Plant
Performance
QTY Lenght Area Cutting Fit up Welding Inspect Test Sub Assembly Fit up Welding Deform Inspect Fit up Welding Deform Inspect
L W t PCS mm mm2 20% 25% 35% 10% 10% 30% 10% 15% 5% 5% 10% 10% 5% 10%
1 Lajur B Kanan fr. 5/6 - 15/16 14920 2460 12 1 3457.44 7.76% 100% 75% 50% 30% 0% 5% 59% 2049 59% 100% 100% 100% 100% 100% 100% 100% 100%
2 Lajur K - C Kanan fr. 23/24 - 33/34 15500 9800 12 1 14308.98 32.12% 100% 100% 40% 30% 0% 20% 62% 8872 62% 100% 100% 100% 100% 100% 100% 100% 100%
3 Lajur B Kiri fr. 7/8 - 11/12 6100 2500 12 1 1436.55 3.22% 100% 100% 100% 100% 0% 3% 90% 1293 90% 100% 100% 100% 100% 100% 100% 100% 100%
4 Lajur A - C Kiri fr. 14/15 - 20/21 9000 7500 12 1 6358.50 14.27% 100% 70% 20% 0% 0% 6% 45% 2830 45% 100% 100% 100% 100% 100% 100% 100% 100%
5 Lajur C Kiri fr. 32/33 - 43/44 18000 2500 12 1 4239.00 9.52% 100% 70% 20% 0% 0% 4% 45% 1886 45% 100% 100% 100% 100% 100% 100% 100% 100%
6 Lajur K - B Kiri fr. 35/36 - 38/39 5000 7500 12 1 3532.50 7.93% 100% 100% 10% 10% 0% 4% 50% 1749 50% 100% 100% 100% 100% 100% 100% 100% 100%
7 Lajur A - B Kiri fr. 38/39 - 43/44 12000 5000 12 1 5652.00 12.69% 100% 100% 10% 10% 0% 6% 50% 2798 50% 100% 100% 100% 100% 100% 100% 100% 100%
8 Lajur K fr. 41/42 - 45/46 9000 2500 12 1 2119.50 4.76% 100% 100% 10% 0% 0% 2% 49% 1028 49% 100% 100% 100% 100% 100% 100% 100% 100%
9 Lajur K fr. 45/46 - 47/48 2000 1500 12 1 282.60 0.63% 100% 100% 10% 0% 0% 0% 49% 137 49% 100% 100% 100% 100% 100% 100% 100% 100%
10 Lajur A kanan fr. 39/40 - 40/41 4000 2440 12 1 919.39 2.06% 100% 100% 10% 0% 0% 1% 49% 446 49% 100% 100% 100% 100% 100% 100% 100% 100%
11 Lajur B Kanan fr. 39/40 - 43/44 9000 2440 12 1 2068.63 4.64% 100% 100% 10% 0% 0% 2% 49% 1003 49% 100% 100% 100% 100% 100% 100% 100% 100%
12 Lajur A - B Kanan fr. 32/33 35/36 6100 5500 12 1 3160.41 7.09% 100% 100% 10% 0% 0% 3% 49% 1533 49% 100% 100% 100% 100% 100% 100% 100% 100%
44547 106.71% 57.5% 25622 16% 10% 15% 5% 5% 10% 10% 0% 0% 0%
44,547 58% 85.0%
Note : Pembagian Progress di Stiap pekerjaan
Hasil Progress setiap pekerjaan
Pekerjaan sudah selesai
Prepared by Checked by Approved by Acknowledge by Acknowledge by
Manager Engginering
No. REPLATING AREA Weight Progress
Performance
Bottom Area
25,622
1.
DIMENTION (mm)
Erection Block (40%)Weight (kg)
PROGRESS SUB ASSEMBLY
Manager Operational
PT. DUTABAHARI MENARA LINEMAINTENANCE, DOCK & REPAIR
HULL CONSTRUKSI GROUP
HULL KONSTRUKSI PPIC/ENGINEERINGOB. AFNA
PROGRESS ASSEMBLY & ERECTION BLOCK
Progress /
Block
Fabrication Dan Sub Assembly (30%) Assemblay (60%)
-
-
Assembly
Progress
%
Real
Performan
ce
Layek Manager Comercial
36423
36423
OB. AFNAOverall
Weight
Progress