Repair of Arch Bridges

Embed Size (px)

Citation preview

  • 7/28/2019 Repair of Arch Bridges

    1/15

    arch 04

    UNIVERSITY

    OF

    MINHO

    Daniel Oliveira & Paulo Loureno

    U N I V E R S I T Y O F M I N H O

    Barcelona, November 17-19 2004

    REPAIR OF STONE MASONRY

    ARCH BRIDGES

    4TH. CONFERENCE ON ARCH BRIDGES

    0

  • 7/28/2019 Repair of Arch Bridges

    2/15

    arch 04

    UNIVERSITY

    OF

    MINHO

    4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4

    INTRODUCTION

    INTRODUCTION

    Masonry Arch Bridges in Portugal:

    - Roman Period, Medieval Age and Modern Period

    (Priceless architectural and cultural legacy, but often showing

    signs of damage)

    Major Causes of Damage:

    -

    Deep change of loads for which bridges were built- Lack of adequate maintenance

    -Ageing processes (decay of the materials)

    1

  • 7/28/2019 Repair of Arch Bridges

    3/15

    arch 04

    UNIVERSITY

    OF

    MINHO

    INTRODUCTION

    Generalized Damage:

    -Absence of mortar in the stone joints

    -Existence of vegetation and biological colonization

    - Presence of humidity and efflorescences

    -Accelerated decay of the materials

    Localized Damage:- Longitudinal cracking of the arches

    - Movement of abutments

    - Lack of plumbness of the spandrel walls

    4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4

    But damage can be minimized

    - By performing periodical inspections

    - By reducing the traffic load

    - By carrying out repair and strengthening measures

    (Preventive maintenance)

    2

  • 7/28/2019 Repair of Arch Bridges

    4/15

    arch 04

    UNIVERSITY

    OF

    MINHO

    INTRODUCTION

    Principles of Intervention in the Architectural Heritage(ICOMOS):

    - Minimum repair to assure safety and durability

    -Respect of the original conception

    - Compatibility between existing and new materials

    4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4

    -

    Survey and Repair of 2 Portuguese Masonry ArchBridges

    - Boutaca Bridge

    -Donim Bridge

    When dealing with architectural valuable constructions

    3

  • 7/28/2019 Repair of Arch Bridges

    5/15

    arch 04

    UNIVERSITY

    OF

    MINHO

    4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4

    INTRODUCTION

    BOUTACA BRIDGE (stone masonry)

    -Local: Batalha, center of Portugal

    BOUTACABRIDGE

    - Dimensions: 60m length, 7m width (5m span )

    - Purpose: roadway (belonging to the former road Lisbon-Porto)

    - Date of construction: 1860

    T1

    C6

    T2

    A7

    C5

    T3C4

    T4

    C3 C2

    T5

    C1

    P7 P6

    A6 A5

    T6

    P5 P4

    A4

    P3 P2

    A3 A2 A1

    P1

    Pointed Arches

    Flat roadwayTie rods + anchorages

    Buttressing System

    Uncertain safety conditions Survey requested4

  • 7/28/2019 Repair of Arch Bridges

    6/15

    arch 04

    UNIVERSITY

    OF

    MINHO

    4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4

    Results of the Survey carried out:

    -Vegetation & lost of plaster (lack of maintenance)

    - Humidity & biological colonization (deficient drainage system)

    - Cracking in the buttress walls

    -Existing anchorages much deterioratedand rather deformed (outward movement ofmasonry)

    (Buttresses

    overloaded)

    INTRODUCTION

    BOUTACABRIDGE

    5

  • 7/28/2019 Repair of Arch Bridges

    7/15

    arch 04

    UNIVERSITY

    OF

    MINHO

    4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4

    Recommended Remedial Measures:

    - Lightening the buttresses Tie rods + patress platesINTRODUCTION

    BOUTACABRIDGE

    Detail

    P7

    A7

    C6C5

    C4 C3 C2 C1

    A) Structural Strengthening

    Additional buttressing system

    Patress plate

    Tie rod6

  • 7/28/2019 Repair of Arch Bridges

    8/15

    arch 04

    UNIVERSITY

    OF

    MINHO

    4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4

    -

    Waterproofing of the pavement and reconstruction of thedrainage system

    INTRODUCTION

    BOUTACABRIDGE

    B) Other measures:

    - Cleaning and removal of vegetation

    - Replacement of plaster

    -Need for periodical visual inspections

    7

  • 7/28/2019 Repair of Arch Bridges

    9/15

    arch 04

    UNIVERSITY

    OF

    MINHO

    4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4

    DONIM BRIDGE (stone masonry)

    - Local: Guimares, North of Portugal

    - Dimensions: 62m length, 4m width (larger span 12m)

    - Purpose: roadway (major importance untill 2 centuries ago)

    - Date of construction: 15th 16th centuryINTRODUCTIONBOUTACABRIDGE

    DONIM BRIDGE

    A1 A2 A3 A4

    Left pier

    Right pier

    Semicircular Arches

    Flat roadway

    Pier + Cutwaters

    Flood arch

    Precarious safety conditions Survey requested8

  • 7/28/2019 Repair of Arch Bridges

    10/15

    arch 04

    UNIVERSITY

    OF

    MINHO

    4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4

    Results of the Survey carried out:

    - Extensive longitudinal cracking in the left arch

    - Infesting vegetation all over the bridgeINTRODUCTION

    BOUTACABRIDGE

    DONIM BRIDGE

    - Longitudinal cracking in the flood (right) arch

    - Cutwater of the right pier highly damaged

    9

  • 7/28/2019 Repair of Arch Bridges

    11/15

    arch 04

    UNIVERSITY

    OF

    MINHO

    4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4

    - 1 block foundation missing (underwater inspection)

    INTRODUCTION

    BOUTACABRIDGE

    DONIM BRIDGE

    -A numerical analysis (3D, non-linear) carried out allow toconfirm the damage observed and helped understandingits causes

    - Spandrel walls out of plumb

    (Incremental principal strains)

    Major problems :

    - Outward movements of spandrel walls

    - Longitudinal cracking in the left and right arches

    - Pre-collapse of a cutwater (right pier) 10

  • 7/28/2019 Repair of Arch Bridges

    12/15

    arch 04

    UNIVERSITY

    OF

    MINHO

    4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4

    INTRODUCTION

    BOUTACABRIDGE

    DONIM BRIDGE

    Recommended Remedial Measures:

    -Remove of the infill

    A) Left Arch (return joints thickness to its original width)

    Tie-rod

    U profilesAnchor rods

    ARCH

    SPANDRELWALL

    -Voussoirs placed in their original positions by means ofrope-strechers

    - Fastening of stainless steel U profiles placed in a U shape

    above the arch and close to the spandrel walls- Tie rod to bind the spandrel walls

    - Infill put back into its place

    ] profiles

    shape

    tie rod

    Anchorrods

    11

  • 7/28/2019 Repair of Arch Bridges

    13/15

    arch 04

    UNIVERSITY

    OF

    MINHO

    4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4

    INTRODUCTION

    BOUTACABRIDGE

    DONIM BRIDGE

    -Full width anchors across the arch

    B) Flood (right) Arch (prevent further spreading of the arch)

    - Stitching anchors linking the arch to the spandrel walls

    Stitchinganchors

    Full widthanchors

    12

  • 7/28/2019 Repair of Arch Bridges

    14/15

    arch 04

    UNIVERSITY

    OF

    MINHO

    4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4

    INTRODUCTION

    BOUTACABRIDGE

    DONIM BRIDGE

    -

    Dismantling and rebuilding of the right cutwater (samestones + steel cramps + steel latches)

    C) Other measures:

    - Replacement of the missing foundation stone block

    - Waterproofing of the pavement and reconstruction of the

    drainage system- Cleaning and removal of vegetation

    - Repointing of the deteriorated masonry joints

    13

  • 7/28/2019 Repair of Arch Bridges

    15/15

    arch 04

    UNIVERSITY

    OF

    MINHO

    4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4

    Final Remarks

    - Cleaning and removal of vegetation

    INTRODUCTION

    BOUTACABRIDGE

    DONIM BRIDGE

    FINAL REMARKS

    -Adoption of repair measures compatible with modernprinciples of structural intervention in the architecturalheritage

    -Waterproofing and drainage of the pavement

    Common features to both examples

    Thank you for your attention