Page 1 of 26 Pre-Bid Clarifications Request for Proposals (RFP) for Customization, Integration, Data Migration, Implementation & Maintenance of e-Procurement Solution for Government of Madhya Pradesh Sr. No. Description RFP Ref Page No /Clause No. Response 1 The MoU /Agreement shall clearly specify the prime bidder, stake of each member and outline the roles and responsibilities of each member. Query: The commercial arrangement between the members, being private arrangement may not be required to be disclosed. 14 Clause 2 (b) OK 2 The Bidder individually or in consortium should have a minimum of 5 years’ experience in the field of e-procurement domain Query1: Does the word domain mean implementation including eTendering? and shall provide references of successfully completed/ running e-Procurement projects of Govt. Depts. /PSUs along with supporting testimonials from them. Query2: What is the minimum validity period of contract i.e. acceptable to meet the requirement Any company having experience of running even a single state wide/ nationwide (India or International) e-Procurement application since last 5 years would be considered equivalent to aforesaid criteria. The bidder should provide work orders and experience certificate and relevant documents in this regard. Query 3: Is the word “running” used to mean continuous operation for 5 years of eTendering module? 14 Clause 3 Query 1: Yes Query 2: As per RFP Query 3 : Yes (Please refer to corrigendum for details) 3 The e-Procurement Application should undergo STQC certification. Certification should be initiated within three months from the Go-live / Final UAT signoff. Query: Who arranges and bears the cost for undergoing STQC certification? Service provider or MPSEDC? 15 clause 7 Service Provider

Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 1 of 26

Pre-Bid Clarifications

Request for Proposals (RFP) for Customization, Integration, Data Migration, Implementation

& Maintenance of e-Procurement Solution for Government of Madhya Pradesh

Sr.

No.

Description RFP Ref Page No

/Clause No.

Response

1 The MoU /Agreement shall clearly specify the prime bidder, stake of each member

and outline the roles and responsibilities of each member.

Query: The commercial arrangement between the members, being private arrangement

may not be required to be disclosed.

14 Clause 2 (b) OK

2 The Bidder individually or in consortium should have a minimum of 5 years’

experience in the field of e-procurement domain

Query1: Does the word domain mean implementation including eTendering?

and shall provide references of successfully completed/ running e-Procurement

projects of Govt. Depts. /PSUs along with supporting testimonials from them.

Query2: What is the minimum validity period of contract i.e. acceptable to meet the

requirement

Any company having experience of running even a single state wide/ nationwide

(India or International) e-Procurement application since last 5 years would be

considered equivalent to aforesaid criteria. The bidder should provide work orders

and experience certificate and relevant documents in this regard.

Query 3: Is the word “running” used to mean continuous operation for 5 years of

eTendering module?

14 Clause 3 Query 1: Yes

Query 2: As per RFP

Query 3 : Yes

(Please refer to

corrigendum for

details)

3 The e-Procurement Application should undergo STQC certification. Certification

should be initiated within three months from the Go-live / Final UAT signoff.

Query: Who arranges and bears the cost for undergoing STQC certification? Service

provider or MPSEDC?

15 clause 7 Service Provider

Page 2: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 2 of 26

4 The bidder (Prime) should be a profit making company having earned profits, for

last 3 years, with a minimum turnover of Rs. 50 Crore in all of the last 3 years (09-10,

10-11, 11- 12). As documentary proof, Balance Sheet & Profit & Loss A/c is to be

submitted.

Query: Since this clause of profitability is to ascertain the financial stability of the

company, you may also alternatively accept the same through appropriate positive

net worth of say Rs. 50 crores for the last 3 years

15 clause 9 Please refer to

corrigendum.

5 The e-Procurement application shall be a n-tiered (3 or more) architecture with

Web, Application and Database Server & offers a superior level of security with Secure

Socket Layer (SSL) encryption, strong authentication with digital certificates

and speed to conduct real time bidding over the Internet.

Query: Please confirm who will bear the cost of SSL certificate for server?

17 clause 7 Service Provider

6 Query: Marks for technical parameter in Sr. No. 1, 2 & 4 are given for the parameters

which are equivalent or even less than the requirement stated in pre-qualification.

The marking parameters need to be above the pre-qualification criteria. Experience

in setting up and maintaining data center may be considered for marking

90,Parameters

for technical

evaluation Sr.

No.1, Sr. No. 2

and Sr. No. 4

Please refer to

corrigendum

7 Provision of sending automated email/SMS to tenderers’. Vendor shall provide

SMS gateways and e-Mail SMTP details to send the SMS or Mail.

Query: Requirement is for automated email or SMS please confirm, cost being the

consideration.

38 Application should

have provision for

SMS & Email

8 GoMP shall provide the Data centre facility to host the e-Procurement Solution.

Query: Will GoMP bear the cost of entire Data centre infrastructure and service

provider has to bear the cost of Server Hardware and operating software?

17 The SP has to bear

the cost of Server

Hardware and

Operating software

however MPSEDC will

charge additionally

Page 3: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 3 of 26

1.5% p.a. of value of

Hardware hosted in

SDC towards O&M

(Please refer

corrigendum)

9 The Bidder shall assess and make his own arrangements for infrastructure

which includes necessary hardware, system software and transportation of

personnel deployed by him, security at the site in addition to the men, machine

and material. The servers and other hardware have to be physically located and

operated from State Data Centre of GoMP. The bidder should assess the

capacity planning and assessment for the solution taking into account a period of

5 years including hardware specifications & configurations.

Query: You are requested to give minimum acceptable requirement of Server

Hardware and related software to be supplied by service provider by way of Bill of

Material.

118 The SP has to assess

the hardware

required and should

adhere to the SLAs.

10 Query: You have taken no of tenders of 2011-12 and assumed no of bids per

tender to be 5. As per the details given by you the momentum in the initial years

is slow. Average no of bids are less than 4. The post tendering modules as per

your estimate also will take its own time.

In view of the above, unless some correction factor is applied the commercial

worked out will be inflated.

156, 157, 158 &

159

As Per RFP

11 Query: Please confirm if the e-Procurement solution will be hosted out of the MP

SDC?

General Yes, please refer

corrigendum

12 Query: Request you to please confirm that the e-Proc Service provider will provide

only the Servers and associated system software for hosting the e-proc solution on

these Servers. if yes, then since these Servers will be hosted out of the SDC, its

administration and monitoring will be part of the SDC Operator. Please confirm.

4.11 Yes, please refer

corrigendum

13 Query: If the e-Procurement solution is hosted at the SDC them the other support

infrastructure which is part of the SDC including NIPS, Firewall, Load Balancers,

Antivirus, Security, backup software, will be provided for at the SDC Operator. Please

confirm

4.11 Yes, please refer

corrigendum

Page 4: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 4 of 26

14 Query: The support, monitoring and management of infrastructure provided as part

of the MP SDC will be done by the SDC Operator.

4.11 Yes, please refer

corrigendum

15 Query: Please confirm that the help desk run by the e-procurement Service Provider

will only take calls pertaining to the e-Procurement solution. The first point of

contact helpdesk would be manned by SDC Operator

4.11 Yes, the helpdesk will

only take calls

pertaining to the e-

Procurement

solution. The first

point of contact for all

e-Procurement

related queries will be

the helpdesk

provided by the SP.

16 Query: Please provide details on Training in terms of no. users to be trained, Training

locations, Training batch size, Online/Offline training details etc

5.13.2 Training is considered

as a critical success

factor for this project.

The bidders are

expected to present a

comprehensive

training strategy. (pls

refer corrigendum)

17 Query: What is the customer expected timeline for phase-2 of implementation 5.13.1 & 5.13 As Per RFP

18 Query: Please provide details of Legacy Data which needs to be migrated in terms of

Volume and technology platform of Legacy application

4.4 As Per RFP

19 Query: Please Provide details of existing tools at SDC used to monitor the

application, server and network which would be used to measure the SLAs

4.11 Please refer to

corrigendum.

20 Query: Bidder submits that there has been a typo in this clause which should be

corrected to bring it in line with Cl. 3.1.(6) and 7.3. Therefore, clause should read,

"...exclusively for MSEDC and based on information or data owned by Gomp...."

3.1(15) As Per RFP clause

3.1(6)

21 Query: Bidder submits that there has been a typo in this clause which should be

corrected. This clause read as, "….and nothing in this Agreement shall be construed

to ...."

7.3 As Per RFP

Page 5: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 5 of 26

22 Query: Bidder submits that MPSEDC should only be entitled to forfeit Security

Deposit in case of breach of this provision.

6.13.4 Please refer to

Corrigendum

23 Query: We requests inclusion of the following language: " Where the Bidder fails to

meet the SLA, MPSEDC shall impose a penalty in accordance with the tables below.

However, where the Bidder performs at a level higher than the SLR, Bidder shall be

entitled to Service Credit at a mutually agreed rate, which shall be adjustable against

SLA penalties. Bidder will not be held liable for any delay or failure to meet SLRs

arising out of the Client's or third-party's failure to perform its obligations or meet its

dependencies."

9.1 As Per RFP

24 Query: We requests to add following so that clause is mutually reciprocative "All

information supplied by MPSEDC may be treated as contractually biding on the

MPSEDC. Bidder's volume and specification. In case of any change in these both

parties shall mutually agree on the change order request with appropriate terms."

6.12.2 Page 72 As Per RFP

25 Query: We propose charging and True up Mechanism to be mutually agreed: We

requests to confirm volume data as minimum base line for the purpose of billing

with an quarterly/6 monthly true up for higher volume to adjust for the actual

number of tenders and other volume use for pricing. Further vendor need to be

protected by way of bare minimum guaranteed volume to avoid risk due to any

decision by Govt/Departments to not use the portal leading to fall in actual

volume/usage.

6.34 page 85

10.2.1

Annexure 2

Commercial Bid

As Per RFP

26 Query: Tax - We Proposes to add following "Prices shall be inclusive of all Taxes

(taxes, duties, charges and levies as applicable except Service Tax) prevailing on date

of bidding. Service Tax shall be reimbursed based on the submission of proof of

actual service tax payments made by the bidder. The MPSEDC shall pay for all taxes

on actual including VAT, duties, license fees, other such levies including Service Tax,

The MPSEDC shall bear impact of any tax law change, tax rate change and

introduction of new tax."

and deleting "The price would be inclusive of all taxes, duties, charges and levies as

applicable except Service Tax. Service Tax shall be reimbursed based on the

submission of proof of actual service tax payments made by the bidder."

6.34 page 86

7.4.5 page 100

Please refer to

Corrigendum

Page 6: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 6 of 26

32 The Bidder (Lead Bidder in case of consortium) should have a minimum of 5 years'

experience in the field of e-procurement domain and shall provide references of at

least five successfully completed/running e-procurement projects of Govt.

Depts./PSUs along with supporting testimonials from them. Any company having

experience of running even a single state wide/nationwide (India or International) e-

Procurement application since last 5 years would be considered equivalent to the

aforesaid criteria. The bidder should provide work orders, experience certificate and

relevant document in this regard.

Suggestions: Only relevant documents should be provided by bidders.

Per Qualification

Point 3

As Per RFP (Please

refer to corrigendum)

33 The bidder should have processed at least 10,000 e-Tenders for Govt. Depts./PSUs in

the last 3 years as on the date of submission of bids.

Suggestions: Refering Pre-Qualification point 3, We understand that nationwide

(India or International) Govt. Dept/PSU will be considered.

Per Qualification

Point 4

It has to be for entire

State Govt. (India or

International)

34 The e-Procurement Application should undergo STQC certification. Certification

should be initiated within three months from the Go-live/Final UAT signoff.

Per Qualification

Point 7

As Per RFP

27 Query: Add "MPSEDC shall pay all amounts due from its side for the products

delivered and services performed by the Bidder till the date of termination."

7.6 at 101 As Per RFP

28 Query: Modify last line to "The MPSEDC shall pay all invoices within 30 day from the

date of of invoice."

10.2 (i) page 117 As Per RFP

29 Query: For maintenance 4 years is considered while O&M is for 5 years. Value of 2g

should be revised.

Annexure 2G As Per RFP

30 Query: We request for the past 3 to 5 year trend of break up of volume data given in

2C,2D,2E,2F,2G in various slabs so that We can run simulation of resource

requirement and cost in future.

Annexure 2

Commercial Bid

As Per RFP

31 Query: REF does not include mechanism and consideration of transfer of system

which is essential in BOOT Deal. We Propose to insert 10.2.1.(vii) "In case of any

termination and completion of contract, vendor shall transfer the system to MPSEDC

on payment of all product/services delivered till date of termination and residual

value of system including hardware, software and related setup"

10.2.1 page 118 As Per RFP

Page 7: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 7 of 26

Suggestions: Please consider CERT-IN certification also.

35 The intellectual property rights in anything developed by the Bidder under this RFP

exclusively for MPSEDC and based on information owned by MPSEDC shall vest with

MPSEDC. GoMP shall use existing domain name or can register different domain

name for the installed instance. The software shall be gradually rolled-out across

offices in the Government of Madhya Pradesh.

Suggestions: Understanding that functionalities developed for MPSEDC will be

owned by MPSEDC and Non-Discloser agreement will be signed but the source code

will not handed over to MPSEDC and all further customization will be done by NIIT

Tech limited. <Open source are suitable for non-financial king of system. They are

cheap but for large database backup and restoration itself is huge task. Security and

authentication implementation are not as advanced. Moreover the ownership of

source code continuous to be with NIIT technologies Ltd.

Features of

Proposed System

- Point 6

As Per RFP

36 The e-Procurement software should be Platform and Browser Independent however

browser for all legal purpose in Microsoft Internet explorer 6.0 above. Application

must work on IE 6.0 & above. At the user-end, various users of the e-Procurement

system should be able to use their PCs under MS Windows XP and above and / or

Linux with commonly used office automation tolls such as MS office/Star

Office/Abode publishing system along with S-MIME (Secure-Multipurpose Internet

Mail Extensions) compliant email systems and Internet browsers. The Software

should support multi platform and should run on open source & Windows platform

as well. GoMP shall provide the Data center facility to host the e-Procurement

Solution.

Suggestions: We would recommend, as per our past experience, not to use Open

source for your requirement as they are suitable for non-financial transactions. They

are cheap but for large database backup and restoration become a challenge and

they are not able to handle large databases. Moreover Security and authentication

implementation methodology are not as advanced as generally required for

financial, sensitive and voluminous data.

Features of

Proposed System

- Point 8

As Per RFP (Please

refer to corrigendum)

Page 8: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 8 of 26

37 The intellectual property rights in anything developed under this RFP exclusively for

MPSEDC and the information or data owned by GoMP shall be proprietary to

MPSEDC. However, each party shall own and retain its pre-existing IP. The Bidder

shall sign the Non disclosure Agreement with MPSEDC.

Suggestions: Understanding that functionalities developed for MPSEDC will owned b

MPSEDC and a Non-Discloser agreement will be signed but intellectual property

rights will not be transferred to MPSEDC and all further customization will be done

by NIIT Tech limited.

Features of

Proposed System

As per RFP

38 The server-end software should be platform independent and able to run on

Microsoft Windows Server and LINUX Operating System environment.

Suggestions: We suggest that rather than multiple platform, It should e on single

platform (Microsoft windows server or Linux or Windows)

Technical

Requirements

Point 4.7.1

Please refer to

Corrigendum

39 The solution shall be capable of being deployed on multiple OS platforms like Linux,

Unix and Windows

Suggestions: We suggest that rather than multiple platform, It should e on single

platform (Microsoft windows server or Linux or Windows)

Table of

Technical

Requirements -

Point 16

Please refer to

Corrigendum

40 Multilingual support - English and Hindi

Suggestions: We understand software should support Unicode and hindi supports

will be required for fixed words only. No keyboard typing is required.

India Localization

- Point 5.9

As Per RFP

41 Offered Software should be in operation & working satisfactorily in Govt./PSU in

India for at least last five year on the date of submission of bids.

Suggestions: Refering Per-Qualification Point 3, We understand that nationwide

(India or International) Govt. Dept/PSU will be considered.

From - P#3 : e-

Procurement

Implementation

Experience

It has to be for entire

State Govt. (India or

International)

42 The Bidder (Lead Bidder in case of consortium) should have a minimum of 5 years'

experience in the field of e-procurement domain and shall provide references of at

least five successfully completed/running e-procurement projects of Govt.

Depts./PSUs along with supporting testimonials from them.OR

Any company having experience of running even a single state wide/nationwide

PQ Point# 3 Query 1: As per RFP

(Please refer to

corrigendum)

Query 2: It will be

Page 9: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 9 of 26

(India or International) e-Procurement application since last 5 years would be

considered equivalent to the aforesaid criteria.

We understand that the bidder having experience of running state/nation wide e-

Procurement application since last 5 years would be considered as equivalent to

above.

Query-1: It there any relaxation of number of years experience for running the e-

Procurement applications? We are requesting to relax the total number of years

from 5 years to 4 years.

Query-2: We assume that the experience will be counted from the date of PO/LOI of

single e-Procurement Application. Please clarify it.

Query-3: Can the bidder consider experience (A Years) prior to the single

state/nationwide experience (B Years) to derive the total experience to meet the

criteria (i.e. T = A Years + B Years)

from date of LOI

Query 3: As Per RFP

43 The bidder should have processed at least 10,000 e-Tenders for Govt. Depts./PSUs in

the last 3 years as on the date of submission of bids.

We understand the clause "Bidder should have processed" as "Processed through e-

Procurement systems i.e. implemented/ deployed by the Bidder." Please clarify it.

Suggestions: The application needs to serve the tendering/auctioning requirements

of entire state MP. Hence we are suggesting to increase the number of tenders from

10,000 to 30,000 at-least in last 3 years.

PQ Point# 4 Yes, Should have

processed through e-

Procurement systems.

As per RFP

44 Indicate whether your firm / consortium have experience in implementing State

wide e-Procurement

System (Yes / No) ........

The content of Forms eg.

a) Name of the Client Department/State

b) No. of Modules in active use in the State/ Dept.

From P#3 As Per RFP

Page 10: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 10 of 26

C) Details of Contact Person/Nodal Officer from PSU/Dept/State

Suggestion: Please change the clause to cover "nation wide" experience as well, i.e.

from "State wide" to "State/Nation wide"

We assume that the same from can be used for "Nation wide" implementation

experience, i.e. the implemented application used across PAN India of a Central

Department, Govt. of India. The bidder can mention the Central Govt. department

name in place of department/state. Please clarify it.

45 The bidder should have the IPR (Intellectual Property Rights) of the proposed e-

Procurement solution so that all type of customization related issues can be

addressed by the bidder.

Please clarify the requirement for this clause as part of BID submission. Can bidder

submit the self declaration certificate about ownership of the proposed solution, if

required any certificate at the bid submission?

PQ Point# 8 Yes

46 The bidder should have a point of presence in Bhopal or should open a Project Office

within 30 days of receipt of Letter of Intent (Lol).

Query: is the development centre/project office at Bhopal is mandatory?

........the bidder will open a Project office with development centre within 15 days of

award notification......

Suggestion: Please correct the deviation "no of days" mentioned in 2 reference

places.

Note # 3

Clause Xiii

The Project Office has

to be in Bhopal or

shall open a Project

Office within 30 days

of issuance of Letter

of Intent (Lol).

(Please refer to

Corrigendum)

47 The Developed Software should be compatible with the GoMP Procurement

Guidelines, PSU, World Bank, IRC & MORTH requirements and Centrally Sponsored

Scheme (CSS) guidelines and any other guidelines specified from time to time.

Query: Are there any difference or difference or additional clauses in GoMP

guidelines than DIT/MIT, Govt. of India Procurement guidelines?

Clause 3.1,

Point# 2

As per RFP

Page 11: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 11 of 26

48 Application Usage:

e-Procurement solution will be utilized by GoMP departments including, local bodies

and municipal corporations along with their vendors. Co-operative Sectors, Public

Sectors and other State Governments can also other authorities can use this solution.

We understand the usage of application by GoMP departments/local

bodies/municipal corporations/state co-operative sectors/ universities but are not

able to understand about the solutions will be used by "Public Sectors and other

State Government can also other authorities can use this solution."

Please elaborate the requirement, contract terms/conditions, commercials, and

deployment/implementation plan for the use of solutions by these bodies/orgn.

Clause 3.1,

Point# 5

As per RFP

49 The Software should support multi platform and should run on open source &

Windows platform as well.

GoMP shall provide the Data centre facility to host the e-Procurement Solution.

We understand that the application will be hosted centrally at Data Centre for the

usage of various departments/bodies across state MP and by their vendors.

Qurey-1: Please elaborate/clarify the requirement of multi platform support.

Qurey-2: The OS of Web/App/Database server would be either MS Windows or Linux

as per Tender Document. Please elaborate the open source requirement?

Qurey-3: We assume that the hardware servers and Infrastructure will be provided

by GoMP/MPSEDC to host the application however, it will be maintained by the

bidder. The system software and e-Procurement applications will be provided by the

selected bidder, Please clarify it.

Suggestion: We propose to restrict the database requirement to any enterprise

database to meet the security requirements and load balancing & high availability

Clause 3.1,

Point# 8

Please refer to

Corrigendum

Query 1 - Please refer

to Corrigendum

Query 2 – As per RFP

Query 3 - Please refer

to Corrigendum

Page 12: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 12 of 26

requirements, and for scalability/ performance(eg. SQL Server, Oracle, Sybase)

instead of any open source database.

50 The transaction fees would be shared between the Service Provider and the MPSEDC

in 90:10 ratios respectively.

Query-1: How it will work? is it the case that the bidder will quote the price for

transactions including the 10% if fees for MPSEDC

Query-2: Whether the bidder will raise the invoice for 90% of fees to MPSEDC or for

100% of fees.

Point# 14 Query 1 - Yes

Query 2 - 90%

51 Implementation Model with Timelines - O&M for 5 year

It seems that schedule is highly tight and may not feasible to accomplish the

specified tasks/activity defined as the milestone. The UAT period is not defined as

well.

Hence, we request your increase the time-line for serial# 3 from T+4 to T+12 weeks,

and subsequently for other milestones. Also increase the overall time-line of project

from T+18 weeks to T+30 weeks (i.e. around 7 overall time-line of project from T+18

weeks T+30 weeks (i.e. around 7 months)

The time-line for phase-2 is not defined. We assume that these modules will be

performed on post go-live of phase-1 modules. Please clarify it.

Section: 5.13.1

As per RFP

It would be mutually

agreed with the

selected service

provider.

52 Acceptance & Sign off of deliverables

We understand the MPSEDC will play a major role and nominate a SPOC and core

team, and will coordinate for implementation of applications and migrations of data

and departments from legacy system to new system. The SPOC of MPSEC would

provide necessary acceptance and sign-off of milestones/deliverables. please clarify

it.

General As per RFP

53 Training to department users/bidders

Please specify the number of trainees needs to be trained and the batch size.

General Please refer to

corrigendum

Page 13: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 13 of 26

What is the frequency of repetition of trainings for same users in 5 years period, if

any

Can the bidder will charge separately for the trainings to vendors/bidders?

Please specify the number out station locations, where the training will be

conducted in 1st year and in future

54 The solution shall be natively built on 64 bit Operating System.

Can 32 bit OS be considered for web/app server?

As per RFP

55 The solution offered should be Service Oriented Architecture complaint

Is the SOA architecture mandatory for entire solutions or partial for integration?

The core solution of proposed DOTS solution is based on MVC architecture/Strut

framework. Is it ok?

Section: 4.8,

Point# 2

As per RFP

56 The solution offered should be Uni-Code Compliant.

We understand that the database should be uni-code compliant, and there will be

options for lables in Hindi/English in the front-end entry/view screen, and there

would not be data entry in both languages on processing/numeric fields. Please

clarify it.

Section: 4.8,

Point# 1

Yes

57 Integration with departmental legacy system (MMS)

Please specify the number of heterogeneous MMS system across various

departments/ bodies and the platform.

last paragraph As per RFP

58 Payment Gateway Integration

We assume that the integration will be made with 1 payment gateway service

provider for all departments. If not, please specify the number of PG needs to be

integrated and service provider names

General One PG, Modalities

would be discussed

with the successful

bidder.

59 Facilitate proxy bidding for contractors, if decided by the department.

This supposed to be discouraged as per DIT Guidelines. If needs to be performed

then who will perform this activity? may be department users will do proxy bid on

behalf of bidder, then what are extra information needs to be captured for this?

On-line Bidding

Functionality

Please refer to

Corrigendum

60 Support of advanced biometric technology for security and authentication of

electronic documentation to establish unique identity with electronic signature.

Section 5.1.11,

Point d

The usage of

advanced biometric

Page 14: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 14 of 26

Please elaborate the usage and implementation of biometric authentication in which

areas of application? Whether it will be applicable for both internal and external

users (bidders/vendors). There is a dependency with biometric device for the

authentication and the same should be available with user. It may not be feasible for

all users.

technology would be

limited to the Dept

user only. The

standard UIDAI

specifications should

be considered.

61 Transactions which are in conformity with the IT Act 2000 and any further

amendments issued by the Government of India (GoI).

Query: Should the database support the ISO 27001 and IT act 2000 requirements?

3.4 : compliance As per RFP

62 Audit Trail

Query: Audit trails and database auditing requirement has mentioned in the RFP we

suggest to further clarify the requirement that the solution should have a centrally

managed secure audit storage system which is able to capture before and after

values from transaction logs, privileged user audits, raise alters on suspicious

activity. The system should provide built-in and customizable reports for department

compliance and monitoring. It should also provide security facilities for role

segregation within auditing functions in terms of administration, auditors etc.

5.2 As per RFP

63 Page 55: database requirement: Encryption

Query: Is department looking for transparent data encryption technology?

5.6 Yes

64 Integrity and confidentiality: Data confidentiality features to be applied to ensure

that the data is only accessible by the intended parties.

Query: There are possibilities of database updating by bypassing the application

hence There should be monitoring/ Preventive mechanism to access/ update

sensitive from backend so that unauthorized access/updation from backend can be

prevented.

5.1.4 The application should

have data integrity

and confidentiality

features as referred in

RFP.

65 The database controls for online Transaction processing systems like Access to

database directly, Access to database through application, Access to log files, Access

by the remote terminals, DBA Controls, Backup policy and backup procedures.

Query: 1- access to log files : Generally DBA has access to audit log files so in case

someone wants to erase the audit logs they will able to do that hence it is suggested

that audit trails should moved and be in a separate systems /repository

5.1.10 The application should

have appropriated

controls.

Page 15: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 15 of 26

66 Database control

Query: Should the backup on the tapes be also encrypted to prevent from physical

theft ?

5.1.10 It will be in

accordance with back-

up policy of MP SDC.

67 Database control

Query: Should the policy be also structured where DBA can be segregated as per

their role and they should request security team to change the role ( should not be

allowed to change by themselves)

5.1.10 It will be in

accordance with the

Security policy of MP

State data centre.

68 Additional Security Features

Query: Does SQL injection prevention also required for the data security?

5.1.11 Yes

69 Additional Security Features

Query: It is suggested that the database should have received the security

certification of at least level 4 (EAL4) from the International Common Criteria for

Information Technology Security Evaluation.

5.1.11 As per RFP

70 Additional Security Features

Query: It is suggested that the Database should support to transparently encrypt

desired data at column, table space etc. levels at the storage, and should be capable

to encrypt data backups and data at the network without application's involvement /

coding.

5.1.11 As per RFP

71 Query: Does Database security requirement includes DBA level segregation and data

masking at test and development environment ?

5.6 As per RFP

72 Interface with payment gateway

Query: RFP solution using credit card as payment method therefore PCI DSS

requirements will be applicable. Does solution should comply to PCI DSS

requirements ?

5.8 As per RFP

73 Role based S/w

Query: 1.Pls elaborate on Roles that are being looked at by GoMP

3.1 As per roles structure

of Govt departments

74 Role based S/w

Query: 2.Ex- Will employees have multiple roles, Is GoMP looking at Enterprise roles.

3.1 Yes

75 Role based S/w

Query: 3. How does GoMP envision to automatically create & assign these roles to

various user community like employees , auctioneers etc.

3.1 Will be discussed with

the selected SP

Page 16: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 16 of 26

76 Users to be considered is 500

Query: Is the total named user population 500 including external & internal users

3.1 Number of concurrent

users is 500 for the

purpose of notional

sizing of hardware

77 Data that has been Audit Stamped must not be physically deleted from the System

until it has been Archived.

Query: Is there any need for the solution in which Administrators are also not

allowed to tamper with the audit data

5.2 As per RFP

78 User Registration services

Query: Does the scope also include self service & knowledge based authentication

for password reset

5.4 As per RFP

79 Also be capable of notifying appropriate parties

Query: Does the reference to suspicious behavior also point for a need for tracking

where the logins are originating & mitigating risks for fraud.

5.12 As per RFP

80 Scalability

Query: Scalability has been mentioned as one of the key requirements of the system,

to clarify, it is suggested that the database layer should have capability to be scaled

up horizontally so that more servers can be added dynamically to read-write

transactions at the single E-proc database.

3.4 As per RFP

81 Database access: Any access to the e-Procurement Software database should only be

via application/portal authorization.

Query: Should the Database have capability to restrict the DBAs and high privileged

users to access the transactional data.

5.12 As per RFP

82 availability: reliable data availability 24x7x365,

Query: As department has mentioned high availability and also mentioned load

balancing and clustered database environment, we suggest to clearly mention that

the active database servers should simultaneously read and write the complete

transactions at the single e-proc database, to avoid a single point in time failure at

database layer as to achieve high availability, load balancing, data security and

scalability.

5.1 As per RFP

Page 17: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 17 of 26

83 Page 55: database requirement:

Query: There would be requirement for data life cycle management and

performance to manage archival and online data. We suggest department to

mention for database partitioning requirement to store and retrieve data based on

various criteria like year, value, location, number, type, and their combinations.

5.6 As per RFP

84 The bidder’s (prime) development unit should have certification of CMMi Level 3 or

above and BS 7799 / ISO 27001. The bidder should submit a copy of the certificates

valid as on bid calling date.

Query: As many of the pure e procurement OEMs in country are not CMM Certified,

we request to relax the clause and keep ISO 9001 & ISO 27001 for wider

participation.

We are under Audit for CMMi 3 and expect to get the certification by end of

December’12.

Section 2 –

Prequalification

Criteria, Clause

No. 5

As per RFP

85 The bidder (Prime) should be a profit making company having earned profits, for last

3 years, with a minimum turnover of Rs. 50 Crore in all of the last 3 years (09-10, 10-

11, 11- 12). As documentary proof, Balance Sheet & Profit & Loss A/c is to be

submitted.

Query: As e procurement is still at nascent stage, many of the pure e proc players do

not have this kind of turnover. Request you to accept a combined Turnover of Rs 50

cr. for stated 3 FYs.

This will not only help for wider participation, but also remove the need for a Front

ending partner thereby will reduce service cost and cost for the MP Govt. vendors.

Section 2 –

Prequalification

Criteria, Clause

No. 9

Please refer to

corrigendum

86 All these conditions need to be fulfilled by Lead Bidder

Query: To our understanding, only 2-3 players will qualify and hence most of the

pure e procurement OEMs will not be able to participate.

However, by relaxing above 2 conditions, the participation will be wider.

Section 2 –

Prequalification

Criteria, Clause

No.3,5 & 9

As per RFP (Please

refer to corrigendum)

87 Data Migration includes the following:

1. Extraction of existing data from the legacy systems;

2. Cleansing and formatting of data extracted from the legacy systems;

3. Creation of new/additional data mandatory in the new system covering the past

Section 4.4 Data

Migration

Requirement

As per RFP

Page 18: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 18 of 26

years.

4. Uploading of these data to the new system;

Data Migration- Bidder shall be responsible for the Data migration from the existing

e- Procurement application to the new system. (Modalities of the data migration will

be finalized after discussions with selected service provider).

Query: Data Migration from existing legacy system to New E-procurement system

will have external dependency dependencies and many factors may be beyond of

immediate control of new vendor Like Data structures, formats etc. This is a long

time taking exercise. The department must provide the sufficient time for the same

and it should be out of scope of Phase I and Phase II timelines. Also till the time

complete data migration happens, Existing service provider should provide existing

site up and running parallel for past information for public viewing, department and

existing vendors’ access.

Section 3.1,

Features of

Proposed system,

Point No. 15

88 Demand Aggregation – The ability to aggregate Government departments demand

to leverage buying power with the supply market.

Query: For Demand Aggregation proper codification of the Items with common

specification is required does MP Govt. / Departments follows standard codifications

for demand aggregation.

Section 3.4,

Objectives of the

Proposed

Solution

Yes, will be provided

to the selected Service

Provider.

89 Monitoring and enhancement of the performance of scheduled backups, schedule

regular testing of backups and ensure adherence to related retention policies.

Retention policies shall be defined by GoMP. SAN storage and other related

infrastructure for backup shall be provided by GoMP.

Query: Please provide Specifications of SAN. Also details of SAN management

software if any.

Section 4.11

Operational

Support for 5

years

Please refer to

corrigendum on SDC.

90 The Bidder shall assess and make his own arrangements for infrastructure which

includes necessary hardware, system software and transportation of personnel

deployed by him, security at the site in addition to the men, machine and material.

The servers and other hardware have to be physically located and operated from

State Data Centre of GoMP. The bidder should assess the capacity planning and

Section 10.2.5.

Infrastructure

arrangement by

Bidder

Please refer to

corrigendum on SDC.

Page 19: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 19 of 26

assessment for the solution taking into account a period of 5 years including

hardware specifications & configurations.

Query: As Indicated Primary Data Centre will be provided by GoMP to host the

server.

Please clarify on the requirement of DR site and location/availability of infrastructure

for the same.

91 Intrusion detection & protection security features. The Vendor shall provide firewall

and IPS as part of the SDC.

Query: Does Firewall and IDS to be procured by Vendor in the name of SDC?

Section 4.7.5

Technical

Requirement

Please refer to

corrigendum on SDC

92 The implementation of the developed e-Procurement application requires

integration with the existing legacy systems & interfacing with the various user

departments. The bidders shall provide open APIs for interface with future e-

commerce/m-commerce /ERP applications. The e-Procurement system should

support integration of payment gateway for electronic payment through web

towards the tender fees, earnest money and security money etc. with all security

standards in place and the Bidder shall facilitate the integration as per requirements.

The e-Procurement application must be integrated with the payment gateway &

should allow bidders to remit the funds via NEFT / RTGS. The bidder should be able

to make the EMD & document fees payment online. Also it should have a provision

to get EMD automatically refunded via NEFT to his/her account for the unsuccessful

bidders.

Query: What all legacy system are required to be integrated with e-procurement

system?

Does the specified integration is part of Phase –II?

As specified The e-procurement system should integrate with the payment gateway.

Integration with payment gateway needs involvement of e-banking service provider.

Does GoMP already have a Nodal e-payment account for integration /e-banking

service provider?

Section 4.10.

Integration/Interf

ace

Requirements

Will be discussed with

selected SP

Page 20: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 20 of 26

Does the process for refund through NEFT already in place?

In case GoMP does not have existing arrangements, then the specified process may

take time to be streamlined and it should be out of the timelines specified in tender

document for phase I.

93 The Bidder should install/develop his/her own tools for monitoring the SLAs.

Query: Please modify the clause as "The Bidder should supply & install SLA

monitoring tool as part of the solution."

4.11.

Operational

Support

As per RFP (Please

refer to corrigendum

on SDC)

94 Physical Security:"Physical security for the solution should address securing all

information assets form physical access by unauthorized personnel."

Query: Since all the information assets will be hosted on State data center, physical

security should be responsibility of the datacenter operator.

5.12

Overall Solution

Security

Requirements:

Yes

95 Query: Please clarify the size of existing data from legacy systems to be migrated. 4.4.

Data Migration

Requirements

Will be discussed with

selected SP

96 "The Bidder shall assess and make his own arrangements for infrastructure which

includes necessary hardware, system software and transportation of personnel

deployed by him, security at the site in addition to the men, machine and material."

Query: Please clarify if redundant internet links will be provided by state data center

OR bidder needs to provide internet links for the solution.

10.2.5.

Infrastructure

arrangement by

Bidder

Please refer

corrigendum related

to SDC

97 Disater recovery

Query: Please clarify if disaster recovery provision should be considered in this

solution. If yes, please specify the location of the DR site, RTO and RPO requirements

General Please refer

corrigendum related

to SDC

98 Help desk

Query: Please specify the location of the help desk support. Please clarify

Connectivity from this location to state data center will be whose responsibility?

9.4.

SLRs for

Helpdesk/

Maintenance

Location can be

remote and

connectivity charges

will be borne by SP

Page 21: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 21 of 26

99 Query: The standard exclusions to Confidential Information is not appearing in this

RFP. Request to insert standard exclusions to confidential information as follows:

This restriction does not limit the right to use information if it:

a. Is obtained from another source without restriction.

b. Is in the possession of, or was known to, the Bidder prior to its receipt, without an

obligation to maintain confidentiality;

c. becomes generally known to the public without violation of this provision;

d. is independently developed by the Bidder without the use of Information provided

by MPSEDC;

e. is required to be provided under any law, or process of law duly executed.

Further, the confidentiality obligations of Bidder under this Agreement shall survive

termination of this Agreement for a period of two (2) years.

Section 7.2, As per RFP

100 Query: Request that the intellectual property rights in anything specifically and

exclusively developed for MPSEDC by Bidder under this Agreement shall vest with

MPSEDC, subject to Bidder’s pre-existing intellectual property rights and any third

party intellectual property rights.

Section 7.3, As per RFP

101 Query: Request that the price shall be exclusive of value added tax and service tax,

which shall be borne at actuals by MPSEDC. Further, Bidder shall be reimbursed for

payment of any new taxes or an increase in the rates of existing taxes or any other

sum, if any payable in respect of any sales tax and/or any other state or central levy.

This will apply retrospectively, if so applicable upon Bidder.

Section 7.4.5, Please refer to

corrigendum

102 Query: Request that liquidated damages shall be levied only for delays that are

solely and entirely attributable to Bidder and shall be limited to 0.1% of the value of

the undelivered portion of the products for every week of delay, subject to

maximum liquidated damages of 5% of the value of the undelivered portion of the

products.

Section 7.4.7, As per RFP

103 Query: The standard exceptions to warranty is not appearing in this RFP. Request to

insert standard exceptions to warranty as follows:

The scope of the warranty shall be limited only to correction of any bugs that were

left undetected during acceptance testing by MPSEDC. Warranty shall not cover any

Section 8.2, As per RFP

Page 22: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 22 of 26

enhancements or changes in the application software, carried out after acceptance

testing. Warranty is provided only for defects against approved Specifications.

Warranty shall also not apply if there is any (i) combination, operation, or use of

some or all of the deliverables or any modification thereof furnished hereunder with

information, software, specifications, instructions, data, or materials not approved

by Bidder and operation of the deliverables on incompatible hardware not

recommended by Bidder; (ii) any change, not made by Bidder, to some or all of the

deliverables; or (iii) if the deliverables have been tampered with, altered or modified

by MPSEDC without the written permission of Bidder; or (iv) defects in components

or materials provided to Bidder by MPSEDC in connection with the preparation of

the deliverable.

104 Query: Request to make this provision mutually applicable. Section 8.3.1, As per RFP

105 Query: Definition of Uptime:

Request that the time lost due to any of the following reasons shall be taken into

account while calculating the availability/ uptime requirement:

(a) Time lost due to power or environmental failures; (b) Time taken to recover the

system because of power or environmental failures; (c) Time lost due to damage or

malfunction in the system or any units thereof due to causes attributable to MPSEDC

such as attachment of additional devices, making alteration to the system,

maintenance of the system, etc. without Bidder’s consent and/ or failure to maintain

the site as required by the Bidder; (d) Time taken for scheduled maintenance/

troubleshooting either for preventive purposes or improvement in function or other

purposes; (e) Time taken for reconfiguration or other planned downtime situations;

(f) Scheduled shutdowns as required by MPSEDC; (Bidder may also request MPSEDC

for a shutdown for maintenance purpose, which request will not be denied

unreasonably by MPSEDC); (g) Time taken for booting the system (h) Time lost due

to unavailability of links.

Section 9, As per RFP

106 Query: Request that the maximum/ overall cumulative penalty levied under this

Agreement shall not exceed 1% of the Contract Value.

Section 9.3, Please refer clause

10.2.1 (vi)

107 Query: Request to insert a provision for deemed acceptance of the deliverables as

follows:

Section 9.6, As per RFP

Page 23: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 23 of 26

A deliverable shall be treated as accepted by MPSEDC if MPSEDC (a) fails to provide

the list of non conformities within two (2) weeks of delivery, (b) fails to notify the

acceptance of the deliverables in terms of this clause within the period of two (2)

weeks from delivery, or (c) starts using the deliverable in a live production

environment (other than as part of agreed review and acceptance testing procedure,

such as UAT).

108 Query: Request to delete this provision.

The GCC (under Section 7.4.7, read with our suggested modification) already clarifies

the maximum liquidated damages leviable under this Agreement.

Under Section 9.3, we request that the maximum penalty levied under this

Agreement shall not exceed 1% of the Contract Value.

10.2.1, (vi), As per RFP

109 Query: Request to modify the provision as follows:

Except for payment obligations, damages for intellectual property infringement and

damages for bodily injury (including death) and willful misconduct, a Party’s total

aggregate liability shall be limited to the amount paid by MPSEDC in the preceding

12 months for the services or deliverables that is subject of the claim. To the extent

allowed by Indian law, these limitations shall apply regardless of the basis of liability,

breach of any kind, or any other claims in Contract, Tort or otherwise.

Section 10.3, As per RFP

110 Query: Request to insert a further provision for ‘pre-existing intellectual property’ of

Bidder as follows:

MPSEDC acknowledges that in performing Services under this Agreement Bidder

may use Bidder’s proprietary materials including without limitation any software (or

any part or component thereof), tools, methodology, processes, ideas, know-how

and technology that are or were developed or owned by Bidder prior to or

independent of the Services performed hereunder or any improvements,

enhancements, modifications or customization made thereto as part of or in the

course of performing the Services hereunder, (“Bidder Pre-Existing IP”).

Notwithstanding anything to the contrary contained in this Agreement, Bidder shall

continue to retain all the ownership, the rights title and interests to all Bidder Pre-

Existing IP and nothing contained herein shall be construed as preventing or

restricting Bidder from using Bidder Pre-Existing IP in any manner.

As per RFP

Page 24: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 24 of 26

111 Role based S/w

Query: How does GoMP envision to create & assign these roles to various user

community like employees , auctioneers etc.

3.1 As per roles structure

of Govt departments

112 Users to be considered is 500

Query: Is the total named user population 500 including external & internal users

3.1 Total number of

concurrent users is

500 for the purpose of

notional sizing of

hardware

113 Prequalification Clause No. 3.The Bidder (Lead Bidder in case of consortium) should

have a minimum of 5 years’ experience in the field of e-procurement domain and

shall provide references of at least five successfully completed/ running e-

Procurement projects of Govt. Depts. /PSUs along with supporting testimonials from

them.

Query: Request: Pls consider the experience of any partner of Consortium.

Please refer to

corrigendum.

114 Ref: Clause No. 4.7.1. The server-end software should be platform independent

and able to run on Microsoft Windows Server and LINUX Operating System

environment. At the user- end, various users of the e-Procurement software should

be able to use their PCs under MS Windows XP and above and/or Linux with

commonly used office automation tools such as MS office/Star Office/Abode

publishing system along with S- MIME compliant email systems and Internet

browsers.

Query: Clarification sought: If system is platform independent then system will work

on both Windows and Linus. But it is mentioned as “MS Windows XP and above

and/or Linux” Pls confirm whether it means both are compulsory or not.

Please refer to

corrigendum.

115 4.7.2.The e-Procurement Software must be compliant to international open

standards at various levels such as schema definition, security, document

management, E-mail/File Transfer Protocol (FTP) etc.

Query: Clarification sought: Pls mention the international open standards to be

complied

As per RFP

Page 25: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 25 of 26

116 Data Migation:

Query: Clarification sought: What is the scope of Data Migration from the existing E-

Procurement System to New System? Should both tender and vendor data be

ported? Which Database is being used currently (with version number).

Would be discussed

with the selected

service provider.

117 General

Query: When can we start billing for the transaction revenue

Not Specified From first transaction

itself.

118 Annex 2

Query: What is the expected Rate of Growth in the no of tenders

Bidder to make their

own assumptions/

calculations.

119 7.4.5

Query: We suggest prices would be exclusive of service tax and VAT. Also any

additional charges or taxes paid shall also be paid over and above the price, as and

when applicable.

Please refer to

corrigendum

120 The bidder (Lead Bidder in case of consortium) should have a minimum of 5 year's

experience in the field of e-procurement domain and shall provide references of at

least five successfully completed/running e-Procurement projects of Govt. Depts. /

PSUs along with supporting testimonials from them. Any company having experience

of running even a since last 5 years would be considered equivalent to the aforesaid

criteria. The bidder should provide work orders, experience certificate and relevant

documents in this regard.

Query: You are requested to relax the above criteria by removing the eligibility of e-

Procurement experience only to Lead Bidder as according the point no. 9 of the

eligibility criteria you have asked a minimum turnover of Rs. 50 Crore in all of the last

3 years as the e-Procurement is the new phenomena and e-Procurement Service

Provider do not get paid in % of e-Procurement they enable but by awarded to L1

Vendor. We have in last 5 Years won e-Procurement Tender floated by NPCIL, BHEL,

SBI, RCF, BPCL, BDL, KIOCL, BHAVINI, NTCL, RBI and many more through a

competitive route where we were L1 Vendor. We annually enable Rs. 50,000 Cr. +

Worth of e-Procurement for Government & PSU, but we charge them very

competitive prices Per Tender or Auction.

Please refer to

corrigendum

Page 26: Reply to Pre-bid Queries of e-Procurement Document/Tender... · As documentary proof, Balance Sheet & Profit & Loss A/c is to be submitted. Query: Since this clause of profitability

Page 26 of 26

Henceforth, it is impracticable for the company to get eligible in both the conditions

and change the condition from "Lead Bidder" to "Any of the consortium partner".

We request you to change the criteria as "Any of the consortium partner should

have a minimum of 5 years' experience in the field of e-Procurement domain.