Remodel Projects Photos by Marvin Dodge
Lucy Phillips Classroom Building Highlights:
• All new heating and air conditioning systems – ducts, air
handler, VAV boxes, pumps, etc.
• All new electrical/data wiring, panels and service
• Addition of fire sprinkler system throughout building
• Virtually complete gutting of the building with all new wall/room construction
• 12 new all-purpose classrooms
• 2 new UEN broadcast classrooms and 1 new conference room
• New and expanded testing center with 125 desks
• Enhanced computer testing with 30 laptop computers complete with lock-down browser
Lucy Phillips Classroom Building Highlights, Cont:
• All classrooms fully enhanced with computer, DVD, projector, 5 point
surround sound, and Elmo
• All new furniture with casters designed to accommodate arranging classrooms for various teaching methods and preferences
• 4 additional faculty offices
• Expanded Information Technology Office space with enhanced security options
• 2nd Floor entrance/exit on the building’s East side
• Modern datacenter with raised floor, state-of-the-art Liebert cooling system, data cabinets, and space for future expansion
• New energy efficient exterior window systems
• New exterior doors with electronic security locks
• Anticipated opening date for classes beginning January 4, 2011
Lucy Phillips – 1st Floor South Wall Demolition
Lucy Phillips – 1st Floor- can you say conduit-new UEN rooms
Lucy Phillips – 1st Floor-Final heating and cooling ducts
Lucy Phillips – 1st Floor-Framing new testing center entrance
Lucy Phillips – 1st Floor-Looking through windows into new testing center
Lucy Phillips – 1st Floor-New testing center-125 seat capacity
Lucy Phillips – 1st Floor-New testing center main entrance and reception area
Lucy Phillips – 2nd Floor-Classroom wall construction
Lucy Phillips – 2nd Floor-North classroom framing
Lucy Phillips – 3rd Floor-Ceiling grid being installed (classroom)
Lucy Phillips – 3rd Floor-Classroom ceiling grid and lighting
Lucy Phillips – 3rd Floor-Datacenter new cabinets
Lucy Phillips – 3rd Floor-Datacenter-new Liebert cooling system
Lucy Phillips – 3rd Floor-hallway ceiling grid and mechanical system
Lucy Phillips – 3rd Floor-installation of light fixtures (classroom)
Lucy Phillips – 3rd Floor-IT Offices-open space with new exterior windows and sprinklers
Lucy Phillips – 3rd Floor-Main Hallway
Lucy Phillips – 3rd Floor-Move in day! New datacenter-server cabinets
Lucy Phillips – 3rd Floor-Move in day! New datacenter
Lucy Phillips – Mechanical Room-New air handler
Lucy Phillips – New ductwork and heat-cool units
Lucy Phillips – New energy efficient exterior windows (north side)
Lucy Phillips – New energy efficient exterior windows (south side)
Lucy Phillips – New main entrance doors
Lucy Phillips – New mechanical systems and fire sprinklers
Richfield Nursing and Business Remodel highlights:
• New registration/student services offices in the Administration
building
• Expanded and remodeled nursing classroom/lab facilities with new counters, sinks, bathroom, observation room, and nurse’s station
• Addition of new nursing classroom
• Consolidation of nursing offices in the Washburn building
• Creation of science lab including gas, air, water, electric and data at each student station
• Creation of lab storage area to include a cadaver for anatomy classes
Richfield Nursing and Business Remodel highlights, continued:
• Remodeled business classrooms including carpet, desks,
chairs, and teaching stations
• Created business conference room for professional student training/presentations
• New offices for business faculty
• Replaced carpeting in all remodeled areas
• Yet to be completed a new student lounge/game room space including offices for student leaders and support staff
SCR-Business classroom remodel
SCR-Faculty office remodel
SCR-New biology and chemistry lab
SCR-New biology and chemistry lab
SCR-New biology and chemistry lab
SCR-New biology and chemistry lab
SCR-New biology and chemistry lab
SCR-New biology and chemistry lab
SCR-New nursing classroom lab
SCR-New nursing classroom lab
SCR-New registration and student services offices
SCR-Nursing classroom remodel
SCR-Nursing lab space
SCR-Nursing lab space