REPAIR IAQ OF RSPOMISSION SUPPORT BUILDING, MS #262
GSK BUILDING, GSK #204UNITED STATES COAST GUARDTRAINING CENTER CAPE MAY
CAPE MAY, NEW JERSEYSHEET INDEX
CONSTRUCTION NOTES
1. GENERAL SCOPE OF WORK CONSISTS OF RELOCATION OF
ESO TESTING AREA FROM MISSION SUPPORT BUILDING #262
TO THE GSK BUILDING, #204 AND WORK RELATED TO THE
FLOOR PLAN CHANGES IN BOTH BUILDINGS, AS WELL AS A
DUCTWORK/ ATTIC VENTILATION REPAIR TO THE GSK
BUILDING AT TRACEN CAPE MAY. REFER TO THE COMPLETE
SET OF CONSTRUCTION DOCUMENTS FOR ALL WORK TO BE
PERFORMED.
2. ALL FEATURES SHOWN ARE EXISTING, UNLESS OTHERWISE
NOTED AS "NEW," "CONSTRUCTION," OR "PROVIDE AND
INSTALL."
3. ALL MATERIALS FOR THE PROJECT SHALL BE FURNISHED BY
CONTRACTOR AND SHALL BE NEW.
4. REFER TO COMPLETE SET OF CONTRACT DOCUMENTS AND
ARCHITECTURAL PLANS FOR ADDITIONAL INFORMATION AND
CONTRACT REQUIREMENTS NOT SHOWN HERE.
5. CONSTRUCTION DETAILS AND SHOP DRAWINGS UTILIZED BY
THE CONTRACTOR SHALL BE REVIEWED AND APPROVED BY
THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND
CONTRACTING OFFICER.
6. ANY VARIATION FROM THE CONTRACT DOCUMENTS MUST BE
AUTHORIZED BY THE CONTRACTING OFFICER.
7. ALL WORK SHALL BE PERFORMED IN A WORKMAN LIKE
MANNER IN ACCORDANCE WITH ALL APPLICABLE CODES,
ORDNANCES, AND MANUFACTURER'S RECOMMENDATIONS
AND STANDARDS.
8. THE CONTRACTOR SHALL VERIFY, IN THE FIELD, ALL
CONDITIONS AS SHOWN ON THE PLANS AND SHALL BE
RESPONSIBLE FOR FIELD MEASUREMENTS FOR ALL NEW
CONSTRUCTION OR RETROFITS.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
SHORRING, UNDERPINNING, AND STRUCTURAL STABILITY
DURING THE WORK.
10. POLLUTANTS SUCH AS FUELS, LUBRICANTS, BITUMENS, RAW
SEWAGE, WASH WATER OR WASTE FROM CONCRETE MIXING
OPERATIONS, AND OTHER HARMFUL MATERIALS SHALL NOT
BE DISCHARGED INTO OR NEAR RIVERS, STREAMS, STORM
SEWER SYSTEMS AND IMPOUNDMENTS, OR INTO NATURAL
OR MAN-MADE CHANNELS LEADING THERETO.
11. ALL APPLICABLE REGULATIONS OF FISH AND WILDLIFE
AGENCIES AND STATUTES RELATING TO THE PREVENTION
AND ABATEMENT OF POLLUTION SHALL BE COMPLIED WITHIN
THE PERFORMANCE CONTRACT.
12. IN THE EVENT CONDITIONS AT THE SITE ARE NOTABLY
DIFFERENT AT THE TIME OF CONSTRUCTION THAN THE
CONSTRUCTION DOCUMENTS PROVIDED, THE CONTRACTOR
SHALL NOTIFY THE COR AND CONTRACTING OFFICER.
LOCATION MAP
SCALE: NTS
MAIN GATE
SITE
TITLE SHEET 1 OF 21
GENERAL SITE PLAN 2 OF 21
ARCH. EXISTING & DEMO PLANS 3 OF 21
ARCH. PROPOSED PLANS FOR MS BUILDING 4 OF 21
ARCH. PROPOSED PLANS FOR GSK BUILDING 5 OF 21
STRUC. M.S. WALL DETAILS 6 OF 21
FIRST FLOOR MS BUILDING MECH. DEMO PLAN 7 OF 21
FIRST FLOOR MS BUILDING NEW WORK PLAN 8 OF 21
MS BLDG. MECHANICAL ROOF PLAN 9 OF 21
MS BLDG. CRAWL SPACE PLBG. DEMO PLAN 10 OF 21
MS BLDG. CRAWL SPACE PLBG. NEW WORK PLAN 11 OF 21
MS BLDG. NEW WORK PLUMBING PLAN AND RISERS 12 OF 21
GSK MECHANICAL DEMO & NEW WORK PLANS 13 OF 21
MECHANICAL SCHEDULES AND DETAILS 14 OF 21
MECHANICAL CONSTRUCTION DETAILS 15 OF 21
PLUMBING SCHEDULES AND DETAILS 16 OF 21
ELECTRICAL DEMOLITION PLAN 17 OF 21
ELEC. NEW WORK PLANS FOR MS 18 OF 21
ELEC. NEW WORK PLANS FOR GSK 19 OF 21
ELEC. POWER TO HVAC EQUIPMENT 20 OF 21
FIRE ALARM PLANS 21 OF 21
SITE
NEWARK
TRENTON
CAMDEN
ATLANTIC CITY
CAPE MAY
NEW
JERSEY
GARDEN STATE PARKWAY
US ROUTE NO. 9
CAPE MAY CANAL
CITY OF CAPE MAY
WASHINGTON ST.
LAFAYETTE ST.
SUPPORT UNIT
GUARD LORAN
U.S. COAST
CAPE MAY HARBOR
OCEAN DRIVE
ATLANTIC OCEAN
TRAINING CENTER
U.S. COAST GUARD
PENNSYLVANIA AVE.
PITTSBURG AVE.
C
A
P
E
M
A
Y
I
N
L
E
T
MTP_SYMBOL
LOCATION PLAN
SCALE: NTS
LOCATION
OF
WORK
GENERAL NOTES:
PROJECT
AREA
SCALE:
MISSION SUPPORT (#262)
FIRST FLOOR PLAN
1/8"=1'-0"
1
A2
SCALE:
GSK LEAN-TO
FLOOR PLAN
1/8"=1'-0"
3
A2
LUCKY BAG
MAIN STORE AREA
(N.I.C.)
LUCKY BAG
STORAGE
(N.I.C.)
OPEN
OFFICE SPACE
MAIL ROOM
OFFICE AREA
(N.I.C.)
STORAGE
(N.I.C.)
PROJECT
AREA
TRANSPORTATION
OFFICE
ID PROCESSING
OFFICE
RSPO
RETIREE
SERVICE
DESK
EDUCATION
CENTER
OFFICE
EDUCATION
CENTER
ESO
LOCATION
OF
WORK
1. DIMENSIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL
MEASUREMENTS.
3. FOR ALL STRUCTURAL DEMOLITION & CONSTRUCTION NOTES, REFER TO STRUCTURAL
DRAWINGS.
4. FOR ALL ELECTRICAL AND FIRE ALARM DEMOLITION & CONSTRUCTION NOTES, REFER TO
ELECTRICAL DRAWINGS.
5. FOR ALL MECHANICAL AND PLUMING DEMOLITION & CONSTRUCTION NOTES, REFER TO
MECHANICAL DRAWINGS.
GENERAL DEMOLITION NOTES:
1. REMOVE AND SALVAGE ALL FLOOR CARPET TILES FROM ALL AREAS TO BE RENOVATED, EXCEPT
WHERE NOTED.
2. REMOVE AND SALVAGE ALL HUNG CEILING SYSTEMS EXCEPT WHERE NOTED.
3. DEMOLISH ALL WALL PARTITIONS, INCLUDING FRAMING, WALL BASE, DOORS, AND DOOR
FRAMES, BETWEEN THE ESO TESTING AREA, THE ESO OFFICE, AND THE VETERAN'S OFFICE.
4. DEMOLISH DOOR, INCLUDING FRAME, BETWEEN ESO TESTING AREA AND GENERAL MS
HALLWAY.
5. CUT AND DEMOLISH DOOR OPENING IN CMU WALL, INCLUDING WALL TILING AND BASE,
BETWEEN ESO TESTING AREA AND GENERAL MS HALLWAY.
6. CUT AND DEMOLISH WINDOW OPENING IN CMU WALL, INCLUDING WALL TILING, BETWEEN ESO
TESTING AREA AND GENERAL MS HALLWAY.
7. CUT OPENING ON CONCRETE CEILING AND ROOF SLABS IN M.S. BUILDING NEW HEAD VENTS.
8. REMOVE AND SALVAGE EXTERIOR WINDOW OF GSK OPEN OFFICE SPACE.
9. CUT AND DEMOLISH EXTERIOR DOOR OPENING IN CMU WALL, INCLUDING EXTERIOR PLASTER
AND INTERIOR WALL FURRING AND PANELING, ON GSK OPEN OFFICE SPACE.
GENERAL CONSTRUCTION NOTES:
1. REMOVE AND SALVAGE ALL FLOOR CARPET TILES FROM ALL AREAS TO BE RENOVATED, EXCEPT
WHERE NOTED.
2. BUILD OUT FEMALE HEAD 002 AND MALE HEAD 001 IN THE PREVIOUS ESO TESTING AREA OF THE
MS BUILDING. REFER TO SHEET A-4 FOR ARCHITECTURAL LAYOUT.
3. BUILD OUT GALLERY 003 TO ACCESS NEW HEADS 001 & 002 IN THE PREVIOUS ESO TESTING
AREA OF THE MS BUILDING. FURNISH & INSTALL NEW ENTRYWAY FRAME TO REPLACE
DEMOLISHED DOOR AND FRAME. REFER TO SHEET A-4 FOR ARCHITECTURAL LAYOUT.
4. FURNISH & INSTALL NEW DOOR AND INTERIOR WINDOW, INCLUDING FRAMES, TILE EDGE, AND
SILL IN NEW OPENINGS BETWEEN ESO TESTING AREA AND GENERAL MS HALLWAY. REFER TO
SHEET A-4 & A-5 FOR ARCHITECTURAL LAYOUT.
5. FURNISH & INSTALL NEW EXTERIOR DOOR INCLUDING DOOR FRAME, WALL EDGE INCLUDING
EXTERIOR PLASTER AND INTERIOR WALL FURRING AND PANELING, AND SALVAGED EXTERIOR
WINDOW INCLUDING WINDOW FRAME ON GSK OPEN OFFICE SPACE TO MATCH EXISTING
EXTERIOR. REFER TO SHEET A-5 FOR ARCHITECTURAL LAYOUT.
6. CLOSE OUT DEMOLISHED DOOR OPENING INCLUDING EXTERIOR PLASTER AND INTERIOR WALL
FURRING AND PANELING ON GSK OPEN OFFICE SPACE TO MATCH EXISTING EXTERIOR. REFER
TO SHEET A-5 FOR ARCHITECTURAL LAYOUT.
7. BUILD OUT WALL PARTITION WITH WALL BASE, DOOR, AND DOOR FRAME IN THE PREVIOUS OPEN
OFFICE SPACE AREA OF THE GSK BUILDING TO DEFINE THE NEW OPEN OFFICE SPACE 005.
REFER TO SHEET A-5 FOR ARCHITECTURAL LAYOUT.
8. BUILD OUT WALL PARTITION WITH WALL BASE, DOOR, AND DOOR FRAME IN THE PREVIOUS OPEN
OFFICE SPACE AREA OF THE GSK BUILDING TO DEFINE THE NEW ESO TESTING AREA 007. REFER
TO SHEET A-5 FOR ARCHITECTURAL LAYOUT.
9. BUILD OUT WALL PARTITION WITH WALL BASE, DOOR, DOOR FRAME AND INTERIOR WINDOW IN
NEW ESO TESTING AREA 007 TO DEFINE THE ESO OFFICE SPACE 008 IN THE GSK BUILDING.
REFER TO SHEET A-5 FOR ARCHITECTURAL LAYOUT.
10. RECONFIGURE SALVAGED HUNG CEILING SYSTEM TO MATCH NEW LAYOUT IN THE GSK
BUILDING. REFER TO SHEET A-5 FOR ARCHITECTURAL LAYOUT.
SCALE:
MISSION SUPPORT (#262)
SECOND FLOOR PLAN
1/8"=1'-0"
2
A2
PROJECT
AREA
PURCHASING
STORAGE
SPO
COMPTROLLER
PROJECT
AREA
1
A3
SCALE:
EXISTING MS ESO SPACE
FIRST FLOOR PLAN
1/4"=1'-0"
2
SCALE:
DEMO MS SPACE
FIRST FLOOR PLAN
1/4"=1'-0"
4
A3SCALE:
EXISTING GSK OFFICE
FLOOR PLAN
1/4"=1'-0"
5
A3SCALE:
DEMO GSK OFFICE
FLOOR PLAN
1/4"=1'-0"
22'-11"
7'-8
1
2
"1
1'-1
0
1
2
"
ESO
TESTING AREA
458 SF
ESO
OFFICE
120 SF
VETERANS
OFFICE
76 SF
20
'-1
"
10'-2"
TELECOMM
CLOSET
30 SF
OPEN
OFFICE SPACE
702 SF
HEAD
44 SF
20
'-1
"
10'-2"
7
1
2
"
11'-4"3'-4"3'-10"
19
'-6
1
2
"
9'-5"
6'-11
1
2
"21'-3
1
2
"
7'
38'-6"
1'-3"
5'-1"
5'-0
1
2
"
33'-5"
3'-4"
F C
A
A
A
B
B
D E
B
GENERAL DEMOLITION NOTES:
1. DEMOLISH NOTED WALL PARTITIONS,
INCLUDING WALL STUDS, AND WALL
BASES.
2. REMOVE AND SALVAGE ALL FLOOR
CARPET, CARPET TILES, AND VINYL TILES,
EXCEPT WHERE NOTED. STRIP ALL
REMAINING ADHESIVE FROM FLOOR.
3. REMOVE AND SALVAGE ALL ACOUSTIC
HUNG CEILING SYSTEM, INCLUDING HVAC
RETURNS, EXCEPT WHERE NOTED.
LEGEND
CARPET TILES & SUSPENDED
CEILING TILE TO BE
REMOVE AND SALVAGE.
PARTITIONS & WALLS
TO BE DEMOLISHED.
SPECIFIC DEMOLITION NOTES:
A. DEMOLISH WALL PARTITION, INCLUDING
PANELING, STUDS, & WALL BASE WHERE
REQUIRED.
B. DEMOLISH DOOR & DOOR FRAME WHERE
REQUIRED..
C. CUT CMU WALL FOR NEW DOOR WHERE
REQUIRED.
D. OPENING. DEMO INCLUDES PANELING,
FURING, WALL BASE AND WALL TILES
WHERE REQUIRED.
E. CUT CMU WALL ALONG EXISTING MORTAR
JOINT FOR NEW DOOR OPENING. DEMO
INCLUDES PANELING, FURING, WALL BASE
AND WALL TILES WHERE REQUIRED.
F. DEMOLISH CMU WALL ALONG EXISTING
MORTAR JOINT FOR NEW WINDOW
OPENING. DEMO INCLUDES PANELING,
FURING, WALL BASE AND WALL TILES
WHERE REQUIRED.
G. REMOVE & SALVAGE DOUBLE WINDOW TO
REINSTALL AS SINGLE WINDOW.
B
HVAC UNIT
TO REMAIN
HVAC UNIT
TO REMAIN
HVAC UNIT
TO REMAIN
HVAC UNIT
TO REMAIN
3
A3
SCALE:
DEMO MS SPACE
SECOND FLOOR PLAN
1/4"=1'-0"
4" FLOOR SLAB
PENETRATION
FOR VENT,
CENTERED
ON WALL
EQ
.E
Q.
PURCHASING
STORAGE
AREA
A
4'-1
0"
A3
A
A3
SCALE:
DEMO GSK OFFICE
WALL SECTION
1/4"=1'-0"
6'-8
1
2
"
A
A2
A
A3
SCALE:
DEMO GSK OFFICE
WALL SECTION
1/4"=1'-0"
6'-8
1
2
"
A
A2
4'-10"
LOUVER TO
BE REMOVED
SEE MECH. DWG
OUTLET TO
BE REMOVED
SEE ELEC. DWG
MD1
MD1
MD1
1
A4SCALE:
PROPOSED MS ESO SPACE
FIRST FLOOR PLAN
1/4"=1'-0"
4'-4"
7'
12
'-2
"
20
'-1
"
4'-8"
MALE
HEAD
132 SF
FEMALE
HEAD
60 SF
GALLERY
32 SF
RECRUIT
WAITING
AREA
395 SF
11"
3'-10" 3'-4"
1'-4"
10'
6"
3'-4"
8"
12
'-7
1
2
"
7'-5
"
4'-9"
1'-6
"2
'-3
"2
'-3
"1
'-1
0"
1'-3
"2
'-6
"2
'-6
"3
'
2'-6
"2
'-6
"2
'-6
"4
'-8
"
5
1
2
"
4'-8
"
1'-6"
1'-9
"3
'-6
"
11" 4'-8" 4'-7"
1'-9
"
4'
1'-2
"1
'-1
0"
11
"
02
01
03
04
A
-
5
7
4
6
5
-
4
001
002
003
004
2
A4
SCALE:
PROPOSED MS ESO SPACE
FIRST FLOOR CEILING PLAN
1/4"=1'-0"
A
UR
UR
UR
LAV
LAV
LAV
LAV
WC
WC
WC
3'-4"
7
1
2
"
LAV
HVAC UNIT
TO REMAIN
HVAC UNIT
TO REMAIN
HVAC UNIT
TO REMAIN
HVAC UNIT
TO REMAIN
A
A2
6
-
- -
7
A4
3
A3SCALE:
MS SECOND FLOOR
VENT DETAILS
1/4"=1'-0"
1
2
" INTERIOR GRADE
GYPSUM BOARD
OVER 3
5
8
" METAL STUDS
AROUND VENT STACK
10"
1'-4
"
EXISTING CLOSED-OUT
SERVICE WINDOWS
EXISTING CLOSED-OUT
SERVICE WINDOWS
7'-1
1"
8'-2
"
1
2
" INTERIOR GRADE
GYPSUM BOARD
OVER 3
5
8
" METAL STUDS
7'-9
"
11
"3
'-1
0"
3'
1
1
2
"
2"
SCALE:
SECTION A
1/2"=1'-0"
A4
FIXED ¼” GLASS
WINDOW WITH
2” ALUMINUM
FRAME
2"
WOOD SILL
A
6'-1
0"
PRE-CAST
REINFORCED
CONCRETE LINTEL,
SEE STRUC DWG
6'-1
0"
SCALE:
INTERIOR
ELEVATION
3/8"=1'-0"
8
A4
A A
3'-6
"
3'
2"
2"
3'-1
0"
1
1
2
"
10'
10'
2" 2"
3'-4"5" 5"1'-4"
A
A4
8"
PRE-CAST REINFORCED
CONCRETE LINTEL,
SEE STRUC DWG
TILE EDGE TO
MATCH EXISTING
EXISTING
HUNG CEILING
SYSTEM
03
04
WALL TILE CUT
TO FIT WINDOW
OPENING
7'-9
"
SCALE:
INTERIOR ELEVATION
1/4"=1'-0"
6
A A
04
03
7'-9
"
3'-1
0"
3'
6'-1
0"
6'-1
0"
6'-1
0"
2'-1
0"
4'-1
0"
1'
1'-5
"
05
02
06
A4
7'-9
"
SCALE:
INTERIOR ELEVATION
1/4"=1'-0"
7
6'
6'-1
0"
1'-9
"
2'-1
0"
6'-1
0"
3'-6
"
1'
4'-1
0"
2'
1'
02
01
06
UR
A4
7'-9
"
SCALE:
INTERIOR ELEVATION
1/4"=1'-0"
4
02
7'-9
"
4"
6'
6'-1
1"
2'-1
0"
3'-4
"2
'-6
"
2'-1
0"
3'-4
"2
'-6
"
06 06 06 07 07
LAV LAV LAV
03 03 04 04
LAV
A4SCALE:
INTERIOR ELEVATION
1/4"=1'-0"
5
6'-1
0"
4'-1
0"
1'
2'
3'-6
"1
'
4'-1
0"
1'
6'-1
0"
7'-9
"
UR UR UR
02
01 0104
0202
A4
01
02
DESCRIPTIONNAMENUM.
URINAL SCREEN
PARTITION
SCREEN
PHENOLIC PARTITION BOARD,
FLOOR & WALL BRACED
PHENOLIC PARTITION BOARD,
WALL BRACED, 18" x 42"
03SOAP
DISPENSER
WALL MOUNTED @ 44" HEIGHT
04PAPER
DISPENSER
WALL MOUNTED @ 52" HEIGHT
05TOILET PAPER
ROLL HOLDER
WALL MOUNTED, DOUBLE ROLL, @ 24"
HEIGHT
SCHEDULE
BATHROOM ACCESSORIES
06MIRROR WALL MOUNTED, 18" X 30", @ 40"
HEIGHT
LAV
DESCRIPTIONNAMETAG
CABINET
MOUNTED
LAVATORY
16" X 13" OVAL WHITE VITREOUS
CHINA, WALL MOUNTED LAVATORY.
SCHEDULE
BATHROOM FIXTURE
URURINAL WHITE VITREOUS CHINA WALL
MOUNTED, LOW CONSUMPTION
SIPHON JET FLUSH ACTION.
WCWATER CLOSET WHITE VITREOUS CHINA WALL
MOUNTED, LOW CONSUMPTION
SIPHON JET FLUSH ACTION.
EXISTING PRECAST
CONCRETE
"DOUBLE T" BEAM
BATHROOM
VENT STACK
4" FLOOR SLAB
PENETRATION
EXISTING
FINISHED
FLOOR LEVEL
EXISTING
HUNG CEILING
LEGEND
2' x 2' COMMERCIAL GRADE
CARPET TILES W/ ADHESIVE
6" X 6" GLAZED TILES
GENERAL NOTES:
1. DIMENSIONS SHOWN ARE APPROXIMATE. CONTRACTOR
SHALL FIELD VERIFY ALL MEASUREMENTS.
3" X 6" GLAZED
WALL TILES
SUBWAY PATTERN
NEW WALL
SECTIONS
1
2
" INTERIOR GRADE
GYPSUM BOARD OVER
3
5
8
" METAL STUDS,
16" O.C. W/ SOUND BATTING
1
2
" INTERIOR GRADE
GYPSUM BOARD OVER
2" X 4" WOOD STUDS,
16" O.C. W/ SOUND BATTING
2' X 4' RECESSED,
LED LIGHT FIXTURE
SUSPENDED CEILING
SYSTEM W/ 2' X 2'
ACOUSTIC TILES
EXISTING
FINISHED
FLOOR LEVEL
FLOOR PLAN:
CEILING PLAN:
INTERIOR ELEVATION:
2' X 2' RECESSED,
LED LIGHT FIXTURE
OPAQUE WINDOW FILM
INSTALLED ON EXISTING
WINDOWS
OPAQUE WINDOW FILM INSTALLED
ON EXISTING WINDOWS
OPAQUE WINDOW FILM INSTALLED
ON EXISTING WINDOWS
15'-6"
PRE-CAST REINFORCED
CONCRETE LINTEL,
SEE STRUC DWG
CEILING PLAN NOTE:
1. SEE MECH. & ELEC. SHEETS FOR DETAILS.
01
DO
OR
NU
M.
DOOR SCHEDULE:
DOOR SIZE
WIDTH HEIGHT
OPENING SIZE
WIDTH HEIGHT
DOOR
MATERIAL
FRAME
MATERIAL
COMMENTS
3'-0" 6'-8"3'-4" 6'-10" METALWOOD
02
03
04
05
06
07
FIXED LOUVER, W/ KICK PLATE
08
3'-0" 6'-8"3'-4" 6'-10" METALWOOD FIXED LOUVER, W/ KICK PLATE
3'-0" 6'-8"3'-4" 6'-10" METALN/A OPEN FRAME, NO DOOR
3'-0" 6'-8"3'-4" 6'-10" METALWOOD
1
4
" GLASS VISION PANEL, FRAME TO MATCH EXISTING DOORS
2'-10" 6'-8"3'-10" 6'-10" METALMETAL
1
4
" GLASS VISION PANEL, W/ BOTTOM DOOR SEAL
3'-0" 6'-10"3'-4" 7'-0" METALMETAL
1
4
" GLASS VISION PANEL, FIXED LOUVER, W/ KICK PLATE
3'-0" 6'-10"3'-4" 7'-0" METALMETAL
1
4
" GLASS VISION PANEL, FIXED LOUVER, W/ KICK PLATE
2'-4" 6'-10"2'-8" 7'-0" METALMETAL
1
4
" GLASS VISION PANEL, FIXED LOUVER, W/ KICK PLATE
2"
2"
7'-1
0"
10
"4
'3
'
SCALE:
SECTION B
1/2"=1'-0"A5
FIXED ¼” GLASS
WINDOW WITH
2” ALUMINUM
FRAME
B
HUNG CEILING
SYSTEM
1
2
" INTERIOR GRADE
GYPSUM BOARD OVER
2" X 4" WOOD STUDS,
16" O.C. W/ SOUND BATTING
1
2
" INTERIOR GRADE
GYPSUM BOARD OVER
2" X 4" WOOD STUDS,
16" O.C. W/ SOUND BATTING
6"
B
A5
B
4'
7'
3'
4'
2"
SCALE:
INTERIOR
ALUM. WINDOW B
3/8"=1'-0"
3
A5
2"
2"
2"
2'-8"
1
A5
SCALE:
PROPOSED ESO TESTING OFFICE
FLOOR PLAN
1/4"=1'-0"
2
A5
SCALE:
PROPOSED ESO TESTING OFFICE
CEILING PLAN
1/4"=1'-0"
OPEN
OFFICE SPACE
217 SF
ESO
TESTING
AREA
702 SF
ESO
OFFICE SPACE
702 SF
GALLERY
170 SF
EXISTING
TELECOMM
CLOSET
30 SF
6'
13
'-1
0"
5'-3
1
2
"
8'-1
1
2
"
3'-4
"2
'-9
"
11
1
2
"
8'-1
"3
'-4
"3
'-6
"
1'-4
1
2
"
9'-10"
13
'-1
1
2
"
17'-9"
4'-3"
15'-8"
1'-8"2'-8"7" 3'-11" 1'
08
07
06
05
B
5"
005
006
008
007
3'-5
1
2
"3'-9
1
2
"
5"
3'-10"
5"
B
A5
3
A5
4'-10"
5'
WOOD PLATFORM
TO MATCH EXISTING
6'-8
"
3'
04
DOOR TYPE
3'
05
DOOR TYPE
6'-8
"
2'-10"
06
DOOR TYPE
6"
3'
07
08
DOOR TYPE
6'-1
0"
SCALE:
DOOR TYPE
ELEVATIONS
3/8"=1'-0"
6" 6"
6"
2'-8
"
6"
6'-1
0"
2'-1
0"
9"
KEYED
LOCK &
HANDLE
TO BE
INSTALLED
KEYED
LOCK &
HANDLE
TO BE
INSTALLED
KEYED
LOCK &
HANDLE
TO BE
INSTALLED
METAL
KICK
PLATE
2'-4"
6" 1'-4"
6"
2'-1
0"
11
"1
'-1
0"
6"1'-4"
FIXED
LOUVERS
1
4
" GLASS
VISION
PANEL
1
4
" GLASS
VISION
PANEL
1
4
" GLASS
VISION
PANEL
01
DOOR TYPE
METAL
KICK
PLATE
11
"1
'-1
0"
6"2'
FIXED
LOUVERS
11
"1
'-1
0"
6"2'
METAL
KICK
PLATE
FIXED
LOUVERS
BOTTOM
DOOR SEAL
6'-8
"
6"
10
1
2
"1
0
1
2
"1
0
1
2
"
2'-8
1
2
"
6" 2'
1
4
" GLASS
VISION
PANEL
METAL
KICK
PLATE
7'
6'-1
0"
6'-9
1
2
"
DOOR FRAME
06 07 08
6'-1
0"
6'-8
"
6'-7
1
2
"
DOOR FRAME
6'-1
0"
6'-8
"
03DOOR FRAME
01 02 04
SCALE:
DOOR FRAME
ELEVATIONS
3/8"=1'-0"
6'-9
1
4
"
6'-8
"
6'-7
1
4
"
7'-1
3
4
"
6'-9
"
6'-8
"
6'-7
1
4
"
7'-2
1
2
"
4
1
2
"
5
1
2
"
05DOOR FRAME
INTERIOR
05DOOR FRAME
EXTERIOR
WOOD FRAMING
TO MATCH EXISTING
WOOD FRAMING
TO MATCH EXISTING
GENERAL NOTE:
1. DIMENSIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL MEASUREMENTS.
001
RO
OM
NU
M.
ROOM NAME FLOOR BASE WALLS CEILING COMMENTSHEIGHT
CEILING
FINISHES SCHEDULE:
2 2 1,3,4 1 7'-9"
AREA
132 S.F.MALE HEAD
002 1 7'-9"60 S.F.FEMALE HEAD-
003 132 S.F.GALLERY
004 1395 S.F.
RECRUIT WAITING
AREA
005 1 1 2 1 7'-10"69 S.F.OPEN OFFICE SPACE
006 1 1 1,2 1 7'-10"44 S.F.GALLERY
007 1 1 2 1 7'-10"760 S.F.ESO TESTING AREA
008 1 1 1, 2 1 7'-10"760 S.F.ESO OFFICE SPACE
7'-9"
7'-9"
2 2 3,4
1 1 1,3
1 1 1,3
-
-
-
-
-
-
-
1. 2' x 2' COMMERCIAL GRADE CARPET TILES W/ ADHESIVE
2. 6" X 6" GLAZED TILES
FLOOR
1.
1
8
" RESILIENT VINYL BASE, 4" H, W/ ADHESIVE
2. 3" GLAZED TILE BASE
BASE
1. CMU WALL, PRIMED & 2 COAT PAINTED W/ LATEX
2.
1
2
" INTERIOR GRADE GYPSUM BOARD OVER 2" X 4"
WOOD STUDS,16" O.C., W/ SOUND BATTING;
PLASTERED, PRIMED, & 2 COAT LATEX PAINTED.
3.
1
2
" INTERIOR GRADE GYPSUM BOARD OVER 3
5
8
" METAL
STUDS,16" O.C., W/ SOUND BATTING; PLASTERED,
PRIMED, & 2 COAT LATEX PAINTED.
4. 3" X 6" GLAZED TILE; 6' HEIGHT; SUBWAY TILE LAYOUT.
WALLS
1. SUSPENDED ACOUSTIC CEILING TILE SYSTEM W/ 2' X 2'
ACOUSTIC TILES ON 1
1
2
" CARRIER CHANNELS & 1" X 5"
WOOD CEILING FRAME.
CEILING
02
VINYL BASE
TO MATCH EXISTING
08
VINYL BASE
TO MATCH
EXISTING
HUNG CEILING
SYSTEM
2'-2"
A
A5
6'-8
"
REPAIR
FLUSHED
CEILING
NEW
PARTITION
WALL REPAIR
A
A5SCALE:
SECTION A
3/8"=1'-0"
CEILING PLAN NOTE:
1. SEE MECH. & ELEC. SHEETS FOR DETAILS.
MASONRY NOTES:
1. CONCRETE MASONRY UNITS (CMU) SHALL CONFORM TO ASTM C90 AND MEET THE
FOLLOWING COMPRESSIVE STRENGTH (f'm) REQUIREMENTS:
1.1. HOLLOW CONCRETE MASONRY UNITS: 1,700 PSI.
1.2. SOLID CONCRETE MASONRY UNITS:2,500 PSI.
2. ALL WORK SHALL BE IN ACCORDANCE TO THE REQUIREMENTS OF ACI 53 AND ACI
530.1.
3. MORTAR SHALL BE TYPE N AND CONFORM TO ASTM C 270. TYPE N, COMPRESSIVE
STRENGTH OF 750 PSI.
4. GROUT SHALL CONFORM TO ASTM C476.
5. NON-SHRINK GROUT SHALL CONFORM TO ASTM C1107. COMPRESSIVE STRENGTH OF
7,000 PSI AT 28 DAYS.
6. REINFORCING BARS SHALL BE DEFORMED AND CONFORM TO ASTM A 615, GRADE 60.
7. LAP SPLICES FOR DEFORMED REINFORCING BARS SHALL BE A MINIMUM OF 24 BAR
DIAMETERS OR 12", WHICHEVER IS GREATER.
8. ALL JOINTS SHALL BE CONCAVE.
REINFORCED CONCRETE NOTES:
1. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 5,000 PSI AT 28
DAYS.
2. ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH REQUIREMENTS OF ACI 318,
LATEST EDITION.
3. REINFORCING BARS SHALL BE DEFORMED AND CONFORM TO ASTM A615, GRADE 60.
4. LAP SPLICES SHALL BE A MINIMUM OF 42 BAR DIAMETERS.
5. REINFORCING SHOWN IS THE MINIMUM REQUIRED. ADDITIONAL REINFORCING
NECESSARY FOR HANDLING SHALL BE THE OPTION AND RESPONSIBILITY OF THE
CONTRACTOR.
NOTES:
1. ALL MATERIALS FOR THE PROJECT SHALL BE FURNISHED BY THE CONTRACTOR AND
SHALL BE NEW.
2. REFER TO COMPLETE SET OF CONTRACT DOCUMENTS AND ARCHITECTURAL PLANS
FOR ADDITIONAL INFORMATION AND CONTRACT REQUIREMENTS NOT SHOWN HERE.
3. CONSTRUCTION DETAILS AND SHOP DRAWINGS UTILIZED BY THE CONTRACTOR
SHALL BE REVIEWED AND APPROVED BY THE CONTRACTING OFFICER
REPRESENTATIVE (COR).
4. ANY VARIATION FROM THE CONTRACT DOCUMENTS MUST BE AUTHORIZED BY THE
CONTRACTING OFFICER (KO).
5. ALL WORK SHALL BE PERFORMED IN A WORKMAN LIKE MANNER IN ACCORDANCE
WITH ALL APPLICABLE CODES, ORDINANCES AND MANUFACTURER'S
RECOMMENDATIONS AND STANDARDS.
6. THE CONTRACTOR SHALL VERIFY, IN THE FIELD, ALL CONDITIONS AS SHOWN ON THE
PLANS AND SHALL BE RESPONSIBLE FOR FIELD MEASUREMENTS FOR ALL NEW
CONSTRUCTION OR RETROFITS.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SHORING, UNDERPINNING ANS
STRUCTURAL STABILITY DURING THE WORK.
8. IN THE EVENT CONDITIONS AT THE SITE ARE NOTABLY DIFFERENT AT TIME OF
CONSTRUCTION THAN THE CONSTRUCTION DOCUMENTS PROVIDED, THE
CONTRACTOR SHALL NOTIFY THE COR.
1
S1
SCALE:
PROPOSED MS
WALL ELEVATION
1/2"=1'-0"
A
S1
EXISTING FINISHED
FLOOR LEVEL
EXISTING
HUNG CEILING
EXISTING
DOORWAY
CUT WALL ALONG
EXISTING MORTAR
JOINTS (TYP.)
NEW
DOORWAY
& FRAME
EXISTING TILE
LINE
6" X 16" X 8" CMU,
SEE DETAIL 2/S1
PRECAST
CONCRETE
LINTEL
PRECAST
CONCRETE
LINTEL
NEW
WINDOW FRAME
CUT WALL ALONG
EXISTING MORTAR
JOINTS (TYP.)
EXISTING TILE
LINE
6" X 16" X 8"
CMU (TYP.)
NEW
WINDOW
& FRAME
NEW
DOORWAY
& FRAME
NEW
CONCRETE LINTEL
NEW
CONCRETE LINTEL
6" X 16" X 8"
CMU (TYP.)#4 REBAR
7,000 PSI
NON-SHRINK
GROUT IN CMU
BLOCK CAVITIES,
SEE SECTION B/S1
PORTION
OF EXISTING
CMU WALL
TO REMAIN
2
S1
SCALE:
PROPOSED MS
WALL REINFORCING DETAIL
3/4"=1'-0"
A
S1
SCALE:
TYPICAL LINTEL SECTION A
1 1/2"=1'-0"
6" X 16" X 8"
CMU (TYP.)
6" X 16" X 4"
CMU CAP (TYP.)
#4 REBAR (TYP).
1
1
2
" CLEAR EACH WAY
5,000 PSI
CONCRETE
WINDOW FRAME
7
5
8
"
EXISTING PRECAST
CONCRETE "DBL T" BEAM
B
S1
B
S1
SCALE:
TYPICAL COLUMN SECTION B
3"=1'-0"
DOOR
FRAME
3
8
"-16 X 4" FH MACHINE SCREW WITH
CONCRETE EXPANSION SHIELD AT 24"
O.C. FOUR ANCHORS PER SIDE
7,000 PSI
NON-SHRINK GROUT
#4 REBAR
WINDOW
FRAME
WINDOW FRAME ANCHORS PURSUANT
TO MANUFACTURER'S REQUIREMENTS
CAULK JOINT BETWEEN
DOOR/WINDOW FRAMES
AND CMU (TYP. BOTH SIDES)
EXISTING PRECAST
CONCRETE BEAM
EXISTING PRECAST CONCRETE
"DOUBLE T" BEAM
SCALE:
MS BUILDING
FIRST FLOOR DEMO PLAN
1/8"=1'-0"
M1
ITEM SPECIFIC NOTES:
1. DEMOLISH EXISTING SIDEWALL MOUNTED EXHAUST FAN AND
PREPARE OPENING (ENLARGE) FOR NEW LOUVER INSTALLATION.SEE
ELECTRICAL DRAWINGS FOR ELECTRICAL REQUIREMENTS.
2. DEMOLISH EXISTING PRE-CAST CONCRETE PLANK (SIDING) IN THE
AMOUNT NEEDED TO INSTALL NEW LOUVER ABOVE EXISTING AND
PROPOSED CEILING. COORDINATE LOCATION WITH EXISTING
CONDITIONS AND PROPOSED DUCTWORK LAYOUT.
3. PARTIALLY DEMOLISH EXISTING HCS/HCR SUPPLY AND RETURN
PIPING IN AMOUNT NEEDED IN ORDER TO CONNECT NEW PIPING /
EQUIPMENT AND FITTINGS.
4. EXISTING FCU IS TO BE DEMOLISHED AND DISPOSED, ALL
CONNECTION PIPES CAPPED, WALL AND FLOOR REPAIRED FOR NEW
FINISH. SEE ELECTRICAL & NEW ARCITECTURAL WORK DRAWINGS FOR
MORE INFO.
5. EXISTING FCU IS TO BE DEMOLISHED AND DISPOSED,, ALL
EXISTING PIPING REMOVED FOR FLOOR INSTALLATION AND THEN
REINSTALLED INTO THE SAME LOCATION UPON NEW FLOORING
INSTALLATION. TEMPORARY CAP PIPING AND REINSTALL. SEE
ELECTRICAL & NEW WORK DRAWINGS FOR MORE INFO.
6. DEMOLISH EXISTING CEILINGS REGISTERS AND RELATED
DUCTWORK IN ORDER TO ACCOMMODATE NE DUCTWORK.
7. EXISTING CONDENSATE PUMP AND DISCHARGE THAT IS ROUTED
THROUGH THE CEILING IS TO BE DEMOLISHED. CONTRACTOR TO
REOPEN EXISTING FLOOR DRAIN CONDENSATE AND PREPARE FOR
FUTURE CONNECTION/UNIT REINSTALLATION. SEE NEW WORK
DRAWINGS FOR MORE INFO.
POINT OF CONNECTION
POINT IF DEMOLITION
POINT IF DEMOLITION (CAP)
FLOOR DRAIN
CLEANOUT
TO BE DEMOLISHED
EQUIPMENT TAG WITH
BALANCING INFO
VENT PIPING
UNDERGROUND SANITARY PIPE
SANITARY PIPE
HEATING / COOLING SUPPLY
HEATING / COOLING RETURN
CONDENSATE PIPE
"E-*" EXISTING PIPE OF "*" TYPE
VENT THROUGH ROOF WITH PIPE SIZE
MOTORIZED DAMPER
BACKDRAFT (GRAVITY) DAMPER
VOLUME DAMPER
THERMOSTAT
REMOTE SENSOR WITH STATUS DISPLAY
ACCESS PANEL
BREAK IN DUCTWORK / PIPING
VERTICAL FAN COIL UNIT
C
LEGEND
DEMOLITION WORK NOTES*:
#
M
U-SAN
HCS
HCR
COND
E-*
T
AP
GENERAL EXISTING INSTALLATION AND
DEMOLITION NOTES *:
A. COORDINATE ALL CONTRACT ACTIVITIES, DEMOLITION AND NEW
INSTALLATION WORK WITH COR, MS BUILDING AND GSK BUILDINGS
MANAGEMENT. ALL MAJOR DEMOLITION AND NEW WORK WITHIN
OFFICE AREAS IS TO BE PERFORMED SIMULTANEOUSLY IN ORDER
TO MINIMIZE DOWN TIME AND POSSIBLE RELOCATIONS OF
OCCUPANTS.
B. CONTRACTOR IS TO PERFORM ALL WORK IN WORKMAN LIKE
MANNER WITH PROPER CARE TO THE MS BUILDING AND GSK
BUILDINGS PROPERTY. ALL DAMAGE CAUSED TO THE
GOVERNMENT'S PROPERTY DURING THE CONSTRUCTION IS TO BE
RECTIFIED BY CONTRACTOR. ALL SURFACES AND GROUNDS
AFFECTED BY THE CONSTRUCTION ARE TO BE LEFT AT
PRE-CONSTRUCTION CONDITION UPON THE PROJECT COMPLETION.
C. EXISTING GSK AIR HANDLING UNITS WHOSE DUCTWORK IS TO BE
MODIFIED AND REBALANCED ARE LOCATED UNDER A SLOPED ROOF
CLOSE TO CEILING. (AT 8 FT. ABOVE FINISHED FLOOR (AFF)),
FLOORING IS CARPET AND VINYL TILE.
D. EXISTING MS BUILDING HVAC CONSISTS MOSTLY OF VERTICAL FAN
COIL UNITS WITH 2-PIPE CHANGEOVER WHICH LOUVERS ARE
MOSTLY BLOCKED/CAPPED AND EXHAUST FANS SERVING
BATHROOMS. BUILDING IS SERVED WITH NEAR BUILDING LOCATED
CHILLER FOR COOLING OPERATION. ADJACENT BOILER ROOM
(WITHIN 30 FT. FROM BUILDING EDGE) HOUSES BUILDING
MANAGEMENT PANEL BY " SIEMENS" AND TWO BOILERS FOR
HEATING OPERATION.
E. CONTRACTOR IS TO COORDINATE DEMOLITION OF FANS/LOUVERS
AND NEW LOUVER SELECTION AND INSTALLATION INTO EXISTING
RECONNECTION OF EXISTING REFRIGERATION LINES AND
DUCTWORK TO THE NEW UNITS.
F. ALL UNOPERATIONAL SIDEWALL FANS AND LOUVERS SHOWN TO BE
ABBANDONED ARE TO BE DISCONNECTED FROM ELECTRIC GRID ,
CAPPED FROM INSIDE AND LEFT IN PLACE.
G. FOR ALL ELECTRICAL POWER AND FIRE ALARM DEMOLITION
REQUIREMENTS, REFER TO ELECTRICAL DRAWINGS.
H. BOTH FIRST AND SECOND FLOOR HAVE A 6'-6" WIDE SILL FOR EASY
ACCESS (VIA LADDER) TO EXISTING FANS AND LOUVERS.
SAN
1
GENERAL EXISTING INSTALLATION AND
DEMOLITION NOTES *:
A. IF NOT NOTED DIFFERENTLY, ALL EXISTING CEILINGS ARE
ACOUSTICAL CEILING TILE (ACT). CEILING GRIDS THAT ARE
IMPACTED BY CONSTRUCTION ARE TO BE TAKEN DOWN AND
REINSTALLED/ MODIFIED TO SUIT INSTALLATION.
B. CONTRACTOR IS TO PERFORM THE WORK IN WORKMAN LIKE
MANNER WITH PROPER CARE TO THE MS BUILDING AND GSK
BUILDINGS PROPERTY. ALL DAMAGE CAUSED TO THE
GOVERNMENT'S PROPERTY DURING THE CONSTRUCTION IS TO
BE RECTIFIED BY CONTRACTOR. ALL SURFACES AND GROUNDS
AFFECTED BY THE CONSTRUCTION ARE TO BE LEFT AT
PRE-CONSTRUCTION CONDITION UPON THE PROJECT
COMPLETION.
C. EXISTING MS BUILDING HVAC CONSISTS MOSTLY OF VERTICAL
FAN COIL UNITS WITH 2-PIPE CHANGEOVER WHICH LOUVERS
ARE MOSTLY BLOCKED/CAPPED AND EXHAUST FANS SERVING
BATHROOMS. BUILDING IS SERVED WITH NEAR BUILDING
LOCATED CHILLER FOR COOLING OPERATION. ADJACENT
BOILER ROOM (WITHIN 30 FT. FROM BUILDING EDGE) HOUSES
BUILDING MANAGEMENT PANEL BY " SIEMENS" AND TWO
BOILERS FOR HEATING OPERATION.
D. CONTRACTOR IS TO COORDINATE DEMOLITION OF
FANS/LOUVERS AND NEW LOUVER SELECTION AND
INSTALLATION INTO EXISTING CONCRETE IN REGARDS TO CORE
DRILLING AND REQUIRED SIZING.
E. FOR ALL ELECTRICAL POWER AND FIRE ALARM DEMOLITION
REQUIREMENTS, REFER TO ELECTRICAL DRAWINGS.
CONCRETE
BEAM (TYP.)
(10" CLEARANCE)
EXG. HCS & HCR
IN FIRST FL. CEILING
1
2
3
1
1
2
" VENT UP TO
SEC. FLOOR
EXG. COND. LINE
IN CEILING
(SERVING 2ND FL.)
FCU
1
2
D3
VENT
3
4
5
4
CD
5
RM
5
5
5
D1
D1
#
"*"- APPLICABLE TO ALL DEMOLITION DRAWINGS
D2
D2
D2
D2
6
6
6
7
7
B
S
SCALE:
MS BUILDING
FIRST FLOOR NEW WORK PLAN
1/8"=1'-0"
1
M2
CONNECT TO EXG.
GENERAL NEW WORK NOTES:
A. AT LOCATIONS WHERE EXISTING HCS&R (2-PIPE HEAT-COOL SUPPLY AND RETURN) PIPING IS RECEIVING NEW PIPING CONNECTIONS EXISTING AND NEW PIPING
,FITTINGS AND VALVES ARE TO BE INSULATED.
B . INSTALL VERTICAL FAN COIL UNITS UPON NEW FLOORING AND WALL PAINTING IS DONE. RECONNECT AND INSULATE EXISTING AND NEW 2-PIPE CONNECTIONS
AND CONDENSATE LINES AND RECONNECT INTO EXISTING CRAWL SPACE CONDENSATE PIPING TO COMPLETE INSTALLATION.
C. INSULATE CONDENSATE PIPES AND TRAPS FROM FAN COIL UNITS.
D. INSTALL / PROVIDE LOUVER WITH NEW DOORS THAT ARE SHOWN TO RECEIVE LOUVERS.
E. COORDINATE INSTALLATION OF NEW DIFFUSERS AND FAN COIL UNIT INTO NEW CEILING GRID. PROVIDE ADEQUATE ACCESS FOR FAN COIL UNIT FILTER
REMOVAL AND MAINTENANCE.
F. COORDINATE INSTALLATION OF CEILING MOUNTED IN LINE FANS WITH EXISTING CEILING CONDITIONS AND 30" WIDE PRE-CAST CONCRETE BEAMS SEPARATING
FLOORS.
G. MOUNT NEW CONDENSATE PUMPS AT NEARBY EXISTING/NEW WALL AND COORDINATE DISCHARGE WITH LAVATORY TAILPIECE PIPING.
H. COORDINATE LOUVER SELECTION AND INSTALLATION WITH EXISTING WALL & CEILING CONDITIONS AND PRE-CAST PLANKS AND CONCRETE T-. JOISTS. CAULK
ALL GAPS TO COMPLETE INSTALLATION.
ITEM SPECIFIC NOTES:
1. PROVIDE A NEW ROUND LOUVER AND INSTALL IT INTO EXISTING
CONCRETE PLANK SIDEWALL .SEE ELECTRICAL DRAWINGS FOR
ELECTRICAL REQUIREMENTS.
2. DEMOLISH EXISTING PRE-CAST CONCRETE PLANK (SIDING) IN THE
AMOUNT NEEDED TO INSTALL NEW LOUVER ABOVE EXISTING WINDOW
AND PROPOSED CEILING. COORDINATE LOCATION WITH EXISTING "T"
PRE-CAST SECOND FLOOR CONCRETE SECTIONS.
3. PROVIDE AND INSTALL NEW PIPING HCS&R, CONDENSATE PIPING
AND PUMP AND CONNECT TO NEW PLUMBING PIPING AND CONNECT TO
NEW FAN COIL UNIT.
4. COORDINATE UNIT PLACEMENT AND INSTALLATION WITH CEILING
GRID, PROPOSED LIGHTING AND ABOVE CEILING CLEARANCES. INSTALL
UNIT IN THE WAY TO MAKE FILTER REPLACEMENT AND ROUTINE
MAINTENANCE EASILY ACCESSIBLE.
5. INSTALL NEW VERTICAL FCU AND RECONNECT TO EXISTING
HCS&R AND CONDENSATE PIPING.
1
2
3
4
5
SCALE:
MS BUILDING
MECHANICAL AND PLUMBING NEW WORK ROOF PLAN
1/8"=1'-0"
1
M3
ITEM SPECIFIC NOTES:
1. PROVIDE AND INSTALL NEW 4" VENT THROUGH EXISTING
CONCRETE ROOF. COORDINATE PENETRATION, DRILLING AND VENT
LOCATION WITH EXISTING CRAWL SPACE, FIRST, & SECOND FLOOR
WALL AND CEILING CONDITIONS. PROVIDE FLASHING AND SEAL
OPENING TO MAKE IT WATER TIGHT IN ORDER TO COMPLETE
INSTALLATION. SEE RELATED FLOOR PLAN AND DETAIL DRAWINGS FOR
MORE INFO.
ROOF
ELLIPSE
CENTERLINE (TYP.)
ROOF
ELLIPSE
CENTERLINE (TYP.)
EXISTING
CHILLER
ENCLOSURE
FLAT ROOF
FLAT ROOF
EXISTING
CHILLER
SCALE:
MS BUILDING BUILDING
CRAWL SPACE PLUMBING DEMO PLAN
1/8"=1'-0"
1
M4
ITEM SPECIFIC NOTES:
1. DEMOLISH EXISTING 5" CLEANOUT AND VERTICAL SANITARY PIPE
IN THE AMOUNT NEEDED AND PREPARE FOR A NEW 4" HORIZONTAL PIPE
CONNECTION FITTING AND CLEANOUT INSTALL.
1
1
SCALE:
MS BUILDING BUILDING
CRAWL SPACE NEW WORK PLUMBING PLAN
1/8"=1'-0"
1
M5
ITEM SPECIFIC NOTES:
1. INSTALL NEW VERTICAL 5" PIPE SECTION WITH CLEANOUT AND A
"Y" FITTING THAT WILL ACCOMODATE NEW HORIZONTAL CONNECTION
AND TIE INTO EXISTING PIPE AT SLAB.
2. PROVIDE AND INSTALL NEW 4" VENT/SANITARY PIPE UP THROUGH
EXISTING CONCRETE FLOOR. COORDINATE PENETRATION, DRILLING
AND VENT LOCATION WITH EXISTING CRAWL SPACE, FIRST, & SECOND
FLOOR WALL AND CEILING CONDITIONS. PROVIDE SLEVES AND SEAL
OPENING TO MAKE IT WATER TIGHT IN ORDER TO COMPLETE
INSTALLATION. SEE RELATED FLOOR PLAN, ROOF AND RISER DETAIL
DRAWINGS FOR MORE INFO.
3. PROVIDE AND INSTALL 1 1/2" CW PIPE FROM MECHANICAL ROOM
BELOW CRAWL SPACE CEILING TO A PROPOSED LOCATION.
COORDINATE PIPE PENNETRATION WITH EXISTING CONCRETE BEAMS
AND PROPOSED ARCHITRECTURAL FLOOR PLAN. PROVIDE SLEEVE AND
SEALS.
4. PROVIDE AND INSTALL NEW 1 1/2" SANITARY PIPE UP THROUGH
EXISTING CONCRETE FLOOR. COORDINATE PENETRATION, DRILLING
AND VENT LOCATION WITH EXISTING CRAWL SPACE & FIRST FLOOR
WALL AND CEILING CONDITIONS AND PROPOSED ARCHITECTURAL
PLANS. PROVIDE SLEVES AND SEAL OPENING TO MAKE IT WATER TIGHT
IN ORDER TO COMPLETE INSTALLATION. SEE RELATED FLOOR PLAN AND
DETAIL DRAWINGS FOR MORE INFO.
5. USE EXISTING CRAWL SPACE VENTS OPENINGS (REMOVE AND
REINSTALL VENTS-PREFERRABLY ON THE BACK OF THE BUILDING) AND
EXISTING MECHANICAL ROOM ACCESS HATCH FOR MATERIAL/PIPING
INTRODUCTION INTO CRAWL SPACE AREA.
FIRST FLOOR CW AND HWBPLUMBING PLAN
FIRST FLOOR CW AND HWBPLUMBING PLAN
SCALE:
MS BUILDING
NEW MALE & FEMALE HEADS CW & HW PIPING PLAN
1/8"=1'-0"
1
M8
SCALE:
MS BUILDING
NEW MALE & FEMALE HEADS SANITARY PLAN
1/8"=1'-0"
2
M8
SCALE:
MS BUILDING
NEW MECHANICAL ROOM PIPING PLAN
1/8"=1'-0"
3
M8
MALE
HEAD
FEMALE
HEAD
GALLERY
RECRUIT
WAITING
AREA
001
002
003
004
MALE
HEAD
FEMALE
HEAD
GALLERY
RECRUIT
WAITING
AREA
001
002
004
MECHANICAL
ROOM
004
POINT OF CONNECTION
POINT IF DEMOLITION
POINT IF DEMOLITION (CAP)
INCREASE IN PIPE SIZE
GENERAL NOTES:
1. ALL WORK IS TO BE PERFORMED PER LAST EDITION OF
PLUMBING CODE.
2. RUN ALL PIPING ABOVE CEILING INSULATED.
3. COORDINATE ALL INSTALLATION, ROUGH-IN HEIGHTS WITH ADA
REQUIREMENTS AND ARCHITECTURAL DRAWINGS, ELEVATIONS
AND EXISTING CONDITIONS.
4. CONNECT VENTING PIPING TO ALL FIXTURES THAT REQUIRE
VENT CONNECTIONS.
5. INSTALL SLEEVES AND FIRESTOPPING FOR ALL PIPING
PENETRATIONS THROUGH WALLS.
6. COORDINATE WC FIXTURE ROUGH-IN AND SEWAGE EJECTOR
PLACEMENT AND CONNECTING PIPING LENGTHS WITH
REQUIRED SLOPING AND MAX. SANITARY PIPE LENGTHS.
7. PROVIDE ISOLATION BALL VALVES REQUIRED FOR
FIXTURE MAINTENANCE AND SERVICING FOR ALL
CONNECTION PIPING.
NEW WORK NOTES:
1. RUN SANITARY DISCHARGE AT 1% SLOPE TO PROPOSED
LOCATION. PROVIDE 2 INCH "WYE" FITTING AND INSTALL ABOVE
CEILING INTO AN EXISTING AUXILIARY VENT. ENSURE PROPER
OPERATION UPON COMPLETION OF FORCED SANITARY PIPE UPON
COMPLETION.
2. CONNECT NEW 1 1/2" COLD WATER (CW) PIPE ABOVE CEILING AND RUN
ALONG SANITARY LINE TO WORK AREA.
4. PROVIDE NEW VENT THROUGH ROOF (VTR) INTO EXISTING ROOF
SYSTEM, INSTALL NECESSARY FLASHING, CAULK AND SEAL OPENING
IN ORDER TO PREVENT LEAKS. RESET THE SHINGLES IN ORDER TO
COMPLETE INSTALLATION.
5. RUN 1 " CONDENSATE LINE FROM FCU-2 TO A FUNNEL AND CONNECT
TO A LAVATORY TAIL PIPE.
REQUIRED WALL SUPPORT TO COMPLETE INSTALLATION.
6. COORDINATE INSTALLATION HEIGHT PIPES SUPPORT AND ROUTING
WITH EXISTING CONDITIONS AND UTILITIES.
C
1
M7
SCALE:
DEMOLITION GSK/ESO TESTING OFFICE
MECHANICALDEMOLITION PLAN-GSK BUILDING
3/16"=1'-0"
DEMOLITION NOTES:
1. FAN COIL UNIT CURRENTLY
BALANCED AT 1200 CFM AND ALL EXISTING
CONNECTIONS ARE TO REMAIN AND TO BE
MODIFIED TO SUIT INSTALLATION. SEE NEW
WORK DRAWING AND NOTES FOR MORE
INFO.
2. ALL NEW WALLS ARE TO BE BUILT
BELOW EXISTING DUCTWORK AND TO BE
COORDINATED WITH IT. EXISTING
DUCTWORK INSULATION IS TO BE
REMOVED AND DISPOSED, IN ORDER FOR
DUCT TO BE REPAIRED AND REINSULATED.
SEE NEW WORK NOTES FOR MORE INFO.
3. EXISTING DIFFUSER/REGISTER AND
CONNECTED DUCT TO BE TEMPORARILY
DISCONNECTED FROM EXISTING GRID AND
MODIFIED AS NEEDED TO SUIT THE
INSTALLATION. SEE NEW WORK DRAWING
AND NOTES FOR MORE INFO.
4. EXISTING THERMOSTAT IS TO BE
TEMPORARY DISCONNECTED &
RELOCATED TO A NEW LOCATION. Repair
EXISTING WALL, PATCH AND PAINT TO A
COLOR MATCHING EXISTING. SEE NEW
WORK DRAWING.
NEW WORK NOTES:
1. FAN COIL UNIT IS TO BE BALANCED TO 1000 CFM. MAINTAIN UNIT ACCESS CLEARANCE AND EXISTING OUTSIDE AIR, RS&lL AS NEEDED AND COORDINATE
OVER NEWLY ERECTED WALL. RE-SEAL EXISTING UN IT'S FLEXIBLE CONNECTIONS AND RE-ALLIGN THE UNIT AND IT'S AUXILLIARY DRAIN PAN AND MAKE
CONDENSATE REMOVAL EFFICIENT. RECONNECT RETURN REGISTER TO UNIT UPON NEW WALL CREATION.
2. PROVIDE EXISTING PAS DIFFUSER MATCHING INSULATION ACCESSORY (FOR ATTIC INSTALLATION) AND NEW FLEXIBLE DUCT AND INSTALL IT INTO NEW
CEILING GRID. COORDINATE FLEX DUCTWORK LENGTHS WITH EXISTING DUCTWORK TAKEOFFS. BALANCE DIFFUSER TO VOLUME SHOWN. SEE DEMO DRAWING
AND NOTES FOR MORE INFO.
3. PROVIDE DOOR WITH INTERNAL 24X24 TRANSFER LOUVER.
4. RELOCATE EXISTING THERMOSTAT TO NEW LOCATION.
5. UPON REMOVAL OF EXISTING DUCTWORK INSULATION, SEAL WITH THICK MASTIC COATING ALL EXISTING DUCTWORK CONNECTIONS. REINSULATE
DUCTWORK TO COMPLETE INSTALLATION.
6. REBALANCE THE UNIT TO 1000 CFM AND EXISTING RETURN AND RELOCATED AND INSULATED DIFFUSERS TO SHOWN AIR VOLUME ( CFM).
7. INSTALL EXISTING THERMOSTAT TO A PROPOSED LOCATION. REUSE / EXTEND WIRING TO COMPLETE INSTALLATION. EXISTING INTERLOCK WITH EXHAUST
FAN SERVING THE STORAGE BATHROOM (HEAD 1-013) ARE TO REMAIN.
8. PROVIDE A DUOSTAT (TEMPERATURE AND HUMIDITY CONTROLLER)THAT WILL OPERATE FAN WHEN ATTIC TEMPERATURE REACHES 60% OR 110° F.
1
2
3
4
GENERAL GSK NEW WORK NOTES:
A. ALL EXISITING DUCTWORK IS TO BE REPAIRED AT JOINTS AND UNIT
CONNECTIONS. THICK COATING OF MASTIC IS TO BE APPLIED AT
LOCATIONS WHERE SHEET METAL SCREWS ARE PENETRATING
DUCTWORK.
B. UNIT'S THERMOSTAT IS TO BE RE-INTERLOCKED WITH EXISTING FAN AND
UNIT SERVING LUCKY BAG STORE.
C. EXISTING GSK DUCTWORK IS TO BE REINSULATED WITH 2" THICK
INSULATION UPON MASTIC APPLICATION.
D. PROVIDE INSULATING PLENUM ACCESSORY FOR EXISTING DIFFUSERS
WHICH ARE TO BE REINSTALLED AT PROPOSED LOCATIONS INTO NEW
CEILING GRID.
2
M7
SCALE:
PROPOSED GSK/ESO TESTING OFFICE
PROPOSED MECHANICAL PLAN
3/16"=1'-0"
OPEN AREA
015
HEAD 1
013
HEAD 2
014
015
OPEN AREA
015
HEAD 1
013
HEAD 2
014
IT ROOM
012
TECH CLO.
015
3
1
2 2
33
HEAD 1
013
HEAD 2
014
IT ROOM
012
015
HEAD 1
013
HEAD 2
014
IT ROOM
012
TECH CLO.
015
GENERAL GSK DEMOLITION NOTES:
A. EXISTING UNITS AND DUCTWORK ARE POORLY INSTALLED AND ARE LEAKING AIR AT UNIT, DUCTWORK AND REGISTER CONNECTIONS,
CAUSING EXCESS CONDENSATION OF CURRENT INSULATION JACKETING IN SUMMER AND EXCESSIVE SWEATING AND DRIPPING. GOAL
FOR WORK SHOWN IS TO REPAIR AND SEAL DUCTWORK AND ALL UNIT CONNECTIONS, REINSULATE DUCTS AS WELL AS PROVIDE NEW
FLEX CONNECTIONS AND INSULATION ACCESSORY FOR ALL EXISTING REGISTERS.
B. EXISTING GSK AIR HANDLING UNITS\ WHICH DUCTWORK IS TO BE MODIFIED AND REBALANCED ARE LOCATED UNDER A SLOPED ROOF
CLOSE TO CEILING (AT 8 FT. ABOVE FINISHED FLOOR (AFF).
C. UNIT'S THERMOSTAT IS INTERLOCKED WITH EXISTING FAN AND UNIT SERVING LUCKY BAG STORE. tHESE INTERLOCKS ARE TO REMAIN
UPON THERMOSTAT RELOCATION.
D. EXISTING GSK DUCTWORK IS LEAKING AIR AND INSULATION IS COMPROMISED. CONTRACTOR IS TO DEMOLISH AND DISPOSE EXISTING
INSULATION. IT WAS MANUFACTURED IN 4' SECTIONS.
E. EXISTING DIFFUSERS WHICH ARE TO BE TEMPORARELY DISCONECTED, MODEL PAS BY TITUS ARE TO BE SALVAGED AND REINSTALLED
IN PROPOSED LOCATIONS INTO NEW CEILING GRID.
F. FOR ALL ELECTRICAL POWER AND FIRE ALARM DEMOLITION REQUIREMENTS, REFER TO ELECTRICAL DRAWINGS.
LUCKY BAG
MAIN STORE AREA
011
LUCKY BAG
MAIN STORE AREA
011
011
LUCKY BAG
STORAGE
012
2
2
3
3
011011
011
LUCKY BAG
STORAGE
012
GENERAL NOTES:
1. ALL WORK TO BE INSTALLED PER LATEST NATIONAL STANDARD
PLUMBING CODE EDITION.
4 4
POWER POLE
PROJECTOR
4
SPEAKER,
TYP OF 2
DEMOLISH SURFACE
MOUNT CONDUIT & WIRE
BETWEEN RECEPTACLES
PANEL C
PANEL D
TELECOMMUNICATIONS
DATA PORT, TO BE MOVED
T
V
UNK
C-6
UNK
C-17,23
SC
RE
EN
ESO
TESTING AREA
ESO
OFFICE
VETERANS
OFFICE
SP
SP
FCU
D-25
H-6
PANEL H
OPEN
OFFICE SPACE
TELECOMM
CLOSET
HEAD
HEAD
H-4
PANEL H
EX
S
H-11
EX EX EX EX
EXEXEXEX
EX
SSS
SS
SS
TESTING IN
PROGRESS SIGN
PANEL C
PANEL D
D-12
UNKD-22
MISSION SUPPORT DEMOLITION NOTES:
1. DEMOLISH RECEPTACLES SHOWN ON PLAN UNLESS NOTED OTHERWISE. FOR SURFACE MOUNTED RECEPTACLES, DEMOLISH
SURFACE MOUNTED CONDUIT AND BOXES. FOR FLUSH MOUNTED RECEPTACLES ON WALLS SLATED TO REMAIN, PROVIDE NEW
STAINLESS STEEL BLANK FACEPLATES. DEMOLISH WIRE BACK TO PANEL OR FIRST JUNCTION BOX FEEDING OTHER DEVICES
SLATED TO REMAIN. DEMOLISH ABANDONED CONDUIT.
2. DEMOLISH MC CABLE BACK TO SOURCE FEEDING THE ONE FAN COIL UNIT SHOWN ON THIS DRAWING. MC CABLE IS RUN IN CRAWL
SPACE. PATCH HOLE IN FLOOR. DISCONNECT AND RECONNECT POWER TO THE FOUR FAN COIL UNITS IDENTIFIED ON THE
MECHANICAL DRAWINGS TO BE TEMPORARILY MOVED.
3. DEMOLISH TWO POWER POLES.
4. PROJECTOR IS HARD WIRED TO CIRCUIT IN JUNCTION BOX ABOVE SUSPENDED CEILING. DEMOLISH WIRE FROM JUNCTION BOX TO
PROJECTOR. REMOVE PROJECTOR AND VIDEO CABLE AND REINSTALL AT GSK.
5. REMOVE TWO SPEAKERS AND REINSTALLED AT GSK.
6. MOVE ONE TELECOMMUNICATIONS DATA PORT TO LOCATION SHOWN ON NEW WORK DRAWING.
7. DEMOLISH REMAINING TELECOMMUNICATIONS DATA PORTS SHOWN ON PLAN. DEMOLISH SURFACE MOUNTED CONDUIT AND
BOXES. DEMOLISH CAT 5E CABLE BACK TO PUNCH DOWN BLOCKS LOCATED IN ROOM APPROXIMATELY 100 FEET AWAY.
8. DEMOLISH EXISTING 2X4 RECESSED LIGHT FIXTURES. DEMOLISH WIRE AND ABANDONED CONDUIT BACK TO TOGGLE SWITCHES.
9. REMOVE TESTING IN PROGRESS SIGN TO BE REINSTALLED AT GSK. DEMOLISH WIRE BACK TO SWITCH AND PATCH HOLE IN WALL.
10. DEMOLISH EXISTING TOGGLE SWITCHES. DEMOLISH WIRE BACK TO NEAREST JUNCTION BOX. DEMOLISH ABANDONED CONDUIT.
EXISTING CIRCUITS TO BE REUSED FOR NEW LIGHTS. IF NECESSARY TO CONSTRUCT NEW WALL, REMOVE SWITCH BOX AND
PATCH HOLE IN BLOCK WALL.
GENERAL NOTES:
1. ALL THE EXISTING POWER AND LIGHTING CIRCUITS FEEDING THE
MISSION SUPPORT ESO SPACES ORIGINATE IN ELECTRICAL PANEL "C"
OR "D". ALL POWER AND LIGHTING CIRCUITS FEEDING THE GSK OFFICE
SPACES ORIGINATE IN ELECTRICAL PANEL "H". CONTRACTOR SHALL
TRACE OUT CIRCUITS AS NECESSARY TO IDENTIFY.
2. THE MISSION SUPPORT CRAWL SPACE IS CONSIDERED A CONFINED
SPACE. REFER TO THE SPECIFICATIONS FOR CONFINED SPACE
REQUIREMENTS.
3. ARC FLASH LABELS IDENTIFYING THE ENERGY LEVEL AND APPROPRIATE
CATEGORY ARE INSTALLED ON THE ELECTRICAL EQUIPMENT. THE
CONTRACTOR SHALL WEAR THE APPROPRIATE PPE IN ACCORDANCE
WITH NFPA 70E WHILE WORKING ON ANY ENERGIZED EQUIPMENT.
GSK DEMOLITION NOTES:
1. DEMOLISH TWO RECEPTACLES, BOXES AND CONDUIT. DEMOLISH WIRE BACK TO FIRST JUNCTION BOX
FEEDING OTHER DEVICES SLATED TO REMAIN.
2. REMOVE EXISTING 2X4 RECESSED LIGHT FIXTURES AND REINSTALL IN LOCATIONS SHOWN ON NEW WORK
PLAN. EXISTING WIRE AND CONDUIT MAY BE REUSED PROVIDED IT IS IN GOOD CONDITION.
3. REMOVE EXISTING EXIT SIGN AND REINSTALL IN LOCATION SHOWN ON NEW WORK PLAN. DEMOLISH WIRE
BACK TO NEAREST JUNCTION BOX AND RECONNECT CIRCUIT. PROVIDE STAINLESS STEEL BLANK FACEPLATE
ON EXISTING BOX.
4. DEMOLISH ONE EXISTING TOGGLE SWITCH. DEMOLISH WIRE BACK TO NEAREST JUNCTION BOX AND
RECONNECT CIRCUIT. PROVIDE STAINLESS STEEL BLANK FACEPLATE ON EXISTING BOX. EXISTING CIRCUITS
TO BE REUSED FOR NEW LIGHTS.
SCALE:
MS ESO SPACE, POWER &
COMM DEMOLITION PLAN
1/4"=1'-0"
SCALE:
GSK OFFICE, POWER
DEMOLITION PLAN
1/4"=1'-0"
SCALE:
GSK OFFICE, LIGHTING
DEMOLITION PLAN
1/4"=1'-0"
TELECOMM
CLOSET
SCALE:
MS ESO SPACE, LIGHTING
DEMOLITION PLAN
1/4"=1'-0"
MISSION SUPPORT NEW WORK NOTES:
1. PROVIDE NEW FLUSH MOUNT RECEPTACLES WHERE SHOWN. GFI RECEPTACLES SHALL BE MOUNTED 6"
ABOVE LAVATORIES. PROVIDE NEW BOXES, STAINLESS STEEL FACEPLATES, AND MC CABLE. CONNECT
RECEPTACLES TO EXISTING CIRCUITS.
2. PROVIDE NEW SURFACE MOUNT RACEWAY AND WIRE NEAR NEW DOOR TO RECONNECT EXISTING
RECEPTACLES TO EXISTING CIRCUITS.
3. PROVIDE NEW LOW VOLTAGE TRANSFORMER(S) ABOVE SUSPENDED CEILING AS NEEDED FOR HANDS FREE
FIXTURES. PROVIDE LOW VOLTAGE WIRE (NOT SHOWN) TO SENSOR / ACTUATOR FOR EACH LAVATORY AND
WATER CLOSET IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. REFER TO MECHANICAL
DRAWINGS.
4. PROVIDE NEW #10 AWG MC CABLE HOME RUNS FOR NEW INSTANT HOT WATER HEATERS. CONNECT WIRING
TO EXISTING SPARE 20A CIRCUIT BREAKERS. THE CIRCUIT BREAKER AND WIRE SIZE STATED HEREIN IS BASED
ON A SPECIFIC BASIS OF DESIGN HEATER. IF THE MECHANICAL CONTRACTOR PROVIDES HEATERS THAT
REQUIRE LARGER CIRCUIT BREAKERS / WIRE, THE ELECTRICAL CONTRACTOR SHALL UPGRADE THE BRANCH
CIRCUITS AT NO ADDITIONAL COST TO THE GOVERNMENT. REFER TO DRAWING E4 FOR LOCATION OF PANEL J.
REFER TO MECHANICAL DRAWINGS.
5. MOVE ONE EXISTING TELECOMMUNICATIONS DATA PORT TO LOCATION SHOWN. PROVIDE NEW FLUSH MOUNT
BOX AND 3/4" EMT CONDUIT INSIDE WALL TO A POINT ABOVE THE SUSPENDED CEILING. ROUTE EXISTING CAT
5E CABLES THROUGH NEW CONDUIT. COAST GUARD PERSONNEL WILL TERMINATE AND TEST CABLES.
6. RE-SECURE ONE EXISTING SURFACE MOUNT TELECOMMUNICATIONS CONDUIT TO WALL. PROVIDE NEW BLANK
FACEPLATE ON EXISTING BOX.
7. PROVIDE ONE NEW TOGGLE SWITCH, BOX, AND MC CABLE. CONNECT TO HALLWAY FIXTURE.
8. PROVIDE NEW DUAL TECHNOLOGY OCCUPANCY SENSORS AND POWER PACKS. PROVIDE NEW 2X4 RECESSED
LED LIGHT FIXTURES. PROVIDE NEW MC CABLE AND CONNECT TO EXISTING CIRCUITS. TEST / ADJUST
OCCUPANCY SENSORS FOR PROPER OPERATION. REFER TO REFLECTED CEILING PLAN FOR EXACT LOCATION
OF NEW FIXTURES.
9. PROVIDE IDENTIFICATION LABELS FOR NEW ELECTRICAL CIRCUITS AND DATA PORTS IN ACCORDANCE WITH
THE SPECIFICATIONS.
PANEL C
PANEL D
GFI
GFI
4
TELECOMMUNICATIONS
DATA PORT, RELOCATED
SEE NOTE 5
C-17,23
C-6
UNK
TX
TX
PANEL C
PANEL D
C
B
A
A
A
A
A A
A
B
B
MD1
MD1
S
MD1
PP
PP
D-22
D-12
PP
2x4 RECESSED LIGHT FIXTURE, LETTER INDICATES
FIXTURE TYPE
2x4 RECESSED LIGHT FIXTURE WITH EMERGENCY
BATTERY PACK, LETTER INDICATES FIXTURE TYPE
2x2 RECESSED LIGHT FIXTURE, LETTER INDICATES
FIXTURE TYPE
DOORWAY LIGHT FIXTURE
EXIT SIGN, WALL MOUNTED
SINGLE POLE TOGGLE SWITCH
THREE-WAY TOGGLE SWITCH
MOTOR STARTER SWITCH
TELECOMMUNICATIONS DATA PORT, 4 JACKS
EXISTING TELECOMMUNICATIONS DATA PORT, TO REMAIN
C
S
S
3
DUPLEX RECEPTACLE
EXISTING RECEPTACLE, TO REMAIN
QUAD RECEPTACLE
GFI RECEPTACLE
ELECTRICAL PANEL, PANEL LETTER INDICATED
HOMERUN, PANEL AND CIRCUIT # INDICATED
DISCONNECT SWITCH, NON-FUSED, RATING INDICATED
EXHAUST FAN MOTOR
DUAL TECHNOLOGY, PASSIVE INFRARED AND ULTRASONIC,
OCCUPANCY SENSOR WITH 12' RADIAL COVERAGE, CEILING
MOUNTED
POWER PACK, MOUNTED ABOVE SUSPENDED CEILING
LOW VOLTAGE TRANSFORMER FOR HANDS FREE FIXTURES
PNL A
A-31
EF
A
B
30DW
LUMINAIRE SCHEDULE
C
2x2, LED TYPE, CEILING MOUNTED TROFFER WITH
0.125" THICK ACRYLIC LENS
RECESSED
2x4, LED TYPE, CEILING MOUNTED TROFFER WITH
0.125" THICK ACRYLIC LENSB
TYPE DESCRIPTION
RECESSED
MOUNTING
120 1
120
LAMPS VOLTS
5
QTY
LED, 4300 LUMENS,
39 WATT, 4000K, 110
LPW
LED, 3300 LUMENS,
35 WATT, 4000K, 102
LPW
DW
SURFACE 120 1
DOORWAY WALLPACK LIGHT, LED, UL WET LISTED,
SWIVEL PHOTOCELL, BRONZE ALUMINUM HOUSING,
POLYCARBONATE LENS, -40°F STARTING TEMP, 5 YEAR
WARRANTY
LED, 2508 LUMENS,
18 WATT, 5000K, 124
LPW, 100,000 L70
2x4, LED TYPE, CEILING MOUNTED TROFFER WITH
0.125" THICK ACRYLIC LENSA
RECESSED 120 7
LED, 3000 LUMENS,
32 WATT, 4000K, 115
LPW
EX
EXISTING LIGHT FIXTURE, TO REMAIN
S
M
MD1
PP
LEGEND
SCALE:
MS ESO SPACE, POWER &
COMM NEW WORK PLAN
1/4"=1'-0"
SCALE:
MS ESO SPACE, LIGHTING
NEW WORK PLAN
1/4"=1'-0"
TX
GSK NEW WORK NOTES:
1. PROVIDE NEW FLUSH MOUNT RECEPTACLES IN WALLS WHERE SHOWN. PROVIDE ONE NEW RECEPTACLE
ABOVE SUSPENDED CEILING WHERE SHOWN. PROVIDE NEW BOXES, STAINLESS STEEL FACEPLATES, AND MC
CABLE. CONNECT RECEPTACLES TO CIRCUITS SHOWN. CIRCUIT H-18 IS A NEW CIRCUIT; CONNECT TO SPARE
SINGLE POLE, 20A CIRCUIT BREAKER IN PANEL.
2. PROVIDE NEW TOGGLE SWITCH DISCONNECT FOR EXHAUST FAN LOCATED ABOVE SUSPENDED CEILING.
PROVIDE NEW MC CABLE BACK TO PANEL AND CONNECT TO SPARE SINGLE POLE, 20A CIRCUIT BREAKER.
REFER TO MECHANICAL DRAWINGS FOR EXHAUST FAN CONTROL.
3. MOUNT PROJECTOR AND SPEAKERS IN LOCATIONS SHOWN. PROVIDE NEW PLUG ON PROJECTOR POWER
CORD. PROVIDE NEW SURFACE MOUNT CONDUIT FROM SUSPENDED CEILING TO 12 INCHES ABOVE FLOOR IN
CORNER NEAR SPEAKER. PROVIDE NEW SPEAKER WIRE AND CONNECT SPEAKERS TO COAST GUARD
EQUIPMENT LOCATED IN SAME CORNER AS SURFACE MOUNT CONDUIT. RECONNECT EXISTING VIDEO CABLE
FROM PROJECTOR TO COAST GUARD EQUIPMENT.
4. PROVIDE THREE NEW FLUSH MOUNT, QUAD TELECOMMUNICATIONS DATA PORTS AND CAT 5e CABLE. RUN
BLUE CAT 5e CABLES FOR ONE QUAD DATA PORT BACK TO TELECOMMUNICATIONS CLOSET. COAST GUARD
PERSONNEL WILL TERMINATE THESE CABLES ON THE EXISTING SWITCH. PROVIDE NEW WALL MOUNT, 16
PORT, GIGABIT SWITCH WHERE SHOWN. RUN PINK CAT 5e CABLES FOR TWO QUAD DATA PORTS BACK TO NEW
16 PORT SWITCH AND TERMINATE. TEST CABLES AND JACKS IN ACCORDANCE WITH THE SPECIFICATIONS.
5. RELOCATE EXISTING LIGHT FIXTURES AND EXIT SIGN AS SHOWN.
6. PROVIDE NEW LIGHT FIXTURES AND SWITCHES WHERE SHOWN. PROVIDE NEW BOXES, STAINLESS STEEL
FACEPLATES AND MC CABLE. CONNECT LIGHTING FIXTURES TO EXISTING CIRCUIT. WIRE EXISTING 2X4
EMERGENCY FIXTURES SUCH THAT THEY TURN OFF WITH THE SWITCH.
7. MOUNT TESTING IN PROGRESS SIGN WHERE SHOWN AND CONNECT TO DEDICATED SWITCH.
8. PROVIDE IDENTIFICATION LABELS FOR NEW ELECTRICAL CIRCUITS AND DATA PORTS IN ACCORDANCE WITH
THE SPECIFICATIONS.
H-6
H-18
PANEL H
PROJECTOR
SC
RE
EN
7'
OFFICE
TELECOMM
CLOSET
HEAD
HEAD
TESTING
AREA
OFFICE
HALLWAY
MOUNT ABOVE
SUSPENDED CEILING
SPEAKER,
TYP OF 2
SP
SP
MOUNT THIS RECEPTACLE 6"
BELOW SUSPENDED CEILING
SURFACE CONDUIT
IN THIS CORNER
SWITCH
WALL MOUNT, 16 PORT,
GIGABIT SWITCH
S
M
H-19
PANEL H
EX
H-11
B
EX
EX
EX
EX
B
S
EX
EX
EX
EX
S
S
S
EX
3
3
S
DW
S
TESTING IN
PROGRESS SIGN
ab
S
a
a
b
b
SCALE:
GSK OFFICE, POWER
NEW WORK PLAN
1/4"=1'-0"
SCALE:
GSK OFFICE, LIGHTING
NEW WORK PLAN
1/4"=1'-0"
PANEL I
PANEL J
S
M
J-7
S
M
HVAC POWER CONSTRUCTION NOTES:
1. PROVIDE NEW TOGGLE SWITCH DISCONNECTS FOR HVAC EQUIPMENT. THE FAN
COIL UNIT AND THE EXHAUST FAN ARE LOCATED ABOVE THE SUSPENDED CEILING.
REFER TO MECHANICAL DRAWINGS FOR HVAC EQUIPMENT CONTROL.
2. PROVIDE ONE RECEPTACLE ABOVE SUSPENDED CEILING NEXT TO THE FAN COIL
UNIT FOR THE ASSOCIATED CONDENSATE PUMP.
3. PROVIDE NEW MC CABLE WIRING BACK TO PANEL "J" AND CONNECT TO EXISTING
SPARE SINGLE POLE, 20A CIRCUIT BREAKER.
SCALE:
MS FIRST FLOOR,
POWER TO HVAC EQUIP.
3/32"=1'-0"
E
ESO
TESTING AREA
ESO
OFFICE
VETERANS
OFFICE
1-8
1-10
1-12
1-13
AV4
30CD
AV4
15CD
1-11
HEAD
OPEN
OFFICE SPACE
TELECOMM
CLOSET
HEAD
1-9
1-12
1-8
1-10
1-13
AV4
30CD
AV4
30CD
AV4
30CD
AV4
15CD
1-19
1-20
1-21
HEAD
TELECOMM
CLOSET
HEAD
TESTING
AREA
OFFICE
OFFICE
HALLWAY
1-11
1-9
WAITING AREA
HEAD
HEAD
HALLWAY
GENERAL NOTES:
1. BOTH BUILDINGS WILL BE OCCUPIED THROUGHOUT THE CONTRACT. CONTRACTOR SHALL MAKE EVERY
EFFORT TO MINIMIZE THE AMOUNT OF TIME THE FIRE ALARM SYSTEMS ARE TURNED OFF AND SHALL NOT
LEAVE ANY PORTION OF THE SYSTEMS TURNED OFF OVERNIGHT. IF NECESSARY, CONTRACTOR SHALL
PROVIDE TEMPORARY CONNECTIONS TO RECONNECT EXISTING FIRE ALARM CIRCUITS DURING
CONSTRUCTION.
2. CONTRACTOR SHALL PROVIDE THE SERVICES OF A NJ LICENSED ELECTRICIAN OR A NICET LEVEL II FIRE
ALARM SYSTEMS CERTIFIED TECHNICIAN WITH A MINIMUM OF THREE YEARS RELEVANT EXPERIENCE TO WORK
ON THE FIRE ALARM SYSTEMS.
3. COAST GUARD PERSONNEL WILL PROGRAM THE CONTRACTOR PROVIDED NEW ADDRESSABLE DEVICES AND
THE EXISTING FIRE ALARM CONTROL PANEL. CONTRACTOR SHALL TEST ALL NEW DEVICES AND A SAMPLING
OF THE EXISTING DEVICES. ALL TESTING SHALL BE WITNESSED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE.
4. FIRE ALARM CABLES SHALL BE INSTALLED IN ONE CONTINUOUS LENGTH (NO SPLICES) BETWEEN TERMINATION
POINTS. FIRE ALARM CIRCUITS SHALL NOT BE T-TAPPED. INITIATION CIRCUITS SHALL USE #16 AWG
CONDUCTORS AND NOTIFICATION CIRCUITS SHALL USE #14 AWG CONDUCTORS.
5. CURRENTLY, THERE ARE NO TROUBLE CONDITIONS BEING REPORTED ON THE FIRE ALARM CONTROL PANELS.
CONTRACTOR SHALL TROUBLESHOOT AND CORRECT ANY TROUBLE CONDITIONS THAT APPEAR DURING
CONSTRUCTION.
6. REFER TO REFLECTED CEILING PLAN FOR EXACT LOCATION OF DETECTORS.
GSK CONSTRUCTION NOTES:
1. THE GSK BUILDING USES ADDRESSABLE FIRE ALARM INITIATION DEVICES ON CLASS B (2 WIRE), SIGNALING
LINE CIRCUITS AND NOTIFICATION DEVICES ON CLASS B (2 WIRE) NOTIFICATION APPLIANCE CIRCUITS. FIRE
ALARM RATED MC CABLE IS USED THROUGHOUT. PROTECT EXISTING DEVICES DURING CONSTRUCTION.
2. MOVE ONE EXISTING PULL STATION TO LOCATION SHOWN AND FLUSH MOUNT BOX IN NEW WALL. DEMOLISH
ABANDONED CABLE AND PROVIDE STAINLESS STEEL BLANK FACEPLATE ON EXISTING BOX.
3. MOVE ONE EXISTING HORN / STROBE TO LOCATION SHOWN AND SURFACE MOUNT ON EXISTING BLOCK WALL.
DEMOLISH ABANDONED CABLE AND PROVIDE STAINLESS STEEL BLANK FACEPLATE ON EXISTING BOX.
4. MOVE TWO EXISTING SMOKE DETECTORS (ADDRESSES 1-9 & 1-11) TO LOCATIONS SHOWN IN SUSPENDED
CEILING. IF NECESSARY, PROVIDE NEW CABLES TO REACH NEW LOCATIONS WITHOUT SPLICING.
5. PROVIDE THREE NEW ADDRESSABLE SMOKE DETECTORS AND BASE PLATES. NEW DETECTORS ARE SHOWN
ON DRAWING AS ADDRESSES 1-19, 1-20, AND 1-21.
6. PROVIDE TWO NEW STROBES AND FLUSH MOUNT ON EXISTING WALL.
7. PROVIDE NEW FIRE ALARM RATED MC CABLE AND BOXES. FOR SURFACE MOUNTED HORN / STROBE, PROVIDE
SURFACE MOUNT CONDUIT AND BOX. CONNECT NEW DEVICES TO EXISTING FIRE ALARM CIRCUITS WITHOUT
CREATING ANY T-TAPS.
8. LABEL EACH NEW SMOKE DETECTOR WITH THE CORRECT ADDRESS (IE 1-19). LABEL EACH NEW STROBE WITH
THE AUDIO / VISUAL ZONE NUMBER (IE AV4). INSTALL LABELS SUCH THAT THEY ARE VISIBLE WITH THE DEVICES
INSTALLED. INSTALL ADDRESS LABELS ON BASE PLATES. INSTALL AV ZONE NUMBERS DIRECTLY ON STROBES.
9. TEST NEW DEVICES IN ACCORDANCE WITH SPECIFICATIONS.
MISSION SUPPORT CONSTRUCTION NOTES:
1. THE MISSION SUPPORT BUILDING USES CONVENTION FIRE ALARM DEVICES WITH ZONED, CLASS B (2 WIRE),
INITIATING DEVICE CIRCUITS. PROTECT EXISTING SMOKE DETECTOR DURING CONSTRUCTION.
2. MOVE EXISTING SMOKE DETECTOR TO LOCATION SHOWN.
3. PROVIDE THREE NEW CONVENTIONAL TYPE SMOKE DETECTORS AND BASE PLATES. PROVIDE FIRE ALARM
RATED MC CABLE AND BOXES. CONNECT NEW DETECTORS TO EXISTING FIRE ALARM CIRCUIT WITHOUT
CREATING ANY T-TAPS.
4. TEST SMOKE DETECTORS IN ACCORDANCE WITH SPECIFICATIONS.
SMOKE DETECTOR
HEAT DETECTOR
PULL STATION
STROBE
HORN / STROBE
KEY
SCALE:
MS ESO SPACE, EXISTING
FIRE ALARM PLAN
1/4"=1'-0"
SCALE:
GSK OFFICE, EXISTING
FIRE ALARM PLAN
1/4"=1'-0"
SCALE:
GSK OFFICE, NEW
FIRE ALARM PLAN
1/4"=1'-0"SCALE:
MS ESO SPACE, NEW
FIRE ALARM PLAN
1/4"=1'-0"