42A1ISE0S03 2.11437 MURPHY 010
REPORT
ON
INDUCED POLARIZATION SURVEY
SOUTHEAST MURPHY PROJECT
MURPHY TOWNSHIP
NTS: 42-A/ll
NOV 8 1991
JANUARY 1991 B. TAYLOR TIMMINS GEOPHYSICS LTD.
* l 44•S*
SUMMARY AND RECOMMENDATIONS
An induced polarization survey was carried out over the western portion of
the Southeast Murphy Property.
The results defined ten zones of high chargeability, all of which represent
good drill targets.
Anomaly 'A' is best defined in the HLEM survey, and was previously tested by
drilling in the north half of Concession II. It is recommended that this zone
be drilled on Line 550 West.
Anomaly 'B' is the target of a number of drill holes between O and 800 East
where the conductivity is highest. It is recommended that this zone is tested
on Lines 700 and 1300 East. The poor conductivity and lower magnetics on these
lines may be due to alterations and silicification along suspected northeast
striking faults.
Anomaly 'C 1 is a very strong chargeability response and a poor EM anomaly
which has not been previously drilled. It is recommended that this zone is
tested on Line 400 West.
Anomaly 'F' is a poor EM anomaly and a strong chargeability anomaly which is
along strike with an alteration zone to the east. It is recommended that this
zone is drilled on Line 450 West.
Anomaly 'L 1 is a high chargeability and VLF-EM anomaly along the southern
edge of the property. It is recommended that this zone is drilled on Line 600
West.
Anomaly 'M' is a weak chargeability response which should be tested on Line
200 West where there is a coincident low magnetic anomaly.
11
Anomaly 'N 1 is a high chargeability and low magnetic anomaly which should be
tested on Line 100 East.
Anomaly 'O' is a chargeability high which is incompletely defined due to
interference from zones 'B 1 and 'P' which are very closely spaced. It is
recommended that this zone be drilled on Line O where the zone is better defined.
Anomaly 'P 1 is a high chargeability anomaly which coincides with a linear
magnetic low anomaly. It is recommended that this zone is tested on Line 400
East.
Anomaly 'Q 1 is a very poorly defined chargeability anomaly to the north of
Anomaly 'F'. The coincident low magnetic anomaly however suggests that the
source may be an alteration zone. It is recommended that it is tested on Line
600 West.
42A11SEe5e3 2.14437 MURPHY 010C
TABLE OF CONTENTS
SUMMARY AND RECOMMENDATIONS ,
INTRODUCTION
SURVEY DESCRIPTION
INDUCED POLARIZATION RESULTS
page
i
. l
. l
. l
IV
LIST OF FIGURES
1. LOCATION MAP
2. CLAIM MAP ..,
3. GRID SKETCH ,
page
, 2
, 3
. 4
LIST OF TABLES
1. DELAY AND INTEGRATION TIMES FOR IPR-11
page
. 5
LIST OF MAPS
1. CHARGEABILITY PLAN MAP :
2. RESISTIVITY PLAN MAP : N
3. PSEUDOSECTIONS (a) LINE 600W 800S - 1600S
(b) LINE 400W 800S - 1600S
(c) LINE 600W ON - SOON
(d) LINE 400W ON - SOON
(e) LINE 200W ON - SOON
(f) LINE O SOON - 1600S
(g) LINE 400E OS - 1600S
INTRODUCTION
During May 1990, an induced polarization (IP) survey was carried out over
selected lines on the Southeast Murphy property. The purpose of the surveys was
to test a number of weak EM anomalies outlined in 1989 surveys. The 1989 work
consisted of magnetic, horizontal loop electromagnetic (HLEM) and very lowi
frequency electromagnetic (VLF-EM) surveys. The property is underlain by steeply
dipping Archean volcanics and metasediments which are along strike with the Bell
Creek, Owl Creek and Hoyle Pond gold deposits to the east.
The property is located approximately ten kilometres northeast of the city
of Timmins in the Porcupine Mining Division (Figure 1). It consists of 26
contiguous claims in the southeast corner of Murphy Township (Figure 2).
The claims were accessed from an all weather road which was accessed from
Highway 655.
The field crew included J. DerWeduwen, B. Pigeon, J. Gasteiger, L. Varin and
D. Londry.
SURVEY DESCRIPTIONS
The grid on the property consists of north-south lines spaced every 100
metres and picketed every 20 metres. The IP survey was carried out on selected
lines as shown in Figure 3.
The survey was conducted with the Scintrex IPR-11 time domain receiver and
the Scintrex TSQ-3 3000 Watt transmitter. The current on-off time is two
Figure l: Location Map
UI523B
1116242
IU5240
1115239
I132S86
1115252
III525S
1115253
IU6254
I4BI4
III4BI5 -J
t-
IU4BI6
UI48I9
1114973
UI4976
III48I7
III48IB
1114974
UI4975
(115248
IU525I
UI5249
UI5250
UI529I
1115290
1115292
IU5293
O
MURPHY TWP.
TISDALE TWP.
SOUTHEAST MURPHY PROJECT
CLAIM MAP
Seal* s l ; 2OOOO
Fioure 2, Claim Map
LO
T
4L
OT
3
i i
LOT
2LO
T
l
i I8Q
UJ U
t 111
88
Ul
88C
8 8
fi Si
-1 -1
~ 12OO S
MU
RP
HY
TW
P.
TISD
ALE
TWP
.
Q.
Q.
Of
UJ
8 8w(M
—
TL 1600 N
—
1200 N
—
TL
8OO
N
—
BL O
—
TL
8OO
S
IP.
Survey
SOU
THEAST
GR
ID
MU
RP
HY
PR
OJE
CT
SK
ETC
H
Seal* 1-
2OO
OO
|
Figure 3.
Grid S
ketch
5
seconds. Integration takes place during ten time intervals or 'slices', after
shut-off; Table l lists the delay and integration times for each slice.
A pole-dipole array was used with an 'a 1 spacing of 50 metres. Readings
were taken for 'n' values of l to 4.
SLICE
010i.3456789
DELAY TIME (MS)
30609012015033051069010501410
INTEGRATION TIME (MS)
30303030180180180360360360
Table 1: Delay and integration times of the Scintrex IPR-11 IP receiver.
IP RESULTS
The 'n' s l results are shown on Maps l and 2 at a scale of 1:5000. The IP
results are presented on pseudosections in Maps 3(a) to 3(g). A total of ten
anomalies were outlined in the results.
Anomalies 'A'and 'B' coincide with strong HLEM anomalies while Anomalies 'C 1
and 'F 1 are weak HLEM anomalies which were extended by the IP survey. Anomaly
'L'corresponds to a VLF-EM anomaly, Anomalies 'M', 'N 1 , 'O', 'P' and 'Q' are
6
chargeable zones not defined in the EM surveys.
It is interesting to note that Anomalies 'E' and 'G' outlined in the VLF-EM
survey have no IP response, indicating that these EM responses have surficial
sources.
ANOMALY 'A'
Anomaly 'A 1 is an east northeast striking anomaly located in Lot 4,
Concession II. It coincides with a conductive zone defined in the 1989 HLEM
survey and is best defined by a low resistivity anomaly. It has been previously
tested by drilling in the north half of Concession II.
ANOMALY 'B'
Anomaly 'B 1 coincides with a strong EM anomaly which strikes east-west
through the north half of Concession I, It is defined by very high chargeability
values and very low resistivity. Several drill holes have tested this zone
between Lines O and 800 East, where conductivity is highest.
ANOMALY 'C 1
Anomaly 'C' is a northeast striking anomaly in Lot 4, Concession II. It is
7
defined by high chargeability values and a slight resistivity low. It coincides
with a poorly defined, mainly quadrature anomaly in the HLEM survey and is
located along the north flank of an area of high magnetics.
Between Anomalies 'A 1 and 'C', the chargeability values are elevated and the
resistivity values are low; Anomalies 'A' and "C" converge toward the east. This
suggests that a wedge of highly chargeable rock is present; whose contact zones
are marked by Anomalies 'A' and 'C'.
ANOMALY 'F'
Anomaly 'F* is a high chargeability, low resistivity anomaly which strikes
east-west at approximately 1300 South. The coincident EM anomaly shows that the
best conductivity is located between 300 and 700 West. East of 300 West, the
source was only detected in the VLF-EM survey, and not in the HLEM survey:
however, the amplitude of the chargeability response is similar over the entire
strike length. There is no anomaly on Line 400 East, but the chargeability
readings in the area are poor due to poor ground contacts.
ANOMALY 'L'
Anomaly 'L 1 coincides with a VLF-EM anomaly which strikes east west along the
southern edge of the property. The survey did not completely cover the zone,
however the high chargeability suggests that the VLF anomaly has a mineralized
bedrock source.
ANOMALY 'M 1
Anomaly 'M 1 is a weak chargeability response which strikes east northeast
between 350 North on Line 400 West and 525 North on Line 0. There is no
corresponding resistivity low, which explains the absence of an EM response over
this zone. The low magnetic values associated with the IP anomaly suggests that
the source Tiay be mineralization within an alteration zone.
ANOMALY 'N'
Anomaly 'N 1 is located just to the north of anomaly 'B 1 . It is a high
chargeability anomaly which coincides with a long linear magnetic low anomaly.
ANOMALY 'O'
Anomaly 'O 1 is an incompletely outlined anomaly with no resistivity low
anomaly. It does not correspond to any EM anomaly, and its position is difficult
to establish because of the presence of Anomalies 'B* and 'P 1 ,
ANOMALY 'P 1
Anomaly 'P' is a chargeability anomaly which has no corresponding EM
response. It coincides with a linear magnetic low anomaly between 300 and 900
South on Lines O and 400 East,
ANOMALY 'Q'
Anomaly 'Q' is located just to the north of Anomaly 'F*. It is a poorly
defined chargeability high because interference from Anomaly 'F'. It is best
defined on Line 600 West and coincides with a linear magnetic low anomaly. Like
Anomaly 'F', a possible anomalous chargeable response is obscured because of poor
ground contacts.
9-8V q i
DATE S. TAYLORTIMMINS GEOPHYSICS LTD.
MWRRHY PROJECT
TON
NSH
IP2o
i 4
43T
' NU
MBERS
e
NEST
' N*
I TO
4
REG
EiyE
R
SCflL
E li
TX PULSE
TIMEi
RECEIVE
TIME:
2500
2.0
SEC
2*0
SEC
SLIC
E 6
(M6J
m
tn
RES
ISTI
VITY
en
tno)
ra
H-
a
ra
rCf
t
ito l O)
O
8 U)
CO C/)
CO
O
oo
if) o Crt
cu 8 trt
t/) a 8 en o 8 CO to s t/) o O
)
SQUIHJRST
HURPHT PR
OJEC
TMURPHY TO
WNSH
IP g* l 44
LINE
NUMBERs
2 WE
ST
50.0
METRES
\ ^
l TO
4
"FH
SCIN
TREX
tPR-ii RE
CEIV
ERPOLE-DIPOLE mm
SCflLE h
TX PULSE
TIME:
RECEIVE
TIME:
2500
2.0
' SE
C 2.
0 SE
C 7LSL
ICE
6 (M
6)
ento
fo
*- CD
OJ to
w
O
RESI
STIV
ITY
m
inO)
M
*-
OJ M
enO
) m
o O
GO /O
A o
o o z tn 8 i."
'',,,V
i- ••."
'•'.' •
s-.'; i
-r^^v
v'1*;
.-, -
,*O
*.,-
'.'
l. :.''
-;"'.
t- ;
.'.V
,, iL
-j, !
'.
jjiiiiij
pfcif 5
-liJ'vb
ii'ij:'
o1 M 'T
J
SiS
a^S
Mi1-
'- 'K
, ^e-
T -*- l6
WEST
W N*
I TO
4
tX
PULS
E TI
Mgi
ftE
CEI
VE
flM
Et
.
ESISTI
VITY
SOUTHERST MU
RPHY
PR
OJEC
TMURPHY TQWNSHIP2*
i 4437
LINE N
UMBE
R:
4 WEST
"RV
50,0
METRES
N^ TO
li
SCIN
TREX
IP
R-ll
RECE
IVER
PO
LE-D
IPO
LE f
iRRR
T SC6L
E
TX PULSE
TIME
: RECEIVE
TIME
:
2500
.
f
2.0
SEC
2.0
SEC
•7
SLIC
E 6
(M6)
O)
tfl
RES
ISTI
VITY
UJ
o
tnro
*-
O
oo/
Bt o O)
r
Ul
O
O) en t-* l CA
O
O
Oo lo
O /P* O
o C/) en
t-* 8 CO g o s V)
H*
f-^ 3 C/) Si o o 8 (O s CO
150 N 200 N 250 N 300 N 350 N 400 N 450 N SOON 550 N 600N 650N 700 N 750N 800 N——f—————l—————\—————l—————j—————l—————J—————I—————j—————j—————j—————l—————i—————i
361.0 381.0 393.0 395.0 381.0
LO 1I50.Q 107070 inTO."0 ^ItJSO 1290.0 1239.0
0 1220.0 1380.0 1380.0 ISOSrO 1450.0 1320.0 -T?10.0 1651.0 ^1*459.0
".- L
150 N 200 N 250 N 300 N 350 N 400 N 450 N
M
SOON 550 N SOON 650 N 700 H 750 N 800 Ni r i i l LL l I
3.6 3,6
af.% 3.3 3,4 3J7 3.9 3*79 3.6
6-Ere
9-e.
t i -y,LNOSS NCOS NOSh H OOh NOSE
IAI
HOS2NOSl MOOT MOS WO SOS
O-OSEI 0-ostii 0-90SI o'oeEi o-oeer 0-0221 o-ooei O-QSST 0-9*121*9m-O'OSZ- ^^
O'OSB O'OIS 0*098 0"OI6 0*OZ8 O ,, ———————~——————————————-———O'Ost
o-oasi o*oi5i o-osei 6-c^i o-06110'022I
^•Q9S J1'0?S n
o*oee
NOSS NODS Nosh.J_____l_____i H 008 N OSl N 001NOSOS
It'1 ———l——————l————— S 001 S DST S 002 S OS2 S OOE S OSE S
50 S 800S 750S 700S 650S
B
600 S 5503 500 S U50S 400 S 350 S 300 S 250 S 200 S 150 S 100 S SOS ON SON 100 N
T T T
J n i 1 /^1 *vi n JK
327.0 330.0
Q sgo.tr sou?TSO.o———————~——————————————————'
1&&-Q 870.0 910.0 860.0 910.0 920.0
SOO.O- 590.0 630.0 590.————————— 750.0-
-0-
0 1190.0 1290.0 1250.0 1270.0 1320.0 1210.0 1270.0 12U6.0 1250.0 1300.
EOS 8003 7905
O
7003 6505 600 ST
B
550 S 500 S t50 S
N •wo s 350S 300S 290S 2003
i l T T1503 —j 1003 SOS ON SON 100 N
2.5 2.5
2.B 2,9
3.3
3.8 3.7 3.7 3.6
1150 S 1100 S 1050 S 1000 S 950 S 900S 850 S 800S 750S 700S 6505
B
600 S 550 S BOOS ISO S 10T T l l f I T 7
560.0 UU80.0 14830.0 25^0.0360
iO.O 5000.0 3870.0 U070
.0 "^660.0 H320.0 35*40.0
4790.0 3530.0^-9990
T T
352XJ.O
5800. 2 i
iUX+FZGrQ.
1150 S 1100 S iOSOS 1000 S 9503nn i i i
P900 S
>
850S 8O3S 7503 700S 650S 6003
B
5503
N
500 S 4503t t . CT T
88tfy
si!
~-,- -ft
:, -f
PRO
JECT
5^'f^M
:f'^
If'te*-/
. ,,
!3 K
-yA
j':'*
' -
'''-'
; ;'-
?(!-'
fc'
'^'a
fei*
' vf #
. IJ
:' 5s
" '\l'-
* ..
t,f'
!":
^aW
NSHI
PSS;
* l
4437
NUMB
ER;
O ER
ST'."
' *
N*l
TO
liTX PULSE T
IME:
2.0
SEC
RECEIVE
TIME:
2.0
SEC
.' ('
, ,-
SGftLE
1:
2500
RESI
STIV
ITY
o
v\
tp
to
ro
^
O
o
O
Oo
o ro
o
O O
ti
O
Oo
a
CO i CO O) to 8 trt s CO 8 CO o
CO O 8 (O s CO CO
S 850S 800 S 750S 700S 650 S 600 S 550S
B,'
SODS 450S 400S 350S 300S 250 S 200S 150 S 100 S SOSl t f l l l T i l T r r
107.8 3^.8 22S,tt 202-7
l73^1~-75?5rfi~-- 665.0
922.0
B O B850 S 800S 750S TOPS 650S 800 S 550 S 500 S
l j i i Tl l
N
450? 400 S 3505 3003 2503 2005 1503 100 S SOS;t . . l l l l T T
RECE
IVE
2500
3LIC
C 8
(M61
RESI
STIV
ITY
en
ento
i\)
*~
en
enCD
rsi
**
ICO
(O
O) 8 o O)
*M
* 8 O)
l Cfl
CD
\
o
to Crt
CO CO 8 CO S o
CO (J)
''ISSfSS' ^of Work Conducted andMines j , After Recording Claim
0!?^r^ , .WJ!^4v; "j- -;-i *- i '-J Mining Ac ' Personal Information collected on this form is obtained under the authority of the this collection should be'directed to the Provincial Manager, Mining Lands, M Sudbury, Ontario, P3E 6AS" telephone (705) 670-7264. : it , 42A11SE0503 2.14437 MURPHY
, v,... s ..300
iMtroctloniiEp^;^' ,^ R^f J0*^ of filing'assessment work or consult the Mining
j ^"Aksepa^at^copy;,of'th^v Tec'hnical^eports and maps, must'accompany this form in duplicate.''f~ A sketch,-showing the claims the work Is assigned to, must accompany this form.
:r^Mor6rflaV.No. '
Physical Includlng'-'DrJIIInff
Asslgnmenffrom*t *,\i-u..Reserve-'-ftA^^'^-fl^^i^WllWpi*^*^^ i- i.Total A88e88mentiWorl?Clalmed'on"the"Attached Statement rof Costst!'* $ ^ 36~8GO.OO- -. .Note: The Minister may reject for assessment work credit all or part of the assessment !work submitted if 'a recorded
holder -cannot 'verify 'expenditures 'claimed in the statement of costs within 30 days of a request for verification.
Persons and Survey, Company Who Performed the Work (Give Name and Address of Author of Report)
''''-^^'':'''^---(attach a schedule'll fn'-*1*-Certlflcatlon'.of|Beneflclallntere8tr* rSee Note No. 1 on reverse side
l certify that at the time the work was performed/the claims covered In this work report were recorded In the .current holder's name or held under a beneficial Interest; by the current recorded holder,
IHO
•*1^ : ,,^fj{'1l*;i':'ii-"'""l''- B'lfffjTiilfferr***1 '"
l certify that l have a personal, knowledge ofr the facts set forth In this Work report, having performed the. work or witnessed same during and/or after Its completion and annexed report Is true.*'"*1**-"-- -- -—- --- -- •'—- ~- -- 1- --'----'- ••-.- ——-——-Name
Telepone No. ~ 235"-
Date Certified By (Signature). /
l
si lX 0 l ir
-0 u*
; 8s
1 w*s
o
T* i
:i|ns
|nl
Ont
ario
Pets
onal
' th
is c
olle
t Su
dbur
y, '
Inst
ruct
-do
sen
Oo 8 0 0 ^ Ci 0
Ot M
00 8 ^ K 8
30 8 it 8
a i 8| v^ 1 a
Vi 8 8 ~- s 8
1 8 ^ - 1 8
1 S ^ 1 0
M 8 b 0 •^ o 0 8
S) 00 o 0 p* Xi 05 8
Vs Co O 0 s X c* 8
Value
of
Assossmont
Work
Done
on this
Claim fill
Cred
its y
ou a
re c
laim
ing
In th
is re
port
may
be
cut b
ack.
In o
rder
to m
inim
ize th
e ad
vers
e ef
fect
s of
suc
h de
letio
ns, p
leas
e In
dicat
e fro
m
which
cla
ims
you
wish
to p
rloriz
e th
e de
letio
n of
cre
dits
. Pl
ease
mar
k (f)
one
of th
e fo
llowi
ng:
1. D
Cre
dits
are
to b
e cu
t bac
k st
artin
g w
ith th
e cla
im li
sted
last,
wor
king
back
ward
s.2.
Ef C
redit
s ar
e to
be
cut b
ack
equa
lly o
ver a
ll cla
ims
conta
ined
in thi
s re
port
of w
ork.
3. O
Cre
dits
are
to b
e cu
t bac
k as
prlo
rlzed
on
the
attac
hed
appe
ndix.
In th
e ev
ent t
hat y
ou h
ave
not s
pecif
ied y
our c
hoice
of p
riority
, opti
on o
ne w
ill be
imple
men
ted.
Note
1:
Exam
ples
of b
enef
icia
l Inte
rest
are u
nrec
orde
d tra
nsfe
rs, o
ptio
n ag
reem
ents
, mem
oran
dum
of a
gree
men
ts, e
tc., w
ith re
spec
t to
the p
inin
g cl
aim
s.4
. ^ '
Note
2:
If wo
rk h
as b
een
perfo
rmed
on
pate
nted
or l
ease
d lan
d, p
lease
com
plet
e th
e fo
llowi
ng:
1 cer
tify
thai
the
reco
rded
hol
der h
ad a
ben
efici
al In
tere
st In
the
pate
nted
or
leas
ed la
nd a
t the
tim
e th
e wo
rk w
as p
erfo
rmed
.Si
gnat
ure
Date
A l\
(atta
ch a
—
Certl
flca'
Ontario
Ministry ofNortheiVi Developmentand Mines
e duDeveloppemenl du Nord et des mines
Statement of Costs for Assessment Credit
frat des coQts aux fins du credit d'evaluation
Mining Act/Loi sur les mines
Transaction No./N" de transaction
Personal information collected on this form is obtained under the authority of the Mining Act. This Information will be used to maintain a record and ongoing status of the mining claim(s). Questions about this collection should be directed to the Provincial Manager, Minings Lands, Ministry of Northern Development and Mines, 4th Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (705) 670-7264.
Les renselgnements personnels contenus dans la presente formula sont recueillis en vertu de la Lol sur le* mines et serviront a lenlr a jour un registre des concessions mlnieres. Adresser toute quesiton sur ta collece de ces renseignements au chef provincial des terrains miniers, ministere du Developpement du Nord et des Mines, 159, rue Cedar, 4e etage, Sudbury (Ontario) P3E 6A5, tel6phone (705) 670-7264.
1. Direct Costs/Couts directs
Type
Wage* Salalres
Contractor'* and Consultant's FeesDrolls de ('entrepreneur et de 1 'expert* consell
Supplies Used Fournltures utlltsees
Equipment Rental Location de materiel
Description
Labour Maln-d'oeuvreField Supervision Supervision sur le terrain
Type
^Ts^^T/.6 Kr*
Type
Type
RECC
NOV -
Receipt .
Amount Montan!
6^
/s*o.
RDEP: 1s ra
--
Total Direct Costs Total des couts directs
Totals Total global
?
l
"(,8to.
2. Indirect Costs/CoOts indirects' * Note: When claiming Rehabilitation work Indirect costs are not
allowable as assessment work. Pour le remboursement des travaux de rehabilitation, les couts indirects ne sont pas admissibles en tant que Iravaux d'evaluation.
Type
Transporta Transport
tlon
1
1
Food and Lodging Nourrlture et hebergementMobilization and Demobilization Mobilisation et
.mobilisation
DescriptionType
imCUiWE HIMIIKilJlV'HWif
MOV ft 1991'
Amount Montan)
PP *-
Sub Total of Indirect Costs Total partlel des coOts Indirects
A, ount Allowable (not greater than 20H of Direct Cost*) V jntant admissible (n'excedant pas 20 H de* coOts direct*)Total Value of Assessment Credit Valeur totale du credit (Total of Direct and Allowable d'evaluation Indirect costs) fTotil dti coott directs
Totals Total global
•t Indirect! tdmliilblti
Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.
Note : Le titulaire enregistr6 sera tenu de verifier les depenses demanded dans le present 6tat des couts dans les 30 jours suivant une demande a cet effet. Si la verification n'est pas effectuee, le mlnistre peut rejeter tout ou une partie des travaux devaluation presented.
Filing Discounts Remises pour depftt
1. Work filed within two years of completion is claimed at 10007o of the above Total Value of Assessment Credit.
1. Les travaux deposes dans les deux ans suivant leur achievement sont rembours6s a 100 *A de la valeur totale susmenltonnee du credit d'evaluation.
2. Work filed three, four or five years after completion is claimed at 5007o of the above Total Value of Assessment Credit. See calculations below:
Total Value of Assessment Credit Total Assessment Claimedx 0.50
2. Les travaux deposes trois, quatre ou cinq ans apres leur achievement sont rembours6s a 50 "/b de la valeur totale du credit devaluation susmentionne. Volr les calculs ci-dessous.
Valeur tolale du credit d'evaluationx 0.50
Evaluation totale demandee
Certification Verifying Statement of Costs
l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.
that as(Recorded Holder, Agent, Position in Company)
to make this certification
Attestation de l'6tat des coQts
J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses ont et6 engagees pour effectuer les travaux d'evaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.
l am authorized Et qu'a titre de je suis autorise(titulaire enregistr*, reprtoentant, poste occup* dans la compagnie)
a faire cette attestation.
Signature
: Dans cell* fwnvi'e.
Date
-r——f—————T desiqne des personnes IP masc-.. ~ 9st utilise au sens neutre
Ministry o1Northern Development
MinesOntark
Report of Work Conducted After Recording Claim
Mining Act
Transaction Number
Personal Information collected on this form Is obtained under the authority of the Mining Act. This information wlUbe used for correspondence. Questions about
this collection should be directed to the Provincial Manager, Mining Lands, Ministry of Northern Development- and Mines, Fourth Floor, 159 Cedar Street,
Sudbury, Ontario, P3E 6A5, telephone (705) 670-7264. O - A A C ;i
Instructions: - Please type or print and submit in duplicate.- Refer to the Mining Act and Regulations for requirements of filing assessment work or consult the Mining
Recorder.- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form In duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form.
Recorded Holder(s)ID/9 tf/ ID MOLLEfJ
Clien nil sAddress tel ne No,
Mining Division poz c. o "P t /v6"
"7 M/-f/A) 5. PUNTownship/Area M or Q Plan No.
P li Y 'Dates Work Performed
From: To: OC.T08ER
Work Performed (Check One Work Group Only)Work Group
Geotechnical Survey
Physical Work, Including Drilling
Rehabilitation
Other Authorized Work
Assays
Assignment from Reserve
Type
JfJj}tyCZ*X) "&OL f) K 1 ?V? r/O /W j Li+fECO 7~T/ A/G
— ncconDED: j* '
NOV - 8 1991
Receipt ~ ——
e.
Total Assessment Work Claimed on the Attached Statement of Costs
Note: The Minister may reject for assessment work credit all or part of the assessment work submit! d if the recorded holder cannot verify expenditures claimed in the statement of costs within 30 days of a roquet; for verification.
Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)
Name
SHfrf&tJ "ib^t-OR , llHrfidS (oZoPtfXSlCX.
Address
4.72). P.O. Sex. 1783 S.ooTf-l'&P&cO'Ptfi/Z, ori~I^ PoiO/H
(attach a schedule It necessary)
Certification of Beneficial Interest * See Note No. 1 on reverse side
l certify that at the time the work was performed, the claims covered In this work report were recorded In the current holder's name or held under a beneficial Interest by the current recorded holder.
Date Recorded Holder or Agent (Signature)
/Certification of Work Report
l certify that l have a personal knowledge of the facts set forth in this Work report, having performed the work or witnessed same during and/or after
Its completion and annexed report is true.Name and Address of Person Certifying
P.O.-&QK 1763Telepone No.
A 35"-Date Certified By (Signature)
' **-Jl
For Office Use OnlyTotal Value Cr. Recorded Date recorded
Date Approved
nts SentNW eW
00
0 Ci
X 0 0
V
ofAsS
)0Work Don
on this
Claim
Cv 0
F**O
" "* *
os
Cred
its y
ou a
re c
laim
ing
in th
is re
port
may
be
cut b
ack.
In or
der t
o m
inim
ize th
e ad
vers
e ef
fect
s of
suc
h de
letion
s, ple
ase
indica
te fr
om
which
cla
ims
you
wish
to p
rioriz
e th
e de
letio
n of
cre
dits.
Plea
se m
ark
(^)
one
of th
e fo
llowi
ng:
1. D
Cre
dits
are
to b
e cu
t bac
k st
artin
g wi
th th
e cla
im li
sted
last,
work
ing
back
ward
s.2.
Q.C
redi
ts a
re to
be
cut b
ack
equa
lly o
ver a
ll cla
ims
cont
ained
in th
is re
port
of w
ork.
3. D
Cre
dits
are
to b
e cu
t bac
k as
prlo
rized
on
the
atta
ched
app
endix
.
In th
e ev
ent t
hat y
ou h
ave
not s
pecif
ied
your
cho
ice o
f prio
rity,
optio
n on
e wi
ll be
impl
emen
ted.
Note
1:
Exam
ples
of b
enef
icia
l inte
rest
are
unre
cord
ed tr
ansf
ers,
optio
n ag
reem
ents
, mem
oran
dum
of a
gree
men
ts, e
tc.,
with
resp
ect
to th
e m
inin
g cl
aim
s. ;
';
Note
2:
If wo
rk h
as b
een
perfo
rate
d M
pat
ente
d or
feas
etf (
and,
pte
ase
com
plet
e th
e fo
llowi
ng:
i cor
tity
that
the
reco
rded
hol
der h
ad w
txm
wfcia
fi m
enu*
m ttm
pat
ente
d or
leas
ed la
nd a
t the
tim
e th
e wo
rk w
a*
Date
Ontario
Ministry olNorthern Developmentand Mines
Devlislere du
iveloppement du Nord et des mines
Statement of Costs for Assessment Creditttat des couts aux fins du credit devaluation
Mining Act/Loi sur les mines
(transaction No./N 0 de transaction
. C&&SI
. I 443vPersonal information collected on this form Is obtained under the authority of the Mining Act. This Information will be used to maintain a record and ongoing status of the mining claim(s). Questions about this collection should be directed to the Provincial Manager, Minings Lands, Ministry of Northern Development and Mines, 4th Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (705) 670-7264.
Les renseignemenls personnels conlenus dans la presente forrnule sonl recueillis en vertu de la Lo) sur les mines el servlronl a tenlr a jour un regislre des concessions minieres. Adresser toute quesiton sur la collece de ces renselgnements au chef provincial des terrains miniers, ministers du Developpemeni du Nord et des Mines, 159, rue Cedar, 4 e elage, Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264.
1. Direct Costs/Gouts directs
Type
Wages Salalres
Contractor's snd Consultant's Fees Drolls de ('entrepreneur et de I'expert- consell
Supplies Used Fournltures utlllsees
Equipment Rental Location de materiel
Description
Labour Main-d'oeuvreField Supervision Supervision sur le terrain
Type /-t fit fi Q O "T'T/ MG"3.3. K o? te Axes/Km
.e K*
Type
Amount Montan!
^/-
ffoQ *
Totals Total global
?W/.
RECORDED .1 jType
NOV -8
Rfif.oipf;
1QQ1 1133UJ
WiLfl
Total Direct Costs Total des couts directs S/y^,
2. Indirect Costs/Gouts indlrects* * Note: When claiming Rehabilitation work Indirect cosls are not
allowable as assessment work.Pour le remboursement des Iravaux de rehabilitation, les couts indirects ne sonl pas admissibles en (ant que Iravaux devaluation.
Type
Transportation Transport
Food andLodging Nourrlture et hebergementMobilization and Demobilization Mobilisation et demobilisation
** i
Description
Type
•^Vu'lUOl'l'.ci.'t.! 1 :^:'.^-
w~rww1 - 1 ,. ___ I ___ — — ... ,.
Amount Montan!
*
Sub Total of Indirect Costs Total partlel des coOts Indirects
Amount Allowable (not greater than 20H of Direct Costs) Montan! admissible (n'excedant pas 20 tt des coins directs)Total Value of Assessment Credit (Total of Direct and Allowable Indirect coal*)
Valeur tolale du creditd'tvaluallon(Tolil del coOli dlreclitt Indlrecti admlnlblei
Totals Total global
Note: The recorded holder will be required lo verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.
Note : Le lilulaire enregislre sera tenu de verifier les depenses demandees dans le present etat des couts dans les 30 jours suivant une demande a eel effel. Si la verification n'est pas effecluee, le minislre peul rejeter lout ou une partie des travaux devaluation presentes
Filing Discounts
1. Work filed within two years of completion is claimed at 1000Xo of the above Total Value of Assessment Credit.
Remises pour dep6t
1. Les travaux deposes dans les deux ans suivanl leur achievement son! rembourses a 100 0A de la valeur totale susmenlionnee du credit devaluation.
2. Work filed three, four or five years after completion is claimed at SQo/o of the above Total Value of Assessment Credit. See calculations below:
Total VaTuTof Assessment Credit Total Assessment Claimedx 0.50
2. Les travaux deposes trois, quatre ou cinq ans apres leur achevernent sont rembourses a 50 "/o de la valeur totale du credit devaluation susmenlionne. Voir les calculs ci-dessous.
[Valeur totale du credit devaluation Evaluation loiale 'demanddex 0,50
Certification Verifying Statement of Costs
l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work lorm.
that as(Recorded Holder, Agent, Position in Company)
lo make this certification
Attestation de I'etat des couts
J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses onl ete engagees pour effectuer les travaux devaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.
l am authorized EI qu'a litre de ___. je suis autorise(lilulaiie enregislre, represenlanl. posle occupA dans la compagnia)
faire cette attestation.
Signature
S—C' t'—J
Dale
ry ofD*yffe*pment
inesOntario
Report of Work Conducted After Recording Claim
Mining Act
Transaction Number
Personal Information collected on this form is obtained under the authority of the Mining Act. This Information will be used for correspondence. Questions about this collection should be directed to the Provincial Manager, Mining Lands, Ministry of Northern Development and Mines, Fourth Floor, 159 Cedar Street, Sudbury, Ontario, P3E 6A5, telephone (705) 670-7264. - i-14 37Instructions: - Please type or print and submit in duplicate. ^ , . _ m.^
- Refer to the Mining Act and Regulations for requirements of filing assessment work oreonstilt the Mining Recorder.
- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form In duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form.
Recorded Holder(s) Clie8SW
AddressP.O. /783,
Telephone
Mining Division Township/AreaMoRPny
M or Q Plan No.
Dates ttmed 9 /a? To: 7/90
Work Performed (Check One Work Group Only)Work Group Type
Geotechnical SurveyPhyslcal Work, Including Drilling
RehabilitationOther Authorized Work
Assays
Assignment from Reserve
Total Assessment Work Claimed on the Attached Statement of CostsNote: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded
holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.
Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name Address
'P.o, BOX,
(attach a schedule if necessary)
Certification of Beneficial Interest * See Note No. 1 on reverse sidel certify that at the time the work was performed, the claims covered In this work report were recorded in the current holder's name or held under a beneficial interest by the current recorded holder.
Date
J iRecorded Holder or AgenjXSignature)
yV-e^
Certification of Work Reportl certify that l have a personal knowledge of the facts set forth in this Work report, having performed the work or witnessed same during and/or after Its completion and annexed report Is true.
Name and Address of Person Certifying
t p, o. BOX
1L.
3'
0XJ
(*\
ft
IN0)
VJK)
^c
.X)
K)M
Is
Z
CO
c
la l
I irX
aa oO o
O
COI b o
o 00 o
f O
O
Xi 00 00 t o o
X3
Xj \ 8I OD 6 o
0 o
B Ob b o0 0
0 o
oo 00 b o V
ri* J (O
p
Cre
dits
you
are
cla
imin
g in
this
repo
rt m
ay b
e cu
t bac
k. In
ord
er to
min
imize
the
adve
rse
effe
cts
of s
uch
dele
tions
, ple
ase
indi
cate
frq
whi
ch c
laim
s yo
u wi
sh to
prlo
rize
the
dele
tion
of c
redi
ts.
Plea
se m
ark
(^)
one
of th
e fo
llowi
ng:
1. D
Cre
dits
are
to b
e cu
t bac
k st
artin
g wi
th th
e cla
im li
sted
last
, wor
king
back
ward
s.
2.
\2 C
redi
ts a
re to
be
cut b
ack
equa
lly o
ver a
ll cl
aim
s co
ntai
ned
in th
is re
port
of w
ork.
3.
D C
redi
ts a
re to
be
cut b
ack
as p
rioriz
ed o
n th
e at
tach
ed a
ppen
dix.
In th
e ev
ent t
hat y
ou h
ave
not s
pecif
ied
your
cho
ice o
f prio
rity,
opt
ion
one
will
be im
plem
ente
d.fe
i*
Not
e 1:
Ex
ampl
es o
f ben
efic
ial I
nter
est a
re u
nrec
orde
d tra
nsfe
rs, o
ptio
n ag
reem
ents
, mem
oran
dum
of a
gree
men
ts, e
tc.,
with
j to
the
min
ing
clai
ms.
f
at tM
Md
tend
, ple
ase
com
plet
e th
e fo
llow
ing:
Mot
e 2:
If
wor
k ha
s be
en jM
riam
nat m
j l c
ertif
y th
at th
e re
cord
ed h
oMer
fewS
x b
fcrwf
te'tal
W*?
wst
in rt?
a pa
tent
edDa
te
Work fttpoft
n
i
•MIMMI)
CMbn Nunftwr {M* Not*
Pt i
to
ofCWm Unto
VMM Of
Wortc Doiw onlMkCMm
V*lu* AppJri tolhte
oo
53.8-0 O
S3.&.001 1
WO
4s,.fc-
908.06
f X 52. 00
90&.CX3
Veto*from
ttttoCtelmWorktoteClalnmtfKt
a Futuw DM*
Ontarir
Ministry 01Ihern Development Mines
Minlstere du D6veloppement du Nord et des mines
Statement of Costs for Assessment Creditdtat des cotits aux fins du credit devaluation
Mining Act/Loi sur les mines
Transaction No./N" de transaction
f c i 443VPersonal information collected on this form Is obtained under the authority of the Mining Act. This information will be used to maintain a record and ongoing status of the mining clalm(s). Questions about this collection should be directed to the Provincial Manager, Minings Lands, Ministry of Northern Development and Mines, 4th Floor. 159 Cedar Street, Sudbury, Ontario P3E 6A5. telephone (705) 670-7264.
Les renseignements personnels contenus dans la presente formule sont recueillis en vertu de la Lol sur lea mines et serviront a tenir a jour un registre des concessions minieres. Adresser loute question sur la collece de ces renseignements au chef provincial des terrains miniers, minlstere du Developpement du Nord et des Mines, 159, rue Cedar, 4® etage. Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264.
1. Direct Costs/CoQts directs
Type
Wages Salalres
Contractor's and Consultant's FeesDrolts de ('entrepreneur •t de ('expert- consell
Supplies Used Fournltures utlllsess
Equipment Rental Location de materiel
Description
Labour Main-d'oeuvreField Supervision Supervision sur le terrain
Type LiKtecorrs/JG.36 *V Km 6! 3.3.0/Kfr,
T.'P Si)-R\JZ-/33. * ivi.
Type
Type
Drr*r:. ntUL
NOV -
Receipt
Amount Montant
&&0&.
30^0.
RDE0-:
81991
Total Direct Costs Total des coOts directs
Totals Total global
*8BW.
i
^BSm
2. Indirect Costs/CoQts indlrects* * Note: When claiming Rehabilitation work Indirect costs are not
allowable as assessment work. Pour le remboursemenl des travaux de rehabilitation, les couts Indirects ne sont pas admissibles en tant que travaux devaluation.
Type
Transported Transport
Food and Lodging Nourrlture et hebergement
on
1\
••MM
Mobilization and Demobilization Mobilisation et demobilisation
DescriptionType
pnf^pflTT?i^injipi^i.'
IM ' ^ ***! J
NOV S MW'
^^^ — . — i——' • ~
Amount Montant
k
MMM
Sub Total of Indirect Costs Total partial des couts Indlrects
Amount Allowable (not greater than 20H of Direct Costs) Montan! admissible (n'excedant pas 20 M des coOts directs)Total Value of Assessment Credit Valeur totale du (Tot*) of Direct and Allowable devaluationIndirect eoitll fTotil rfci coflli d
credit
rceli
Totals Total global
it IndlrtcU admlttlble*
Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.
Note : Le titulaire enregistre sera tenu de verifier les depenses demandees dans le present 6tat des couts dans les 30 jours sulvant une demande a cet effet. Si la verification n'est pas effectuee, le ministre peut rejeter tout ou une partie des travaux devaluation presented.
Filing Discounts
1. Work filed within two years of completion is claimed at 10007o of the above Total Value of Assessment Credit.
Remises pour depot
1 . Les travaux deposes dans les deux ans suivant leur achievement sont rembourses a 100 "A de la valeur totale susmentionnee du credit devaluation.
2. Work filed three, four or five years after completion is claimed at 5007o of the above Total Value of Assessment Credit. See calculations below:
Total Value of Assessment Credit Total Assessment Claimedx 0.50 -
2 . Les travaux deposes trois, quatre ou cinq an? -ipres leur achievement sont rembourses a 50 Vo de la valeur tot; j credit devaluation susmentionne. Voir les calculs ci-dessous.
Valeur totale du credit d evaluationx 0,50
Evaluation totale demandee
Certification Verifying Statement of Costs
l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.
that as(Recorded Holder, Agent, Position in Company)
to make this certification
Attestation de I'etat des couts
J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses ont ete engagees pour effectuer les travaux devaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.
l am authorized Et qu'a litre de je suis autorise(titulaire enregislre, reprtsentant, posle occup* dans la compagnie)
a faire cette attestation.
Ministry o1Northern Development
i MinesOntaric
Report of Work Conducted After Recording Claim
Mining Act
Transaction Number
Personal Information collected on this form Is obtained under the authority of the Mining Act. Thislnformatlon will be used for correspondence. Questions about
this collection should be directed to the Provincial Manager, Mining Lands, Ministry of Northern Development and Mines, Fourth Floor, 159 Ceggr, Street,
Sudbury, Ontario, P3E 6A5, telephone (705) 670-7264.I i** 1*111 f W) i wwi tt i i iwi i * w **vifm^t
'. 1 4437Instructions: - Please type or print and submit In duplicate.
- Refer to the Mining Act and Regulations for requirements of filing assessment work or consult the Mining
Recorder.- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form In duplicate.- A sketch, showing the claims the work Is assigned to, must accompany this form.
Recorded Holder(s)
Address Telephone No.
MlningDrvJslon
___ PCR
Township/Area
HtJftFr/XM or Q Plan No.
Dates Work Performed
From: To: 7/yo
Work Performed (Check One Work Group Only)Work Group
Geotechnical Survey
Physical Work, Including Drilling
Rehabilitation
Other Authorized Work
Assays
Assignment from Reserve
Type
ttJ~E)ocZ72 *PoLAFn?~/} T~JG*J , {./t/c^vrry/^G
^ M M mm MM
-. fiECORDPn
NOV - 8 i99|
Receipt — ____
Total Assessment Work Claimed on the Attached Statement of Costs
Note: The Minister may reject for assessment work credit all or part of the assessment work submitteo if the recorded
holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.
Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)
Name
5/WJEto/P -rttt&f?, -f/rtrinJIS G&Ptf&A
Address
?s LTD., -P.O. BOX / 703, s&ort-i FbtzcoP/tje, OA-TT p^
(attach a schedule If necessary)
Certification of Beneficial Interest * See Note No. 1 on reverse side
1 certify that at the time the work was performed, the claims covered in this work report were recorded in the current holder's name or held under a beneficial Interest by the current recorded holder.
Date Recorded Holder or Agent (Signature)f -7
Certification of Work Reportl certify that l have a personal knowledge of the facts set forth in this Work report, having performed the work or witnessed same during and/or after
its completion and annexed report is true.Name and Address of Person Certifying
IHTelepone No. Date
f
Certified By (Signature)
l ^^- j
For Office Use Only X s
l
If.
'3 • zO*
CO
f
i i u 1A 1 8 00 OB 8
--...
^ 00 OD b 0 v xi 00 b
g
-
f X S
B
x-S
5-
o5?|
*fff f
a3*2 i'lgS til
Cre
dits
you
are
cla
imin
g in
this
repo
rt m
ay b
e cu
t bac
k. In
ord
er to
min
imize
the
adve
rse
effe
cts
of s
uch
dele
tions
, ple
ase
indi
cate
from
which
cla
ims
you
wis
h to
prio
rlze
the
dele
tion
of c
redi
ts.
Plea
se m
ark
(s)
one
of th
e fo
llowi
ng:
1. D
Cre
dits
are
to b
e cu
t bac
k st
artin
g wi
th th
e cla
im li
sted
last
, wor
king
back
ward
s.
2.
OZTc
redi
ts a
re to
be
cut b
ack
equa
lly o
ver a
ll cla
ims
cont
aine
d in
this
repo
rt of
wor
k.
3.
D C
redi
ts a
re to
be
cut b
ack
as p
rioriz
ed o
n th
e at
tach
ed a
ppen
dix.
In th
e ev
ent t
hat y
ou h
ave
not s
pecif
ied
your
cho
ice o
f prio
rity,
opt
ion
one
will
be im
plem
ente
d.
Not
e 1:
Ex
ampl
es o
f ben
efic
ial i
nter
est a
re u
nrec
orde
d tra
nsfe
rs, o
ptio
n ag
reem
ents
, mem
oran
dum
of a
gree
men
ts, e
tc.,
with
resp
ect
to th
e m
inin
g cl
aim
s.(
-*
Not
* 2:
If
wor
k ha
s be
ea p
erfo
rmed
Oft
pate
nted
at tea
sed
lend
, pte
ase
com
plet
e th
e fo
llow
ing:
rl eer
fily ttia
t th
e re
cwde
d M
Wer
Ivad
l a fo
*n**S
e*al
wAeir
est "
m tfs
e pa
i&nt
etl
w le
ased
larx
l a! t
he li
me
-ifc*
*or
k -w
a'i p
alor
wec
)
Dat
e
Ontario
Ministry olNorthe'rn Development
l Mines
^^is
Statement of Costs for Assessment Credit
listere du Ueveloppement du Nord et des mines
des couts aux fins du credit devaluation
Mining Act/Lol sur les mines
Transaction No./N 0 de transaction
. i 4437Personal information collected on this form is obtained under the authority of the Mining Act. This information will be used to maintain a record and ongoing status of the mining clalm(s). Questions about this collection should be directed to the Provincial Manager, Minings Lands, Ministry of Northern Development and Mines, 4th Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (705) 670-7264.
Les renseignemenls personnels contenus dans la presente formule sont recueillis en vertu de la Loi tur les mines et serviront a lenir a jour un regislre des concessions minieres. Adresser toute question sur la collece de ces renseignements au chef provincial des terrains miniers, ministere du Developpement du Nord et des Mines, 159, rue Cedar, 4^ etage, Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264.
1. Direct Costs/CoQts directs
Type
Wages Salalres
Contractor's and Consultant's Fees Drolls de ('entrepreneur et de ('expert- consell
Supplies Used Fournltures utillsees
Equipment Rental Location de materiel
Description
Labour Main-d'oeuvreField Supervision Supervision sur le terrain
Type
g. P. •Sii.'fciT/-P /c' rv.
Type
Type
Amount Montant
^26.
*7tfl.
— IJECORDl
N|W - y i*Receif t ____
Total Direct Costs Total des couts directs
Totals Total global
^6fr
;D91_ . ,Mm-
r^ 1 0 Ct t^ii jf^ Ju3t? *
2. Indirect Costs/CoQts Indirects* * Note: When claiming Rehabilitation work Indirect costs are not
allowable as assessment work. Pour le remboursement des travaux de rehabilitation, les couts Indirects ne sont pas admissibles en tant que travaux devaluation.
Type
Transportation Transport
Food and Lodging Nourrlture et hebergementMobilization and Demobilization Mobilisation et demobilisation
Description
Type
' 4"" ^OM'CuY'iNtMll'ilNCiO! 1
P1EGIEIIW
Amount Montant
•olONmJ**^ r'*yj—— NOV ft 1^1 ———
Sub Total of Indirect Costs Total partlel des coOts Indirects
Amount Allowable (not greater than 20H of Direct Costs) Montant admissible (n'excedant pas 20 H de* couts directs)Total Value of Assessment Credit Valeur totale du credit (Total of Direct and Allowable devaluation Indirect coitt) (Tolil dti coflti dlrceli
Totals Total global
tt Indirect* idmlulblei
Note: The recorded holder will be required lo verify expenditures claimed in this statement of costs within 30 days of a request (or verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.
Note : Le titulaire enregistr6 sera tenu de verifier les depenses demandees dans le present etat des coOts dans les 30 jours suivant une demande a eel effet. Si la verification n'est pas effectuee, le mlnlstre pfeut rejeter tout ou une partie des travaux d'evalualion presents.
Filing Discounts
1. Work filed within two years of completion is claimed at 10007o of the above Total Value of Assessment Credit.
Remises pour depot
1. Les travaux deposes dans les deux ans suivant leur achievement sont rembourses a 100 0A de la valeur totale susmentionnee du credit d'evalualion.
2. Work filed three, four or five years after completion is claimed at 5007o of the above Total Value of Assessment Credit. See calculations below:
Total Value of Assessment Credit Total Assessment Claimed
x 0.50
2. Les travaux deposes trois, quatre ou cinq ans apres leur achevement sont rembourses a 50 o/fa de la valeur totale du credit devaluation susmentionne. Voir les calculs ci-dessous.
Valeur totale du credit devaluation
x 0,50
Evaluation totale demandee
Certification Verifying Statement of Costs
l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.
that as{Recorded Holder, Agenl, Position in Company)
to make this certification
Attestation de i'etat des couts
J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses ont et6 engagees pour effectuer les travaux devaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.
l am authorized Et qu'a litre de je suis autorise(titulaire enregislre, representant, poste occupd dans la compagnie)
a faire cette attestation.
Nota : OSRS ceHo form'j'% Vyso des personnos. Ip niasculin esl utilisA an son r. np'j
Ministry ofNorthern Development
MinesOntario
Report of Work Conducted After Recording'Claim
Mining Act
Transaction Number
Personal Information collected on this form Is obtained under the authority of the Mining Act. This information will be used for correspondence. Questions about this collection should be directed to the Provincial Manager, Mining Lands, Ministry of Northern Development and Mines, Fourth Floor, 159 Cedar Street, Sudbury, Ontario, P3E 6A5. telephone (705) 670-7264. ' ' fi f O '/
y , 1 4 '-i o 6Instructions: - Please type or print and submit In duplicate. ^
- Refer to the Mining Act and Regulations for requirements of filing assessment work or consult the Mining Recorder.
- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form in duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form.
Recorded Holder(s) Client
Address
31Telephne
Mining Division Township/Area M or O Plftn No.
Dates Permed
fnmt
Work Performed (Check One Work Group Only)Work Group~
Geotechnical Survey
Physical Work, Including Drilling
Rehabilitation
Other Authorized Work
Assays
Assignment from Reserve
Type
/MT?tPC^Z5 "Po^-A/5 x 2797-^/0 t ^//OfCO-rT~sAS(?
Total Assessment Work Claimed on the Attached Statement of CostsNote: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded
holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.
Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name Address
REP.nRHED
NOV - 8 1991 —
Rer-ftlpf
(attach a schedule If necessary)
Certification of Beneficial Interest * See Note No, 1 on reverse side
l certify that at the time the work was performed, the claims covered in this work report were recorded in the current holder's name or held under a beneficial Interest by the current recorded holder.
Date
/V^tA 4? /S y /
Recorded Holder or Agent (Signature)
Certification of Work Reportl certify that l have a personal knowledge of the facts set forth in this Work report, having performed the work or witnessed same during and/or after its completion and annexed report Is true.
Name and Address of Person Certifying
7? O. 'S Soon-1 Pert i /-toTelepone No. Dale Certified 8y (Signature)
For Office Use Only
lOX
JX)
. g
Ht
cQ f
X O
x:00 o o o
So o x
If 55
li iroo Cv o
(K ^ 0 0
Cft 0
1 b
V CD
)o O
Cred
its y
ou a
re c
laim
ing
in th
is re
port
may
be
cut b
ack.
In or
der t
o m
inim
ize th
e ad
vers
e ef
fects
of s
uch
delet
ions,
pleas
e ind
icate
from
wh
ich c
laim
s yo
u wi
sh to
prio
rize
the
dele
tion
of c
redit
s. Pl
ease
mar
k (^
) on
e of
the
follo
wing
:
1. D
Cre
dits
are
to b
e cu
t bac
k sta
rting
with
the
claim
liste
d las
t, wo
rkin
g ba
ckwa
rds.
2. H
'Cre
dits
are
to b
e cu
t bac
k eq
ually
ove
r all
claim
s co
ntain
ed in
this
repo
rt of
wor
k.3.
D C
redi
ts a
re to
be
cut b
ack
as p
riorlz
ed o
n th
e at
tach
ed a
ppen
dix.
In th
e ev
ent t
hat y
ou h
ave
not s
pecif
ied y
our c
hoice
of p
riorit
y, op
tion
one
will
be im
plem
ente
d.
Note
1:
Exam
ples
of b
enef
icia
l Int
eres
t are
unr
ecor
ded
trans
fers
, opt
ion
agre
emen
ts, m
emor
andu
m o
f agr
eem
ents
, etc
., wi
th re
spec
t to
the
min
ing
clai
ms.
, ;
Note
2:
If wo
rk h
as b
een
perfo
rmed
oh
pate
nted
or
leas
ed la
nd, p
lease
com
plet
e th
e fo
llowi
ng:
l cer
tify
that
the
reco
rded
hol
der fc
** i.
toum
Mctol
Men
st if
f tfw
pat
eate
d or
tea&
ed la
nd a
t the
tim
e th
eDa
le
Ontario
Ministry otNorthern Developmentand Mines
t*Dive
|isl6re duTiveloppement du Nord ei des mines
Statement of Costs for Assessment Creditfztat des couts aux fins du credit devaluation
Mining Act/Lol sur les mines
Transtion No 1H" de transactiontransaction y
Personal inlormation collected on this (orm is obtained under the authority of the Mining Act. This inlormation will be used to maintain a record and ongoing status of the mining ctaim(s). Questions about this collection should be directed to the Provincial Manager, Minings Lands, Ministry of Northern Development and Mines, 4th Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (70S) 670-7264.
Les renseignemenls personnels conlenus dans la presenle formule son) recueillis en vertu de la Lo) sur les mines et serviront a lenir a jour un regislre des concessions minieres. Adresser (oule question sur la collece de ces renseignemenls au chef provincial des terrains miniers, minislere du Developpement du Nord el des Mines, 159, rue Cedar, 4 0 eiage, Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264.
1. Direct Costs/Couts directs
Type
Wages Salalres
Contractor's and Consultant's Fees Drolls de ('entrepreneur et de ('expert- consell
Supplies Used Fournltures utlllsees
Equipment Rental Location de materiel
Description
Labour Maln-d'oeuvreField Supervision Supervision sur ie terrain
Type//'Vif (LO r/7 //G.f/ Z Ki* fe 3.i.tyxr^
"Z". 'p So^VE S 6 AVw
Type
Type
******w**WWsTfir
RE(
— NW
Receipt -
Amount Montan!
(520,
;ORDED
^-199,
'-"LIIJL -- - ——
Total Direct Costs Total des couts directs
Totals Total global
x wet
..-^
" —— .r4
^W
Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is no! made, the Minister may reject for assessment work all or part of the assessment work submitted.
2. Indirect Costs/Couts indirectsNote: When claiming Rehabilitation work Indirect costs are not
allowable as assessment work.Pour le remboursemenl des Iravaux de rehabilitation, les couts indirects ne sont pas admlssibles en (ant que Iravaux devaluation.
Type
Transportation Transport
Food and 'Lodging Nourrlture el hebergemenlMobilization and Demobilization Mobilisation et demobilisation
Description
type"" "' ~"
MfM/ O IQOIlNUY O WV*'
Amount Montan!
Sub Total of Indirect Costs Total partlel des couts indlrects
Amount Allowable (not greater than 20H of Direct Costs) Montant admissible (n'excedant pas 20 K des couls directs)Total Value of Assessment Credit Valeur totale du credit [Total of Direct and Allowable devaluation indirect costa) fTolil del codti dliecli
Totals Total global
*l Indlrtcll tdmlulblei
Note : Le litulaire enregislre sera lenu de verifier les depenses demandees dans le present etat des couts dans les 30 jours suivant une demande a eel ellel Si la verification n'est pas elfecluee, le millisite peut rejeter tout ou une partie des travaux devaluation preserves.
Filing Discounts
1. Work filed within two years of completion is claimed at 1000Xo of the above Total Value of Assessment Credit.
Remises pour dep&t
1, Les travaux deposes dans les deux ans suivant leur achevemenl sont rembourses a 100 0A de la valeur tolale susmentionnee du credit devaluation
2. Work filed three, four or five years after completion is claimed at 500,'o of the above Total Value of Assessment Credit. See calculations below:
Total Value of Assessment Credit Total Assessment Claimed
x 0.50 -
2. Les travaux deposes trois, quatre ou cinq ans apres leur achevemenl sont rembourses a 50 "/b de la valeur totale du credit devaluation susmentionne. Voir les calculs ci-dessous.
VaJeur totale du credit d'6valuation "f valuation ioiale demandee
x 0,50
Certification Verifying Statement of Costs
l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.
that as -~———————— l arn authorized(Recorded Holder, Agent. Position in Company)
to make this certification
Attestation de i'etat des couts
J'atteste par la presents :que les montants indiques sont le plus exact possible et que ces depenses ont ete engagees pour effectuer les travaux devaluation sur les terrains indiques dans la formule de rapport de travail ci joint
Et qu'a litre de _________________ je suis autorise(litulaire enregislre, representanl. paste occiipi dans la compagnie)
a faire cette attestation.________x____ ———
Signature Dale
P.O. Box 1783 South Porcupine, Ont.
PON 1HO (705) 235-4592
February 6, 1992
Mr T. AndersonAssessment Office, Mining Lands BranchMinistry of Northern Development and Mines4th Floor, 159 Cedar StreetSUDBURY, OntarioP3E 6A5
Dear Sir:
I am writing with regard to an Induced Polarization (I.P.) survey and linecutting which was submitted for assessment credits on a property in Murphy Township, Porcupine Mining Division. The property consists of 27 contiguous claims which are held :by five individuals, as outlined in the appended list.
Although the I.P, survey did not cover all of the lines cut, we have previously filed horizontal loop EM, VLF-EM and magnetic surveys along all of these lines, under the old mining act (Files 2.13189 and 2.14146). We had intented on submitting the line cutting with a geological survey which is in progress; however, because of changes in the mining act, we wanted to file the linecutting before two years after we had completed that work.
I hope this meets with your approval.
Yours truly,
Ontario
Ministere du Developpement du Nord et des Mines
Ministry ofNorthern Developmentand Mines
February 5, 1992
Mining RecorderPorcupine DivisionMinistry of Northern Developmentand Mines60 Wilson StreetTimmins, OntarioP4N 2S7
Dear Sir:
SUBJECT!
Mining Lands Branch Geoscience Approvals Section 159 Cedar Street, 4th Floor Sudbury, Ontario P3E 6A5
Toll Free: Telephone: Fax:
Our File: Your File:
1-800-465-3880 (705) 670-7264 (705) 670-7262
2. 14437 W. 9160. 00250 et al.
APPROVAL OF ASSESSMENT WORK SUBMITTED ON MINING CLAIMS P 1114814 ET AL IN MURPHY TOWNSHIP.
The assessment work credits for the Geophysics Survey, under section 14 of the Mining Act Regulations, submitted on the above work report have been approved as of February 5, 1992.
Please indicate this approval on your records.
Yours sincerely,
Ron C. GashinskiSenior Manager, Mining Lands BranchMines and Minerals Divison
1A TAA/j lEnclosures:
cc: ^Assesssment Files Office Toronto, Ontario
Resident Geologist Timmins, Ontario
559 50 0 0 TIN
WARK TWR
Aerial Cableway —
Boundary
Pipthni(O*en greund)
Roi l road
Park lount
BridgeHand, Pol If
Building
Chimney
Cliff. Pit,Pile
Contour*
^ T* os a k^. 'A4+&XH28O39 1 0837 S4
y a i
Dbukl* lin* nvtr A• ilk •iiiripl* rapid* V-
—Reservoir
River, Stream . Canal
Bigwoter ,- — — ~ — 4- - - — — T
I D 'ai^
Spot ElevationHal. .l.. a t, 0n .) - i00 '0
Towtr B *
Transmistion Lin*
Floooto Lono
cock
Marsh o r Swamp -^ *!^k
Utility Poles Wharf , Dock, Pier
Wooded A rta
lBeaver Do*ns
Mos1 ^
Mine Head From* a
Oulcrop
AREAS WITHDRAWN FROM DISPOSITION
M.R.O. -MINING RIGHTS ONLY
S.R.O. - SURFACE RIGHTS ONLY
M.+ S. - MINING AND SURFACE RIGHTS
Description Order No. Dm Di*KHition Fit*
Dom saozt, j W8001 ?bh
5390O otJ mN'
J-v-——Ar
V ?9*\ '* v L \ ' \
'"^ "'l: ^ '' Fni.'-^'j**rfr*,l* l 'i f*1380 g
•9- -^^-X **
s?***. \^X.|!O5^-, t ; . ', ' X ffi
1168890UMTS)
THE INFORMATION THAT APPEARS ON THIS MAP HAS BEEN COMPILED FROM VARIOUS SOURCES. AND ACCURACY 'S NOT GUARANTEED. THOSE WISHING TO STAKE MIN ING CLAIMS SHOULD CON SULT WITH THE MINING RECORDER, MINISTRY OF NORTHERN DEVELOP MENT AND MINES, FOR AD DITIONAL INFORMATION ON THE STATUS OF THE
CMDWN MFRFON TISDALE TWP
LEGENDHIGHWAY AND ROUTE No
OTHER ROADSTRAILS
:'j uses-i.BASE LtNES, ETC.
MINING CLAIMS PARCELS ETC UNSURVEYED LINES
LOT LINESPARCEL QOUNDARYMINING CLAIMS ETC
RAILWAY AND RIGHT OF WAY UTILITY LINES NON PERENNIAL STREAM FLOODING OR FLOODING RIGHTS SUBDIVISION OR COMPOSITE PLAN RESERVATIONS ORIGINAL SHORELINE MARSH OR MUSKEGMINESTRAVERSE MONUMENT
ae
'^////////7^////////////.
K-f
DISPOSITION OF CROWN LANDS
TYPE OF DOCUMENT SYMBOL
PATENT. SURFACE Si MINING RIGHTS .. ....... ........ 0
.SURFACE RIGHTSONLY..,.,...^............... O
.MINING RIGHTSONLY ^.,. ^. . . ....... W
LEASE, SURFACE ft MINING RIGHTS.- — ..-.. — ... — B
" .SURFACE RIGHTSONLY._............. .... B
" .MINING RIGHTSONLY.-.-..,..-....——^..-.—. B
LICENCE OF OCCUPATION ...,-....,.................—.. T
ORDER IN-COUNCIL .. ........................ ..-... OC
RESERVATION..... .... . . ...... .......——......,... ©
CANCELLED .........,....... . . ... —.......... ®
SAND&GRAVEL .......,.................... — ......... ©
NOTt: MINING RIGHTS IN PARCELS PATENTED PRIOR TO MAY 6. 1913. VESTED IN ORIGINAL PATENTEE BY THE PUBLIC LANDS ACT, R.SO 19TO, CMAP 380, SCC. 63. SUBSEC 1.
SODMtl rv*
1000— M*tr*v
10 10 20 30 40 SO 60 70Chslnt
500 Q Fv*t - - -
1000
Cftatni
2000 3000 *000 SOOO—————————: i—————————- F**t
SCALE 1:20 000
GRID ZONE : 17l NOTES
lL/7/.' P .ANNED PEFCI-ESTATiON M AY 2/83
r-ANO AND GRAVEL
LA.8OS CXnMTMlK JAM ft MM
M
JAN 21 1992*
2- l 4437TOWNSHIP
MURPHYMN R ADMINISTRATIVE DISTRICT
TIMMINSMINING DIVISION
PORCUPINELAND TITLES/ REGISTRY DIVISION
COCHRANEMinistry ofNatural Management
ReSOUrceS B ranch
OntarioORIGINAL
COMPILATION JULY .1984
REVISED:
Nufflbn
G-3980
CD
C
D rn
r-o
CD
CDB C
D
CO
N
ill
CO
N
li
1400
N
D12
00
N
1000
N
800
N
CD a. u] CO a
CD
C
D
T-D
en S
D
1400
N
1200
N
KE
Y
MA
PS
CA
LE
. l
: 5O
6.88
O
1000
N
D
600
N
400
N
200
N —
OC
ON
CO
N
200
S
400
S
600
S
800
S
1000
S
CD
CD
CD
C
D
CD
C
DC
DC
D
CD
CD
1200
S
1400
S
1600
S
to CO in
c\j
rO t CL
800
N
600
N
—
400
N
200
N
CD
C
D
CD
CD
C
D m
CD
C
D m
CJL)
C
D
CD
CD
C
Den C
D
CD
en CD
CD
en
en-••
jC
D
CD
en CD
CO
C
OCD
en
CD
C
D
eo CD
C
DL
O en CD
ro CD
C
DC
D
r-o CD CD
r-o
IXJ
CD
C
D
m
m
rnm
rn
rn
ro CD
CD m
ro CD
C
D m
s m
CO sj- CM
ID
(M
(T)
^T cvj
in O
in
CM
tn CL
CM en C\f in a ro
O
) CV
J in CL
CD
C
D
CD
CD
CD
ro CD
C
D
(JO
C
D
CD
CD
C
D
en CD
C
D
CO
C
DC
D
en
--j
en
CDCD
CD
m
rn
en C
D mm
CO s
CO
C
D
O
-- ro
CD
C
Den
CD
CD
C
D
m
m r
n
r-o CD
C
D m
r-o
ro CD
C
D m
O 200
S
400
S
600
S
800
S
m
TJ X H ~D
m
1000
S
ir o m
1200
S
1400
S
Str
ong
Anom
aly
Wea
k A
nom
aly
Rece
iver
: S
cintr
ex
IPR
—11
Tra
nsm
itter
: S
cintr
ex
TS
Q-3
3.0
kW
On
Tim
e :
2 S
econ
ds
Off
Tim
e :
2 S
econ
ds
Del
ay
Tim
e :
510
ms
Inte
gra
tion
Tim
e :
180
ms
Ele
ctro
de
C
onfig
ura
tion
: P
ole
—D
ipole
A :
50
Met
res
N :
1
Readin
gs
: C
ha
rgea
bili
ty
(ms)
Plo
ttin
g
poin
t
2.
l 4437
MU
RP
HY
T
WP
.16
00
S
TIS
DA
LE
TW
P.
CO
CD
—
*
CD
C
D
CD
C
D
CD
CD
C
D
CD
CO
CD
C
D
"-jc
n
cocn
cn-e
^
^-
coou
CD
cn
CD
cn
cDen
CD
cn
cDCDCD
CDCD
CDCD
CD
CDCD
ro
~-CD
CD
CD
CD
CD
CD
CD
ro CD CDUJ
CD
CD
-**.
enCD
CD
CD
CD
en CD
CD
--•J
CD
CD
mrn
CO
CD
CD m
CO
CDCD m
SOUT
HEAS
T M
URPH
Y PR
OJEC
TL
P.
CH
AR
GE
AB
ILIT
Y
MU
RPH
Y TO
WN
SH P
SCALE
: 1: 50
00DA
TE
: OC
TOBE
R 1990
WORK BY
:
X*
^
Tim
min
s G
eoph
ysic
s L
td.
4a
AI1
SE
05
03
2
.14437
MU
RP
HY
1400
N
—
1200
N
1000
N
—
800
N —
600
N —
400
N
200
N
O
600
S
800
S
1200
S
1600
S
200
S —
400
S —
1000
S
—
1400
S
—
CD
C
D
CO
C
DC
D
-e*.
CD
CD
en CD CD
CO
N
lil
CO
N
M
•*-j
coCD
en
CD
C
Dco
en
en
-t*
-CD
en
CD
en
CD
C
D
CD
C
D
^ CD i O. to CO CL
D
1400
N
1200
N
1000
N
D
CO
N
II
CO
N
en
CDC
D
CD
CD
C
DC
D
CD
CD
C
D
a
CO in CJ i a.
800
N
—
600
N
400
N
200
N
CO
C
D
CD
CD
C
DC
DC
D
CD
CO
CD
C
DC
D
CD
C
DC
DC
Dro C
DC
DC
O
CD
C
DC
D
CD
en
CD CD
CO
C
OCD
en
CD
C
DC
D
CD
8 CD
en CD
Sro C
D
CD
C
Drn
rn
m
CD
CD m
ro
co
CD
CD m
ro -p* 'B m
i m
D
co co
CD a
co
ft C\J in
c\j
in
•a
(J)
^f
OJ m o
m (M in i IX
CD
00 i CL
CD
C
D
CD
CO
C
D
CD
CD
C
D m
en
CD CD
CO B
CD
--
-J
S 8
m
m
-s
gen
CD
a0
m
m
CO g
— r
oC
D
CD
en C
D CD
CD
ro CD CD
r-o CD CD m
m
mm
O
—
200
S
—
400
S
600
S
800
S
en
c 33
~D X
a
1000
S
o K (~
m H ^ T)12
00
S
in
en i a
1400
S
MU
RP
HY
T
WP
.—
16
00
S
TIS
DA
LE
T
WP
.C
OC
DC
D
CD
C
D
CD
C
D
CD
C
D
CO
CD
^.
CD
en^
CD
CDC
D
—-
—-
co
cn
enjs
*.C
De
n
CD
cn
CDCD
CDCD
-^.
ou
eo
CD
eno
CD
C
DC
Dro CD
CD
CD
CD
CD
CD
ro
o CDCO
CD
CD
-t*.
enCD
CD
CD
CD
rn
rn
co 8 m8
co CD
CD
CO
CD
CD
KE
Y
MA
PS
CA
LE
: l
; 5O
6.88
O
-l
Str
ong
Charg
eabili
ty
Ancr
naiy
Wea
k C
harg
eabili
ty
Anom
aly
Rec
eive
r :
Sci
ntre
x [P
R—1
1
Tra
nsm
itter
:
Sci
ntre
x T
SQ
-3
3.0
kW
On
Tim
e :
2 Se
cond
s
Off
Tim
e :
2 S
econ
ds
Del
ay
Tim
e :
510
ms
Inte
grat
ion
Tim
e :
180
ms
Ele
ctro
de
Co
nfig
ura
tion
:
Pol
e—D
ipol
e
A :
50
Met
res
N :
1
Rea
ding
s :
Res
istiv
ity
(ohm
—m
)
/
va/
/P
lotti
ng
poin
t
2.
l 44
37SO
UTHE
AST
MUR
PHY
PROJ
ECT
l. P
. R
ES
IST
IVIT
Y
MUR
PHY
TOW
NSHI
P
SCAL
E :
1:
5000
RLE
:
MU
R.IP
DATE
:
OCTO
BER
1 990
WORK
BY
: -T
imm
ins
Geo
phys
ics
tid
42A11SE0503 2.14437 MURPHY
B20