Click here to load reader
Upload
barnard-warren
View
213
Download
0
Embed Size (px)
DESCRIPTION
3 Impacts on NDM Reads READ 1READ 2 READ 3 VOLUME 1 VOLUME 2 Replaced Read New Volume 1 New Reconciliation 1 New Volume 2 New Reconciliation 2 New Filter Failure? New Filter Failure? NOTE: If Read 2 = Opening Read, need prior Shipper agreement to change this read Cancel any outstanding Filter Failures
Citation preview
Replacement of Any Read – Initial views
2
Assumptions
Can’t re-open NDM Allocation or Energy Balancing
after D+5Can’t go back to a read before prevailing Line-in-
the-Sand date
3
Impacts on NDM Reads
READ 1 READ 2 READ 3
VOLUME 1 VOLUME 2Replaced
Read
New Volume 1
New Reconciliation 1
New Volume 2
New Reconciliation 2
New Filter Failure?
New Filter Failure?
NOTE: If Read 2 = Opening Read, need prior Shipper agreement to change this read
Cancel any outstanding Filter Failures
4
Impacts on NDM AQs
READ 1 READ 2 READ 3
VOLUME 1
If Replaced Read was used as start or end read for current or previous AQ …
ReplacedRead
Revised AQ
New Volume 1
Historic data invalidated, e.g. MRF?
Revised Capacity Charges and Commodity Transportation Rates
NOTE: Could impact a previous Shipper’s AQ and charges
VOLUME 2
Historic charges invalidated, e.g. Must reads?
SHIPPER ASHIPPER A orSHIPPER B
NOTE: No filter mechanism for erroneous charges
Need to review historic charges, e.g. Mod 640 Threshold Crossers?
5
Impact of Change of Read outside of Ownership
Shipper may initiate change prior to or after their ownership
Other Shipper(s) volume amendedOther Shipper(s) approval required to amend
volumes?Can other Shipper change the volume back if they
disagree?Could lead to “yo-yoing” changesShould the number of changes be limited?