2
www.swanhunter.com Vessel Operability Studies Development of Lay and Beach Pull-in methodologies Vessel Mooring and Beaching analysis We are currently working on an offshore wind farm located approximately 34km from Zeebrugge in the Belgium secon of the North Sea. The offshore wind farm will have an installed capacity of 309MW, and is to be installed in Q3 2017. Swan Hunter were contracted to provide specialist engineering and installaon analysis services to NKT for offshore cable installaon operaons planned for summer 2017 using the newly commissioned NKT Victoria cable laying vessel. The varying dal condions and high dal current speeds at the beach pull in locaon required for an in depth analysis study including dal range, dal current speeds, wave and weather fore / hind casng, and exploraon of various mooring and beaching opons for the vessel, invesgang vessel anchor moored, tug assisted, or midline barge support scenarios. © SWAN HUNTER. Project Informaon Page 1 of 2. CLIENT I I VESSEL SERVICES PROVIDED PROJECT OVERVIEW NKT NKT VICTORIA RENTEL OFFSHORE WINDFARM

RENTEL OFFSHORE WINDFARM PROJECT …swanhunter.com/wp-content/uploads/2017/07/SH_PROJECT_NKT.pdf · Development of Lay and Beach ... anchor moored, tug assisted, or midline barge

Embed Size (px)

Citation preview

www.swanhunter.com

Vessel Operability Studies

Development of Lay and Beach Pull-in methodologies

Vessel Mooring and Beaching analysis

We are currently working on an offshore wind farm located approximately 34km from Zeebrugge in the Belgium section of the North Sea. The offshore wind farm will have an installed capacity of 309MW, and is to be installed in Q3 2017.

Swan Hunter were contracted to provide specialist engineering and installation analysis services to NKT for offshore cable installation operations planned for summer 2017 using the newly commissioned NKT Victoria cable laying vessel.

The varying tidal conditions and high tidal current speeds at the beach pull in location required for an in depth analysis study including tidal range, tidal current speeds, wave and weather fore / hind casting, and exploration of various mooring and beaching options for the vessel, investigating vessel anchor moored, tug assisted, or midline barge support scenarios.

© SWAN HUNTER. Project Information Page 1 of 2.

CLIENT I

IVESSEL

SERVICES PROVIDED

PROJECT OVERVIEW

NKT

NKT VICTORIA

RENTEL OFFSHORE WINDFARM

www.swanhunter.com

© SWAN HUNTER. Project Information Page 2 of 2.

SWAN HUNTER’S SCOPE OF WORK

Collation and interpretation of existing wave and weather forecast models, tidal data, and site information

Development of various cable installation methodologies for beach pull-in operations

Consolidation of analysis results, reporting, and proposal of chosen solution

DETAILED ANALYSIS

Investigation of station keeping options including anchor moored, tug assisted, or mid-line supported options

Operability analysis of options considering tidal cycle time windows

Define detailed cases for dynamic mooring and beaching analysis using OrcaFlex and GMOOR software

+44 (0) 191 295 0295 [email protected]