    ENMAS ANDRITZ PRIVATE LIMITEDTECHNICAL SERVICES POWER BOILER

    CHENNAI, INDIA

    BIRLA CELLULOSIC KHARACH (WB029M) 1 x 120 TPH AFBC BOILER

    REPORT ON BIRLA CELLULOSIC SITE VISIT

    Self has reached the site on 17-06-09 @ 7.00 PM and the elaborate operating

    problems & issues has been discussed ith !irla cellulosic operation team &

    Maintenance team

    "he issues and root cause has been stated belo

    Problem1. #efractor$ insulation at clinger seal bo% area has been eroded and the bed

    material has been pops outside @ 160609 11.10 pm ith a !oiler load of

    10'-10( "P) and bed temp of 9*0-9(0 deg +. ,fter this incident 1st

    compartment has been slumped off and all other compartment here in

    operation e%pect 6thcompartment ith boiler load of 7'-7* "P)

    Causes and suggested solution:

    1. rosion of refractor$ started from clinger door seal bo% area and the

    boiler as under near full load operation from 0*0609 to till this incident. t

    has been obser/ed that !+ personnels didnt place a refractor$ !ric2 lining at

    clinger door area as it as clearl$ shon in ,rrg. 3f #efractor$ draing.

    4rg 5o-00-7'-01-00700

    '. ,ll other area of refractor$ ill be cooled b$ ater alls b$ conducti/e

    heat transfer ith tube. !ut areas li2e clinger door8 here the heat transfer is

    predominantl$ b$ radiation should be insulated ith refractor$ bric2 lining.

    Problem

    1. !+ informed that some of the coal feeders ere cant able to ta2e in auto

    mode

    REPORT No: EAPLWB029M1!0"0901 TECHNICAL SER#ICES PB B$: RAA%A REUBEN R

    DATE : 200"09 ENMAS ANDRIT& P#T LTD E'ECUTI#E ENINEER

  • 7/23/2019 Report on Birla Cellulosic Site Visit 200609

    2/3

    ENMAS ANDRITZ PRIVATE LIMITEDTECHNICAL SERVICES POWER BOILER

    CHENNAI, INDIA

    BIRLA CELLULOSIC KHARACH (WB029M) 1 x 120 TPH AFBC BOILER

    Causes and suggested solution:

    1. "his problem as due to con/erter on :4 panel8 since the feeder

    motor rpm is mandator$ for auto mode. !+ ants all failed ,M"+) supplied

    :4 panels +,53P;S con/erter to be replaced ith M,S!;S con/erter

    '. !+ replaced +,53P;S con/erter of coal feeder ith M,S!;S

    con/erter from

  • 7/23/2019 Report on Birla Cellulosic Site Visit 200609

    3/3

    ENMAS ANDRITZ PRIVATE LIMITEDTECHNICAL SERVICES POWER BOILER

    CHENNAI, INDIA

    BIRLA CELLULOSIC KHARACH (WB029M) 1 x 120 TPH AFBC BOILER

    1. Ahile on B100C!M+# ?1'6"P) on 060609 ith drum Pressure of (7

    gcm'. "he flo of the steam as recorded as 1*6"P) hich is lasted for fe

    seconds8 since flo is pressure compensated. Soon be$ond the set /alue of

    1*("P)8 the has been sitched o/er to manual mode. n response to that

    drum le/el has a ide fluctuation and finall$ M:" acted for 4rum le/el )).

    Suggested solution:

    1. +ontroller should ha/e the pro/ision to sitch o/er from to 1 hile on

    boiler normal operation itself. Pro/iding a selection button for 1 for 100C

    + in !oiler normal operation. f there is hea/$ fluctuation on drum le/el

    because of abo/e stated issue8 operator can sitch o/er to 1 to a/oid

    fluctuation and folloed boiler tripping.

    Problem

    1. Safet$ /al/e passing

    Response

    1. 5M,S ill send an e%pert soon regarding this issue ?as con/e$ed b$ Mr.

    #MD

    Problem

    1. ,P) side casing plate tears off and ha/ing hea/$ /ibration

    Response

    1. "his ill be attended hile on forthcoming boiler shutdon schedule ?as in

    M3M on 09-06-09

    REPORT No: EAPLWB029M1!0"0901 TECHNICAL SER#ICES PB B$: RAA%A REUBEN R

    DATE : 200"09 ENMAS ANDRIT& P#T LTD E'ECUTI#E ENINEER