Upload
renard-mun
View
273
Download
2
Embed Size (px)
Citation preview
1700 7th (Northstroom) 06starbucks
architecture design portfolio
RenardDuties on Project: DMStratification: Core PlusCaféPrograms:WOC & ReserveLEED Certification:NASq/Ft:1,716SFCM: Duncan ChalmersDesMgr:Renard MunThrough this project Ilearned a lot of detailsand SBUX CA.Status: Opened May/2015
2011-present
WINDFALL RECLAIMED OAK WALLFINISH PANELS, FEATURED WOOD WALL & CEILING,
CONCRETE STAINLIGHT GREY- 11377
CONCRETE STAIN DARK BROWN- 11289
BAR COUNTERTOPCREAM W/ RECYCLED GLASS -CP0012
LEATHER @ ESPRESSO BARANTIQUE BLACK- L0016
METAL @ CEILING EDGE TRIM , SCREEN & FURNITUREANTIQUE BLACK- L0016
TILE-BACK BARGLOSS NAVY BLUE- 12615
CEMENT BOARD – FEATURED WALL HARDIE PLANKS CUSTOM FINISH1
1
2
2
1
1
2
2
UW HUB, Seattle WA07starbucks
RenardDuties on Project: DMStratification: LS CoreCafePrograms:WOC &Modified Kiosk caféLEED Certification:NASq/Ft:1,100SFPDM: Tim TowncendDesMgr:Renard MunThrough this projectFirst University LS projectCoordination withLicensee was challenge.Status: In progress
2011-present
“a forward-thinking, contemporary
facility and a true embodiment of what
a 21st-century student and campus
center “
“the new HUB serves as a model of
how colleges and universities across the
country can take existing buildings on
campus and re-purpose them for the
future”
“the building seamlessly bridges
the university’s past, present and
future by blending elements of
the original HUB with new
features”
“create a welcoming space that
connects students to both the campus
and greater community,”
“create a welcoming space that
connects students to both the campus
and greater community,”
Pacific Uni, Forest OR08starbucks
RenardDuties on Project: DMStratification: LS new corecaféPrograms:WOCLEED Certification:NASq/Ft:2500SFPDM : Tim TownsendDesMgr:Renard MunCoordination with LSarchitect was challengeStatus: OpenedSeptember/28 2015
2011-present
Sunriver, sunriver OR09starbucks
RenardDuties on Project: DMStratification: LS new corecaféPrograms:WOCLEED Certification:NAPDM : Tim TownsendDesMgr:Renard MunCoordination with LS
2011-present
2nd division, Spokane WA & Woodburn premium, OR10starbucks
RenardDuties on Project: DMStratification: Core DTPrograms:WOC &DTELEED Certification:YesSq/Ft:1,8226SFCM: Kristie kucurDesMgr:Renard MunExpansion projectControl budgetCombine existing andnew elementsStatus: Completed
woodburn Duties on Project: DMStratification: New CorecaféPrograms: No programLEED Certification:YesSq/Ft:1,111SFCM: Ron BlanchetteDesMgr:Renard MunFirst metal CW projectI learned Starbucksdesign process in OregonMallStatus: Completed
2011-present
LAX11starbucks
2011-present
FLL
FLL RFP
12starbucks
2011-present
LS experience
Atlanta airport YVR
Supervalu PPH
Kiosk
YYZIAH airport
DFW airport
13starbucks
2011-present