMANA ARMM funds (Roads to Peace)
Special funds/ODA
2013
42.14 kms
________ 42.14 kms
2014
118.93 kms
126.69 kms
245.62 kms
2015
100 kms
200 kms
1,092.24 kms
1,392.24 kms
Measure 462.14 kms (22% Paved)
707.76 kms (34% Paved)
2,100 kms (100 %Paved)
Resource Requirements
P425 Million (2013) P2,491.64 Million (2014); P13,922.40 Million (2015)
Support Agencies OP intervention, DBM, ORG, 116 LGUs, possible ODA assistance, NGOs.
C. Sector Outcome : 100% Paved Municipal Roads by end of 2015
DPWH-ARMM initial report, ARMM has 2,100 kms Municipal
Roads. Only 420 kms paved (20%) and 1,680 kms unpaved (80%)
4. RAPID INFRASTRUCTURE DEVELOPMENT ASSISTANCE (RIDA) for ARMM
Strategy Provide water supply projects in all 1,497 barangays (Level I, II or III Water Supply); conduct inventory of potential water sources in the areas; and secure Geo-Resistivity mapping that identify sufficient ground water sources
Actions
DPWH-ARMM will construct
WS projects using Regular Funds
DPWH-ARMM will construct WS projects using special funds/ODA assistance
2013 108 brgys
______ 108 brgys
2014 278 brgys
________ 278 brgys
2015 500 brgys
611 brgys
_______ 1,111 brgys
Measure 1,106 brgys (44%)
1,384 brgys (55%)
2,495 brgys (100%)
Resource Requirements
P108 Million (2013) P278 Million (2014); P 1,111 Million (2015)
Support Agencies OP intervention, DBM, NWRB, ORG, possible ODA assistance, LWUA, NGOs.
D. Sector Outcome : WATER FOR ALL 2,495 BARANGAYS in the ARMM by end of 2015. JICA Study revealed, only 998 barangays (40%) are provided with safe water supply facilities. About 1,497 barangays (60%) are deriving water from open dug wells or surface water with no treatment.
4. RAPID INFRASTRUCTURE DEVELOPMENT ASSISTANCE (RIDA) for ARMM
Strategy Rehabilitation of 23 Sea Ports and Expansion of the other 10 Sea Ports.
Actions
DPWH-ARMM will
rehabilitate/reconstruct 23 Sea Ports under regular budget.
DPWH-ARMM will expand the other 10 sea ports under regular budget.
2013 11 Ports
2 Ports
_______ 13 Ports
2014 7 Ports
3 Ports
________ 10 Ports
2015 5 Ports
5 Ports
_______ 10 Ports
Measure 13 Ports (39%)
23 Ports (70%)
33 Ports (100%)
Resource Requirements
P135 Million (2013) P155 Million (2014); P515 Million (2015)
Support Agencies DBM, ORG, LGUs, NGOs.
E. Sector Outcome : 100% Operational and Serviceable 33 Sea Ports in the ARMM by
end of 2015.
4. RAPID INFRASTRUCTURE DEVELOPMENT ASSISTANCE (RIDA) for ARMM
Strategy Generated in-house savings to purchase 9 units of survey instruments and solicited support from JICA on 8 RoCon Survey instruments for the 8 DEOs.
Actions
DPWH-ARMM generated saving from MNRB funds and purchased 9 survey instruments for the Regional Office and the 8 DEOs.
Convinced JICA to support the RoCon Survey of National Roads in the ARMM; JICA donated 8 units of Rocon Survey instrument for the 8 DEOs.
Measure All 8 DEOs will complete their RoCon Survey 3rd Quarter of 2013
Resource Requirements
P2.40 Million
Support Agencies Lanao del Sur 1st DEO, Lanao del Sur 2nd DEO, Maguindanao 1st DEO, Maguindanao 2nd DEO, Basilan Satellite DEO, Sulu 1st DEO, Sulu 2nd DEO and Tawi-Tawi DEO
F. Outcome : 100% Road Condition (RoCon) Survey as Baseline Data for
National Road Maintenance budgeting before end of 2013.
4. RAPID INFRASTRUCTURE DEVELOPMENT ASSISTANCE (RIDA) for ARMM
Strategy Implement the expanded-ARMM Road Mapping and Management (e-ARMM) Project, in order to: establish a database containing all roads in the ARMM inclusive
of their connectivity and conditions, and other public infrastructures within ARMM which are essential for use as monitoring tool and reference in future programming; and
create a network system (via internet) involving 8 DEOs as data providers and the ORG thru DPWH ARMM as data repository.
Actions
A portion of PDES fund has been reserved for e-ARMM Project.
8 DEOs of the DPWH-ARMM shall be tapped to collaborate with the provincial engineering offices and LGUs in their respective areas and jointly conduct surveys and data gathering.
Measure Completion of e-ARMM Project is in March 2014.
Resource Requirements
P2.50 Million
Support Agencies ORG, REO and the 8 DEOs of DPWH-ARMM, 5 Provincial Government Offices, 116 LGUs and NGOs.
G. Outcome : 100% Baseline Data Mapping on Roads (national, provincial and municipal) Connectivity by end of 2013. This will serve as reference in prioritizing road programs and budgeting.
4. RAPID INFRASTRUCTURE DEVELOPMENT ASSISTANCE (RIDA) for ARMM
Strategy Initiated talk with DPWH ManCom in 2012. Accepted conditionalities prior to devolution.
Actions
DPWH-ARMM established the Basilan Satellite DEO in Lamitan City through EO 14, series of 2012 signed by RG Hataman.
Assigned Technical Personnel to run the office.
Constructed the building for Satellite Office in Feb 2013.
Allocated project funds for 2012, 2013 and MOOE/PS.
Measure Devolution will take effect on the 3rd Quarter 2013.
Resource Requirements
Will be provided Regular Budget
Support Agencies DPWH-ARMM, DPWH National, DBM and ORG
H. Outcome : Devolution of Basilan DEO from DPWH National to DPWH-ARMM before end of 2013.
4. RAPID INFRASTRUCTURE DEVELOPMENT ASSISTANCE (RIDA) for ARMM
I. Outcome : Sufficient Acquisition of DPWH-ARMM Construction Equipment
Fleet for the 5 Area Equipment Service Offices by the end of 2013.
Strategy Generate savings to purchase additional equipment.
Action
Prudent fiscal
management on budget spending. additional 11 equipment/vehicles to be purchased.
2013 (First Half) 27 equipment/vehicles
9 survey instruments
________________ 27 equipment/vehicles
2013 (Second Half) 11 equipment/vehicles
___________________ 11 equipment/vehicles
Measure 27 units (73%)
38 units (100%)
Resource Requirements
P150 M (Budget from savings)
Support Agencies DBM, ORG and DPWH-ARMM
4. RAPID INFRASTRUCTURE DEVELOPMENT ASSISTANCE (RIDA) for ARMM
V. PERSONNEL REPORT
PERSONNEL SUMMARY
Regional Office
Basilan DEO
Lanao del Sur
Maguindanao Sulu Tawi-Tawi
Total
a. DEO I b. DEO II c. AES
a. DEO b. AES
a. DEO I b. DEO II c. AES
a. DEO b. AES
a. DEO b. AES
Regular 128 44 a. 81 b. 12 c. 37
a. 73 b. 41
a. 75 b. 45 c. 41
a. 59 b. 14 650
Casual None None a. None b. None c. None
a. None b. None
a. 10 b. None c. None
a. None b. None 10
Contractual None None a. None b. None c. None
a. None b. None
a. None b. None c. None
a. None b. None None
Contract of Service
None None a. None b. None c. None
a. None b. None
a. None b. None c. None
a. None b. None None
Job Order 79 20 a. 104 b. 33 c. 4
a. 98 b. 6
a. None b. 36 c. 5
a. None b. 4 389
Total 79 64 a. 185 b. 45 c. 41
a. 171 b. 47
a. 85 b. 81 c. 46
a. 59 b. 18 1,049
As of December 15, 2013
STATUS OF APPOINTMENTS As of December 15, 2013
OFFICES Number of Personnel
Permanent Temporary Co-terminus
Regional Office 128 126 0 2
Maguindanao Engineering District 73 72 1 0
Lanao del Sur Engineering District 93 92 1 0
Sulu First Engineering District 75 74 1 0
Sulu Second Engineering District 45 41 4 0
Tawi-Tawi Engineering District 59 59 0 0
Basilan Engineering District 44 44 0 0
Maguindanao Area Equipment Services 41 41 0 0
Lanao del Sur Area Equipment Services 37 37 0 0
Sulu Area Area Equipment Services 41 41 0 0
Tawi-Tawi Area Equipment Services 14 14 0 0
TOTAL 650 641 7 2
DPWH – ARMM CURRENT ORGANIZATIONAL CHART
OFFICE OF THE REGIONAL CABINET SECRETARY
OFFICE OF THE ASSISTANT REGIONAL SECRETARIES
PLANNING & PROGRAMMING
DIVISION
ADMINISTRATIVE DIVISION
SURVEY & DESIGN DIVISION
MAGUINDANAO AREA EQUIPMENT
SERVICES
MAGUINDANAO ENGINEERING.
DISTRICT OFFICE
LANAO DEL SUR ENGINEERING
DISTRICT OFFICE
SULU 1ST ENGINEERING
DISTRICT OFFICE
SULU 2ND ENGINEERING
DISTRICT OFFICE
TAWI-TAWI ENGINEERING
DISTRICT OFFICE
LANAO DEL SUR AREA EQUIPMENT
SERVICES
SULU AREA EQUIPMENT SERVICES
FINANCE AND MANAGEMENT
DIVISION
CONSTRUCTION DIVISION
MATERIAL QUALITY CONTROL & HYDROLOGY
DIVISION
MAINTENANCE DIVISION
EQUIPMENT DIVISION
SERVICES TECHNICAL
TAWI-TAWI AREA EQUIPMENT
SERVICES
DPWH – ARMM 2014 MODIFIED ORGANIZATIONAL CHART
NEWLY CREATED OFFICES/PLANTILLA IN 2014 EXISTING OFFICES
MANAGEMENT INFORMATION SYSTEM
PLANNING & PROGRAMMING
DIVISION
ADMINISTRATIVE DIVISION
SURVEY & DESIGN DIVISION
MAGUINDANAO 1ST ENGINEERING
DISTRICT
MAGUINDANAO AREA EQUIPMENT SERVICES
TAWI-TAWI AREA
EQUIPMENT SERVICES
MAGUINDANAO 2ND ENGINEERING
DISTRICT
LANAO DEL SUR 1ST ENGINEERING
DISTRICT
LANAO DEL SUR 2ND ENGINEERING
DISTRICT
SULU 1ST ENGINEERING
DISTRICT
SULU 2ND ENGINEERING
DISTRICT
TAWI-TAWI ENGINEERING
DISTRICT
BASILAN ENGINEERING
DISTRICT
LANAO DEL SUR AREA EQUIPMENT SERVICES
SULU AREA EQUIPMENT SERVICES
BASILAN AREA EQUIPMENT
SERVICES
FINANCIAL & MANAGEMENT
DIVISION
CONSTRUCTION DIVISION
MATERIALS QUALITY CONTROL & HYDROLOGY
DIVISION
MAINTENANCE DIVISION
EQUIPMENT DIVISION
BUREAU OF SERVICES BUREAU O F OPERATIONS
OFFICE OF THE REGIONAL CABINET SECRETARY
OFFICE OF THE ASSISTANT REGIONAL SECRETARIES
VI. CHALLENGES
DPWH-ARMM TO SUSTAIN THE SIGNIFICANT GAINS OF REFORM ON ITS EXISTING PROGRAMS AND POLICIES UNDER THE HATAMAN ADMINISTRATION.
DPWH-ARMM TO ACCELERATE IMPLEMETATION OF ARMM
INFRASTRUCTURE AS EMBODIED UNDER THE “RAPID INFRASTRUCTURE DEVELOPMENT ASSISTANCE (RIDA) for ARMM” IN ORDER TO UPLIFT LIVING CONDITION OF LOCAL RESIDENTS AND ENSURE SOCIO-ECONOMIC DEVELOPMENT IN THE ARMM BEFORE THE BANGSAMORO TRANSITION IN 2015.
DPWH-ARMM TO ENHANCE COLLABORATIVE EFFORT WITH THE
PROVINCIAL AND LOCAL GOVERNMENT UNITS IN THE ARMM, AND SECURE TECHNICAL AND FINANCIAL ASSISTANCE FROM THE JICA IN THE SUSTAINABLE IMPLEMENTATION OF THE EXPANDED ARMM ROAD MAPPING AND MANAGEMENT (e-ARMM) SYSTEM.
Thank you…