4
J.-P. Riunaud PS/AE PSMB 11/09/2000 Report from SPSC meeting 05-06/09/2000 OPEN SESSION on Tuesday, 5 September 2000 at 08:30 h, Main Auditorium 1. Status report on ICARUS: C. Rubbia 2. Proposal: OPERA - An appearance experiment to search for oscillations in the CNGS beam : J- P. Repellin, P. Strolin, K. Niwa (SPCS 2000-028/P318, LGNS-P25/2000): 3. Addendum to PS212/DIRAC: First observation of K atoms and their lifetime measurement :L. Nemenov (SPSC 2000-032/P284 Add. 1): CLOSED SESSION on Tuesday, 5 September at 14:00 h, 6 th Floor Conference Room, continuing on Wednesday, 6 September at 09:00 h 1. Approval of the minutes of the 48 th meeting of the SPSC 2. Report on the 147 th meeting of the Research Board 3. Status Report on the SPS 4. Status Report on the PS 5. Status Report on the PS and SPS experiments 6. Status of ICARUS: W. Kühn (and A. Zalewska) 7. Discussion on P318/OPERA: S. Dalla Torre, R. Forty SPCS 2000-028/P318, LGNS P25/2000) 8. Discussion on addendum to PS212/DIRAC : M. Cavalli-Sforza SPSC 2000-032/P284 Add. 1 9. Discussion on addenda 2 and 3 to NA48 : Y. Déclais, M. Pennington, A. Pich SPSC 2000-002/P253 Add.2, SPSC 2000-003/P253 Add.3 10. Discussion on addenda 5, 6 and 7 to NA49 : N. Pavlopoulos SPSC 2000-011/P264 Add. 5; SPSC 2000-033/P264 Add. 6; SPSC 2000-035/P264 Add. 7 11. Discussion on NA60 ion phase : W. Kühn SPSC 2000-010/P136 12. Discussion on P317 / CLOUD : F. Bobisut, P.J. Crutzen SPSC 2000-021/P317, SPSC 2000-030/P317 Add.1 13. SPS and PS schedules 14. A.O.B. Memorandum from MONOLITH

Report from SPSC meeting 05-06/09/2000

  • Upload
    locke

  • View
    36

  • Download
    0

Embed Size (px)

DESCRIPTION

OPEN SESSION on Tuesday, 5 September 2000 at 08:30 h , Main Auditorium 1. Status report on ICARUS: C. Rubbia 2. Proposal: OPERA - An appearance experiment to search for     oscillations in the CNGS beam : J-P. Repellin, P. Strolin, K. Niwa(SPCS 2000-028/P318, LGNS-P25/2000): - PowerPoint PPT Presentation

Citation preview

Page 1: Report from SPSC meeting    05-06/09/2000

J.-P. Riunaud PS/AE

PSMB 11/09/2000

Report from SPSC meeting 05-06/09/2000

OPEN SESSION on Tuesday, 5 September 2000 at 08:30 h, Main Auditorium

1. Status report on ICARUS: C. Rubbia 2. Proposal: OPERA - An appearance experiment to

search for oscillations in the CNGS beam : J-P. Repellin, P. Strolin, K. Niwa

(SPCS 2000-028/P318, LGNS-P25/2000):

3. Addendum to PS212/DIRAC: First observation of K atoms and their lifetime measurement :L. Nemenov

(SPSC 2000-032/P284 Add. 1):

CLOSED SESSION on Tuesday, 5 September at 14:00 h, 6th Floor Conference Room, continuing on Wednesday, 6 September at 09:00 h

1. Approval of the minutes of the 48th meeting of the SPSC2. Report on the 147th meeting of the Research Board

3. Status Report on the SPS4. Status Report on the PS5. Status Report on the PS and SPS experiments

6. Status of ICARUS: W. Kühn (and A. Zalewska)7. Discussion on P318/OPERA: S. Dalla Torre, R. Forty

SPCS 2000-028/P318, LGNS P25/2000)

8. Discussion on addendum to PS212/DIRAC : M. Cavalli-SforzaSPSC 2000-032/P284 Add. 1

9. Discussion on addenda 2 and 3 to NA48 : Y. Déclais, M. Pennington, A. Pich SPSC 2000-002/P253 Add.2,

SPSC 2000-003/P253 Add.310. Discussion on addenda 5, 6 and 7 to NA49 : N. Pavlopoulos

SPSC 2000-011/P264 Add. 5; SPSC 2000-033/P264 Add. 6; SPSC 2000-035/P264 Add. 7

11. Discussion on NA60 ion phase : W. Kühn SPSC 2000-010/P136

12. Discussion on P317 / CLOUD : F. Bobisut, P.J. CrutzenSPSC 2000-021/P317, SPSC 2000-030/P317 Add.1

13. SPS and PS schedules14. A.O.B. Memorandum from MONOLITH

SPSC 2000-031

Page 2: Report from SPSC meeting    05-06/09/2000

J.-P. Riunaud PS/AE

PSMB 11/09/2000

Report from SPSC meeting 05/09/2000

Closed session1. Approval of the minutes of the 48th meeting of the SPSC

2. Report on the 147th meeting of the Research Board

3. Status Report on the SPS

4. Status Report on the PS

5. Status Report on the PS and SPS experiments

6. Status of ICARUS: W. Kühn (and A. Zalewska)

... the Research Board requested the SPSC to review, at its 5 September 2000 meeting, all the fixed-target experimental proposals which are still pending and therefore still not included in the current Medium Term Plan. This review should include competition from other experiments world-wide, and conclude by establishing scientific priorities for the period 2001 to 2005. It should be presented to the Research Board at its 14 September 2000 meeting, at which time a parallel review by the management of the resources that these proposals request from CERN (finances, man power,...) will also be presented. …

- Comments from the Chairman & C. Détraz

Running at 400 GeV/c; Very good SPS efficiency this year : 90 %

PS Intensity record; AD status & physics start; News from RFQ-D being tested in Aarhus

DIRAC benefits from AD spare cycles; AD Experiments are running; Good results from ASACUSA & ATRAP; ATHENA progressing well

- A first 20 m long track from T600 should be seen early next year;

- Congratulations of the SPSC for the impressive progress over last year.;

Page 3: Report from SPSC meeting    05-06/09/2000

J.-P. Riunaud PS/AE

PSMB 11/09/2000

Report from SPSC meeting 23/05/2000

Closed session (Ct’d)7. Discussion on P318/OPERA: S. Dalla Torre, R. Forty

SPCS 2000-028/P318, LGNS P25/2000)

8. Discussion on addendum to PS212/DIRAC : M. Cavalli-SforzaSPSC 2000-032/P284 Add. 1

9. Discussion on addenda 2 and 3 to NA48 : Y. Déclais, M. Pennington, A. Pich SPSC 2000-002/P253 Add.2,

SPSC 2000-003/P253 Add.3

10. Discussion on addenda 5, 6 and 7 to NA49 : N. Pavlopoulos SPSC 2000-011/P264 Add. 5; SPSC 2000-033/P264 Add. 6; SPSC 2000-035/P264 Add. 7

11. Discussion on NA60 ion phase : W. Kühn SPSC 2000-010/P136

12. Discussion on P317 / CLOUD : F. Bobisut, P.J. CrutzenSPSC 2000-021/P317, SPSC 2000-030/P317 Add.1

13. SPS and PS schedules

14. A.O.B. Memorandum from MONOLITH SPSC 2000-031

- Data taking expected in 2005; 18 events expected in 5 years ; Cost 83 MSF; Collaboration not strong enough ; - SPSC asks for clear definition of responsibility, definition of SW organisation and a long list of technical items.

- Proposal to measure K life time in 2003-2005 - SPSC recommends approval for 2003, provided existence of K atoms is shown

- Extension of NA48, after installation in 2002-3 shut-down- With NA48 CERN can bring important and unique data to CP violation. SPSC: low cost & natural extension of NA48. Extension recommended for approval

- Proposal to run at 80 A.GeV/c (6days) in 2000.- This year’s request recommended for approval- Request for 15 days at 20 & 30 A.GeV/c in 2002. To be decided at next SPSC

- Request for Indium run in 2002 and Pb run in 2003- Position of runs still to be decided- SPSC comments : Physics is clear; should be done; Recommended for approval

- Why PS beam ? - It’s a research programme, not an experiment- Not recommended for approval

- 2001 schedule recommended for approval

Page 4: Report from SPSC meeting    05-06/09/2000

J.-P. Riunaud PS/AE

PSMB 11/09/2000

Physics starts: 2 April

East Hall, AD, ISOLDE, nTOF

Physics stops: 29 October

28 weeks for East Hall (29 weeks in 2000)

3000 h for AD

Supercycle length: 16.8 sec

Informal meeting on July 7th with users about distribution of proton cycles between East Hall, PS and SPS/MD, ISOLDE and nTOF. Possible scenarios send to users on August 2nd.

Efficient use of beam time requires close collaboration between the PS and ISOLDE coordinators.

Expecting detailed user requests until end of October.

Physics starts: 2 April

East Hall, AD, ISOLDE, nTOF

Physics stops: 29 October

28 weeks for East Hall (29 weeks in 2000)

3000 h for AD

Supercycle length: 16.8 sec

Informal meeting on July 7th with users about distribution of proton cycles between East Hall, PS and SPS/MD, ISOLDE and nTOF. Possible scenarios send to users on August 2nd.

Efficient use of beam time requires close collaboration between the PS and ISOLDE coordinators.

Expecting detailed user requests until end of October.

From Thomas Ruf