Upload
derek-decker
View
20
Download
1
Embed Size (px)
DESCRIPTION
Report to TT-WRM-3 on Chapter 8. Paul Pilon and Gabriel Arduino November 25-29, 2013 Geneva. Content remaining to be refined. No reviews received to date Cross linkages and dependency on other sections 8.4.4 Incident Management 8.4.5 Change Management 8.5 Observational Metadata - PowerPoint PPT Presentation
Citation preview
Report to TT-WRM-3 on Chapter 8Report to TT-WRM-3 on Chapter 8
Paul Pilon and Gabriel ArduinoNovember 25-29, 2013
Geneva
Content remaining to be refinedContent remaining to be refined
• No reviews received to dateNo reviews received to date• Cross linkages and dependency on other Cross linkages and dependency on other
sectionssections– 8.4.4 Incident Management– 8.4.5 Change Management – 8.5 Observational Metadata– 8.6 Quality Management– 8.7 Capacity Development
• Want to ensure consistency and avoid Want to ensure consistency and avoid duplication, in general, and in particular with duplication, in general, and in particular with these sectionsthese sections
Key Stakeholder ReviewsKey Stakeholder Reviews
• CHy PresidentCHy President
• CHy Advisory Working GroupCHy Advisory Working Group
• Some members of CHy OPACHE on Some members of CHy OPACHE on Basic Systems (supporting QMF-Basic Systems (supporting QMF-Hydrology and Data Operations and Hydrology and Data Operations and management theme areas)management theme areas)