1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and Development Center Vicksburg, Mississippi [email protected]

Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

  • Upload
    dodang

  • View
    223

  • Download
    5

Embed Size (px)

Citation preview

Page 1: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

1

Remedy Optimization and Adaptive Management

Todd S. Bridges, Jongbum Kim, Igor Linkov

U.S. Army Engineer Research and Development Center

Vicksburg, Mississippi

[email protected]

Page 2: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

2

Our Systems• Navigation system:

– locks, dams, channels• Reservoir system:

– structures and operating procedures

• Flood risk reduction system:– Structural, nonstructural,

ecosystem features• The components of a

sediment remedy and the encompassing watershed and its uses

Page 3: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

3

• The complexity of the system– Intuition is an unreliable guide

• Sediment clean-up projects are “wicked problems” (Rittel and Webber, 1973) – no definitive formulation of the problem– no right or wrong solutions, only better or

worse solutions– a broad diversity of values and opinions that

are germane to defining solutions– no ultimate test of a solution to the problem

We need help to resolve our decision problem

Page 4: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

4

How to Manage the Risks• Navigation vs. Cleanup

– Do the sediments have to go?

• In situ alternatives– Monitored Natural

Recovery (MNR)– Capping– Treatment

• Ex situ alternatives– Dredging

• Containment• Treatment

• What combination of technologies is optimal?– Satisfy your objectives hierarchy

Page 5: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

5

• 9 NCP criteria– Threshold Criteria

• Overall protection of HH and E• Compliance with ARARs

– Balancing Criteria• Long-term effectiveness/permanence• Reduction of TMV thru treatment• Short-term effectiveness• Implementability• Cost

– Modifying Criteria• State (or support agency) acceptance• Community acceptance

What are the objectives and decision criteria?

• Other/Imbedded Criteria– Consistency with current

uses of the waterbody• Recreation, navigation

– Consistency with objectives for the waterbody

• Restoration– Compatibility with other

ongoing remediation or restoration activities

– Compatibility with other activities in the watershed

– Etc.

Page 6: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

6

Optimization• History: Operations research arose during WW II to support logistics

and training schedules. Later applications within industry • OR aims to improve the quality of decisions about the management

of limited resources– How to allocate limited resources efficiently– Applicable to capital investments, quality of life/environment, etc.

Optimization

Operations Research,Management Science

Decision Analysis,Decision Science

Risk Analysis MCDALinear/ Non Linear/Integer Programming

Project Management (e.g., Critical Path)

Page 7: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

7

Simple Optimization Problem

– Inspect at least 250 points per day– Two grades of inspectors, A and B– 7 grade A and 15 grade B

inspectors are available– Inspector A can check 25 points

and B can check 18 points per day– Wage of Grade A is $80 and $60

for Grade B per day– What is optimal assignment of

inspectors? 0 10

15

# of Inspector A

# o

f Ins

pect

or B

(7, 4.17)

Z=80*A+60*B

25*A+18*B≥250

Page 8: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

8

Transporting Dredged Material to a Landfill• You want to determine

how much sediment to go from each dredging site to each landfill in order to minimize the total cost– Cost can include not only

$, but also other non- monetary impacts

• Can consider multi- period planning

Sediment (CY)

25,000 Site A

Site B

Site C

10,000

35,000

1012 15

Capacity(CY)45,000

35,000

20,000

20

1810

8

11

14

Landfill1

Landfill2

Landfill3

Page 9: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

9

OR Success Stories• FAA Ground-Delay Program

– To reduce congestion and improve flow of air traffic into airports

• Determine which aircraft/ how long to delay departures• Between 1998 and 2000, 90,000 hours of schedule delays

were avoided at a cost savings of more than $150 million• NYC

– To improve the deployment of street cleaner, garbage trucks, and inspectors

• Productivity increased 17%• GM

– To identify the optimal way to ship 300 types of components to 30 assembly plants.

• Cut cost by 26%, saving $2.9 million a year

Page 10: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

10

Multi-Objective Optimization• Problem: Allocating remedial approaches across a

spatially diverse site – Site divided into three areas– 3 remedial technologies available– What is the optimal allocation?

• Objectives:– Minimize Cost– Minimize incidental harm/risks– Minimize time to achieve acceptable risk reduction

• Constraint– Each area can use only one of the 3 options– Only remedial option 1 or 2 are applicable to Area 1– Only remedial option 2 or 3 are applicable to Area 3– The total suspended concentration from two adjacent areas must

be less than 8

Page 11: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

11

Characteristics

Characteristic

Area 1 Area 2 Area 3

Option 1

Option 2

Option 3

Option 1

Option 2

Option 3

Option 1

Option 2

Option 3

Cost per cubic yard 10 13 14 11 15 17 13 14 18

Risk reduction

time (mos.)60 45 30 45 30 20 50 30 15

Incidental harm/risk 13 10 14 9 7 12 14 8 17

Suspended conc. 4 2 3 7 3 2 6 2 2

Page 12: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

12

Results

Objective

Optimal Decision & Performance

When minimize

Cost Risk reduction days

Environmental impact

Optimal technique

Area 1 1 2 2Area 2 3 3 2Area 3 2 3 2

Performance

Cost 41 48 42

Risk Reduction

Time110 80 105

Incidental Harm/Risk 33 39 25

Page 13: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

13

Trade-offs

• Optimal solution depends on the relative importance of each objective– E.g., Two extreme points are (Wcost, Wrisk)=(1,0) or

(Wcost,Wrisk)=(0,1)– With multiple objectives, can use Z= Wi*f(i)+ Wj*fj(j)+…+ Wt*f(t)

where f(i) is a function of various objectives

Cost

Ris

k R

educ

tion

Cost=41Risk Reduction Time = 110

Cost = 48Risk Reduction Time = 80

Page 14: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

• An approach for structuring and analyzing decision problems

• Emphasis given to:– Defining the problem– Establishing explicit objectives– Defining metrics for evaluating alternative

solutions/plans– Incorporating human values and risk attitudes

• Through weighting and utility functions

– Ranking plans based on quantitative scores derived from metrics

• Using multi-attribute utility theory

Multi-Criteria Decision Analysis

Page 15: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

15

Data MatrixMetric (Weight) Units Cars

Option 1

Option 2

Option 3

Option 4

Option 5

Cost (25) Dollars 27,000 45,000 30,000 35,000 12,000

Resale Value After Three Years (5) % of Original Value

44 56 57 49 33

Repair/Maintenance Cost Per Year (5) Dollars 100 500 1,000 250 500

Fuel Efficiency (15) MPG 30 25 45 27 32

Passenger Compartment Space (15) ft3 150 170 165 160 145

Style and Comfort (5) Qualitative Finest Finest Average Average Poor

Safety Rating (30) NHTSA Safety Rating

2 3 3 5 2

Page 16: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

16

Ranking and Contributions by Metric

Page 17: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

17

Ranking Sensitivity to Weight Allocation

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.0

0.1

0.2

0.3

0.4

0.5

0.6

Option 3 Option 4 Option 5 Option 2 Option 1

Fuel EfficiencyCostPassenger Compartment SpaceSafety RatingResale Value After Three YearsStyle and ComfortRepair/Maintenance Cost Per Ye

Cost: 25 to 30 Safety: 30 to 25

Page 18: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

18

Planning Objectives

• Reduce risk to public safety from catastrophic storm inundation

• Reduce damages from catastrophic storm inundation

• Promote a sustainable ecosystem• Restore and sustain diverse fish

and wildlife habitats, and• Sustain the unique heritage of

coastal Louisiana by protecting historic sites and supporting traditional cultures

Risk Metrics

• National Economic Development– Residual damages– Life-cycle costs (Implementation, O&M)– Construction time

• Regional Economic Development– Regional Economic Development (jobs,

income, regional output)• Environmental Quality

– Spatial integrity– Wetlands restored and/or protected– Direct impacts– Indirect impacts– Historical properties protected– Archeological properties protected

• Other Social Effects– Residual population impacted– Historical districts protected

LaCPR Objectives and Metrics

Page 19: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

19

LaCPR Weightings Results

0.0

0.2

0.4

0.6

0.8

1.0

0.00.1

0.20.3

0.40.5

0.6

0.10.2

0.30.4

0.50.6

Envi

ronm

enta

l Obj

ectiv

es

National Eco

nomic Objectiv

es

Regional Economic Objectives

ABCDOutliers

Weight allocation for gov’t agencies (a) and all stakeholders (b)

(a) (b)

0.0

0.2

0.4

0.6

0.8

1.0

0.00.1

0.20.3

0.40.5

0.6

0.10.2

0.30.4

0.50.6

Envi

ronm

enta

l Obj

ectiv

es

National E

conomic O

bjectives

Regional Economic Objectives

ABCDEFGHOutliers

Page 20: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

20

Example Plan Rankings

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

6 5 7 2 3 4 25 15 26 16 27 18 17 8 20 10 21 19 9 23 11 13 22 12 1 24 14

Alternative Plan

Util

ity s

core

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Scenario 1Metric:

GA-A

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

6 7 5 2 3 4 25 15 26 16 27 17 18 8 20 21 10 19 23 9 11 13 22 12 24 14 1

Alternative Plan

Util

ity s

core

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Scenario 2Metric:

GA-A

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

5 6 7 2 3 4 25 15 26 16 27 18 17 8 20 10 19 21 9 23 11 13 22 12 1 14 24

Alternative Plan

Util

ity s

core

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Scenario 3Metric:

GA-A

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

6 7 5 2 3 4 25 15 26 16 27 17 18 8 20 10 21 19 23 9 11 13 22 12 1 14 24

Alternative Plan

Util

ity s

core

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Scenario 4Metric:

GA-A

Page 21: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

21

A Sediment Example

Landfill Upland CDF Nearshore CDF CAD Pit No-Action Island CDF

Water Line

In-place Sediment

Dredged Material

Effluent

Manufactured Liner

Dike Wall

Cap

Standard Landfill Waste

KEY:

In-place Soil

Kane Driscoll, S.B., W.T. Wickwire, J.J. Cura, D.J. Vorhees, C.L. Butler, D.W. Moore, T.S. Bridges. 2002. A comparative screening- level ecological and human health risk assessment for dredged material management alternatives in New York/New Jersey Harbor. International Journal of Human and Ecological Risk Assessment 8: 603-626.

Manufactured SoilCement Lock

Page 22: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

22

Criteria Levels for Each NY DM AlternativeCost Public

AcceptabilityEcological Risk Human Health Risk

DM Alternatives

($/CY) Impacted Area/Capacity (acres / MCY)

Ecological Exposure Pathways

Magnitude of Ecological HQ

Human Exposure Pathways

Magnitude of Maximum

Cancer Risk

Estimated Fish COC

/ Risk Level

CAD 5-29 4400 23 680 18 2.8 E -5 28

Island CDF 25-35 980 38 2100 24 9.2 E -5 92

Near-shore CDF 15-25 6500 38 900 24 3.8 E -5 38

Upland CDF 20-25 6500 38 900 24 3.8 E -5 38

Landfill 29-70 0 0 0 21 3.2 E –4 0

No Action 0-5 0 41 5200 12 2.2 E –4 220

Cement-Lock 54-75 0 14 0.00002 25 2.0 E -5 0

Manufactured Soil 54-60 750 18 8.7 22 1.0 E –3 0

Blue Text: Most Acceptable ValueRed Text: Least Acceptable Value

Page 23: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

23

Criteria Contributions to Decision Score

USACE weighting

0.0

0.2

0.4

0.6

0.8

0.0

0.2

0.4

0.6

0.8

CostMaximum Cancer Probability (Non-Barge Worker)Ecological Hazard QuotientEst. COC Conc in Fish / Risk-based ConcComplete Human Health Exposure PathwaysComplete Ecological Exposure PathwaysRatio of Impacted Area to Facility Capacity

EPA weighting

0.0

0.2

0.4

0.6

0.8

0.0

0.2

0.4

0.6

0.8

CostMaximum Cancer Probability (Non-Barge Worker)Ecological Hazard QuotientEst. COC Conc in Fish / Risk-based ConcComplete Human Health Exposure PathwaysComplete Ecological Exposure PathwaysRatio of Impacted Area to Facility Capacity

Page 24: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

24

• Uncertainty is inherent to planning, design, construction, and O&M

• Adaptive management requires a framework for collecting and using information that results from:– Implementing a plan– Monitoring the performance of the plan– Learning

• The OR and MCDA provide suitable approaches

Adaptive Planning and Engineering

Page 25: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

25

Ris

k

Time

Risk Reduction Trajectories

Risk reduction goal

New information incorporated

A

B

Page 26: Remedy Optimization and Adaptive Management - FRTR · 1 Remedy Optimization and Adaptive Management Todd S. Bridges, Jongbum Kim, Igor Linkov U.S. Army Engineer Research and …

26

• 3 principles relevant to transforming practice– Sediment remedial projects should be

addressed as decision problems– Deliberation is essential to the successful

resolution of risk-decision problems– Transforming practice requires commitment

to change, experimentation, and learning

The Path Forward