INTRODUCTION
LEVELLING
Levelling or leveling is the measurement of geodeticheightusing a levelling instrument and
alevel staff. Common levelling instruments include the spirit level, the dumpy level, andthe laser level. The two main types of levelling are single-levelling and double-levelling. In
double-levelling, a surveyor takes two foresights and two backsights and makes sure the
difference between the foresights and the difference between the backsights are equal, thereby
reducing the amount of error. ouble-levelling costs twice as much as single-levelling.
!n automatic level or dumpy was commonly used in surveying work to transfer, measure or to
test levels. It is used to gather and"or to transfer a known level to any unknown level. This survey
work is a common practice and basic procedure during site surveys, building construction or
other civil constructions.
TRAVERSE
Traverse is a method in the field ofsurveyingto establish control networks. It is also used in
geodetic work. Traverse is a series of surveys points whose relative positions are determined by
measured distances and directions between each set of consecutive points. The measured
distances are usually referred to as #course$ or #leg$. The survey points are called #traverse
stations$, or angle points.
TACHEOMETRY
Tacheometry is a system of rapid surveying,by which the positions, both hori%ontal and vertical,
of points on the earth surface relatively to one another are determined without using a chain or
tape or a separate levelling instrument.
The introduction of tacheometry, in which, instead of the pole formerly employed to mark a
point, a staff similar to alevel staff is used. This is marked with heights from the foot, and is
graduated according to the form of tacheometer in use. Thea%imuthangle is determined as
formerly. The hori%ontal distance is inferred either from the vertical angle included between two
well-defined points on the staff and the known distance between them, or by readings of the staff
indicated by two fi&edstadiawires in the diaphragm 'reticle( of thetelescope. The difference of
height is computed from the angle of depression or elevation of a fi&ed point on the staff and the
hori%ontal distance already obtained. Thus all the measurements requisite to locate a point both
vertically and hori%ontally with reference to the point where the tacheometer is centred are
determined by an observer at the instrument without any assistance beyond that of a man to hold
the staff.
http://en.wikipedia.org/wiki/Geodetic_systemhttp://en.wikipedia.org/wiki/Heighthttp://en.wikipedia.org/wiki/Level_staffhttp://en.wikipedia.org/wiki/Spirit_levelhttp://en.wikipedia.org/wiki/Dumpy_levelhttp://en.wikipedia.org/wiki/Laser_levelhttp://en.wikipedia.org/wiki/Surveyinghttp://en.wikipedia.org/w/index.php?title=Control_networks&action=edit&redlink=1http://en.wikipedia.org/wiki/Surveyinghttp://en.wikipedia.org/wiki/Level_staffhttp://en.wikipedia.org/wiki/Azimuthhttp://en.wikipedia.org/wiki/Stadiumhttp://en.wikipedia.org/wiki/Reticlehttp://en.wikipedia.org/wiki/Telescopehttp://en.wikipedia.org/wiki/Geodetic_systemhttp://en.wikipedia.org/wiki/Heighthttp://en.wikipedia.org/wiki/Level_staffhttp://en.wikipedia.org/wiki/Spirit_levelhttp://en.wikipedia.org/wiki/Dumpy_levelhttp://en.wikipedia.org/wiki/Laser_levelhttp://en.wikipedia.org/wiki/Surveyinghttp://en.wikipedia.org/w/index.php?title=Control_networks&action=edit&redlink=1http://en.wikipedia.org/wiki/Surveyinghttp://en.wikipedia.org/wiki/Level_staffhttp://en.wikipedia.org/wiki/Azimuthhttp://en.wikipedia.org/wiki/Stadiumhttp://en.wikipedia.org/wiki/Reticlehttp://en.wikipedia.org/wiki/Telescope8/12/2019 repot 7
2/9
METHODOLOGY
LEVELLING
)( *e started the leveling process from the given benchmark point.
+( The !uto-level was set up accordingly by fi&ing the bubble method.
( enchmark is the first back-sight and staff was placed there. The well-balanced !uto-
level was shooting e&actly to the staff and first benchmark reading was obtained.( Then the staff was moved to the ne&t point referred as the front-sight, the reading was
obtained as the first front-sight.'the distance was fi&ed(
/( Then the !uto-level was moved and shoot to the previous staff position and reading
obtained was the backside reading. Then the staff was moved to ne&t point and referred
as the front-sight.
0( This step was repeated until we arrived at the last point which was fi&ed by the lecturers.
1( Then we repeat again but in reverse direction until we met the benchmark again.2( !ll the arithmetical check, errors and misclosures was computed.
TRAVERSE
)( *hen the area of traversing was described to us, firstly we walk around the location and
develop a simple sketch, in order to assist us in making the e&act plan.
+( Then we mark the traverse location by spraying a nail onto the ground. *e manage to
give the area into two four sided polygon.( ! tripod was placed above the first point and a plumb line, 'a piece of lead with a
tapering end hung to the base of the tripod pointing e&actly on the nail hanging by a thin
thread(, plumb bob was placed at the point of convergence of the legs of the tripod, and
made to drop freely onto the top of the nail.
( To set up the theodolite properly we refer to the bubble ad3ustment method./( 4ame procedures are repeated to set up the theodolite at each station.
0( !fter set up was done, the recording are started, we were using the face-to-the-left
traversing method. Therefore from our first point, we will measure the angle from right to
the left which was the last and the second point.1( Then we hold the reading in theodolite and moved to the second point.
2( The method is repeated until all the internal angle of our polygon was measured.
5( *e supposed to measure the distance between points but its quite impossible and thus we
decided to obtain the distance in tacheometry.
)6( !ll readings were recorded in a table provided.
))( Then the error of traverse was determined by calculating the total internal angle andcompares it to the theoretical value.
TACHEOMETRY
8/12/2019 repot 7
3/9
)( *e did the tacheometry using the same location and the same e&act traverse station.
+( ! tripod was placed above the first point and a plumb line, 'a piece of lead with a
tapering end hung to the base of the tripod pointing e&actly on the nail hanging by a thin
thread(, plumb bob was placed at the point of convergence of the legs of the tripod, and
made to drop freely onto the top of the nail.
( To set up the theodolite properly we refer to the bubble ad3ustment method.( 4ame procedures are repeated to set up the theodolite at each station.
/( In tacheometry we faced several problems such as difficulties in obtaining e&act 567 for
the vertical angles. This is due to the environmental condition.
0( Then we obtain the reading of the stadia hair 'upper and lower(, mid-reading, hori%ontal
and vertical angle from each station.
1( 8ach data was tabulated in the table given.2( The error internal angle were determined.
DISCUSSION
LEVELLING
8/12/2019 repot 7
4/9
Levelling is operation the comparison of heights of point on the surface of the
earth. In levelling, the things that we have to measure is the backsight and the foresight.
*e have start the levelling from the ukit !yer until reached the mosque. It is about
.2)1 km. Then we continue from mosque until ukit !yer back. 4o the total distance is
double. In levelling there are two methods of calculating level. The first one is
collimation method and the second one is 9ise-and-:all method. ;ur group have choose
9ise-and-:all method to calculate the level. *e have measure the backsight and the
foresight. Then, we have to take backsight minus foresight. If the answer is positive, it
known as rise but if the answer is negative, it known as fall.
*e have to calculate all the backsight and foresight. ased on the result that we
have calculated for the levelling, finally we get the level which is 555.21.It is only 6.)+0
to )666 km. It is because due to the error that may occurred during carry this e&periment.
The error may occurred when taking the measurement due to paralla& error. To prevent
this error, we have to take the repeated readings and fine the average. Then, when holding
the stuff, the bubble of the stuff may not be in the middle of the circle. This make the
stuff do not vertically straight. To prevent this error, we have to make sure that the bubble
is in the middle of the circle. esides that, the autolevel also have the bubble to show the
stability and accuracy. *e have to make sure that, the bubble at the autolevel also is in
the middle of the circle. This is because, along the road, the surface of the road is not
plane. There is up and down in road. :urthermore, using the 9ise-and-:all method, it is
laborious and several calculations. This system is suitable for fly leveling where they are
no intermediate sights. In
8/12/2019 repot 7
5/9
Tacheometry is a branch of surveying in which hori%ontal and vertical distances
are determined by taking angular observations with an instrument known as tacheometer.
This method is very useful to us since the environmental conditions in our assigned
location aren=t very suitable for direct surveying like traverse. :irstly we take a look
around the ma3or location described by the lecturers and choose the appropriate point so
that there are no difficulties while tacheometry is done. The point must be seen clearly
from consecutive point and any minor obstacles that can be removed are removed. In this
practical the readings that must be considered are the hori%ontal and vertical angle, the
stadia readings 'upper and lower(, and also the mid-reading. :rom the theoretical formula
that we learnt in class, the value of > 'the hori%ontal distances(, and ? 'vertical
distances(, and also the height of instrument at each station.
*e didn=t manage to obtain e&act 56@ since there are so many obstacles such as
trees and other structure. Therefore the vertical must be taken. *e divided the area of
surveying into two ma3or areas. The first area covers half of the location but not including
the poolside. The difference sign in the vertical distances obtained is due to the
difference level of each point considering the elevation and depression angle 'the sight
uphill and sight downhill(. *ith this value we can determine the reduced level at each
point precisely. Then we sketch the plan accordingly to its ratio and importance structures
are included to give a better graphical appearance. The actual si%e might not be e&act to
its original structure since it is the bird view. !ll the ma3or station determined by the
lecturers has taken into consideration an include in our plan. The errors occurs in this
practical might due to the environmental factor and also the paralla& error done while
taking the stadia reading. The surface condition of the location such as big drain, river,
pool, and big rock preventing us from getting a straight view also made us choosing more
point and thus increasing the number of errors.
TRAVERSE
8/12/2019 repot 7
6/9
:or this e&periment, we have conducted a traversing with a theodolite in >utan
Lipur ukit !yer. !s we know traversing is a series of survey points whose relative
positions are determine by measured distance and direction between each consecutive
point. In this survey , we have separate the area to two area due to the area is too big and
there are too many things such as the branches of trees and the leaves or the utility of the
park that block our sight while the survey is done when we want determine our hori%ontal
.The both area of our survey consist of four corners and it is combine through a line of
each area, therefore by using the formula )26'n-+(, we can find the total interior angle is
06 degree. In this survey we have also can determine the distance of the points but due
to the distance of each points is far from each other, we calculate the distance using
formula. :rom this survey, we can determine the location and distance of each item in the
park. In our survey, we are doing closed traverse which starts and ends on the point of
known position. Then our survey is also a loop traverse because it starts and ends at the
same point. y the result we get in the survey, we can calculate the latitude and departure
and the ad3usted coordinates of the survey we do.
*hen we are conducting the survey, several errors might occur .;ne of the error
that occur during the survey is conducted is systematic error, where it is due to the
sensitivity of the theodolite. esides that, paralla& error also might occur while
conducting the survey as they didn=t observed the result while taping is not watch 56
degree. Therefore we need to calculate the linear error of misclosure, 8 using the formula
'latABdepA( and the precision error using the formula 8"'perimeter(. y calculating
these values, we will know whether our result is precise or not.
CONCLUSION
8/12/2019 repot 7
7/9
:rom the three e&periments that we have done, we are now have gained a lot of knowledge of
basic geomatic work and how to conduct the instruments.
In levelling, we are now completely understood on how to do the work. Long distance and
working under the heat of the sun have really gives us e&periences. :rom what we have done, we
successfully obtained a good result of the e&periment.
In tacheometry and traverse, we have done both in one measurement. It means that everytime we
take the measurement, we will use the value for both tacheometry and traverse calculations. The
whole area is like a trape%ium shape. :or such a huge area, we divided it into two portions. *e
calculate the distance using formula. *e get the degree of stations in clockwise direction. This
kind of surveying works also have give us a lot of e&periences. *e have mastered on how to
handle the instruments such as theodolite, staff, tape, and tripod.
!s a conclusion, we finally have reach the real ob3ectives of the e&periments. 8&periences and
knowledge of how to do the real leveling, techeometry, and traverse are the most important part
of this Deomatic Camp and honestly, we were having a good time doing it.
REFERENCES
8/12/2019 repot 7
8/9
Doogle.com
E4urveying for Construction=, *illiam >yslop Irvine
EConstruction 4urveying and LayoutF ! 4tep-y-4tep :ield 8ngineering
8/12/2019 repot 7
9/9
Practical 7geomatic camp