Revis James John Bistline Director Project Manager May 14, 2014 Renewable Integration and Plant Flexible Operations Insights from EPRI Research

Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

Revis James John Bistline Director Project Manager

May 14, 2014

Renewable Integration and Plant Flexible Operations

Insights from EPRI Research

Page 2: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

2 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Overview

• Understanding Flexible Operations: Drivers and Impacts • Insights from EPRI Research on Meeting Future Demand for Flexible Operations

Page 3: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

3 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Overarching Issues

• Maintain grid security

• Meet demand on sub-hourly basis

• Maintain continuous environmental compliance

• Implies challenges

– How can flexible operations be valued such that added costs of flexible operations are recovered?

– What is the optimal generation mix and level of generation capacity reserves?

– Answers are key to assuring future asset viability

Page 4: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

4 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Natural Gas Prices and Demand for Gas Unit Flexible Operations

• Low gas prices in North America

– Accelerating shift to higher capacity factors for gas-fired assets

– Putting coal on the margin

– Gas competitive with nuclear

• High gas prices internationally

– Increasing layups of gas-fired plants in Europe

– Increasing transients in operation of gas plants

Trends in Worldwide Gas Prices

Page 5: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

5 © 2014 Electric Power Research Institute, Inc. All rights reserved. © 2012 Electric Power Research Institute, Inc. All rights reserved. 5

German Power Generation (January 2012)

Anti-correlation between peak demand and wind generation Significant cycling of gas and coal assets

increasing power demand

declining wind feed-in

must-run

coal

gas

nuclear

wind

GW GW

Sunday, 1.1.2012 Monday, 2.1.2012 Sunday, 1.1.2012 Monday, 2.1.2012

Used with permission from RWE

Demand, Wind Generation Generation Dispatch

Page 6: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

6 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Range of Variability Is Challenging

Max for year near the 50 GW of capacity

Minimum < 5 GW

Range = 100% down to 10% of peak 30 hours

~30 hrs

Page 7: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

7 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Engineering Challenges of Flexible Operation

• Drivers – Variable generation (i.e., wind and solar) – Demand response – Automated load management and aggregation – Distributed generation – Changing demand (i.e., load curve) – Changing economics (e.g., natural gas prices)

Page 8: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

8 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Modes of Flexible Operation: Impacts

Asset Operational

Changes

Impacts on Plant Operations and

Maintenance

• Faster Load Ramps

• More Startups

• More Frequent Load Changes

• More Frequent and Deeper Minimum Load Operation

• Reserve Shutdown

• Increased Fuel Costs

• Increase in Number of Thermal Cycles

• Reduced Plant Efficiency

• Maintaining Cycle Chemistry

• Increased Corrosion

• Risk of Operator Error

Page 9: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

9 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Engineering Challenges of Flexible Operation

• Limitations on flexible operations – Minimum temperature and pressure conditions – Emissions controls requirements – Design limits on thermal and mechanical stresses

Page 10: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

10 © 2014 Electric Power Research Institute, Inc. All rights reserved. 10

Flexible Operation: Major Damage Mechanisms

•Thermal fatigue

•Creep-fatigue interaction

•Corrosion pitting

•Differential thermal expansion

Page 11: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

11 © 2014 Electric Power Research Institute, Inc. All rights reserved. 11

Damage Effects Are Not Immediate Increasing HRSG Tube Failures over Years

Cum

ulat

ive

HR

SG T

ube

Leak

s

VGP: Vertical Gas Path HGP: Horizontal Gas Path

Page 12: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

12 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Operational Impacts

• Increased heat rate

• Lower capacity factors… lower revenues

• Increased emissions levels per MWh

• Fuel contracts and inventory management

• More plant transients… increased opportunity for human error

• Maintenance costs incurred during reserve standby

• Accelerated rate of material damage

• Requires change to plant preventive maintenance strategy

Economic viability of generating asset is the major concern

Page 13: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

13 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Cost Impacts of Flexible Operation

• Strategically important to plant owners:

– Basis for bidding, rate cases, capital budgets

– Cost has both tangible and intangible elements

• Cost evaluation is technically challenging:

– Limitations on availability and accurate use of historical data

– Relevancy of statistical sample of plants

– Costs typically realized years after start of cycling operation

• Potential approach to improved cost evaluation:

– Pareto analysis of cost elements

– Industry collaborative – common framework for self-assessment

– Benchmark against some component life-consumption models

Page 14: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

14 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Insights on Meeting Future Demand for Flexible Operations

• Ongoing research – Damage effects – Case studies – Operational and maintenance strategies – Anticipating challenges through fleet

transition studies

Page 15: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

15 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Insights on Meeting Future Demand for Flexible Operations

• Anticipating challenges – Will transitioning the generation fleet evolve

such that fleet operational flexibility capabilities will be adequate to support increasing variability in generation and demand?

– To what extent do costs and operational limitations associated with flexible operations of generation assets affect mix of technologies in the future generation fleet?

Page 16: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

16 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Insights on Meeting Future Demand for Flexible Operations

• Integrate generation planning and unit commitment perspectives – Consider long-term asset investment decisions and evolution in

generation asset mix – Include policy and economics drivers – Assess flexibility needs in context of regional differences in

generation fleet composition – Consider role of electricity trade

• Research approach – Intertemporal, CGE model – Unit commitment model – Calculation of flexibility metrics – Sensitivity studies

Page 17: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

17 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Integrated View of Multiple Regions

Page 18: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

18 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Example: National Generation Mix

0

1000

2000

3000

4000

5000

6000

2010 2015 2020 2025 2030 2035 2040 2045 2050

TWh

PTC Scenario Solar

Geothermal

Biomass

Wind

Hydro+

Nuclear (New)

Nuclear (Existing)

Gas w/CCS

CCS Coal

New Gas

Existing Gas

New Coal

Existing Coal Ret

Existing Coal

Baseline

Page 19: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

19 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Example: Texas Region Capacity Mix

0

50

100

150

200

250

2010 2015 2020 2025 2030 2035 2040 2045 2050

GW

Solar

Geothermal

Biomass

Wind

Hydro+

Nuclear (New)

Nuclear (Existing)

Gas w/CCS

Gas Turbines

NGCC

New Coal w/CCS

New Coal

CCS Retrofit

Environmental Retrofit

Existing Coal

US Peak LoadPeak Load

Page 20: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

20 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Unit Commitment (UC) Model

• Electrical power system simulation of optimal dispatch of generating units on a grid

• Large-scale mixed-integer optimization problem • Examples of inputs

– Ramp rates – Minimum turndown limits – Startup costs

Time Horizon Seconds (or less) Decades

Detail System Component

Capacity Planning Production

Cost Unit Commitment

Load Flow Protection

and Stability

Page 21: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

21 © 2014 Electric Power Research Institute, Inc. All rights reserved.

0

20

40

60

80

100

120

5600 5624 5648 5672 5696 5720 5744

Gene

ratio

n (G

Wh)

Time (hours)

2030 Ref Scenario, TexasWind

Solar

Gas Turbines

Gas w/ CCS

NGCC

Coal w/ CCS

CCS Retrofit

Coal

Hydro

Biomass

Geothermal

Nuclear

Energy for Load

Example: TX Region, 2030, Peak Week

Page 22: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

22 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Example: TX Region, 2030, Selected Month

NGCC dispatch with ramp rate, turndown

constraints

NGCC dispatch with no constraints

Page 23: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

23 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Example: TX Region, 2030, Selected Week

NGCC unit count and generation with ramp rate, turndown constraints

NGCC unit count and generation with no constraints

Page 24: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

24 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Example: TX Region, 2015 and 2030

Ramp Duration Curve comparing variable generation, net load

(2015)

Ramp Duration Curve comparing variable generation, net load

(2030)

-15

-10

-5

0

5

10

15

0 1000 2000 3000 4000 5000 6000 7000 8000

Ram

p M

agni

tude

(GW

)

Duration (hours)

2015 Scenario, Texas

Demand

Variable Gen

Net Load

-15

-10

-5

0

5

10

15

0 1000 2000 3000 4000 5000 6000 7000 8000

Ram

p M

agni

tude

(GW

)

Duration (hours)

2030 Ref Scenario, Texas

Demand

Variable Gen

Net Load

Page 25: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

25 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Characterize and Measure Flexibility

• Examine start/stop, ramping, low-load operations behavior under wide range of conditions with different generation technology mixes

• Define, calculate key metrics, e.g.: –Distribution of capacity vs. startup times –Ramp rates, durations, and statistics –Insufficiency of capacity capable of providing

necessary flexibility capabilities: •Duration of time periods with “flexibility deficit” •Magnitude of deficit in capacity terms

Page 26: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

26 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Other Emerging Insights

• Will over-reliance on imports/inter-regional trade create new generation planning challenges?

• To what extent do new “mission profiles” (e.g., prolonged low turndown operations, different patterns of output) imply: – Needs for new power plant staff capabilities and training? – Needs for new organizational and O&M procedural

approaches? • Need to focus technology R&D on specific capabilities, e.g.:

– More rapid 1–3 hour ramping capability – More resilience of flexibly operating units through improved

design, monitoring & diagnostics, and maintenance (e.g., HRSG drain design and maintenance)

– Establish capabilities to achieve lower levels of power output for longer periods of time (i.e., low turndown)

Page 27: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

27 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Together…Shaping the Future of Electricity

Page 28: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

28 © 2014 Electric Power Research Institute, Inc. All rights reserved. 28

EPRI Research on Flexible Operations and Fleet Transition Flexible Operation: Major Damage Mechanisms

• Thermal fatigue

– Affects boiler-turbine circuit

– Temperature mismatch between steam and metal surfaces

– High amplitude stress cycles result

– Rapid cooling caused by liquid quenching; surface tensile stresses

tensile stress

compressive stress

hot fluid

cold metal

Thermal Stress

Tube-to-header crack in HRSG

Ligament cracking in boiler header

Thermal stress process

tensile stress

compressive stress

cold fluid

hot metal

Page 29: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

29 © 2014 Electric Power Research Institute, Inc. All rights reserved. 29

Flexible Operation: Major Damage Mechanisms

• Creep-Fatigue Interaction

– Creep damage found in units operating near design life

– Cycling these older units can increase fatigue damage

– Interaction of these mechanisms is synergistic, greatly reducing cycling operational life

– Remaining life estimation is area of significant study

Fatigue

Creep

Creep-Fatigue Interaction

Page 30: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

30 © 2014 Electric Power Research Institute, Inc. All rights reserved. 30

Flexible Operation: Major Damage Mechanisms

• Corrosion pitting

– Associated with unit layup

– Unprotected metal surfaces exposed to oxygen, water, and oxygen

– Resulting pitting can initiate corrosion-fatigue cracking

– New research looking at feedwater treatments that protect surfaces during shutdown

Pitting on steam turbine rotor

Pit morphology

Corrosion in boiler tubes

Page 31: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

31 © 2014 Electric Power Research Institute, Inc. All rights reserved. 31

Flexible Operation: Major Damage Mechanisms

• Differential Thermal Expansion

– Affects components in boiler, turbine, generator

– Accelerated wear of generator winding insulation due to load swings

– Generator wedge fretting

– Risk of axial rubs in steam turbines due to relatively rapid expansion during fast starts

Cycling accelerates wear of stator windings

Generator rotor after frequent cycling

Page 32: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

32 © 2014 Electric Power Research Institute, Inc. All rights reserved. 32

Flexible Operation: Major Damage Mechanisms

• Flow-Accelerated Corrosion (FAC)

– Mechanism influenced by material and local steam conditions

– Cycling and reduced minimum load operation exposes new areas to risk

– FAC prevention is a significant safety issue Changing steam conditions cause FAC in

heaters, extractions, drains

Page 33: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

33 © 2014 Electric Power Research Institute, Inc. All rights reserved. 33

Flexible Combined-Cycle Plant An Integrated Approach to Improve Flexibility Capabilities

1

2

3

4 5

6

• Reduce NOx/CO emissions at low load

• Install inlet dampers

• Isolation/venting of fuel headers

• Improved drains and attemperator sprays

• New alloys – thinner walled headers

• Improved tube-to-header connection

• Stack damper • Steam bypass

2

1

• Improved drains 3

• Improved casing design to reduce distortion

• Improved thermal insulation

4

• Accommodation of winding thermal growth 5

• Automated startups • Improved operator

displays and alarm management 6

Page 34: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

34 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Future Plant Considerations

• Design basis must reflect emerging role of coal and gas as load-balancing assets

• Potential conflict between flexibility and thermal efficiency

• Materials improvements can reduce thermal stress

• New makeup water and air removal schemes

• Management of water quenching (improved drains and attemperator sprays)

• System-approach to combined cycle plant design

• Provide operators the tools to improve situational awareness

Industry initiative on intrinsically flexible plants is needed

Page 35: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

35 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Improving Asset Flexibility: Systematic Approach

Equipment Impacts Operational Impacts

Cost Impact

Improved Flexible Operation of Existing Assets

Improved Flexible Operation of Future Plants

Improve operational flexibility of current and future assets

Page 36: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

36 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Pacific

California

Mountain-N

Texas

NW-Central

SW-Central

NE-Central-R

M-Atlantic

S-Atlantic

SE-Central

Florida

NE NE-Central-C NY

Mountain-S

PRISM 2.0: Improved Regional Model

General Equilibrium

Economy Model

• Aggregate Economic Representation

• Energy Markets for Oil, Natural Gas, Coal, and Bioenergy

• Foreign Exchange

• Land use (Ag and Forest)

Energy Demand (Electric & Non-

Electric)

• Energy Efficiency across Commercial, Industrial, and Residential Sectors

• Transportation: Detailed model of vehicle technologies and intermodal choices

Electric Sector Module

• CO2 Mitigation Technologies

• Environmental Controls: Air, Water, Land

• Transmission

U.S. Regional Energy, GHG, and Economy (US-REGEN) Model

Page 37: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

37 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Design Choices

Static/Dynamic Recursive Intertemporal Optimization

Partial Equilibrium General Equilibrium

Regional disaggregation National Aggregate

Levelized cost / process model

Investment and Dispatch

Large unit classes Individual units

Peak-baseload Hourly (or less)

Simple dispatch Unit commitment

Pipeline transmission Detailed power flow

Aggregate sectors Industrial detail

Fuel as sectoral input End-use service structure

Framework

Electric Model

Macro Model

Page 38: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

38 © 2014 Electric Power Research Institute, Inc. All rights reserved.

• Baseline reference: EIA Annual Energy Outlook (AEO) – Projected level of energy demand (AEO 2011) – Reference energy prices (AEO 2013)

• Electric sector policies – Renewables

• Existing state RPS requirements • Production tax credit through 2020

– Environmental • Environmental controls required on existing coal units (MATS, cooling water, coal ash)

• CAA Sec 111(b): No coal units without CCS

US-REGEN Reference Case

Page 39: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

39 © 2014 Electric Power Research Institute, Inc. All rights reserved.

• Nuclear – New nuclear allowed – 80% of existing nuclear extended to 60 years – 6 GW constructed before 2020; maximum build rate = 7 GW/decade

thereafter

• Renewable Energy – Cost reductions over time

• Coal

– Existing unit lifetime = 70 years – CCS (50% or 90%) retrofit available as of 2025 – CCS (50% or 90%) available for new units as of 2030

• Transmission

– Historical growth rates

US-REGEN Reference Case Technology Assumptions

Page 40: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

40 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Example Reference Case UC Output – TX Region, 2015 and 2030

Ramp Duration Curve (2015)

Ramp Duration Curve (2030)

-15

-10

-5

0

5

10

15

0 1000 2000 3000 4000 5000 6000 7000 8000

Hour

ly C

hang

e in

Disp

atch

(GW

)

Hours of Year

2015 Scenario, Texas

Coal

NGCC

Gas Turbines

Nuclear

-15

-10

-5

0

5

10

15

0 1000 2000 3000 4000 5000 6000 7000 8000

Hour

ly C

hang

e in

Disp

atch

(GW

)

Hours of Year

2030 Ref Scenario, Texas

Coal

NGCC

Gas Turbines

Nuclear

Net Imports

Page 41: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

41 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Inflexion Tool – Example Output Distribution of resource capacity vs. start up time

Page 42: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

42 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Inflexion Tool – Example Output 3-Hour Ramp Magnitude

Page 43: Renewable Integration and Plant Flexible Operations...– Needs for new power plant staff capabilities and training? ... HRSG drain design and maintenance) – Establish capabilities

43 © 2014 Electric Power Research Institute, Inc. All rights reserved.

Inflexion Tool – Example Output Period of Flexibility Deficit Metric