Pre-Permitting Environmental / Socio-Economic Data Report Series
Report Series D-Groundwater Hydrology Figures
Preliminary data. Do not cite or quote.
The Pebble Partnership is providing environmental and socio-economic baseline data collected to inform the development of the Pebble Project to state and federal agencies, project stakeholders and the general public prior to project permitting as part of its commitment to full and open disclosure.
A comprehensive Environmental Baseline Document (EBD) will subsequently be prepared and appended to future project permit applications. The EBD will also be made publicly available when complete.
Prepared for the Pebble Limited Partnership byWater Management Consultants130-10691 Shellbridge WayRichmond BC V6X 2W8CANADA
604 273 6299
Report D-5 (Figures)Pumping Test FiguresPW1, PW3, PW4, PW5, PW6, PW7, PW8
September 20, 2004 - September 22, 2005Submitted to the Pebble Limited Partnership June 2008
PRE-PERMITTING ENVIRONMENTAL SOCIOECONOMIC DATA
REPORT SERIES
REPORT SERIES D: GROUNDWATER HYDROLOGY
SECTION 5 PUMPING TEST FIGURES
Section 5 Pumping Test Figures
Table of Contents
PW1:
P-4AS ................................................................................................1 P-4AD ................................................................................................2 P-6S...................................................................................................3 P-6M ..................................................................................................4 P-6D...................................................................................................5 Barologger .........................................................................................6
PW3: MW-11S.............................................................................................7 MW-11M ............................................................................................8 MW-11D.............................................................................................9 Barologger .........................................................................................10
PW4:
MW-1S...............................................................................................11 MW-1M ..............................................................................................12 MW-1D...............................................................................................13 Barologger .........................................................................................14
PW5:
MW-11D.............................................................................................15 MW-14S.............................................................................................16 MW-14D.............................................................................................17 P-05-24 ..............................................................................................18 P-05-25 ..............................................................................................19
PW6:
MW-14S.............................................................................................20 MW-14D.............................................................................................21 P-05-25 ..............................................................................................22 PW5...................................................................................................23 PW6...................................................................................................24 Barologger .........................................................................................25
Section 5 Pumping Test Figures
Table of Contents contd
PW7:
MW-3 .................................................................................................26 P-05-26S............................................................................................27 P-05-26D ...........................................................................................28 PW7...................................................................................................29 Barologger .........................................................................................30
PW8:
P-05-29S............................................................................................31 P-05-29M...........................................................................................32 P-05-29D ...........................................................................................33 P-05-29D2 .........................................................................................34 P-2D...................................................................................................35 Barologger .........................................................................................36
SECTION 5 PUMPING TEST FIGURES
PUMPING TEST PW1
Pumping Test PW1 - Piezometer P-4AS
30.32
30.34
30.36
30.38
30.40
30.42
30.44
30.46
30.48
30.50
20/Sep/046:00
20/Sep/0412:00
20/Sep/0418:00
21/Sep/040:00
21/Sep/046:00
21/Sep/0412:00
21/Sep/0418:00
22/Sep/040:00
22/Sep/046:00
22/Sep/0412:00
Pres
sure
(ft H
2O)
P-4AS (3323 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 1.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW1Piezometer P-4AS
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 1 of 36 The Pebble Partnership
Pumping Test PW1 - Piezometer P-4AD
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
20/Sep/046:00
20/Sep/0412:00
20/Sep/0418:00
21/Sep/040:00
21/Sep/046:00
21/Sep/0412:00
21/Sep/0418:00
22/Sep/040:00
22/Sep/046:00
22/Sep/0412:00
22/Sep/0418:00
Pres
sure
(ft H
2O)
P-4AD (12091 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 1.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW1Piezometer P-4AD
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 2 of 36 The Pebble Partnership
Pumping Test PW1 - Piezometer P-6S
19.58
19.59
19.60
19.61
19.62
19.63
19.64
19.65
19.66
19.67
19.68
19.69
20/Sep/046:00
20/Sep/0412:00
20/Sep/0418:00
21/Sep/040:00
21/Sep/046:00
21/Sep/0412:00
21/Sep/0418:00
22/Sep/040:00
22/Sep/046:00
22/Sep/0412:00
Pres
sure
(ft H
2O)
P-6S (2891 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 1.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW1Piezometer P-6S
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 3 of 36 The Pebble Partnership
Pumping Test PW1 - Piezometer P-6M
26.00
26.50
27.00
27.50
28.00
28.50
29.00
29.50
20/Sep/046:00
20/Sep/0412:00
20/Sep/0418:00
21/Sep/040:00
21/Sep/046:00
21/Sep/0412:00
21/Sep/0418:00
22/Sep/040:00
22/Sep/046:00
22/Sep/0412:00
Pres
sure
(ft H
2O)
P-6M (7731 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 1.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW1Piezometer P-6M
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 4 of 36 The Pebble Partnership
Pumping Test PW1 - Piezometer P-6D
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
20/Sep/046:00
20/Sep/0412:00
20/Sep/0418:00
21/Sep/040:00
21/Sep/046:00
21/Sep/0412:00
21/Sep/0418:00
22/Sep/040:00
22/Sep/046:00
22/Sep/0412:00
22/Sep/0418:00
Pres
sure
(ft H
2O)
P-6D (22854 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 1.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW1Piezometer P-6D
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 5 of 36 The Pebble Partnership
Pumping Test PW1 - Barometric Pressure
31.80
32.00
32.20
32.40
32.60
32.80
33.00
33.20
20/Sep/046:00
20/Sep/0412:00
20/Sep/0418:00
21/Sep/040:00
21/Sep/046:00
21/Sep/0412:00
21/Sep/0418:00
22/Sep/040:00
22/Sep/046:00
22/Sep/0412:00
22/Sep/0418:00
Pres
sure
(ft H
2O)
Barologger (2312 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 1.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW1
Barologger
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 6 of 36 The Pebble Partnership
SECTION 5 PUMPING TEST FIGURES
PUMPING TEST PW3
Pumping Test PW3 - Monitoring Well MW-11S
18.30
18.40
18.50
18.60
18.70
18.80
18.90
19.00
19.10
07/Oct/040:00
07/Oct/0412:00
08/Oct/040:00
08/Oct/0412:00
09/Oct/040:00
09/Oct/0412:00
10/Oct/040:00
10/Oct/0412:00
11/Oct/040:00
11/Oct/0412:00
12/Oct/040:00
12/Oct/0412:00
Pres
sure
(ft H
2O)
MW-11S (6317 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 3.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW3
Monitoring Well MW-11S
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 7 of 36 The Pebble Partnership
Pumping Test PW3 - Monitoring Well MW-11M
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
07/Oct/040:00
07/Oct/0412:00
08/Oct/040:00
08/Oct/0412:00
09/Oct/040:00
09/Oct/0412:00
10/Oct/040:00
10/Oct/0412:00
11/Oct/040:00
Pres
sure
(ft H
2O)
MW-11M (14974 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 3.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW3
Monitoring Well MW-11M
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 8 of 36 The Pebble Partnership
Pumping Test PW3 - Monitoring Well MW-11D
29.60
29.80
30.00
30.20
30.40
30.60
30.80
07/Oct/040:00
07/Oct/0412:00
08/Oct/040:00
08/Oct/0412:00
09/Oct/040:00
09/Oct/0412:00
10/Oct/040:00
10/Oct/0412:00
11/Oct/040:00
11/Oct/0412:00
12/Oct/040:00
12/Oct/0412:00
Pres
sure
(ft H
2O)
MW-11D (15072 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 3.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW3
Monitoring Well MW-11D
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 9 of 36 The Pebble Partnership
Pumping Test PW3 - Barometric Pressure
31.80
32.00
32.20
32.40
32.60
32.80
33.00
33.20
07/Oct/040:00
07/Oct/0412:00
08/Oct/040:00
08/Oct/0412:00
09/Oct/040:00
09/Oct/0412:00
10/Oct/040:00
10/Oct/0412:00
11/Oct/040:00
11/Oct/0412:00
12/Oct/040:00
12/Oct/0412:00
Pres
sure
(ft H
2O)
Barologger (2312 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 3.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW3
Barologger
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 10 of 36 The Pebble Partnership
SECTION 5 PUMPING TEST FIGURES
PUMPING TEST PW4
Pumping Test PW4 - Monitoring Well MW-1S
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
20/Sep/040:00
23/Sep/040:00
26/Sep/040:00
29/Sep/040:00
02/Oct/040:00
05/Oct/040:00
08/Oct/040:00
11/Oct/040:00
14/Oct/040:00
17/Oct/040:00
20/Oct/040:00
23/Oct/040:00
Pres
sure
(ft H
2O)
MW-1S (6890 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 4.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW4
Monitoring Well MW-1S
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 11 of 36 The Pebble Partnership
Pumping Test PW4 - Monitoring Well MW-1M
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20/Sep/040:00
23/Sep/040:00
26/Sep/040:00
29/Sep/040:00
02/Oct/040:00
05/Oct/040:00
08/Oct/040:00
11/Oct/040:00
14/Oct/040:00
17/Oct/040:00
20/Oct/040:00
23/Oct/040:00
Pres
sure
(ft H
2O)
MW-1M (10402 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 4.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW4
Monitoring Well MW-1M
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 12 of 36 The Pebble Partnership
Pumping Test PW4 - Monitoring Well MW-1D
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20/Sep/040:00
23/Sep/040:00
26/Sep/040:00
29/Sep/040:00
02/Oct/040:00
05/Oct/040:00
08/Oct/040:00
11/Oct/040:00
14/Oct/040:00
17/Oct/040:00
20/Oct/040:00
23/Oct/040:00
Pres
sure
(ft H
2O)
MW-1D (11807 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 4.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW4
Monitoring Well MW-1D
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 13 of 36 The Pebble Partnership
Pumping Test PW4 - Barometric Pressure
31.80
32.00
32.20
32.40
32.60
32.80
33.00
33.20
33.40
20/Sep/040:00
23/Sep/040:00
26/Sep/040:00
29/Sep/040:00
02/Oct/040:00
05/Oct/040:00
08/Oct/040:00
11/Oct/040:00
14/Oct/040:00
17/Oct/040:00
20/Oct/040:00
23/Oct/040:00
Pres
sure
(ft H
2O)
Barologger (2860 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 4.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW4
Barologger
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 14 of 36 The Pebble Partnership
SECTION 5 PUMPING TEST FIGURES
PUMPING TEST PW5
Pumping Test PW5 - Monitoring Well MW-11D
19.04
19.06
19.08
19.10
19.12
19.14
19.16
19.18
04/Aug/0512:00
05/Aug/050:00
05/Aug/0512:00
06/Aug/050:00
06/Aug/0512:00
07/Aug/050:00
07/Aug/0512:00
08/Aug/050:00
08/Aug/0512:00
Pres
sure
(ft H
2O)
MW-11D (426 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 5.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW5
Monitoring Well MW-11D
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 15 of 36 The Pebble Partnership
Pumping Test PW5 - Monitoring Well MW-14S
10.40
10.50
10.60
10.70
10.80
10.90
11.00
11.10
11.20
11.30
04/Aug/0512:00
05/Aug/050:00
05/Aug/0512:00
06/Aug/050:00
06/Aug/0512:00
07/Aug/050:00
07/Aug/0512:00
08/Aug/050:00
08/Aug/0512:00
Pres
sure
(ft H
2O)
MW-14S (549 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 5.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW5
Monitoring Well MW-14S
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 16 of 36 The Pebble Partnership
Pumping Test PW5 - Monitoring Well MW-14D
18.40
18.60
18.80
19.00
19.20
19.40
19.60
19.80
20.00
04/Aug/0512:00
05/Aug/050:00
05/Aug/0512:00
06/Aug/050:00
06/Aug/0512:00
07/Aug/050:00
07/Aug/0512:00
08/Aug/050:00
08/Aug/0512:00
Pres
sure
(ft H
2O)
MW-14D (1445 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 5.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW5
Monitoring Well MW-14D
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 17 of 36 The Pebble Partnership
Pumping Test PW5 - Piezometer P-05-24
12.00
12.20
12.40
12.60
12.80
13.00
04/Aug/0512:00
05/Aug/050:00
05/Aug/0512:00
06/Aug/050:00
06/Aug/0512:00
07/Aug/050:00
07/Aug/0512:00
08/Aug/050:00
08/Aug/0512:00
Pres
sure
(ft H
2O)
P-05-24 (588 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 5.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW5Piezometer P-05-24
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 18 of 36 The Pebble Partnership
Pumping Test PW5 - Piezometer P-05-25
18.80
19.00
19.20
19.40
19.60
19.80
20.00
20.20
04/Aug/0512:00
05/Aug/050:00
05/Aug/0512:00
06/Aug/050:00
06/Aug/0512:00
07/Aug/050:00
07/Aug/0512:00
08/Aug/050:00
08/Aug/0512:00
Pres
sure
(ft H
2O)
P-05-25 (16753 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 5.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW5Piezometer P-05-25
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 19 of 36 The Pebble Partnership
SECTION 5 PUMPING TEST FIGURES
PUMPING TEST PW6
Pumping Test PW6 - Monitoring Well MW-14S
19.50
20.00
20.50
21.00
21.50
22.00
22.50
23.00
24/Sep/050:00
27/Sep/050:00
30/Sep/050:00
03/Oct/050:00
06/Oct/050:00
09/Oct/050:00
12/Oct/050:00
15/Oct/050:00
18/Oct/050:00
Pres
sure
(ft H
2O)
MW-14S (8376 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 6.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW6
MW-14S
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 20 of 36 The Pebble Partnership
Pumping Test PW6 - Monitoring Well MW-14D
21.00
21.50
22.00
22.50
23.00
23.50
24.00
24.50
25.00
25.50
24/Sep/050:00
27/Sep/050:00
30/Sep/050:00
03/Oct/050:00
06/Oct/050:00
09/Oct/050:00
12/Oct/050:00
15/Oct/050:00
18/Oct/050:00
Pres
sure
(ft H
2O)
MW-14D (8626 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
Pre-permitting Environmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW6
Monitoring Well MW-14D
Pumping Test PW6 - Piezometer P-05-25
19.40
19.50
19.60
19.70
19.80
19.90
20.00
20.10
20.20
20.30
20.40
13/Oct/0512:00
14/Oct/050:00
14/Oct/0512:00
15/Oct/050:00
15/Oct/0512:00
16/Oct/050:00
16/Oct/0512:00
17/Oct/050:00
Pres
sure
(ft H
2O)
P-05-25 (2098 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 6.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW6Piezometer P-05-25
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 22 of 36 The Pebble Partnership
Pumping Test PW6 - Monitoring Well PW-5
18.60
18.70
18.80
18.90
19.00
19.10
19.20
19.30
19.40
13/Oct/0512:00
14/Oct/050:00
14/Oct/0512:00
15/Oct/050:00
15/Oct/0512:00
16/Oct/050:00
16/Oct/0512:00
17/Oct/050:00
Pres
sure
(ft H
2O)
PW-5 (2086 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 6.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW6
Monitoring Well PW5
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 23 of 36 The Pebble Partnership
Pumping Test PW6 - Pumping Well PW6
0.00
2.00
4.00
6.00
8.00
10.00
12.00
13/Oct/0512:00
14/Oct/050:00
14/Oct/0512:00
15/Oct/050:00
15/Oct/0512:00
16/Oct/050:00
16/Oct/0512:00
17/Oct/050:00
Pres
sure
(ft H
2O)
PW-6 (2940 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 6.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW6Pumping Well PW6
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 24 of 36 The Pebble Partnership
Pumping Test PW6 - Barometric Pressure
25.00
26.00
27.00
28.00
29.00
30.00
24/Sep/050:00
27/Sep/050:00
30/Sep/050:00
03/Oct/050:00
06/Oct/050:00
09/Oct/050:00
12/Oct/050:00
15/Oct/050:00
Pres
sure
(inc
hes
Hg)
Barologger (1475 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 6.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW6
Barologger
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 25 of 36 The Pebble Partnership
SECTION 5 PUMPING TEST FIGURES
PUMPING TEST PW7
Pumping Test PW7 - Monitoring Well MW-3D
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
21/Sep/050:00
24/Sep/050:00
27/Sep/050:00
30/Sep/050:00
03/Oct/050:00
06/Oct/050:00
09/Oct/050:00
12/Oct/050:00
15/Oct/050:00
Pres
sure
(ft H
2O)
MW-3D (14905 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 7.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW7
Monitoring Well MW-13D
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 26 of 36 The Pebble Partnership
Pumping Test PW7 - Piezometer P-05-26S
11.80
12.00
12.20
12.40
12.60
12.80
13.00
13.20
13.40
13.60
13.80
21/Sep/050:00
24/Sep/050:00
27/Sep/050:00
30/Sep/050:00
03/Oct/050:00
06/Oct/050:00
09/Oct/050:00
12/Oct/050:00
15/Oct/050:00
Pres
sure
(ft H
2O)
P-05-26S (15217 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 7.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW7
Piezometer P-05-26S
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 27 of 36 The Pebble Partnership
Pumping Test PW7 - Piezometer P-05-26D
29.00
30.00
31.00
32.00
33.00
34.00
35.00
21/Sep/050:00
24/Sep/050:00
27/Sep/050:00
30/Sep/050:00
03/Oct/050:00
06/Oct/050:00
09/Oct/050:00
12/Oct/050:00
15/Oct/050:00
Pres
sure
(ft H
2O)
P-05-26D (11184 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 7.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW7
Piezometer P-05-26D
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 28 of 36 The Pebble Partnership
Pumping Test PW7 - Pumping Well PW7
15.00
17.00
19.00
21.00
23.00
25.00
27.00
29.00
24/Sep/050:00
26/Sep/050:00
28/Sep/050:00
30/Sep/050:00
02/Oct/050:00
04/Oct/050:00
06/Oct/050:00
08/Oct/050:00
10/Oct/050:00
12/Oct/050:00
14/Oct/050:00
16/Oct/050:00
Pres
sure
(ft H
2O)
PW-7 (7913 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 7.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW7Pumping Well PW7
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 29 of 36 The Pebble Partnership
Pumping Test PW7 - Barometric Pressure
27.50
27.70
27.90
28.10
28.30
28.50
28.70
28.90
29.10
29.30
29.50
13/Sep/050:00
15/Sep/050:00
17/Sep/050:00
19/Sep/050:00
21/Sep/050:00
23/Sep/050:00
25/Sep/050:00
27/Sep/050:00
29/Sep/050:00
01/Oct/050:00
Pres
sure
(ft H
2O)
Barologger (711 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 7.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW7
Barologger
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 30 of 36 The Pebble Partnership
SECTION 5 PUMPING TEST FIGURES
PUMPING TEST PW8
Pumping Test PW8 - Piezometer P-05-29S
1.20
1.25
1.30
1.35
1.40
1.45
1.50
1.55
1.60
14/Sep/050:00
14/Sep/0512:00
15/Sep/050:00
15/Sep/0512:00
16/Sep/050:00
16/Sep/0512:00
17/Sep/050:00
17/Sep/0512:00
18/Sep/050:00
18/Sep/0512:00
19/Sep/050:00
19/Sep/0512:00
20/Sep/050:00
Pres
sure
(ft H
2O)
P-05-29S (2809 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 8.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW8
Piezometer P-05-29S
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 31 of 36 The Pebble Partnership
Pumping Test PW8 - Piezometer P-05-29M
27.20
27.25
27.30
27.35
27.40
27.45
27.50
27.55
27.60
15/Sep/050:00
15/Sep/0512:00
16/Sep/050:00
16/Sep/0512:00
17/Sep/050:00
17/Sep/0512:00
18/Sep/050:00
18/Sep/0512:00
19/Sep/050:00
19/Sep/0512:00
20/Sep/050:00
Pres
sure
(ft H
2O)
P-05-29M (2397 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 8.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW8
Piezometer P-05-29M
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 32 of 36 The Pebble Partnership
Pumping Test PW8 - Piezometer P-05-29D
15.00
17.00
19.00
21.00
23.00
25.00
27.00
29.00
31.00
33.00
35.00
15/Sep/050:00
15/Sep/0512:00
16/Sep/050:00
16/Sep/0512:00
17/Sep/050:00
17/Sep/0512:00
18/Sep/050:00
18/Sep/0512:00
19/Sep/050:00
19/Sep/0512:00
20/Sep/050:00
Pres
sure
(ft H
2O)
P-05-29D (11344 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 8.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW8
Piezometer P-05-29D
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 33 of 36 The Pebble Partnership
Pumping Test PW8 - Piezometer P-05-29D2
5.00
10.00
15.00
20.00
25.00
30.00
35.00
14/Sep/050:00
14/Sep/0512:00
15/Sep/050:00
15/Sep/0512:00
16/Sep/050:00
16/Sep/0512:00
17/Sep/050:00
17/Sep/0512:00
18/Sep/050:00
18/Sep/0512:00
19/Sep/050:00
19/Sep/0512:00
20/Sep/050:00
Pres
sure
(ft H
2O)
P-05-29D2 (15701 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 8.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW8
Piezometer P-05-29D2
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 34 of 36 The Pebble Partnership
Pumping Test PW8 - Piezometer P-2D
22.30
22.40
22.50
22.60
22.70
22.80
22.90
23.00
14/Sep/050:00
14/Sep/0512:00
15/Sep/050:00
15/Sep/0512:00
16/Sep/050:00
16/Sep/0512:00
17/Sep/050:00
17/Sep/0512:00
18/Sep/050:00
18/Sep/0512:00
19/Sep/050:00
19/Sep/0512:00
20/Sep/050:00
Pres
sure
(ft H
2O)
P-2D (1023 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 8.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW8Piezometer P-2D
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 35 of 36 The Pebble Partnership
Pumping Test PW8 - Barometric Pressure
28.10
28.20
28.30
28.40
28.50
28.60
28.70
28.80
28.90
29.00
29.10
14/09/050:00
15/09/050:00
16/09/050:00
17/09/050:00
18/09/050:00
19/09/050:00
20/09/050:00
21/09/050:00
22/09/050:00
23/09/050:00
Pres
sure
(ft H
2O)
Barologger (361 Data Points)
Project: 7126
Version: 1 Author: WMC-LC
Date: June 16, 2008
Legend
\\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 8.xls
Pre-permittingEnvironmental/Socioeconomic
Data Report Series
Report Series D: Groundwater Hydrology
Section 5 - Pumping Tests:Pumping Well PW8
Barologger
Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008
7126 Page 36 of 36 The Pebble Partnership